B08_Solicitation_-_Bid_Schedule.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- ZION- Crawford Dam Removal and Diversion
- Solicitation number
- 140P6426B0008
About this file
This is a Price Schedule Template for the Crawford Dam Removal project at Zion National Park in southwest Utah, issued under Solicitation Number 140P6426B0008. The template provides two sample contract price schedules: one for the active Crawford Dam project and one design-bid-build sample from a previous Yellowstone National Park project. Both templates establish the format and structure for offeror pricing submissions, requiring lump-sum pricing for major work items and unit pricing for measurable line items such as lineal feet or cubic yards.
For the Crawford Dam Removal project specifically, offerors must submit pricing for the base line item of Dam Removal on a lump-sum basis, with a total proposed price for base work. The solicitation mandates that all offerors submit minimum conforming offers that include pricing for both base and all option line items, with failure to do so potentially rendering proposals unacceptable. All pricing must be rounded to whole dollars, with unit prices governing in cases of calculation errors and corrected totals governing in summation errors. Additional measurement and payment information is contained in Division 01 Specifications Section 01 10 00 Definition of Contract Line Items. This firm-fixed-price contract is set aside 100% for small businesses, with a project magnitude between $1,000,000 and $5,000,000, and construction wage rate requirements for Washington County, Utah will apply.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template Contract Price Schedule Template
| Solicitation Number: | P6426B0008 |
| PARK - PMIS: | ZION NATIONAL PARK |
| Developed Area: | Crawford Dam | ||||
| Project Title: | Dam Removal | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Dam Removal | 1 | Lump Sum | $0.00 | $0.00 |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ----------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 4) ------------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 10 00 Definition of Contract Line Items. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .