B09_Solicitation_Amendments-Q___A_0001.pdf

PDF 127 KB Posted

Attached to
INDU FIRE SUPPRESSION SYSTEM INSPECTION SERVICE
Solicitation number
140P6426Q0124
Issued by

About this file

This is a Questions and Answers document (Amendment P00001) for Solicitation #140P6426Q0124 regarding Fire Suppression System Inspection services for INDU. The document provides clarification on fire suppression system inspection requirements across multiple facilities.

The respondent clarified that the Good Fellow Lodge system represents recently completed new construction and will require inspection, while all other facility locations were inspected, repaired, and successfully tested in Fall 2025. Regarding backflow preventers serving the fire sprinkler systems, the document specifies sizes for nine locations: Cabin 1-10 (1¼"), Cowles Lodge (3"), Staff Cabin (1¼"), Directors Cabin (3"), Caretakers (1½"), Sears House (1"), 20 Dorm (¾"), Douglas Center (10"), and Douglas Center bypass (¾"). All backflow devices are confirmed as dedicated to the fire sprinkler system rather than domestic water systems. Questions 3 through 10 remain open for future responses. This document does not address pricing terms, response dates, award dates, or contract type information.

View the file

Other files

File Type Posted
Sol_140P6426Q0124_Amd_0001.pdf PDF
Sol_140P6426Q0124.pdf PDF
B08_Solicitation-SOW.pdf PDF
B08_Solicitation-SOW-Attachment_BFI_Form.pdf PDF
B03_DOL_Wage_Determination.pdf PDF
B08_Solicitation-Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P6426Q0124

Amendment #: P00001

Fire Suppression System Inspection – INDU

Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. 8/24/26 Can you tell me the last time the systems were inspected? Or is this the first inspection?

Good Fellow Lodge system is recently completed new construction. All other locations were inspected, repaired, and successfully tested Fall 2025

2. 8/24/26 • Do you know the size of the backflows

• Are the backflows dedicated to the fire sprinkler system. Not domestic

Cabin 1 – 10 = 1 ¼”

Cowles Lodge = 3”

Staff Cabin = 1 ¼”

Directors Cabin = 3”

Caretakers = 1 ½”

Sears House = 1”

20 Dorm = ¾”

Douglas Center = 10”

Douglas Center (bypass) = ¾”

All backflows are dedicated to fire sprinkler system.

3.

4.

5.

6.

7.

8.

9.

10.