B08-Submittals_Report.pdf
PDF 55 KB Posted
- Attached to
- WI LEOPOLD WMD HVAC Federal contract opportunity
- Solicitation number
- 140FC223Q0035
About this file
This document outlines submittal requirements for a federal contract solicitation to redesign the return air system at the Leopold Headquarters building. Key requirements include product data, shop drawings, and samples for quality control, product specifications, HVAC ducts and accessories, air outlets and inlets, and testing, adjusting and balancing of the HVAC system.
Related details include solicitation number 140FC223Q0035 for the "WI LEOPOLD WMD HVAC" project, issued by the Department of the Interior Fish and Wildlife Service as an unspecified opportunity. No further product, pricing, or timeline information is provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06-Crawlspace_piping_to_water_softener_photo.JPG | JPG image | |
| B08-Table_of_Contents.pdf | ||
| Wage_Determination.pdf | ||
| B08-Leopold_Bid_Schedule_-_base_bid1.pdf | ||
| A06-UTILITY_ROOM_RELOCATES_Model_drawing.pdf | ||
| B08-York_Submittal.pdf | ||
| A06-Drawing_EXISTING-Proposed_HVAC_PAGE.pdf | ||
| A06-Furnance_1_photo.JPG | JPG image | |
| A06-Crawl_space_area_photo_example.JPG | JPG image | |
| Sol_140FC223Q0035.pdf | ||
| A06-Test_Report_22-02-16_ESA_T_B_report.pdf | ||
| A06-Specifications.pdf | ||
| A06-Foundations_Drawing.pdf | ||
| A06-Return_air_box-typical_photo.JPG | JPG image | |
| B08-Pre-Con_Safety_FWS_Form_3-2199_(5-03).pdf | ||
| A06-Furnace_2_photo.JPG | JPG image |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
22-RF-039 Submittals Page 1 Leopold HQ Return Air Redesign - Copy
7/6/2023
SECTIONS CONTAINING SUBMITTALS REQUIREMENTS
Product Shop Data Drawings Samples
DIVISION 01 - GENERAL REQUIREMENTS
01-30-00 - ADMINISTRATIVE REQUIREMENTS Y N N
01-40-00 - QUALITY REQUIREMENTS Y N N
01-60-00 - PRODUCT REQUIREMENTS Y Y Y
DIVISION 23 - HEATING, VENTILATING, AND
AIR-CONDITIONING (HVAC)
23-05-93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC N Y N
23-07-13 - DUCT INSULATION Y N N
23-31-00 - HVAC DUCTS AND CASINGS Y N N
23-33-00 - AIR DUCT ACCESSORIES Y N N
23-37-00 - AIR OUTLETS AND INLETS Y N N
File details come from the government source that posted it. Updated .