B08_Solicitation-SOW-Attachment_BFI_Form.pdf

PDF 79 KB Posted

Attached to
INDU FIRE SUPPRESSION SYSTEM INSPECTION SERVICE
Solicitation number
140P6426Q0124
Issued by

About this file

This is a template form for documenting the testing and maintenance of backflow prevention assemblies used within National Park Service facilities. Form BF-1 serves as the official record for certifying that backflow prevention devices meet safety and operational standards.

The form captures general information about the assembly including the facility address, FMSS Asset ID, installation date, incoming line pressure, manufacturer details, model number, serial number, size, and assembly type (RP, RP Detector, DC Detector, or PVB). Section II documents initial and final test results for three critical components: Check Valve No. 1, Check Valve No. 2, and the Differential Pressure Relief Valve. The form records whether valves leaked or closed tight, specific pressure drop measurements across check valves, and the pressure at which the relief valve opened. A repairs section allows documentation of any corrections made to failed components between initial and final testing. Section III requires approval signatures and credentials from the certified technician performing the work, including company name, address, phone number, certificate number, and gauge number, as well as final approval from the Regional Structural Fire Management Officer or designee. The form concludes with a pass/fail determination for the overall assembly.

View the file

Other files

File Type Posted
B09_Solicitation_Amendments-Q___A_0001.pdf PDF
Sol_140P6426Q0124_Amd_0001.pdf PDF
Sol_140P6426Q0124.pdf PDF
B08_Solicitation-SOW.pdf PDF
B03_DOL_Wage_Determination.pdf PDF
B08_Solicitation-Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Backflow Prevention Assembly Test And Maintenance Record (Form BF-1)

I. GENERAL INFORMATION

Address: FMSS Asset ID Number:

Location of Assembly:

Date of Installation: Incoming Line Pressure:

Manufacturer: Model No.

Serial No.: Size:

Assembly Type: RP RP Detector DC Detector PVB

II. TESTS AND REPAIRS INFORMATION

Differential Pressure Check Valve No. 1 Check Valve No. 2 Relief Valve

Initial Test: Leaked Leaked Opened at psid

Closed Tight Closed Tight Did not Open

Pressure drop across the Pressure drop across the first check valve is second check valve psid psid

Repairs: List Repairs and List Repairs and List Repairs and Corrections Corrections Corrections

Final Test Closed Tight Closed Tight Opened at psid

Condition of No. 1 Control Valve: Closed Tight Leaked

Condition of No. 2 Control Valve: Closed Tight Leaked

Remarks: Assembly Failed Assembly Passed

III. APPROVALS

Name of Technician Company Name:

Address:

Phone No.: Certificate Number: Gauge Number:

Signature of Technician:

Date:

Regional Structural Fire Management Officer (or his designee):

Date:

File details come from the government source that posted it. Updated .