These are construction drawings for the Crawford Diversion Fish Passage project at Zion National Park in Utah, prepared by the Department of the Interior National Park Service Denver Service Center. The project involves demolition of an existing concrete dam and construction of a new fish passage and river restoration system.
The scope of work includes removal of the existing concrete dam core to elevation 4012.0 and associated structures; construction of a new intake structure with fish screens and bypass gates; installation of an 18-inch ADS N-12 pipe for sediment flushing with appropriate transitions and check dams; creation of a temporary diversion channel with constant 0.03 ft/ft slope during construction; and restoration of the river channel with rock ramps, riprap protection, habitat boulders, and bank stabilization. Key components include two low-flow fishways on the river left and right; fish return pipes; guide rails and trash racks; erosion control measures including silt fencing and sediment traps; and temporary mobilization infrastructure including upper and lower staging areas and stabilized construction exits. The contractor is responsible for site dewatering, erosion control, dust control, traffic management, and environmental protections including prevention of water pollution and wildlife habitat disturbance. All construction work must be performed during daytime/daylight hours with an accident prevention plan, and all equipment and materials must be removed and the site stabilized upon completion. The construction documents provide detailed specifications, cross-sections, and notes for proper installation and environmental compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6426B0008_Amd_0002.pdf | ||
| Crawford_PrebidSiteVisit_20260520_0002.pdf | ||
| Questions_and_Answers_-_Crawford_Dam_Removal_0001.pdf | ||
| Sol_140P6426B0008_Amd_0001.pdf | ||
| B08_Solicitation_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_DOL_Wage_Determination.pdf | ||
| Sol_140P6426B0008.pdf | ||
| A06_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
SPRINGDALE
AutoCAD SHX Text
ROCKVILLE
AutoCAD SHX Text
AutoCAD SHX Text
EAST
AutoCAD SHX Text
FORK
AutoCAD SHX Text
VIRGIN
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
COALPITS
AutoCAD SHX Text
WASH
AutoCAD SHX Text
VIRGIN
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
VIRGIN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
LEFT FORK
AutoCAD SHX Text
RIGHT FORK
AutoCAD SHX Text
DEEP
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
GOOSE CREEK
AutoCAD SHX Text
BLUE
AutoCAD SHX Text
SPRINGS
AutoCAD SHX Text
RESERVOIR
AutoCAD SHX Text
KOLOB
AutoCAD SHX Text
RESERVOIR
AutoCAD SHX Text
WASHINGTON CO.
AutoCAD SHX Text
KANE CO.
AutoCAD SHX Text
IRON COUNTY
AutoCAD SHX Text
WASHINGTON COUNTY
AutoCAD SHX Text
WASHINGTON COUNTY
AutoCAD SHX Text
KANE COUNTY
AutoCAD SHX Text
IRON COUNTY
AutoCAD SHX Text
WASHINGTON COUNTY
AutoCAD SHX Text V.C.
AutoCAD SHX Text
KOLOB
AutoCAD SHX Text
CANYONS
AutoCAD SHX Text
ORDERVILLE
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
GREAT
AutoCAD SHX Text
WEST
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
PARUNUWEAP
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
TOWERS
AutoCAD SHX Text
OF THE
AutoCAD SHX Text
VIRGIN
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
MT. CARMEL
AutoCAD SHX Text
JUNCTION &
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
& ST. GEORGE
AutoCAD SHX Text
AutoCAD SHX Text
TO CEDAR CITY
AutoCAD SHX Text
KOLOB
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
KOLOB
AutoCAD SHX Text
TERRACE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
LODGE
AutoCAD SHX Text
ZION
AutoCAD SHX Text
GROTTO
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
VIRGIN
AutoCAD SHX Text
FORK
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
WATCHMAN
AutoCAD SHX Text
ZION CANYON CANYON HEADQUARTERS & MUSEUMMUSEUM
AutoCAD SHX Text
VISITOR CENTER
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
ZION
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
ARIZONA
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
ARIZONA
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
MT. CARMEL
AutoCAD SHX Text
JUNCTION
AutoCAD SHX Text
ST. GEORGE
AutoCAD SHX Text
CEDAR
AutoCAD SHX Text
CITY
AutoCAD SHX Text
AutoCAD SHX Text
ALT
AutoCAD SHX Text
AutoCAD SHX Text
PANACA
AutoCAD SHX Text
CALIENTE
AutoCAD SHX Text
AutoCAD SHX Text
MILFORD
AutoCAD SHX Text
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
BRYCE
AutoCAD SHX Text
CANYON
AutoCAD SHX Text N.P.
AutoCAD SHX Text
LAKE MEAD
AutoCAD SHX Text N.R.A.
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
CANYON
AutoCAD SHX Text N.P.
AutoCAD SHX Text
TROPIC
AutoCAD SHX Text
KANAB
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
SPRINGS
AutoCAD SHX Text N.M.
AutoCAD SHX Text
CEDAR
AutoCAD SHX Text
BREAKS
AutoCAD SHX Text N.M.
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
SCALE OF KILOMETERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ZION NATIONAL PARK
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
DENVER SERVICE CENTER
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
CRAWFORD DIVERSION FISH PASSAGE
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
CONSTRUCTION DRAWINGS
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
AMPHITHEATER
AutoCAD SHX Text
CAMPGROUND
AutoCAD SHX Text
PICNIC AREA
AutoCAD SHX Text
RANGER STATION
AutoCAD SHX Text
PARK HEADQUARTERS
AutoCAD SHX Text
VISITOR CENTER
AutoCAD SHX Text
HQ.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
STATE LINE
AutoCAD SHX Text
UNPAVED ROAD
AutoCAD SHX Text
COUNTY LINE
AutoCAD SHX Text
CREEK OR RIVER
AutoCAD SHX Text
PAVED ROAD
AutoCAD SHX Text
PARK BOUNDARY
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
OF
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
QUALITY DESIGN CERTIFICATION
AutoCAD SHX Text
OR
AutoCAD SHX Text
OR
AutoCAD SHX Text Development (Title I)
AutoCAD SHX Text Prepared in Accordance with Design
AutoCAD SHX Text by Design Development (Title I)
AutoCAD SHX Text Construction Drawing Not Preceded
AutoCAD SHX Text Approved by Superintendent on
AutoCAD SHX Text Variance from Design Development (Title I)
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Sheet
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
A/E FIRM - A/E CONTRACT NUMBER
AutoCAD SHX Text
PRIME:
AutoCAD SHX Text
ONEFISH ENGINEERING, LLC
AutoCAD SHX Text
PAGOSA SPRINGS, CO
AutoCAD SHX Text
ZION NATIONAL PARK
AutoCAD SHX Text
INTERMOUNTAIN
AutoCAD SHX Text
SOUTHWEST
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
CV
AutoCAD SHX Text
ZION NATIONAL PARK
AutoCAD SHX Text
INTERMOUNTAIN
AutoCAD SHX Text
SOUTHWEST
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
GENERAL CV CIVIL C0 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text COVER SHEET GENERAL AND CIVIL NOTES ACCESS, STAGING AND DEMOLITION EROSION CONTROL AND CONCEPTUAL TEMPORARY DIVERSION PLAN EROSION CONTROL DETAILS EROSION CONTROL NOTES OVERALL SITE PLAN INTAKE STRUCTURE AND UPPER WATERLINE PLAN INTAKE STRUCTURE FISH SCREEN DETAILS IRRIGATION CANAL AND PIPE PLAN, PROFILE AND DETAILS RIVER AND WASH PLAN RIVER AND WASH PROFILE ROCK RAMP CREST DETAILS RIVER CROSS SECTIONS (1 OF 2) RIVER CROSS SECTIONS (2 OF 2) RIVER GRADING DETAILS
AutoCAD SHX Text
60%%% SET
AutoCAD SHX Text 7/25
AutoCAD SHX Text
SBH
AutoCAD SHX Text
90%%% SET
AutoCAD SHX Text 11/25
AutoCAD SHX Text
SBH
AutoCAD SHX Text ABBREVIATIONS: ADS - ADVANCED DRAINAGE SYSTEMS BMPS - BEST MANAGEMENT PRACTICES CIP - CAST IN PLACE CMP - CORRUGATED METAL PIPE C.O.- CONTRACTING OFFICER CONTRACTING OFFICER C.O.R - CONTRACTING OFFICER REPRESENTATIVE EDPM - ETHYLENE, PROPYLENE, DIENE, MONOMER EL/ELEV - ELEVATION EW - EACH WAY NPS - NATIONAL PARK SERVICE NTS - NOT TO SCALE
AutoCAD SHX Text
90%%% SET (REV. 1)
AutoCAD SHX Text 1/26
AutoCAD SHX Text
SBH
AutoCAD SHX Text P/N - PART NUMBER PVC - POLYVINYL CHLORIDE SCH - SCHEDULE SWPPP - STORMWATER POLLUTION PREVENTION PLAN T&B - TOP AND BOTTOM TOW - TOP OF WALL TYP - TYPICAL
AutoCAD SHX Text
100%%% SET
AutoCAD SHX Text 2/26
SBH
GENERAL NOTES
AutoCAD SHX Text
1. THESE DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THESE DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL AND THE CONTRACTOR IS RESPONSIBLE FOR ALL AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE CONTRACTOR IS RESPONSIBLE FOR ALL THE CONTRACTOR IS RESPONSIBLE FOR ALL CONTRACTOR IS RESPONSIBLE FOR ALL CONTRACTOR IS RESPONSIBLE FOR ALL IS RESPONSIBLE FOR ALL IS RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL FOR ALL FOR ALL ALL ALL ITEMS SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE C.O. FOR ANY CLARIFICATION OR THE C.O. FOR ANY CLARIFICATION OR C.O. FOR ANY CLARIFICATION OR C.O. FOR ANY CLARIFICATION OR FOR ANY CLARIFICATION OR FOR ANY CLARIFICATION OR ANY CLARIFICATION OR ANY CLARIFICATION OR CLARIFICATION OR CLARIFICATION OR OR OR FURTHER DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DEVIATION FROM THESE PLANS WITHOUT THE C.O. DEVIATION FROM THESE PLANS WITHOUT THE C.O. FROM THESE PLANS WITHOUT THE C.O. FROM THESE PLANS WITHOUT THE C.O. THESE PLANS WITHOUT THE C.O. THESE PLANS WITHOUT THE C.O. PLANS WITHOUT THE C.O. PLANS WITHOUT THE C.O. WITHOUT THE C.O. WITHOUT THE C.O. THE C.O. THE C.O. C.O. C.O. APPROVAL ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY WILL NOTIFY THE C.O. IMMEDIATELY OF ANY WILL NOTIFY THE C.O. IMMEDIATELY OF ANY NOTIFY THE C.O. IMMEDIATELY OF ANY NOTIFY THE C.O. IMMEDIATELY OF ANY THE C.O. IMMEDIATELY OF ANY THE C.O. IMMEDIATELY OF ANY C.O. IMMEDIATELY OF ANY C.O. IMMEDIATELY OF ANY IMMEDIATELY OF ANY IMMEDIATELY OF ANY OF ANY OF ANY ANY ANY UNEXPECTED AND CHANGED CONDITIONS, SAFETY HAZARDS AND ENVIRONMENTAL PROBLEMS ENCOUNTERED. 2. A PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., A PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BY THE NPS, ENGINEER, C.O., C.O.R., BY THE NPS, ENGINEER, C.O., C.O.R., THE NPS, ENGINEER, C.O., C.O.R., THE NPS, ENGINEER, C.O., C.O.R., NPS, ENGINEER, C.O., C.O.R., NPS, ENGINEER, C.O., C.O.R., ENGINEER, C.O., C.O.R., ENGINEER, C.O., C.O.R., C.O., C.O.R., C.O., C.O.R., C.O.R., C.O.R., CONTRACTOR'S SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE PURPOSE OF THE MEETING IS TO GO OVER THE PURPOSE OF THE MEETING IS TO GO OVER THE OF THE MEETING IS TO GO OVER THE OF THE MEETING IS TO GO OVER THE THE MEETING IS TO GO OVER THE THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE IS TO GO OVER THE IS TO GO OVER THE TO GO OVER THE TO GO OVER THE GO OVER THE GO OVER THE OVER THE OVER THE THE THE WORK, PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND ATTENTION WILL BE PAID TO FISHERIES AND ATTENTION WILL BE PAID TO FISHERIES AND WILL BE PAID TO FISHERIES AND WILL BE PAID TO FISHERIES AND BE PAID TO FISHERIES AND BE PAID TO FISHERIES AND PAID TO FISHERIES AND PAID TO FISHERIES AND TO FISHERIES AND TO FISHERIES AND FISHERIES AND FISHERIES AND AND AND ENDANGERED SPECIES ISSUES AND PROTECTION REQUIREMENTS. 3. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONDITIONS DURING THE COURSE OF THE CONSTRUCTION DURING THE COURSE OF THE CONSTRUCTION DURING THE COURSE OF THE CONSTRUCTION THE COURSE OF THE CONSTRUCTION THE COURSE OF THE CONSTRUCTION COURSE OF THE CONSTRUCTION COURSE OF THE CONSTRUCTION OF THE CONSTRUCTION OF THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL ENVIRONMENTAL PROTECTION ELEMENTS. ENVIRONMENTAL PROTECTION ELEMENTS. ENVIRONMENTAL PROTECTION ELEMENTS. PROTECTION ELEMENTS. PROTECTION ELEMENTS. ELEMENTS. ELEMENTS. CONTRACTOR SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY REGULATIONS. THESE REQUIREMENTS SHALL APPLY REGULATIONS. THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY REQUIREMENTS SHALL APPLY REQUIREMENTS SHALL APPLY SHALL APPLY SHALL APPLY APPLY APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD SHALL DEFEND, INDEMNIFY, AND HOLD SHALL DEFEND, INDEMNIFY, AND HOLD DEFEND, INDEMNIFY, AND HOLD DEFEND, INDEMNIFY, AND HOLD INDEMNIFY, AND HOLD INDEMNIFY, AND HOLD AND HOLD AND HOLD HOLD HOLD THE NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND ALL LIABILITY, REAL OR ALLEGED, IN AND ALL LIABILITY, REAL OR ALLEGED, IN ALL LIABILITY, REAL OR ALLEGED, IN ALL LIABILITY, REAL OR ALLEGED, IN LIABILITY, REAL OR ALLEGED, IN LIABILITY, REAL OR ALLEGED, IN REAL OR ALLEGED, IN REAL OR ALLEGED, IN OR ALLEGED, IN OR ALLEGED, IN ALLEGED, IN ALLEGED, IN IN IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ARISING FROM THE SOLE NEGLIGENCE OF ARISING FROM THE SOLE NEGLIGENCE OF FROM THE SOLE NEGLIGENCE OF FROM THE SOLE NEGLIGENCE OF THE SOLE NEGLIGENCE OF THE SOLE NEGLIGENCE OF SOLE NEGLIGENCE OF SOLE NEGLIGENCE OF NEGLIGENCE OF NEGLIGENCE OF OF OF THE OWNER OR ENGINEER. 4. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, NATIVE TREES AND SHRUBS, PATHWAYS, NATIVE TREES AND SHRUBS, PATHWAYS, TREES AND SHRUBS, PATHWAYS, TREES AND SHRUBS, PATHWAYS, AND SHRUBS, PATHWAYS, AND SHRUBS, PATHWAYS, SHRUBS, PATHWAYS, SHRUBS, PATHWAYS, PATHWAYS, PATHWAYS, FENCING AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE TO SUCH ITEMS, CONTRACTOR SHALL BE TO SUCH ITEMS, CONTRACTOR SHALL BE SUCH ITEMS, CONTRACTOR SHALL BE SUCH ITEMS, CONTRACTOR SHALL BE ITEMS, CONTRACTOR SHALL BE ITEMS, CONTRACTOR SHALL BE CONTRACTOR SHALL BE CONTRACTOR SHALL BE SHALL BE SHALL BE BE BE RESPONSIBLE FOR REPAIR OR REPLACEMENT IN LIKE NUMBER, KIND, CONDITION AND SIZE AS DIRECTED BY THE OWNER. 5. THE APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK, POINTS OF INGRESS-EGRESS, CREEK WORK, POINTS OF INGRESS-EGRESS, CREEK POINTS OF INGRESS-EGRESS, CREEK POINTS OF INGRESS-EGRESS, CREEK OF INGRESS-EGRESS, CREEK OF INGRESS-EGRESS, CREEK INGRESS-EGRESS, CREEK INGRESS-EGRESS, CREEK CREEK CREEK CHANNEL ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, THE FIELD BY THE PROJECT C.O. ALL MATERIALS, THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FIELD BY THE PROJECT C.O. ALL MATERIALS, FIELD BY THE PROJECT C.O. ALL MATERIALS, BY THE PROJECT C.O. ALL MATERIALS, BY THE PROJECT C.O. ALL MATERIALS, THE PROJECT C.O. ALL MATERIALS, THE PROJECT C.O. ALL MATERIALS, PROJECT C.O. ALL MATERIALS, PROJECT C.O. ALL MATERIALS, C.O. ALL MATERIALS, C.O. ALL MATERIALS, ALL MATERIALS, ALL MATERIALS, ALL MATERIALS, MATERIALS, MATERIALS, EXCESS SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. BE WITHIN THE STAGING AND MOBILIZATION AREA. BE WITHIN THE STAGING AND MOBILIZATION AREA. WITHIN THE STAGING AND MOBILIZATION AREA. WITHIN THE STAGING AND MOBILIZATION AREA. THE STAGING AND MOBILIZATION AREA. THE STAGING AND MOBILIZATION AREA. STAGING AND MOBILIZATION AREA. STAGING AND MOBILIZATION AREA. AND MOBILIZATION AREA. AND MOBILIZATION AREA. MOBILIZATION AREA. MOBILIZATION AREA. AREA. AREA. EQUIPMENT MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AREAS AS DIRECTED BY APPLICABLE AREAS AS DIRECTED BY APPLICABLE AS DIRECTED BY APPLICABLE AS DIRECTED BY APPLICABLE DIRECTED BY APPLICABLE DIRECTED BY APPLICABLE BY APPLICABLE BY APPLICABLE APPLICABLE APPLICABLE PERMITS. AVOID WETLAND DISTURBANCE EXCEPT WHERE DIRECT WORK IS REQUIRED. 6. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND AS PART OF THE WORK. INSTALL APPROVED EROSION AND AS PART OF THE WORK. INSTALL APPROVED EROSION AND PART OF THE WORK. INSTALL APPROVED EROSION AND PART OF THE WORK. INSTALL APPROVED EROSION AND OF THE WORK. INSTALL APPROVED EROSION AND OF THE WORK. INSTALL APPROVED EROSION AND THE WORK. INSTALL APPROVED EROSION AND THE WORK. INSTALL APPROVED EROSION AND WORK. INSTALL APPROVED EROSION AND WORK. INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND APPROVED EROSION AND APPROVED EROSION AND EROSION AND EROSION AND AND AND SEDIMENT CONTROL AT DOWNSTREAM END OF ALL CHANNEL GRADING AREAS PRIOR TO THE INITIATION OF CREEK GRADING WORK. 7. THE CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND FAMILIAR WITH THE PERMIT REQUIREMENTS, AND FAMILIAR WITH THE PERMIT REQUIREMENTS, AND WITH THE PERMIT REQUIREMENTS, AND WITH THE PERMIT REQUIREMENTS, AND THE PERMIT REQUIREMENTS, AND THE PERMIT REQUIREMENTS, AND PERMIT REQUIREMENTS, AND PERMIT REQUIREMENTS, AND REQUIREMENTS, AND REQUIREMENTS, AND AND AND SHALL BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, PERMIT CONDITIONS AS PART OF THE OVERALL WORK, PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONDITIONS AS PART OF THE OVERALL WORK, CONDITIONS AS PART OF THE OVERALL WORK, AS PART OF THE OVERALL WORK, AS PART OF THE OVERALL WORK, PART OF THE OVERALL WORK, PART OF THE OVERALL WORK, OF THE OVERALL WORK, OF THE OVERALL WORK, THE OVERALL WORK, THE OVERALL WORK, OVERALL WORK, OVERALL WORK, WORK, WORK, INCLUDING POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FOR VIOLATIONS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .