This document is a bid schedule for a federal construction project to install new underfloor return air ductwork at a Department of the Interior Fish and Wildlife Service facility in Wisconsin. The base bid work includes designing and installing two insulated ductwork trunks with laterals in the office foundation crawl space to replace existing wall returns, avoiding existing floor structure and installing new return air locations as proposed. Ductwork will be tested and balanced to compare to pre-existing return air flow. Existing wall air returns will be modified as well. The solicitation number is provided for reference.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06-Crawlspace_piping_to_water_softener_photo.JPG | JPG image | |
| B08-Table_of_Contents.pdf | ||
| Wage_Determination.pdf | ||
| A06-UTILITY_ROOM_RELOCATES_Model_drawing.pdf | ||
| A06-Foundations_Drawing.pdf | ||
| A06-Return_air_box-typical_photo.JPG | JPG image | |
| B08-Pre-Con_Safety_FWS_Form_3-2199_(5-03).pdf | ||
| A06-Furnace_2_photo.JPG | JPG image | |
| B08-Submittals_Report.pdf | ||
| A06-Test_Report_22-02-16_ESA_T_B_report.pdf | ||
| A06-Specifications.pdf | ||
| B08-York_Submittal.pdf | ||
| A06-Drawing_EXISTING-Proposed_HVAC_PAGE.pdf | ||
| A06-Furnance_1_photo.JPG | JPG image | |
| A06-Crawl_space_area_photo_example.JPG | JPG image | |
| Sol_140FC223Q0035.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 36, JULY 1966 REF NO OF DOC BEING CONT'D PAGE 1 OF 1
GENERAL SERVICES ADMINISTRATION
FED PROC. REG. (41 CFR) 1-16.101
NAME OF OFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
SCHEDULE 1
1-1 The Base Bid work includes but is not limited to: 1 LS
Designing and installing two underfloor return air insulated ductwork trunks, with laterals, in the office foundation crawl space which will replace the existing two wall returns. Ductwork trunks/laterals will be installed to avoid existing floor structure/framing members which are covered with insulation/barrier. Floor return locations will be proposed by bidder. Return air flow will be tested/balanced and compared to pre-existing return air flow. Existing wall air returns will be modified as noted.