A06_Drawings.pdf

PDF 8 MB Posted

Attached to
ZION- Crawford Dam Removal and Diversion
Solicitation number
140P6426B0008
Issued by

About this file

These are construction drawings for the Crawford Diversion Fish Passage project at Zion National Park in Utah, prepared by the Department of the Interior National Park Service Denver Service Center. The project involves demolition of an existing concrete dam and construction of a new fish passage and river restoration system.

The scope of work includes removal of the existing concrete dam core to elevation 4012.0 and associated structures; construction of a new intake structure with fish screens and bypass gates; installation of an 18-inch ADS N-12 pipe for sediment flushing with appropriate transitions and check dams; creation of a temporary diversion channel with constant 0.03 ft/ft slope during construction; and restoration of the river channel with rock ramps, riprap protection, habitat boulders, and bank stabilization. Key components include two low-flow fishways on the river left and right; fish return pipes; guide rails and trash racks; erosion control measures including silt fencing and sediment traps; and temporary mobilization infrastructure including upper and lower staging areas and stabilized construction exits. The contractor is responsible for site dewatering, erosion control, dust control, traffic management, and environmental protections including prevention of water pollution and wildlife habitat disturbance. All construction work must be performed during daytime/daylight hours with an accident prevention plan, and all equipment and materials must be removed and the site stabilized upon completion. The construction documents provide detailed specifications, cross-sections, and notes for proper installation and environmental compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

SPRINGDALE

AutoCAD SHX Text

ROCKVILLE

AutoCAD SHX Text

AutoCAD SHX Text

EAST

AutoCAD SHX Text

FORK

AutoCAD SHX Text

VIRGIN

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

COALPITS

AutoCAD SHX Text

WASH

AutoCAD SHX Text

VIRGIN

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

VIRGIN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

LEFT FORK

AutoCAD SHX Text

RIGHT FORK

AutoCAD SHX Text

DEEP

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

GOOSE CREEK

AutoCAD SHX Text

BLUE

AutoCAD SHX Text

SPRINGS

AutoCAD SHX Text

RESERVOIR

AutoCAD SHX Text

KOLOB

AutoCAD SHX Text

RESERVOIR

AutoCAD SHX Text

WASHINGTON CO.

AutoCAD SHX Text

KANE CO.

AutoCAD SHX Text

IRON COUNTY

AutoCAD SHX Text

WASHINGTON COUNTY

AutoCAD SHX Text

WASHINGTON COUNTY

AutoCAD SHX Text

KANE COUNTY

AutoCAD SHX Text

IRON COUNTY

AutoCAD SHX Text

WASHINGTON COUNTY

AutoCAD SHX Text V.C.

AutoCAD SHX Text

KOLOB

AutoCAD SHX Text

CANYONS

AutoCAD SHX Text

ORDERVILLE

AutoCAD SHX Text

CANYON

AutoCAD SHX Text

GREAT

AutoCAD SHX Text

WEST

AutoCAD SHX Text

CANYON

AutoCAD SHX Text

PARUNUWEAP

AutoCAD SHX Text

CANYON

AutoCAD SHX Text

TOWERS

AutoCAD SHX Text

OF THE

AutoCAD SHX Text

VIRGIN

AutoCAD SHX Text

AutoCAD SHX Text

TO

AutoCAD SHX Text

MT. CARMEL

AutoCAD SHX Text

JUNCTION &

AutoCAD SHX Text

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

TO

AutoCAD SHX Text

& ST. GEORGE

AutoCAD SHX Text

AutoCAD SHX Text

TO CEDAR CITY

AutoCAD SHX Text

KOLOB

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

KOLOB

AutoCAD SHX Text

TERRACE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

LODGE

AutoCAD SHX Text

ZION

AutoCAD SHX Text

GROTTO

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

VIRGIN

AutoCAD SHX Text

FORK

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

WATCHMAN

AutoCAD SHX Text

ZION CANYON CANYON HEADQUARTERS & MUSEUMMUSEUM

AutoCAD SHX Text

VISITOR CENTER

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

ZION

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

PARK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

ARIZONA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

ARIZONA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

MT. CARMEL

AutoCAD SHX Text

JUNCTION

AutoCAD SHX Text

ST. GEORGE

AutoCAD SHX Text

CEDAR

AutoCAD SHX Text

CITY

AutoCAD SHX Text

AutoCAD SHX Text

ALT

AutoCAD SHX Text

AutoCAD SHX Text

PANACA

AutoCAD SHX Text

CALIENTE

AutoCAD SHX Text

AutoCAD SHX Text

MILFORD

AutoCAD SHX Text

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

BRYCE

AutoCAD SHX Text

CANYON

AutoCAD SHX Text N.P.

AutoCAD SHX Text

LAKE MEAD

AutoCAD SHX Text N.R.A.

AutoCAD SHX Text

GRAND

AutoCAD SHX Text

CANYON

AutoCAD SHX Text N.P.

AutoCAD SHX Text

TROPIC

AutoCAD SHX Text

KANAB

AutoCAD SHX Text

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

SPRINGS

AutoCAD SHX Text N.M.

AutoCAD SHX Text

CEDAR

AutoCAD SHX Text

BREAKS

AutoCAD SHX Text N.M.

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

SCALE OF KILOMETERS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ZION NATIONAL PARK

AutoCAD SHX Text

STATE

AutoCAD SHX Text

NATIONAL PARK SERVICE

AutoCAD SHX Text

DENVER SERVICE CENTER

AutoCAD SHX Text

REGION

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

LOCATION WITHIN PARK

AutoCAD SHX Text

NAME OF PARK

AutoCAD SHX Text

TITLE OF DRAWING

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

CRAWFORD DIVERSION FISH PASSAGE

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

CONSTRUCTION DRAWINGS

AutoCAD SHX Text

WASHINGTON

AutoCAD SHX Text

AMPHITHEATER

AutoCAD SHX Text

CAMPGROUND

AutoCAD SHX Text

PICNIC AREA

AutoCAD SHX Text

RANGER STATION

AutoCAD SHX Text

PARK HEADQUARTERS

AutoCAD SHX Text

VISITOR CENTER

AutoCAD SHX Text

HQ.

AutoCAD SHX Text V.C.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

STATE LINE

AutoCAD SHX Text

UNPAVED ROAD

AutoCAD SHX Text

COUNTY LINE

AutoCAD SHX Text

CREEK OR RIVER

AutoCAD SHX Text

PAVED ROAD

AutoCAD SHX Text

PARK BOUNDARY

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

OF

AutoCAD SHX Text

PKG.

AutoCAD SHX Text

NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

QUALITY DESIGN CERTIFICATION

AutoCAD SHX Text

OR

AutoCAD SHX Text

OR

AutoCAD SHX Text Development (Title I)

AutoCAD SHX Text Prepared in Accordance with Design

AutoCAD SHX Text by Design Development (Title I)

AutoCAD SHX Text Construction Drawing Not Preceded

AutoCAD SHX Text Approved by Superintendent on

AutoCAD SHX Text Variance from Design Development (Title I)

AutoCAD SHX Text Project Manager

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Sheet

AutoCAD SHX Text Mark

AutoCAD SHX Text

REVISION

AutoCAD SHX Text Date

AutoCAD SHX Text Initial

AutoCAD SHX Text

A/E FIRM - A/E CONTRACT NUMBER

AutoCAD SHX Text

PRIME:

AutoCAD SHX Text

ONEFISH ENGINEERING, LLC

AutoCAD SHX Text

PAGOSA SPRINGS, CO

AutoCAD SHX Text

ZION NATIONAL PARK

AutoCAD SHX Text

INTERMOUNTAIN

AutoCAD SHX Text

SOUTHWEST

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

CV

AutoCAD SHX Text

ZION NATIONAL PARK

AutoCAD SHX Text

INTERMOUNTAIN

AutoCAD SHX Text

SOUTHWEST

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

GENERAL CV CIVIL C0 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NO.

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text COVER SHEET GENERAL AND CIVIL NOTES ACCESS, STAGING AND DEMOLITION EROSION CONTROL AND CONCEPTUAL TEMPORARY DIVERSION PLAN EROSION CONTROL DETAILS EROSION CONTROL NOTES OVERALL SITE PLAN INTAKE STRUCTURE AND UPPER WATERLINE PLAN INTAKE STRUCTURE FISH SCREEN DETAILS IRRIGATION CANAL AND PIPE PLAN, PROFILE AND DETAILS RIVER AND WASH PLAN RIVER AND WASH PROFILE ROCK RAMP CREST DETAILS RIVER CROSS SECTIONS (1 OF 2) RIVER CROSS SECTIONS (2 OF 2) RIVER GRADING DETAILS

AutoCAD SHX Text

60%%% SET

AutoCAD SHX Text 7/25

AutoCAD SHX Text

SBH

AutoCAD SHX Text

90%%% SET

AutoCAD SHX Text 11/25

AutoCAD SHX Text

SBH

AutoCAD SHX Text ABBREVIATIONS: ADS - ADVANCED DRAINAGE SYSTEMS BMPS - BEST MANAGEMENT PRACTICES CIP - CAST IN PLACE CMP - CORRUGATED METAL PIPE C.O.- CONTRACTING OFFICER CONTRACTING OFFICER C.O.R - CONTRACTING OFFICER REPRESENTATIVE EDPM - ETHYLENE, PROPYLENE, DIENE, MONOMER EL/ELEV - ELEVATION EW - EACH WAY NPS - NATIONAL PARK SERVICE NTS - NOT TO SCALE

AutoCAD SHX Text

90%%% SET (REV. 1)

AutoCAD SHX Text 1/26

AutoCAD SHX Text

SBH

AutoCAD SHX Text P/N - PART NUMBER PVC - POLYVINYL CHLORIDE SCH - SCHEDULE SWPPP - STORMWATER POLLUTION PREVENTION PLAN T&B - TOP AND BOTTOM TOW - TOP OF WALL TYP - TYPICAL

AutoCAD SHX Text

100%%% SET

AutoCAD SHX Text 2/26

SBH

GENERAL NOTES

AutoCAD SHX Text

1. THESE DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THESE DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL GENERAL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL DESIGN INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL INTENT TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL TO BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL BE IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL IMPLEMENTED AND THE CONTRACTOR IS RESPONSIBLE FOR ALL AND THE CONTRACTOR IS RESPONSIBLE FOR ALL AND THE CONTRACTOR IS RESPONSIBLE FOR ALL THE CONTRACTOR IS RESPONSIBLE FOR ALL THE CONTRACTOR IS RESPONSIBLE FOR ALL CONTRACTOR IS RESPONSIBLE FOR ALL CONTRACTOR IS RESPONSIBLE FOR ALL IS RESPONSIBLE FOR ALL IS RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL FOR ALL FOR ALL ALL ALL ITEMS SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR SHALL BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR BE RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR RESPONSIBLE FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR FOR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTACTING THE C.O. FOR ANY CLARIFICATION OR CONTACTING THE C.O. FOR ANY CLARIFICATION OR THE C.O. FOR ANY CLARIFICATION OR THE C.O. FOR ANY CLARIFICATION OR C.O. FOR ANY CLARIFICATION OR C.O. FOR ANY CLARIFICATION OR FOR ANY CLARIFICATION OR FOR ANY CLARIFICATION OR ANY CLARIFICATION OR ANY CLARIFICATION OR CLARIFICATION OR CLARIFICATION OR OR OR FURTHER DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DETAILS NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. NECESSARY TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. TO ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACCOMMODATE ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ACTUAL SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. SITE CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. CONDITIONS. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. ANY DEVIATION FROM THESE PLANS WITHOUT THE C.O. DEVIATION FROM THESE PLANS WITHOUT THE C.O. DEVIATION FROM THESE PLANS WITHOUT THE C.O. FROM THESE PLANS WITHOUT THE C.O. FROM THESE PLANS WITHOUT THE C.O. THESE PLANS WITHOUT THE C.O. THESE PLANS WITHOUT THE C.O. PLANS WITHOUT THE C.O. PLANS WITHOUT THE C.O. WITHOUT THE C.O. WITHOUT THE C.O. THE C.O. THE C.O. C.O. C.O. APPROVAL ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY ARE AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AT THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTORS OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY OWN RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY RISK AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY AND EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY EXPENSE. THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY THE CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY CONTRACTOR WILL NOTIFY THE C.O. IMMEDIATELY OF ANY WILL NOTIFY THE C.O. IMMEDIATELY OF ANY WILL NOTIFY THE C.O. IMMEDIATELY OF ANY NOTIFY THE C.O. IMMEDIATELY OF ANY NOTIFY THE C.O. IMMEDIATELY OF ANY THE C.O. IMMEDIATELY OF ANY THE C.O. IMMEDIATELY OF ANY C.O. IMMEDIATELY OF ANY C.O. IMMEDIATELY OF ANY IMMEDIATELY OF ANY IMMEDIATELY OF ANY OF ANY OF ANY ANY ANY UNEXPECTED AND CHANGED CONDITIONS, SAFETY HAZARDS AND ENVIRONMENTAL PROBLEMS ENCOUNTERED. 2. A PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., A PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., PRE-CONSTRUCTION MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., MEETING WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., WILL BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., HELD AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., AT THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., THE JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., JOB SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., SITE TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., TO BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BE ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., ATTENDED BY THE NPS, ENGINEER, C.O., C.O.R., BY THE NPS, ENGINEER, C.O., C.O.R., BY THE NPS, ENGINEER, C.O., C.O.R., THE NPS, ENGINEER, C.O., C.O.R., THE NPS, ENGINEER, C.O., C.O.R., NPS, ENGINEER, C.O., C.O.R., NPS, ENGINEER, C.O., C.O.R., ENGINEER, C.O., C.O.R., ENGINEER, C.O., C.O.R., C.O., C.O.R., C.O., C.O.R., C.O.R., C.O.R., CONTRACTOR'S SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE SUPERINTENDENT AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE AND KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE KEY CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE CONTRACTOR WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE WORK PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE PERSONNEL. THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE THE PURPOSE OF THE MEETING IS TO GO OVER THE PURPOSE OF THE MEETING IS TO GO OVER THE PURPOSE OF THE MEETING IS TO GO OVER THE OF THE MEETING IS TO GO OVER THE OF THE MEETING IS TO GO OVER THE THE MEETING IS TO GO OVER THE THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE MEETING IS TO GO OVER THE IS TO GO OVER THE IS TO GO OVER THE TO GO OVER THE TO GO OVER THE GO OVER THE GO OVER THE OVER THE OVER THE THE THE WORK, PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PROVIDE CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CLARIFICATIONS, AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND DISCUSS CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND CONDITIONS OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND OF THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND THE PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND PERMITS. SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND SPECIAL ATTENTION WILL BE PAID TO FISHERIES AND ATTENTION WILL BE PAID TO FISHERIES AND ATTENTION WILL BE PAID TO FISHERIES AND WILL BE PAID TO FISHERIES AND WILL BE PAID TO FISHERIES AND BE PAID TO FISHERIES AND BE PAID TO FISHERIES AND PAID TO FISHERIES AND PAID TO FISHERIES AND TO FISHERIES AND TO FISHERIES AND FISHERIES AND FISHERIES AND AND AND ENDANGERED SPECIES ISSUES AND PROTECTION REQUIREMENTS. 3. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION RESPONSIBILITY FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION FOR SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONDITIONS DURING THE COURSE OF THE CONSTRUCTION CONDITIONS DURING THE COURSE OF THE CONSTRUCTION DURING THE COURSE OF THE CONSTRUCTION DURING THE COURSE OF THE CONSTRUCTION THE COURSE OF THE CONSTRUCTION THE COURSE OF THE CONSTRUCTION COURSE OF THE CONSTRUCTION COURSE OF THE CONSTRUCTION OF THE CONSTRUCTION OF THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. THE SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. SAFETY OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. OF ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PERSONS AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. PROPERTY, AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. AND ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL ENVIRONMENTAL PROTECTION ELEMENTS. ALL ENVIRONMENTAL PROTECTION ELEMENTS. ENVIRONMENTAL PROTECTION ELEMENTS. ENVIRONMENTAL PROTECTION ELEMENTS. PROTECTION ELEMENTS. PROTECTION ELEMENTS. ELEMENTS. ELEMENTS. CONTRACTOR SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SHALL FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY FOLLOW ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY ALL APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY APPLICABLE CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONSTRUCTION AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY AND SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY SAFETY REGULATIONS. THESE REQUIREMENTS SHALL APPLY REGULATIONS. THESE REQUIREMENTS SHALL APPLY REGULATIONS. THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY THESE REQUIREMENTS SHALL APPLY REQUIREMENTS SHALL APPLY REQUIREMENTS SHALL APPLY SHALL APPLY SHALL APPLY APPLY APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WILL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD SHALL DEFEND, INDEMNIFY, AND HOLD SHALL DEFEND, INDEMNIFY, AND HOLD DEFEND, INDEMNIFY, AND HOLD DEFEND, INDEMNIFY, AND HOLD INDEMNIFY, AND HOLD INDEMNIFY, AND HOLD AND HOLD AND HOLD HOLD HOLD THE NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN NATIONAL PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PARK SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN SERVICE AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN THE PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN PROJECT ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ENGINEER HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN HARMLESS FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN FOR ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ANY AND ALL LIABILITY, REAL OR ALLEGED, IN ANY AND ALL LIABILITY, REAL OR ALLEGED, IN AND ALL LIABILITY, REAL OR ALLEGED, IN AND ALL LIABILITY, REAL OR ALLEGED, IN ALL LIABILITY, REAL OR ALLEGED, IN ALL LIABILITY, REAL OR ALLEGED, IN LIABILITY, REAL OR ALLEGED, IN LIABILITY, REAL OR ALLEGED, IN REAL OR ALLEGED, IN REAL OR ALLEGED, IN OR ALLEGED, IN OR ALLEGED, IN ALLEGED, IN ALLEGED, IN IN IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF WORK ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ON THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THIS PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF PROJECT, EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF EXCEPT FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF FROM LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ARISING FROM THE SOLE NEGLIGENCE OF ARISING FROM THE SOLE NEGLIGENCE OF FROM THE SOLE NEGLIGENCE OF FROM THE SOLE NEGLIGENCE OF THE SOLE NEGLIGENCE OF THE SOLE NEGLIGENCE OF SOLE NEGLIGENCE OF SOLE NEGLIGENCE OF NEGLIGENCE OF NEGLIGENCE OF OF OF THE OWNER OR ENGINEER. 4. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXERCISE CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, CARE TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, AVOID DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, DAMAGE TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, TO EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, EXISTING PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, PROPERTY, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, INCLUDING NATIVE TREES AND SHRUBS, PATHWAYS, NATIVE TREES AND SHRUBS, PATHWAYS, NATIVE TREES AND SHRUBS, PATHWAYS, TREES AND SHRUBS, PATHWAYS, TREES AND SHRUBS, PATHWAYS, AND SHRUBS, PATHWAYS, AND SHRUBS, PATHWAYS, SHRUBS, PATHWAYS, SHRUBS, PATHWAYS, PATHWAYS, PATHWAYS, FENCING AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE AND OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE OTHER PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE PROPERTY IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IMPROVEMENTS. IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE IF CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CONTRACTOR CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE CAUSES DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE DAMAGES TO SUCH ITEMS, CONTRACTOR SHALL BE TO SUCH ITEMS, CONTRACTOR SHALL BE TO SUCH ITEMS, CONTRACTOR SHALL BE SUCH ITEMS, CONTRACTOR SHALL BE SUCH ITEMS, CONTRACTOR SHALL BE ITEMS, CONTRACTOR SHALL BE ITEMS, CONTRACTOR SHALL BE CONTRACTOR SHALL BE CONTRACTOR SHALL BE SHALL BE SHALL BE BE BE RESPONSIBLE FOR REPAIR OR REPLACEMENT IN LIKE NUMBER, KIND, CONDITION AND SIZE AS DIRECTED BY THE OWNER. 5. THE APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK APPROXIMATE LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ARE SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK SHOWN ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK ON THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK THE DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK DRAWINGS. EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK EXACT LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK LIMITS OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK, POINTS OF INGRESS-EGRESS, CREEK OF WORK, POINTS OF INGRESS-EGRESS, CREEK WORK, POINTS OF INGRESS-EGRESS, CREEK WORK, POINTS OF INGRESS-EGRESS, CREEK POINTS OF INGRESS-EGRESS, CREEK POINTS OF INGRESS-EGRESS, CREEK OF INGRESS-EGRESS, CREEK OF INGRESS-EGRESS, CREEK INGRESS-EGRESS, CREEK INGRESS-EGRESS, CREEK CREEK CREEK CHANNEL ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, ACCESS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, MOBILIZATION, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, STAGING AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AND WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WORK AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, AREAS WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, WILL BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, BE FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FLAGGED IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, IN THE FIELD BY THE PROJECT C.O. ALL MATERIALS, THE FIELD BY THE PROJECT C.O. ALL MATERIALS, THE FIELD BY THE PROJECT C.O. ALL MATERIALS, FIELD BY THE PROJECT C.O. ALL MATERIALS, FIELD BY THE PROJECT C.O. ALL MATERIALS, BY THE PROJECT C.O. ALL MATERIALS, BY THE PROJECT C.O. ALL MATERIALS, THE PROJECT C.O. ALL MATERIALS, THE PROJECT C.O. ALL MATERIALS, PROJECT C.O. ALL MATERIALS, PROJECT C.O. ALL MATERIALS, C.O. ALL MATERIALS, C.O. ALL MATERIALS, ALL MATERIALS, ALL MATERIALS, ALL MATERIALS, MATERIALS, MATERIALS, EXCESS SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. SOIL, DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEMOLITION DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. DEBRIS AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. RUBBLE, AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. AND EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. EQUIPMENT STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. STORAGE MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. MUST BE WITHIN THE STAGING AND MOBILIZATION AREA. BE WITHIN THE STAGING AND MOBILIZATION AREA. BE WITHIN THE STAGING AND MOBILIZATION AREA. WITHIN THE STAGING AND MOBILIZATION AREA. WITHIN THE STAGING AND MOBILIZATION AREA. THE STAGING AND MOBILIZATION AREA. THE STAGING AND MOBILIZATION AREA. STAGING AND MOBILIZATION AREA. STAGING AND MOBILIZATION AREA. AND MOBILIZATION AREA. AND MOBILIZATION AREA. MOBILIZATION AREA. MOBILIZATION AREA. AREA. AREA. EQUIPMENT MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MAINTENANCE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE REFUELING MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MUST OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE OCCUR WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE WITHIN THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE THE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE STAGING AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AND MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MOBILIZATION AREAS AS DIRECTED BY APPLICABLE MOBILIZATION AREAS AS DIRECTED BY APPLICABLE AREAS AS DIRECTED BY APPLICABLE AREAS AS DIRECTED BY APPLICABLE AS DIRECTED BY APPLICABLE AS DIRECTED BY APPLICABLE DIRECTED BY APPLICABLE DIRECTED BY APPLICABLE BY APPLICABLE BY APPLICABLE APPLICABLE APPLICABLE PERMITS. AVOID WETLAND DISTURBANCE EXCEPT WHERE DIRECT WORK IS REQUIRED. 6. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND IS RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND RESPONSIBLE FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND FOR ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND ALL EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND EROSION CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND CONTROL WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND WORK AS PART OF THE WORK. INSTALL APPROVED EROSION AND AS PART OF THE WORK. INSTALL APPROVED EROSION AND AS PART OF THE WORK. INSTALL APPROVED EROSION AND PART OF THE WORK. INSTALL APPROVED EROSION AND PART OF THE WORK. INSTALL APPROVED EROSION AND OF THE WORK. INSTALL APPROVED EROSION AND OF THE WORK. INSTALL APPROVED EROSION AND THE WORK. INSTALL APPROVED EROSION AND THE WORK. INSTALL APPROVED EROSION AND WORK. INSTALL APPROVED EROSION AND WORK. INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND INSTALL APPROVED EROSION AND APPROVED EROSION AND APPROVED EROSION AND EROSION AND EROSION AND AND AND SEDIMENT CONTROL AT DOWNSTREAM END OF ALL CHANNEL GRADING AREAS PRIOR TO THE INITIATION OF CREEK GRADING WORK. 7. THE CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND CONTRACTOR SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BE GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND GIVEN COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND COPIES OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND OF ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND ALL THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND THE PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND PERMITS, SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND SHALL BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND BECOME FAMILIAR WITH THE PERMIT REQUIREMENTS, AND FAMILIAR WITH THE PERMIT REQUIREMENTS, AND FAMILIAR WITH THE PERMIT REQUIREMENTS, AND WITH THE PERMIT REQUIREMENTS, AND WITH THE PERMIT REQUIREMENTS, AND THE PERMIT REQUIREMENTS, AND THE PERMIT REQUIREMENTS, AND PERMIT REQUIREMENTS, AND PERMIT REQUIREMENTS, AND REQUIREMENTS, AND REQUIREMENTS, AND AND AND SHALL BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, BE RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, RESPONSIBLE FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, FOR ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ADHERENCE TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, TO AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, AND CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONFORMANCE WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, WITH ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, ALL PERMIT CONDITIONS AS PART OF THE OVERALL WORK, PERMIT CONDITIONS AS PART OF THE OVERALL WORK, PERMIT CONDITIONS AS PART OF THE OVERALL WORK, CONDITIONS AS PART OF THE OVERALL WORK, CONDITIONS AS PART OF THE OVERALL WORK, AS PART OF THE OVERALL WORK, AS PART OF THE OVERALL WORK, PART OF THE OVERALL WORK, PART OF THE OVERALL WORK, OF THE OVERALL WORK, OF THE OVERALL WORK, THE OVERALL WORK, THE OVERALL WORK, OVERALL WORK, OVERALL WORK, WORK, WORK, INCLUDING POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE POSSIBLE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FINES AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE AND MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE MITIGATION FOR VIOLATIONS. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR PERMIT COMPLIANCE FOR VIOLATIONS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .