B08_Solicitation_-_DOL_Wage_Determination.pdf

PDF 2 MB Posted

Attached to
ZION- Crawford Dam Removal and Diversion
Solicitation number
140P6426B0008
Issued by

About this file

Summary

This is a General Decision (GD) wage determination document (UT20260110, issued 01/02/2026) establishing prevailing wage rates for highway construction projects in Washington County, Utah. The document supersedes a previous decision (UT20250110) and applies to highway construction work, with modification number 0 published on 01/02/2026. The wage determination includes rates and fringe benefits for multiple job classifications under three primary project codes: CARP0801-004 (effective 07/01/2024), ENGI0003-021 (effective 07/01/2022), and SUUT2019-022 (effective 04/03/2023).

The determination establishes hourly rates and fringe benefit amounts for numerous classifications including carpenters ($32.17 base rate, $17.50 fringe), power equipment operators ($31.99 base, $17.64 fringe), and various laborer categories, ranging from cement masons/concrete finishers ($20.41 base, $2.41 fringe) to general laborers ($18.83 base, $2.53 fringe). Equipment operators for cranes, drills, graders, loaders, and pavers are included with rates between $20.03–$30.66 hourly. The document specifies union rate identifiers (PLUM, UAVG), survey rate identifiers (SU), and state-adopted rate identifiers (SA), explaining how rates are derived from collective bargaining agreements, weighted union averages, or state surveys. The document includes provisions regarding Executive Order 13706 (paid sick leave) and Executive Order 13658 (minimum wage requirements), along with procedures for wage determination appeals through the U.S. Department of Labor's Wage and Hour Division.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .