This is a Statement of Work for road rehabilitation projects at Mingo National Wildlife Refuge in Puxico, Missouri. The U.S. Fish and Wildlife Service is seeking contractor quotes to complete gravel road rehabilitation on up to 8.35 miles of roads within the refuge. The project consists of four road segments: Redmill Drive 1st Segment (1.2 miles, 14 feet wide), Redmill Drive 2nd Segment (2.1 miles, 14 feet wide), Redmill Drive 3rd Segment (1.8 miles, 14 feet wide), and Sandblow Ridge Road (3.25 miles, 14 feet wide). All work must be completed by October 15, 2026.
The primary scope of work requires contractors to haul and tailgate spread 4 inches of one inch minus aggregate along the entire road surface of all four segments, with an estimated requirement of approximately 1,100 tons of aggregate per mile. The contractor is responsible for providing all materials, equipment, and incidental costs and must repair any damage to existing gravel roads caused during the project. The contractor must notify Mingo NWR contacts (Corey Kudrna, Deputy Refuge Manager, 573-225-1535, or Ben Mense, Refuge Manager, 573-225-4504) at least 48 hours before beginning work. Site pre-bid visits are highly recommended. All equipment must be cleaned before and after site entry to prevent spread of noxious and invasive species, and work must be conducted to minimize rutting, soil disturbance, and compaction. Payment will be processed following submission of proper invoices and inspection of work for compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amedment_2_mingo_0002.pdf | ||
| Sol_140FGA26Q0041_Amd_0002.pdf | ||
| Amedment_1_mingo_0001.pdf | ||
| Sol_140FGA26Q0041_Amd_0001.pdf | ||
| B03_WageDetermination_MO20260001.pdf | ||
| Sol_140FGA26Q0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
U.S. Fish and Wildlife Service Mingo National Wildlife Refuge
24279 State HWY 51 Puxico, MO 63901
573/222-3589
STATEMENT OF WORK
Mingo NWR Road Rehab
Overview:
Seeking quotes from contractors to complete road rehabilitation projects on Mingo NWR. This project will include hauling and tailgate spreading gravel on up to 8.35 miles of gravel road within the refuge. Specifications on work for each road segment is outlined below. Read carefully as specifications per site and materials provided vary.
Location:
Mingo National Wildlife Refuge Headquarters, 24279 State HWY 51, Puxico, MO 63901
GPS coordinates will be provided for each site below.
Contact Information:
Corey Kudrna Deputy Refuge Manager Mingo National Wildlife Refuge 573-225-1535 corey_kudrna@fws.gov
Ben Mense Refuge Manager Mingo National Wildlife Refuge 573-225-4504 ben_mense@fws.gov
Contractor Responsibilities:
• Prior to starting work on site, the contractor must inform Contact listed above at least 48 hours in advance.
• It is HIGHLY recommended that contractors visit the site prior to submitting a bid or quote. Bids must include any mobilization or other related fees.
• Work must be completed by: October 15, 2026
• Equipment left on-site must be secured and is the sole responsibility of the contractor.
• Equipment must be cleaned pre and post entry of the site for noxious and invasive species.
• Work will be conducted in a manner that will minimize rutting, disturbance, or compaction of soil or sod and the spread of noxious and invasive species.
• Payment will be processed following receipt of proper invoices and inspection of work for contract compliance.
Description of Work to be Completed:
Project (#) correspond to locations on attached map.
Redmill Drive 1st Segment (1)–1.2 miles – 14 feet wide -- Location: 36°58’16.51, 90°08’45.92 Redmill Drive 2nd Segment (2)–2.1 miles – 14 feet wide – Location: 36°58’40.56, 90°07’56.55 Redmill Drive 3rd Segment (3)–1.8 miles – 14 feet wide – Location: 37°00’29.20, 90°07’54.17 Sandblow Ridge Road (4) – 3.25 miles – 14 feet wide – Location: 36°59’33.54, 90°07’56.64
Contractor shall haul and spread 4 inches of one inch minus aggregate along the entire road surface. Any damage to existing gravel road is the responsibility of the contractor to fix. Refuge will work with the contractor to close roads to the public, if necessary. The aggregate, and incidentals are to be provided by the contractor.
General Process:
• Haul and tailgate spread 4 inches of one inch minus aggregate along all four segments of road as per attached map. The estimate is approximately 1,100 tons of aggregate per mile.
Mingo NWR Road Rehab Project Write a description for your map.
Legend
Road 1- 1.2 Miles
Road 2- 2.1 Miles
Road 3- 1.8 miles
Road 4- 3.25 Miles
5000 ft
N
N
Image © 2026 Airbus
Image © 2026 Airbus
Image © 2026 Airbus
| B08 SOW.pdf |
| A06 Mingo NWR Road Rehab Project Map.pdf |
File details come from the government source that posted it. Updated .