This is a Request for Quotation (RFQ) for construction services issued by the United States Fish and Wildlife Service (USFWS) for trail repairs and improvements at Santa Ana National Wildlife Refuge in Alamo, Texas.

The solicitation seeks quotations for five contract line items (CLINs) involving repairs to five separate refuge trails: Pintail Lakes Trail, Pintail 3 West Trail, Chachalaca Trail, Willow Lakes Trail, and Tower Trail. The trails were damaged by a significant flooding event on March 27, 2025, that resulted in erosion, washouts, and loss of surface materials. The project is a 100% small business set-aside with a NAICS code of 237310 and a size standard of $45 million. The anticipated project magnitude is between $300,000 and $500,000. All work must be performed during regular working hours (7:30 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays), with a performance period of September 7, 2026 through October 21, 2026, completed within 45 calendar days of receiving notice to proceed. Contractor performance and payment bonds equal to 100% of the contract price are required, as is liability insurance with minimum coverage of $500,000 per person, $500,000 per occurrence, and $1,000,000 property damage.

Quotations must be submitted electronically to Contracting Specialist Ian Young at Ian_Young@ios.doi.gov no later than 2:00 p.m. Central Time on August 25, 2026. The Government will evaluate offers based on price, technical capability (including project approach narrative and schedule), and past experience on similar projects within the past five years. An organized site visit is scheduled for August 4, 2026, from 9:00 a.m. to 12:00 p.m. CDT. All questions regarding the solicitation must be submitted by 1:00 p.m. Central on August 14, 2026. The contract will be administered by the USFWS, with invoices submitted through the Department of Treasury's Invoice Processing Platform, and Davis-Bacon prevailing wage requirements apply.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140FGA26R0029

FWS GAOA

FWS, GAOA

5275 Leesburg Pike Falls Church VA 22041

Ian Young Ian_Young@ios.doi.gov

0044044236

FGA

Ian Young 6127135214

07/23/2026

08/25/2026

10 45

Statement Of Work and all corresponding attachments.

All questions pertaining to this solicitation must be submitted via email to the Contracting Specialist

Ian Young at Ian_Young@ios.doi.gov by the question deadline outlined in the email correspondence.

Project Magnitude: For general project order-of-magnitude only. The anticipated cost of construction services will be between $300,000 and $500,000.

1 3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

5275 Leesburg Pike Falls Church VA 22041

FGA

Ian Young

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140FGA26R0029

Delivery: 07/31/2026

Delivery Location Code: 0011279599

FWS SANTA ANA NWR

3325 Green Jay Road

ALAMO TX 78516-9509 US

00010 Repair Pintail Lakes Trail

Period of Performance: 09/07/2026 to

10/21/2026

00020 Repair Pintail 3 West Trail

Period of Performance: 09/07/2026 to

10/21/2026

00030 Repair Chachalaca Trail

Period of Performance: 09/07/2026 to

10/21/2026

00040 Repair Willow Lakes Trail

Period of Performance: 09/07/2026 to

10/21/2026

00050 Repair Tower Trail

Period of Performance: 09/07/2026 to

10/21/2026

Solicitation 140FGA26R0029 Trail repairs and improvements on Santa Ana National Wildlife Refuge

GENERAL INFORMATION:

This is a request for quotations for construction prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Part 13 and Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation issued as Request for Quotation (RFQ). The United States Fish and Wildlife Service contemplates award of a firm-fixed price contract as a result of this combined synopsis/solicitation to the vendor whose offer provides the best value to the Government. This announcement constitutes the only solicitation issued as Request for Quotation (RFQ) 140FGA26R0029. FAR clauses and provisions enclosed within this RFQ are those in effect through Federal Acquisition Circular (FAC) 2025-06 and are available in full text through Internet access at http:// www.acquisition.gov/far/.

Point of Contact:

USFWS Contracting Specialist Name: Ian Young

Email: Ian_Young@ios.doi.gov

Phone: Not Available

This acquisition is in support of the Santa Ana National Wildlife Refuge.

This is a 100% Total Small Business Set Aside. The North American Industry Classification System (NAICS) code is 237310. The small business size standard is $45 million. The Magnitude of this project is between $300,000 and $500,000.

SPECIFICATIONS:

The contractor shall provide all material, personnel, equipment, supplies, transportation, tools, supervision, and other items and non-personal services necessary to perform trail repairs and improvements on Santa Ana National Wildlife Refuge (Refuge).

The Refuge trails and roads provide access to visitors 365 days a year during daylight hours for recreational opportunities at Santa Ana NWR. Additionally, refuge staff rely on these roads to maintain habitats and infrastructure. The Refuge was impacted by a significant flooding event on March 27, 2025 which dropped 13.38 inches of water. This flooding caused several issues on the trails and roads including erosion, washouts, and washing away surface materials.

There are five (5) Contract Line Item Number (CLIN) for this project. The CLIN shall include all preparation, mobilization, facilities, management, supervision, labor, subcontracts, equipment, materials, tools, testing, commissioning, training, permitting, insurance, bonds, taxes, and other costs incurred to complete the requirement as defined within the Scope of Work.

SPECIFIC WORK / TASKS: SEE ATTACHED STATEMENT OF WORK

CLIN #0010 Repair Pintail Lakes Trail CLIN #0020 Repair Pintail 3 West Trail CLIN #0030 Repair Chachalaca Trail CLIN #0040 Repair Willow Lakes Trail CLIN #0050 Repair Tower Trail http://www.acquisition.gov/far/ mailto:Ian_Young@ios.doi.gov

AWARD SELECTION PROCESS:

Award will be made in accordance with FAR Part 13 to the offeror that provides the best value to the government based on price, technical, and prior experience. This solicitation is not stating nor required to state the relative importance assigned to each evaluation factor and/or sub factor (FAR 13.106-1(a)(2)).

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Price.

2. Technical: The factual documentation of the firm’s ability to meet the specifications.

• Project approach narrative o The offeror shall provide a narrative, which describes its management and construction approach, illustrating an understanding of what is necessary to successfully complete this project, given the semi remote nature of the work site.

At a minimum the offeror shall address the following in this section:

a) Description of the approach to completing this project.

b) Include any potential obstacles, pitfalls, and assumptions that your firm must consider in advance to guarantee the successful completion of this project, and what considerations you have taken into account to resolve these issues if they do in fact arise.

• Project Schedule o The offeror shall provide a Proposed Progress Schedule, which shows how the solicitation requirements will be accomplished. Include pre-construction submittals and ordering of long-lead items, any needed permits, mobilization, construction, and closeout actions required in accordance with the project specifications and drawings. Show all the phases of the project, and clearly identify all major activities together with milestone events.

3. Past experience:

Provide details of experience working on projects of similar scope and magnitude, to include a description of each project, final contract price and name of the entity you contracted with. Mentioned projects may demonstrate past experience as a Construction Team between the Construction Prime Contractor and major Sub-contractors/Specialists if Sub-contractors/Specialists are to be provided. The Construction Prime Contractor and Sub-Contractor/Specialists Team Members you propose for the Construction of this project shall have had similar roles on at least 3 projects in the past 5 years, completed within contract scope, schedule, and budget constraints.

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

INSTRUCTIONS TO OFFERORS:

Quotes shall be in accordance with and in the order detailed in this section. Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent’s quote not being considered for award.

(a) The United States Fish and Wildlife Service (USFWS) is seeking quotations for construction services as attached in the accompanying scope of work. The USFWS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13.

(b) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation.

Respondents are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award.

(c) Respondents are cautioned to submit adequate information to enable the Government to fully ascertain each respondent’s capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ).

(d) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale prior to the closing of this RFQ.

(e) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government.

(f) Must be valid for a minimum of 30 days.

(g) All interested parties shall be registered in the System for Award Management or SAM at time an offer or quotation is submitted.

(h) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate.

(i) Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer and Contracting Specialist.

(j) REQUEST FOR INFORMATION

All questions should be emailed directly to the Contracting Specialist. Only written RFI’s will be considered and responded to by the Government. USFWS responses to RFIs will be posted as an amendment to the solicitation. All questions are due by 1 p.m. Central on August 14, 2026.

ELECTRONIC RESPONSE

Offerors shall submit a quote to the contracting specialist by email to Ian_Young@ios.doi.gov no later than 2:00 p.m. Central on August 25, 2026.

52.236-27 – SITE VISIT (CONSTRUCTION)(TAILORED) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit will be scheduled on August 4th, from 9:00 AM – 12:00 PM CDT. If an offeror misses the established site visit time they are encouraged to access the work site during the solicitation period. Please coordinate with the refuge manager before arriving for a site visit. The contact information to schedule the site visit has been provided below:-

Primary Technical Coordinator:

Stephanie Bilodeau, Refuge Manager Santa Ana National Wildlife Refuge 3325 Green Jay Road Alamo, TX 78516-9509 (956)475-8420 stephanie_bilodeau@fws.gov

Alternate Point of Contact:

Joe D’Arrigo, Administrative Support Assistant Santa Ana National Wildlife Refuge 3325 Green Jay Road Alamo, TX 78516-9509 (956)784-7630 joe_darrigo@fws.gov

(c) Site Visit Location- Santa Ana National Wildlife Refuge 3325 Green Jay Road Alamo, TX 78516-9509

(End of Provision)

SPECIAL CONTRACT REQUIREMENTS

WORK HOURS

The performance period established for this contract is based upon all work being conducted during regular working hours between 7:30am and 4:00pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, mailto:Ian_Young@ios.doi.gov mailto:stephanie_bilodeau@fws.gov mailto:joe_darrigo@fws.gov and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.

The following Federal Legal Holidays are observed:

New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas

PERIOD OF PERFORMANCE (Reference 52.211-10)

Notice to Proceed will only be issued upon receipt of acceptable bonding and insurance. All onsite work shall be performed within 45 days. The estimated period of performance is September 07, 2026 – October 21, 2026.

Offers shall submit the following information in its entirety:

A) CHECKLIST FOR PROPOSAL SUBMITTAL:

• This page of the solicitation completed as the first page in the package ☐

• Signed acknowledgement of SF 1442 ☐

• Signed amendments if applicable (SF30) ☐

• Completed Provisions (including 52.204-24, 52.204-26, and others as applicable) ☐

• Provide all technical requirements in response ☐

• Provide performance/payment bonds ☐

• Provide proof of insurance documentation ☐

Clauses Section

52.252-2 Clauses Incorporated by Reference FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): ):

https://www.acquisition.gov

For each clause cited below, the version and date are as shown and govern; if the FAR is updated after RFQ issuance, the latest clause versions will apply only if incorporated by amendment per FAR 4.2304(c).

52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

JAN 2025

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015

52.219-28 Post-Award Small Business Program Representation JAN 2025

52.222-6 Construction Wage Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related

Act Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015

52.222-54 Employee Eligibility Verification JAN 2025 52.223-2 Reporting of Biobased Products Under Service and Construction

Contracts

MAY 2024

52.223-3 Hazardous Material Identification and Material Safety Data FEB 2021 52.227-4 Patent Indemnity – Construction Contracts DEC 2007 https://www.acquisition.gov/

52.228-2 Additional Bond Security OCT 1997

52.228-14 Irrevocable Letter of Credit NOV 2014

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements.

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-21 Warranty of Construction MAR 1994 52.249-10 Default (Fixed-Price Construction) APR 1984

52.211-10 Commencement, Prosecution, and Completion of Work APR 1984

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date established at award.

(End of clause)

52.213-4 Terms and Conditions - Simplified Acquisition (Other Than

Commercial Products and Commercial Services)

MAR 2026

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (DEC 2023) (Pub. L. 115–390, title II).

(vi) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(viii) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

(ix) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(xi) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) ( Pub. L. 108- 77 and 108-78 ( 19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.233-1, Disputes (MAY 2014).

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (NOV 2024).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3553&num=0&edition=prelim https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.govinfo.gov/link/plaw/108/public/77 https://www.govinfo.gov/link/plaw/108/public/77 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-1#FAR_52_232_1 https://www.acquisition.gov/far/52.232-8#FAR_52_232_8 https://www.acquisition.gov/far/52.232-11#FAR_52_232_11 https://www.acquisition.gov/far/52.232-25#FAR_52_232_25 https://www.acquisition.gov/far/52.232-39#FAR_52_232_39 https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.244-6#FAR_52_244_6

(viii) 52.253-1, Computer Generated Forms (JAN 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712);

this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024) (E.O.

13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) ( 41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(viii) 52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(ix)

(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).

https://www.acquisition.gov/far/52.253-1#FAR_52_253_1 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/4.1403#FAR_4_1403 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.222-20#FAR_52_222_20 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter65&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/22.1408#FAR_22_1408 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-chapter67-front&num=0&edition=prelim https://www.acquisition.gov/far/52.222-50#FAR_52_222_50

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act ( 43 U.S.C. 1331, et seq.))).

(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2024) ( 42 U.S.C.

11001-11050 and 13101-13109) (Applies to services performed on Federal facilities).

(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products as prescribed at FAR 23.109(d)(1)).

(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv) 52.223-20, Aerosols (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xvii) 52.223-23, Sustainable Products and Services (MAY 2024) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l) (Applies to contracts when the agency identifies in the statement of work, or elsewhere in the contract, the sustainable products and services that apply to the acquisition).

(xviii)

(A) 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition-

(1) Is set aside for small business concerns; or https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1331&num=0&edition=prelim https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.223-5#FAR_52_223_5 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11001&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11001&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13101&num=0&edition=prelim https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/23.109#FAR_23_109 https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/2.101#FAR_2_101

(2) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).

(B) Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end product in paragraph (a) of 52.225-1: (A) The cost of its components mined, produced, or manufactured in the United States exceeds ____ percent of the cost of all its components. [ Contracting officer to insert the percentage per instructions at 13.302-5(d)(4). ])

(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations., Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).

(xx) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).

(xxi) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).

(xxii) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118- 31, 41 U.S.C. 3901 note prec.).

(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305)(Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).

(xxiv) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (JAN 2025) ( 49 U.S.C. 40118(g)). (Applies to contracts with a U.S.-flag carrier for the transportation by air of passengers; does not apply to contracts awarded by the Department of Defense or contracts for commercial products).

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)

(ii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).

(iii) 52.211-17, Delivery of Excess Quantities (SEPT 1989) (Applies to fixed-price supplies).

(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).

https://www.acquisition.gov/far/19.502-2#FAR_19_502_2 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/13.302-5#FAR_13_302_5 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6 https://www.acquisition.gov/far/26.404#FAR_26_404 https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 https://www.acquisition.gov/far/52.240-1#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section55305&num=0&edition=prelim https://www.acquisition.gov/far/47.504#FAR_47_504 https://www.acquisition.gov/far/52.247-69#FAR_52_247_69 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section40118(g)&num=0&edition=prelim https://www.acquisition.gov/far/52.204-21#FAR_52_204_21 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.acquisition.gov/far/9.405-2#FAR_9_405_2 https://www.acquisition.gov/far/52.211-17#FAR_52_211_17 https://www.acquisition.gov/far/52.247-29#FAR_52_247_29

(v) 52.247-34, F.o.b. Destination (JAN 1991) (Applies to supplies if delivery is f.o.b.

destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

[Insert one or more Internet addresses]

(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights-

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records.

The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future https://www.acquisition.gov/far/52.247-34#FAR_52_247_34 performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

52.219-6 Notice of Total Small Business Set-Aside Nov 2020

(a) Definition. Small business concern, as used in this clause—

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(2) Affiliates, as used in paragraph (a)(1) of this clause, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships.

SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) Applicability. This clause applies only to-

(1) Contracts that have been totally set aside for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

52.225-9 Buy American Act - Construction Material OCT 2022

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/25.105#FAR_25_105 calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.

The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .