This is a design and construction document package for the rehabilitation of Cedar Pass Lodge Cabin Road in Badlands National Park, Interior, South Dakota. The project involves demolition of existing gravel surfacing, construction of a new 6-inch gravel-surfaced roadway, installation of concrete valley gutters, grading and drainage improvements, an earthen berm, and comprehensive erosion control measures. The design includes approximately 37 stations of new road construction with associated utility coordination, drainage channel development extending approximately 1.2 miles, and storm water pollution prevention planning.
The scope encompasses site preparation including stabilized construction entrance installation, removal and stockpiling of existing materials at an NPS-designated soil waste site, placement of imported fill for berm construction in lifts compacted to 95% maximum dry density per ASTM D698, installation of erosion control blankets and silt fencing around perimeter areas, seeding and hydromulching of disturbed areas, and maintenance of temporary erosion controls throughout construction. The contractor is responsible for obtaining the stormwater permit from the South Dakota Department of Agriculture & Natural Resources, conducting all inspections and modifications to the Storm Water Pollution Prevention Plan, and submitting notice of termination upon final project stabilization. Control survey data is provided with horizontal datum NAD83 South Dakota South and vertical datum NAVD88, with nine survey control points established by 5/8-inch rebar with caps.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIDGE
PINE
RESERVATION
RESERVATION
PINE
RIDGE
PROJECT SITE:
CEDAR PASS LODGE CABIN ROAD
SOUTH DAKOTA
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
MIDWEST REGIONAL OFFICE
REHABILITATE CEDAR PASS LODGE CABIN ROAD
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA 29
MJS
DGD
RMD
05-16-25
80117
NATIONAL
SERVICE
PARK
5/16/2025
CONTROL TABLE
Point #
Northing
519879.01
519752.21
519782.13
519043.17
519898.22
518711.52
517471.65
518452.50
518759.80
Easting
1543115.98
1543081.55
1543261.25
1543392.42
1543837.03
1543942.07
1544084.50
1544129.88
1543159.69
Elevation
2437.58
2436.14
2433.88
2429.15
2437.75
2426.97
2415.20
2434.82
2441.57
Description
5/8" RB
5/8" RB
5/8" RB
5/8" RB
5/8" RB
5/8" RB
5/8" RB
5/8" RB
5/8" RB
GAS
E
G
4"
E
E G
G
GE
G
G
"12
G
6"
G
G
E
6"
" 1 8"
E
E
E
E
"12
"18
" 12
6"10
"16 "14 "18
"24
"30
"18
" 36
7"
5" 8" 14
6"
7"
" 26
" 14
" 18
" 18 "12
" 30
FO
UGE
UGE
UGE
UGE
FO
FO
W
W
WWWW
W
W
W
W W
FO
FO
FO
FO
FO
FO
FO
W W W W W
FO
W
W
W W
W
FO
FO FO
FO UGE
UGEUGE UGE UGE UGE UGE UGE
FO
FO
FO
UGE UGE UGE UGEFO
FO
FO FO
FO
FO
W W
WWWWWWWWWWWWWWWWW
W
O O
O
O
O O
W W
W
W W
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS GAS
GAS
GAS GAS GAS
GAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
W W
W W
W
W W W W W W W W W FO
FO
FO
UG
E
W W
W W
W
W
W W
W W
W W
W
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO
UGE
UGE UGE
FO
FO
FO
FO
FO
FO
FO
W
W
W
W
W
W W
GAS
GAS
GAS
GAS
GAS
GAS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
W
W W
W W
W
W
W
W W W W W W
W
W W
W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
GAS GAS
GAS
GA
S
GA
S
GA
S
UGE
UGE
UGEUGE
UGE
UGE
W W
W
W W
W W
W
W
W W
W W
W W
W W
W
W
W
W
WW
W W
W W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
W W
W W
W
W
W
W
WW
W W
W W
W W
W W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
FOFO
FO
FO
W W
W W W
SAN SAN SAN SAN
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWWWWWWWWWWWWW
GAS
GAS
GAS
GAS
GAS
G
G
GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
G
G
GAS
GAS GAS
G
G
G
G
G
G
GAS
GAS
W
W
W
W
W
W
W
W
W
W
W W
W
W
WWWW
W
W
W
GAS
W
W
W
W
W
G
G
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
0100 100
NOTE:
UNDERGROUND UTILITY LOCATIONS SHOWN ARE FROM
INFORMATION PROVIDED TO US FROM UTILITY
COMPANIES. UTILITY COMPANIES MAKE NO
WARRANTIES OR GUARANTEES REGARDING THE
ACCURACY OF THE INFORMATION CONTAINED IN THEIR
DOCUMENTS AND PROVIDES IT ONLY AS GENERAL
INFORMATION TO THE RECEIVER.
TOPOGRAPHIC SURVEY
(FOR REFERENCE ONLY)C1
HORIZONTAL DATUM: NAD83 SOUTH DAKOTA SOUTH
4002 WITH A SCALE FACTOR OF 1.00020102
VERTICAL DATUM: NAVD88
- CHAIN-LINK FENCE
- ELECTRIC MANHOLE
D - STORM SEWER MANHOLE
- PROPERTY LINE
H Y D
W
- CORNERS SET (#5 Rebar With Cap)
- FIRE HYDRANT
- POWER PEDESTAL
- GUY WIRE/ POLE
- TELEPHONE POLE
- WATER MANHOLE
- CONIFEROUS TREE w/trunk size
- STORM SEWER FLARED-END-SECTION
- ELECTRICAL TRANSFORMER
LEGEND
- GAS VALVE
- SANITARY SEWER MANHOLES
- CABLE TV MANHOLE
- TELEPHONE/ COMMUNICATIONS MANHOLE
E
- DUAL LIGHT POLE
- SURVEY CONTROL POINT
- STORM GRATE INLET ROUND
- BARBED-WIRE FENCE
- GAS LINE
- GUARDRAIL
- CORNERS FOUND (As Noted)
O
X
GAS
T
- SANITARY SEWER LINESAN
- STORM SEWER LINE WITHOUT INVERT SIZESD
- OVERHEAD TELEPHONE LINEOHT
- UNDERGROUND TELEPHONE LINEUGT
- OVERHEAD POWER LINEOHE
- UNDERGROUND POWER LINEUGE
- FIBER OPTIC LINEFO
- IRRIGATION LINEIRRG
- SHRUB
- BOLLARD
- SECTION CORNER
- SECTION CORNER TIE
- MONITORING WELL
- RIGHT-OF-WAY MARKERR.O.W.
- BOARD FENCE[][]
- STORM SEWER LINE WITH INVERT SIZE
- WATER LINEW
- SPRINKLER VALVE
- CABLE TV PEDESTAL
- WATER VALVE
- IRRIGATION VALVE
- TELEPHONE PEDESTAL
- METER (As Noted)
- SIGN
- DECORATIVE LIGHT POLE
- POWER POLE
- LIGHT POLE
- CLEANOUT
C
- DECIDUOUS TREE w/trunk size
- STORM GRATE INLET SQUARE
- PULLBOX
- STUMP
G - GAS METER
WETLANDS
WETLANDS
WETLANDS
WETLANDS
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
0500 500
LOCATION MAPC2
PROJECT LOCATION
BEN REIFEL ROAD
CEDAR PASS LODGE CABIN ROAD
PROPOSED DRAINAGE CHANNEL
CONTRACTOR STAGING AND
SOIL WASTE SITE
SEE SHEET C3
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
CONTRACTOR STAGING
AREA PLANC3
CEDAR PASS LODGE
BEN REIFEL ROAD
BEN REIFEL VISITOR CENTER
SOIL WASTE AREA
(INSET 1)
HWY 240
HWY 240
HWY 377
HWY 240
1 SOIL WASTE AREA
NORTH
1 inch = ft.
0500 500
NORTH
1 inch = ft.
0100 100
THE PARK WILL PROVIDE ADEQUATE SPACE NEAR THE WASTEWATER
LAGOONS FOR CONTRACTOR STAGING AND SOIL STOCKPILING
19"
34"12"
40"
12"
6"
10"
16"
20"
12"16" 14"18"18"24"30"
18"18"
12"
20"
36"
10"
24"
22"
7"
5" 8"
14" 6"
W W
W W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W
W
W
W W
W W
W W
W
W
W W
W W
W W
W W
W
W
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
W W W W W W W
W
W
W
W
W
W
W
W
W
W W
W W
W
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
CEDAR PASS LODGE CABIN
ROAD DEMOLITION PLANC4
XREF. DEMO NOTES ( )
1 REMOVE GRAVEL SURFACING.
2 PROTECT EXISTING UTILITY TO REMAIN.
3 PROTECT EXISTING TREE TO REMAIN.
4 PROTECT EXISTING BOLLARD TO REMAIN.
LEGEND
REMOVE GRAVEL SURFACING
22222
3333333
19"
34"12"
40"
12"
6"
10"
16"
20"
12"16" 14"18"18"24"30"
18"18"
12"
20"
36"
10"
24"
22"
7"
5" 8"
14" 6"
W W
W W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W
W
W
W W
W W
W W
W
W
W W
W W
W W
W W
W
W
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
W W W W W W W
W
W
W
W
W
W
W
W
W
W W
W W
W
24+00
25+00
26+00
27+00
PI: 24+69.54
PC: 23+69.98
PT: 23+84.12
PT: 23+47.68
25+00
26+00
27+00
28+00
BP: 25+00.00
24 25
LAYOUT COORDINATES
POINT #
NORTHING
519127.32
519133.83
519095.63
519099.11
519070.44
519074.67
519086.13
519091.36
519121.33
519130.49
519265.21
519270.50
519266.08
519263.38
519259.93
519247.36
519287.08
519282.26
519285.99
519288.69
519292.17
519305.60
519398.97
519408.73
519408.61
EASTING
1543301.50
1543319.85
1543313.40
1543332.88
1543382.43
1543389.23
1543374.35
1543380.38
1543384.85
1543407.04
1543321.75
1543308.92
1543296.75
1543289.22
1543279.60
1543273.44
1543258.48
1543270.77
1543281.10
1543288.63
1543298.27
1543304.04
1543263.09
1543260.91
1543285.07
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
CEDAR PASS LODGE CABIN
ROAD LAYOUT PLANC5
XREF. NOTES ( )
1 CONSTRUCT 6" GRAVEL SURFACING, SEE 1/C14.
2 CONSTRUCT CONCRETE VALLEY GUTTER, SEE 2/C14.
LEGEND
GRAVEL SURFACING
P.C.C. PAVEMENT
24.0'
24.0'
24.0'
8.0'
8.0'
10.0'
R10.0'
R1 0.0
R10.0'
R10 .0'
R28.3'
R50.0'
6"
"16
"14
"18
7"
5" 8"
6"
W W
W
W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W W
W
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W
W
W
W W
W W
W W
W
W
W W
W W
W W
W W
W
W
W W
W W
W W
W
W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
WWWWW
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
25+00
26+00
27+00
28+00
PI: 24+69.54
25+00
26+00
27+00
28+00
BP: 25+00.00
2429.32 GR
2429.68 GR*
2429.26 GR
2429.70 GR
2430.01 GR*
2429.47 GR*
2430.70 GR* 2430.38 GR
2430.39 GR
2430.62 GR
2430.84 GR*
2430.50 GR
2430.22 GR
2430.38 GR*
2430.04 GR*
2430.07 GR*
2429.65 GR
2430.27 GR*
2430.15 GR*
2430.62 GR*
2430.89 GR*
2431.06 GR
2430.97 GR*
2430.67 GR
2430.59 GR
2430.84 GR
2431.10 GR*
2431.21 GR*
2430.89 GR*
2431.49 GR
2431.90 GR*
2431.60 GR* 2432.05 GR
2432.39 GR*
2431.57 GR* 2431.64 GR*
2431.54 GR
2432.17 GR*
2431.65 GR*
2432.04 PFG*
2432.05 PFG*
2432.06 PFG*
2431.80 PFG
2431.23 PFG
2430.72 PFG
2430.24 PFG
2429.82 PFG
2429.38 PFG
2430.18 PFG*
2430.27 PFG*
2426.70 PFG*
2426.68 PFG*
2430.91 PFG*
2431.12 PFG*
2431.12 PFG*
2431.21 PFG*
2431.31 PFG*
2431.66 PFG*
2431.66 PFG*
2431.81 PFG*
2431.79 PFG*
2430.91 PFG*
2431.63 PFG*
2431.01 PFG
2429.43 PFG
2428.58 PFG
2427.56 PFG
2427.20 PFG
2426.90 PFG*
2428.04 PFG*
2429.35 PFG*
2430.24 PFG*
2426.00 PFG*
2427.87 PFG*
2427.98 PFG*
2428.29 PFG*
2428.87 PFG*
2430.44 TS
2430.38 TS
2430.44 TS
2430.13 TS
2430.19 TS
2430.19 TS
2428.25 TS
2428.03 TS2427.93 TS
2428.01 TS
2428.11 TS
2428.20 TS
2429.75 GR
2429.54 GR
2429.32 PFG*
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
CEDAR PASS LODGE CABIN
ROAD GRADING & DRAINAGE
PLANC6
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
TS TOP OF SLAB ELEVATION
GR GRAVEL SURFACING ELEVATION
* MATCH EXISTING ELEVATION
XX
XX
XREF. NOTES ( )
1 ADJUST WATER VALVE TO GRADE.
SEE DRAINAGE
CHANNEL PLAN
SEE BERM PLAN
GAS
E
G
4"
E
E G
G
GE
G
G
"12
G
6"
G
G
E
6"
" 1 8"
E
E
E
E
"12
"18
" 12
6"10
"16 "14 "18
"24
"30
"18
" 36
7"
5" 8" 14
6"
7"
" 26
" 14
" 18
" 18 "12
" 30
FO
UGE
UGE
UGE
UGE
FO
FO
W
W
WWWW
W
W
W
W W
FO
FO
FO
FO
FO
FO
FO
W W W W W
FO
W
W
W W
W
FO
FO FO
FO UGE
UGEUGE UGE UGE UGE UGE UGE
FO
FO
FO
UGE UGE UGE UGEFO
FO
FO FO
FO
FO
W W
WWWWWWWWWWWWWWWWW
W
W W
W
W
GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS
GAS
GAS GAS GAS
GAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
W W W W W W W W W FO
FO
FO
UG
E
W W
W W
W
W
W W
W W
W W
W
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO
UGE
UGE UGE
FO
FO
FO
FO
FO
FO
FO
W
W
W
W
W
W W
GAS
GAS
GAS
GAS
GAS
GAS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
W W
W
W W
W
W
W
W W W W W W
W
W W
W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
GAS GAS
GAS
GA
S
GA
S
GA
S
UGE
UGE
UGEUGE
UGE
UGE
W W
W
W W
W W
W
W
W W
W W
W W
W W
W
W
W
W
WW
W W
W W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
W W
W W
W
W
W
W
WW
W W
W W
W W
W W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
FOFO
FO
FO
W W
W W W
SAN SAN SAN SAN
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWWWWWWWWWWWWW
GAS
GAS
GAS
GAS
GAS
G
G
GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
G
G
GAS
GAS GAS
G
G
G
G
G
G
GAS
GAS
W
W
W
W
W
W
W
W
W
W
W W
W
W
WWWW
W
W
W
GAS
W
W
W
W
W
G
G
0+
1+00 2+00 3+
4+00
5+
6+00
7+00
8+
9+
10+00
11+00
+0
13+00
14+00
15+00 16+00 17+00
18+00
+0
+0
21+00
22+00
23+00 24+00
25+00
26+00
27+00
28+00 29+00 30+00
31+00
32+00
33+00 34+00
35+00 36+00
37+00 37+40
25+00
26+00
27+00
28+00
29+00 30+00
31+00 32+00
32+59
-2.00:1
2.00:1
-2.00:1
2.00:1
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
0100 100
DRAINAGE CHANNEL
KEY MAPC7
SEE SHEET C8 FOR
PLAN & PROFILE
SEE SHEET C9 FOR
PLAN & PROFILE
SEE SHEET C10 FOR
PLAN & PROFILE
SEE SHEET C12 FOR
PLAN & PROFILE
SEE SHEET C11 FOR
PLAN & PROFILE
WETLANDS
WETLANDS
WETLANDS
WETLANDS
SEE SHEET C12 AND
C13 FOR BERM PLAN
6.0'
CHANNEL CENTERLINE
TYPICAL SECTION
DRAINAGE CHANNEL NOTES:
A
EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE
EARTHEN BERM. ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE
LOCATION.
B
PRIOR TO SEEDING, THE DRAINAGE CHANNEL BOTTOM AND SIDE SLOPES SHALL BE SCARIFIED
UNIFORMLY TO A DEPTH OF 5" (SEE SPECIFICATIONS).
C ALL AREAS DISTURBED BY CHANNEL CONSTRUCTION SHALL BE SEEDED (SEE SPECIFICATIONS).
D PLACE TEMPORARY EROSION CONTROL BLANKET ON SIDE SLOPES OF CHANNEL AFTER SEEDING.
FO
FO
FO
FO
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
STREAM
BEN REIFEL ROAD
AS
PH
AL
T
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN. MANHOLE
RIM ELEV: 2424.31
(NW) 8" HDPE I.E.: 2412.96
(SE) 8" HDPE I.E.: 2413.16
13+00
14+00
15+00 16+00
17+00
18+00
PI: 17+82.03
PI
: 1
3+
.42
PI:
+2 2.3
PI: 14+62.47
PC: 18+49.76
PC
: 1
6+
.36
PC
: 1
4+
.23
PT: 16+82.32
PT
: 1
5+
.69
24242424
+0
0.0
13+50.00
14+00.00
14+50.00
+0
0.0
+5
0.0
+0
0.0
+5
0.0
17+00.00
17+50.00
18+00.00
18+50.00 19+00.00
L5
L4
L3
L2
L1
C2
C1
CHANNEL
0.75%
GR
AD
E
BR
EA
K
ST
A
+4 6.7
EL
EV
0.5
12+50
.0
13+00
.2
.3
.54
14+00
.5
.92
.8
.29
15+00
.4
.67
.7
.04
16+00
.1
.41
.5
.79
17+00
.9
.16
.1
.53
18+00
.4
.91
18+50
.7
.28
EXISTING 8" HDPE SANITARY LINE
STA:14+39.24
ELEV:2412.72
LINE TABLE
NO.
L1
L2
L3
L4
L5
LENGTH
118.05
31.77
132.67
99.70
67.73
DIRECTION
N54° 18' 01"E
N37° 47' 32"E
N5° 07' 41"W
N34° 32' 31"W
N22° 44' 10"W
START STATION
13+44.42
14+62.47
15+31.69
16+82.32
17+82.03
END STATION
14+62.47
14+94.23
16+64.36
17+82.03
18+49.76
START COORD.
N: 518266.43 E: 1543866.53
N: 518335.32 E: 1543962.40
N: 518395.53 E: 1543992.15
N: 518544.39 E: 1543974.27
N: 518626.51 E: 1543917.73
END COORD.
N: 518335.32 E: 1543962.40
N: 518360.42 E: 1543981.87
N: 518527.67 E: 1543980.30
N: 518626.51 E: 1543917.73
N: 518688.98 E: 1543891.56
CURVE TABLE
NO.
C1
C2
P.C. STA.
14+94.23
16+64.36
P.I. STA.
15+13.89
16+73.54
P.T. STATION
15+31.69
16+82.32
RADIUS
50.00
35.00
LENGTH
37.46
17.97
DELTA
42°55'13"
29°24'51"
TANGENT
19.66
9.19
CHORD DIRECTION
N16° 19' 56"E
N19° 50' 06"W
CHORD
36.59
17.77
P.C. COORD.
N: 518360.42 E: 1543981.87
N: 518527.67 E: 1543980.30
P.I. COORD.
N: 518375.95 E: 1543993.91
N: 518536.82 E: 1543979.48
P.T. COORD.
N: 518395.53 E: 1543992.15
N: 518544.39 E: 1543974.27
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
X
NORTH
1 inch = ft.
020 20
REF. NOTES ( )
1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.
2 PROPOSED CHANNEL CENTERLINE.
DRAINAGE CHANNEL
PLAN & PROFILEC8
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C9
EXISTING GRADE @ CL
PROPOSED GRADE @ CL
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING WETLANDS
XX
XX
NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE
NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.
SCALE:
HORIZ: 1"=20'
VERT: 1"=4'
W
W
W
W
FO
FO
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
FO
FO
FO
W
W
W
W
W
STREAM
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
UGE
UGE
UGE
UGE
UGE
W W
W W
W W
W W
W W
W W
SAN
SAN
SAN
SAN
12" CMP
FL ELEV: 2424.86
SAN. MANHOLE
RIM ELEV: 2426.18
(N) 8" HDPE I.E.: 2419.69
(S) 8" HDPE I.E.: 2419.18
19+00
20+00
21+00
22+00
23+00
24+00
PI: 19+93.96
PC: 23+69.98
PC
: 2
3+
.56
PC
: 2
2+
.87
PC
: 2
2+
.67
PC: 21+82.24
PC: 21+32.87
PC
: 2
0+
.71
PC
: 1
8+
.76
PT
: 2
3+
.12
PT: 23+47.68
PT
: 2
2+
.79
PT
: 2
2+
.48
PT
: 2
2+
.00
PT: 21+58.43
PT: 21+10.61
PT: 18+91.38
24272427
24282428
+5
0.0
19+00.00
19+50.00
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
23+50.00
+0
0.0
L14
L13
L12
L11
L10 L9
L8
L7
L6
C10
C9
C8
C7
C6
C5
C4
C3
SF
CHANNEL
18+50
.7
.28
19+00
.9
.66
.9
.03
20+00
.7
.40
.0
.78
21+00
.2
.14
.3
.46
22+00
.9
.78
.3
.10
23+00
.4
.42
.7
.73
24+00
.8
.04
24+50
.4
.32
GR
AD
E
BR
EA
K
ST
A
+8 8.0
EL
EV
6.0
GR
AD
E
BR
EA
K
ST
A
+7 9.0
EL
EV
7.9
0.64%
EXISTING 8" HDPE SANITARY LINE
STA:19+67.67
ELEV:2419.92
EXISTING WATER LINE
STA:24+27.32
ELEV:2423.63
LINE TABLE
NO.
L6
L7
L8
L9
L10
L11
L12
L13
L14
LENGTH
102.58
97.75
22.26
23.81
21.68
36.39
30.77
22.30
85.42
DIRECTION
N70° 25' 43"W
N50° 22' 31"W
N3° 46' 42"E
N69° 26' 39"W
N12° 49' 36"W
N58° 06' 48"W
N18° 57' 10"W
N9° 03' 58"E
N23° 20' 33"W
START STATION
18+91.38
19+93.96
21+10.61
21+58.43
22+02
22+39.48
22+99.79
23+47.68
23+84.12
END STATION
19+93.96
20+91.71
21+32.87
21+82.24
22+23.67
22+75.87
23+30.56
23+69.98
24+69.54
START COORD.
N: 518716.77 E: 1543862.19
N: 518751.13 E: 1543765.54
N: 518830.20 E: 1543683.04
N: 518872.45 E: 1543671.58
N: 518895.09 E: 1543636.81
N: 518928.77 E: 1543623.06
N: 518966.34 E: 1543577.55
N: 519012.33 E: 1543566.10
N: 519048.20 E: 1543567.88
END COORD.
N: 518751.13 E: 1543765.54
N: 518813.47 E: 1543690.25
N: 518852.40 E: 1543684.51
N: 518880.81 E: 1543649.29
N: 518916.23 E: 1543632.00
N: 518947.99 E: 1543592.16
N: 518995.44 E: 1543567.56
N: 519034.35 E: 1543569.61
N: 519126.63 E: 1543534.03
CURVE TABLE
NO.
C3
C4
C5
C6
C7
C8
C9
C10
P.C. STA.
18+49.76
20+91.71
21+32.87
21+82.24
22+23.67
22+75.87
23+30.56
23+69.98
P.I. STA.
18+71.86
21+01.93
21+47.73
21+93.01
22+32.02
22+88.32
23+39.29
23+77.25
P.T. STATION
18+91.38
21+10.61
21+58.43
22+02
22+39.48
22+99.79
23+47.68
23+84.12
RADIUS
50.00
20.00
20.00
20.00
20.00
35.00
35.00
25.00
LENGTH
41.62
18.90
25.56
19.76
15.81
23.92
17.12
14.14
DELTA
47°41'33"
54°09'13"
73°13'20"
56°37'03"
45°17'12"
39°09'38"
28°01'08"
32°24'30"
TANGENT
22.10
10.22
14.86
10.77
8.34
12.45
8.73
7.27
CHORD DIRECTION
N46° 34' 57"W
N23° 17' 55"W
N32° 49' 59"W
N41° 08' 07"W
N35° 28' 12"W
N38° 31' 59"W
N4° 56' 36"W
N7° 08' 18"W
CHORD
40.43
18.21
23.86
18.97
15.40
23.46
16.95
13.95
P.C. COORD.
N: 518688.98 E: 1543891.56
N: 518813.47 E: 1543690.25
N: 518852.40 E: 1543684.51
N: 518880.81 E: 1543649.29
N: 518916.23 E: 1543632.00
N: 518947.99 E: 1543592.16
N: 518995.44 E: 1543567.56
N: 519034.35 E: 1543569.61
P.I. COORD.
N: 518709.36 E: 1543883.01
N: 518819.99 E: 1543682.37
N: 518867.23 E: 1543685.49
N: 518884.59 E: 1543639.20
N: 518924.36 E: 1543630.14
N: 518954.57 E: 1543581.59
N: 519003.70 E: 1543564.72
N: 519041.52 E: 1543570.75
P.T. COORD.
N: 518716.77 E: 1543862.19
N: 518830.20 E: 1543683.04
N: 518872.45 E: 1543671.58
N: 518895.09 E: 1543636.81
N: 518928.77 E: 1543623.06
N: 518966.34 E: 1543577.55
N: 519012.33 E: 1543566.10
N: 519048.20 E: 1543567.88
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
C9
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C10MA
TC
HL
INE
- S
TA
+5 0 S
HE
ET
C8
DRAINAGE CHANNEL
PLAN & PROFILE
EXISTING GRADE @ CL
PROPOSED GRADE @ CL
XREF. NOTES ( )
1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.
2 PROPOSED CHANNEL CENTERLINE.
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING WETLANDS
XX
XX
NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE
NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.
SCALE:
HORIZ: 1"=20'
A/C
A/CA/CA/CA/CA/CA/C
A/C
A/C
6"
8"
6"
FO
FO
FO
FO
FO
FO FO
FO
W W
W
FO
DECK, TYP.
DECK, TYP.
OVERHEAD CANOPY, TYP.
RAMP, TYP.
STREAM
2431 243
GR
AV
EL
GR
AV
EL
SAN
SAN
WWWWWWWWW
W
W
W W
W W
W W
W WW
W W
W W
W W
WW
W W
W W
W W
W WWW
W W
W W
W W
WW
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
FO
FO
FO
FO
FO
FO
25+00 26+00
27+00 28+00
29+00
PI
: 2
4+
.54
PI
: 2
8+
.11
243224 +5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
25+00 26+00
27+00 28+00
29+00
BP
: 2 5+
.00
2432 2432
243425 +0
0.0 0 (
+5
0.0 0 (
+0
0.0 0 (
+5
0.0 0 (
+0
0.0 0 (
+5
0.0 0 (
+0
0.0 0 (
+5
0.0 0 (
+0
0.0 0 (
L16
L15
CHANNEL
24+50
.4
.32
25+00
.6
.60
.9
.88
26+00
.1
.17
.4
.45
27+00
.6
.73
.8
.01
28+00
.5
.30
.8
.58
29+00
.1
.86
29+50
.3
.09
0.56%
GR
AD
E
BR
EA
K
ST
A
+1 2.9
EL
EV
0.9
LINE TABLE
NO.
L15
L16
LENGTH
379.57
108.63
DIRECTION
N24° 41' 32"W
N7° 41' 31"W
START STATION
24+69.54
28+49.11
END STATION
28+49.11
29+57.74
START COORD.
N: 519126.63 E: 1543534.03
N: 519471.49 E: 1543375.47
END COORD.
N: 519471.49 E: 1543375.47
N: 519579.14 E: 1543360.93
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
C10
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C11
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C9
DRAINAGE CHANNEL
PLAN & PROFILE
EXISTING GRADE @ CL
PROPOSED GRADE @ CL
XREF. NOTES ( )
1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION
AND DEPTH.
2 PROPOSED CHANNEL CENTERLINE.
3 PROPOSED BERM.
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING WETLANDS
XX
XX
NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE
HAULED AND STOCKPILED AT THE NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3
FOR NPS SOIL WASTE SITE LOCATION.
SCALE:
HORIZ: 1"=20'
DECK, TYP.
STREAM
30+00
31+00
32+00
33+00
34+00 35+00
PI: 33+98.46
PI
: 3
3+
.99
PI
: 3
3+
.42PI:
+7 0.2
PI
: 3
1+
.61
PI
: 3
0+
.11
PI
: 3
0+
.26
PI: 29+57.74
PC
: 3
5+
.28
PT: 35+18.35
2435 2435
2435 2435
2432 2432
2433 2433
2434 2434
24342434
2436 2436
29+50.00
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
+5
0.0
+0
0.0
35+50.00 30+00
30+00.00 (20)
L24
L23
L22 L21
L20
L19
L18
L17
C11
CHANNEL
29+50
.3
.09
30+00
.5
.29
.8
.50
31+00
.2
.71
.4
.91
32+00
.3
.12
.7
.33
33+00
.0
.53
.4
.74
34+00
.7
.95
.6
.15
35+00
.9
.36
35+50
.6
.57
0.41%
LINE TABLE
NO.
L17
L18
L19
L20
L21
L22
L23
L24
LENGTH
52.52
75.85
106.50
77.63
39.18
48.57
40.47
105.82
DIRECTION
N16° 32' 02"E
N36° 42' 20"E
N24° 40' 46"E
N54° 54' 02"E
N39° 34' 45"E
N16° 41' 20"E
N0° 15' 51"E
N20° 35' 28"E
START STATION
29+57.74
30+10.26
30+86.11
31+92.61
32+70.24
33+09.42
33+57.99
33+98.46
END STATION
30+10.26
30+86.11
31+92.61
32+70.24
33+09.42
33+57.99
33+98.46
35+04.28
START COORD.
N: 519579.14 E: 1543360.93
N: 519629.49 E: 1543375.87
N: 519690.30 E: 1543421.21
N: 519787.07 E: 1543465.68
N: 519831.71 E: 1543529.19
N: 519861.90 E: 1543554.15
N: 519908.43 E: 1543568.10
N: 519948.90 E: 1543568.29
END COORD.
N: 519629.49 E: 1543375.87
N: 519690.30 E: 1543421.21
N: 519787.07 E: 1543465.68
N: 519831.71 E: 1543529.19
N: 519861.90 E: 1543554.15
N: 519908.43 E: 1543568.10
N: 519948.90 E: 1543568.29
N: 520047.96 E: 1543605.51
CURVE TABLE
NO.
C11
P.C. STA.
35+04.28
P.I. STA.
35+11.62
P.T. STATION
35+18.35
RADIUS
20.00
LENGTH
14.07
DELTA
40°17'37"
TANGENT
7.34
CHORD DIRECTION
N0° 26' 40"E
CHORD
13.78
P.C. COORD.
N: 520047.96 E: 1543605.51
P.I. COORD.
N: 520054.83 E: 1543608.09
P.T. COORD.
N: 520061.73 E: 1543605.61
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
C11
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C12
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C10
DRAINAGE CHANNEL
PLAN & PROFILE
EXISTING GRADE @ CL
PROPOSED GRADE @ CL
XREF. NOTES ( )
1 PROPOSED CHANNEL CENTERLINE.
2 PROPOSED BERM.
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING WETLANDS
XX
XX
NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE
NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.
SCALE:
HORIZ: 1"=20'
W
W
2439 24
BOX CULVERT
FL: 2436.10
BOX CULVERT
FL: 2436.23
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
36+00
37+00
37+40
EP
: 3
7+
.00
PI
: 3
6+
.70
24352434 24342436
+5 0.0
+0
0.0 0 36
+5 0.0
+0
0.0
L26
L25
CHANNEL
35+50
.6
.57
36+00
.8
.77
.0
.98
37+00
.6
.18
37+40
.5
.35
GR
AD
E
BR
EA
K
ST
A
+4 0.0
EL
EV
4.3
EXISTING WATER LINE
STA:37+07.70
ELEV:2429.29
LINE TABLE
NO.
L25
L26
LENGTH
111.36
110.30
DIRECTION
N19° 42' 09"W
N9° 18' 49"W
START STATION
35+18.35
36+29.70
END STATION
36+29.70
37+40
START COORD.
N: 520061.73 E: 1543605.61
N: 520166.57 E: 1543568.07
END COORD.
N: 520166.57 E: 1543568.07
N: 520275.42 E: 1543550.22
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
X
NORTH
1 inch = ft.
020 20
REF. NOTES ( )
1 CLEAN OUT DOUBLE-BOX CULVERT TO EXISTING FLOW LINE.
2 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.
3 PROPOSED CHANNEL CENTERLINE.
C12
MA
TC
HL
INE
- S
TA
+5
0 S
HE
ET
C11
DRAINAGE CHANNEL
PLAN & PROFILE
EXISTING GRADE @ CL
PROPOSED GRADE @ CL
1 LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING WETLANDS
XX
XX
NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE
NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.
SCALE:
HORIZ: 1"=20'
A/C
A/C
A/C
A/C
A/C
6"
"16
"14
"18
8"
6"
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W W
W
DECK, TYP.
OVERHEAD CANOPY, TYP.
RAMP, TYP.
STREAM
GR
AV
EL
GR
AV
EL
SAN SAN SAN SAN SAN
W W
W W
W W
W W
W W
W
W W
W W
W W W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W
W
W
W W
W W
W W
W
W
W W
W W
W W
W
W
W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
W
SAN. MANHOLE
RIM ELEV: 2430.01
(N) 6" HDPE I.E.: 2422.76
(S) 6" HDPE I.E.: 2422.81
26+00
27+00
28+00
29+00
PI
: 2
9+
.74
PI: 28+49.11
25+00
26+00
27+00
28+00
29+00
30+00
BP: 25+00.00
PI: 29+42.16
25+00.00 (10)
25+50.00 (11)
26+00.00 (12)
26+50.00 (13)
27+00.00 (14)
27+50.00 (15)
28+00.00 (16)
28+50.00 (17)
29+00.00 (18)
+5
0.0 0 (
L27
LINE TABLE
NO.
L27
LENGTH
442.16
DIRECTION
N24° 41' 32"W
START STATION
25+00
END STATION
29+42.16
START COORD.
N: 519140.99 E: 1543492.37
END COORD.
N: 519542.72 E: 1543307.66
BERM
2.31%
0.67%
GR
AD
E
BR
EA
K
ST
A
+0 0.0
EL
EV
0.4
GR
AD
E
BR
EA
K
ST
A
+6 7.4
EL
EV
2.0
GR
AD
E
BR
EA
K
ST
A
+4 2.1
EL
EV
4.5
25+00
.5
.49
.9
.65
26+00
.1
.27
.4
.61
27+00
.8
.94
.9
.27
28+00
.3
.61
.4
.94
29+00
.2
.27
.2
.55
30+00
.2
.55
-3.00:1
3.00:1
-3.00:1
3.00:1
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
C13
BERM PLAN
MA
TC
HL
INE
- S
TA
+0
0 S
HE
ET
C14
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
XX
XX
PROPOSED BERM CENTERLINE
6.0' @ 2.0%
BERM CENTERLINE
TYPICAL SECTION
EARTHEN BERM NOTES:
A WITHIN THE FOOTPRINT OF THE PROPOSED BERM, STRIP ALL VEGETATION AND TOPSOIL MATERIAL.
SCARIFY AND RECOMPACT THE TOP 6" OF EXISTING MATERIAL PRIOR TO CONSTRUCTING FILL.
B
EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE
EATHERN BERM. MATERIAL USED FOR CONSTRUCTION OF THE BERM SHALL BE IMPORTED FROM
OFFSITE, SEE SPECIFICATIONS FOR IMPORTED FILL MATERIAL REQUIREMENTS.
C PLACE FILL IN LIFTS OF NOT MORE THAN 8" LOOSE THICKNESS AND COMPACT TO AT LEAST 95% OF THE MAXIMUM DRY UNIT WEIGHT OF THE SOIL, AS DETERMINED BY ASTM D698 STANDARD PROCTOR
TEST.
D PRIOR TO SEEDING AND HYDROMULCHING, THE BERM SHALL BE SCARIFIED UNIFORMLY TO A DEPTH
OF 2" (SEE SPECIFICATIONS).
E BERM SHALL BE SEEDED AND HYDROMULCHED (SEE SPECIFICATIONS).
SCALE:
HORIZ: 1"=20'
VERT: 1"=5'
PROPOSED TOP OF BERM @ CL
EXISTING GRADE
DECK, TYP.
OVERHEAD CANOPY, TYP.
DECK, TYP.
CONCRETE SIDEWALK
SAN
SAN
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W30+00
PI:
+8 6.1
PI
: 3
0+
.26
30+00
31+00
32+00
32+59
EP: 32+59.18
PI
: 3
0+
.64
PI
: 3
1+
.28
+0
0.0 0 (
+5
0.0 0 (
+0
0.0 0 (
+5
0.0 0 (
) 32+00.00 (24)
32+50.00 (25)
2435243524352434
L18
L17
L28
L29
L30
LINE TABLE
NO.
L28
L29
L30
LENGTH
151.48
94.64
70.90
DIRECTION
N9° 06' 18"W
N11° 17' 12"E
N36° 49' 15"W
START STATION
29+42.16
30+93.64
31+88.28
END STATION
30+93.64
31+88.28
32+59.18
START COORD.
N: 519542.72 E: 1543307.66
N: 519692.29 E: 1543283.69
N: 519785.11 E: 1543302.21
END COORD.
N: 519692.29 E: 1543283.69
N: 519785.11 E: 1543302.21
N: 519841.87 E: 1543259.72
BERM
30+00
.2
.55
.5
.55
31+00
.9
.59
.5
.91
32+00
.0
.18
.1
.28
32+59.18
.3
.30
0.00% 0.63% 0.19%
GR
AD
E
BR
EA
K
ST
A
+9 3.6
EL
EV
4.5
GR
AD
E
BR
EA
K
ST
A
+8 8.9
EL
EV
5.1
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
NORTH
1 inch = ft.
020 20
C14
BERM PLAN
MA
TC
HL
INE
- S
TA
+0
0 S
HE
ET
C13
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
XX
XX
EARTHEN BERM NOTES:
A WITHIN THE FOOTPRINT OF THE PROPOSED BERM, STRIP ALL VEGETATION AND TOPSOIL MATERIAL.
SCARIFY AND RECOMPACT THE TOP 6" OF EXISTING MATERIAL PRIOR TO CONSTRUCTING FILL.
B
EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE
EATHERN BERM. MATERIAL USED FOR CONSTRUCTION OF THE BERM SHALL BE IMPORTED FROM
OFFSITE, SEE SPECIFICATIONS FOR IMPORTED FILL MATERIAL REQUIREMENTS.
C PLACE FILL IN LIFTS OF NOT MORE THAN 8" LOOSE THICKNESS AND COMPACT TO AT LEAST 95% OF THE MAXIMUM DRY UNIT WEIGHT OF THE SOIL, AS DETERMINED BY ASTM D698 STANDARD PROCTOR
TEST.
D PRIOR TO SEEDING AND HYDROMULCHING, THE BERM SHALL BE SCARIFIED UNIFORMLY TO A DEPTH
OF 2" (SEE SPECIFICATIONS).
E BERM SHALL BE SEEDED AND HYDROMULCHED (SEE SPECIFICATIONS).
PROPOSED BERM CENTERLINE
SCALE:
HORIZ: 1"=20'
VERT: 1"=5'
PROPOSED TOP OF BERM @ CL
EXISTING GRADE
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
SITE DETAILS & TYPICAL
SECTIONSC15
1 GRANULAR SURFACING
NO SCALE
A B
A. 6" GRANULAR MATERIAL
B. 6" PREPARED SUBGRADE SCARIFY AND RECOMPACT TO A
MINIMUM OF 95% OF MAXIMUM DENSITY PER ASTM D698
EXISTING EARTH
2 CONCRETE VALLEY GUTTER
NO SCALE
4 EROSION CONTROL BLANKET
NO SCALE 5 SILT FENCE
NO SCALE 6 ROCK CHECK DAM
NO SCALE
NOTES:
1. ALL REBAR SHALL BE EPOXY COATED
2. REFER TO PLANS FOR LENGTH OF VALLEY GUTTER
3. ALL REBAR WILL BE TIED AND IN PLACE.
#4 DEFORMED REBAR AT
12" ON CENTER BOTH WAYS. REINFORCED CONCRETE
VALLEY GUTTER.
2" GRAVEL CUSHION
OR BASE COURSESection A-A
1 1 2"
7- 1/2
2"
6" SCARIFIED AND RECOMPACTED SUBGRADE,
COMPACT TO A MINIMUM OF 95% OF MAXIMUM
DENSITY PER ASTM D698
PROFILE
PLAN VIEW
CONSTRUCTION SPECIFICATIONS:
1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
2. LENGTH - AS REQUIRED, BUT NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE
LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY).
3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
4. WIDTH - TWENTY FIVE (25) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS
WHERE INGRESS OR EGRESS OCCURS.
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
FILTER WILL NOT BE REQUIRED ON A SINGLE FAMILY RESIDENCE LOT.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION
ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A
MOUNTABLE BERM WITH 5H:1V SLOPES WILL BE PERMITTED.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY
REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND
REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT
SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE
REMOVED IMMEDIATELY.
8. WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO
PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA
STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
DEVICE.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
EXISTING PAVEMENT
MOUNTABLE BERM (OPTIONAL)
EXISTING PVMT.
EXISTING
GROUND
FILTER CLOTH
50' MIN.
' M
IN
10'
6" M
IN
50' MIN.
3 STABILIZED CONSTRUCTION ENTRANCE
NO SCALE
3- 3/4
12+00.00
12+50.00
13+00.00
.4
.0
.2
13+50.00
.3
.54
14+00.00
14+50.00
15+00.00
15+50.00
.5
.92
.8
.29
.4
.67
.7
.04
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C16
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
VERT: 1"=5'
16+00.00
16+50.00
17+00.00
17+50.00
.1
.41
.5
.79
.9
.16
.1
.53
18+00.00
18+50.00
19+00.00
19+50.00
.4
.91
.7
.28
.9
.66
.9
.03
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C17
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
20+00.00
20+50.00
21+00.00
21+50.00
.7
.40
.0
.78
.2
.14
.3
.46
22+00.00
.9
.78
22+50.00
23+00.00
23+50.00
.3
.10
.4
.42
.7
.73
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C18
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
24+00.00
24+50.00
25+00.00
25+50.00
.8
.04
.4
.32
.6
.60
.9
.88
26+00.00
26+50.00
.1
.17
.4
.45
27+00.00
27+50.00
.6
.73
.8
.01
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C19
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
28+00.00
28+50.00
29+00.00
29+50.00
.5
.30
.8
.58
.1
.86
.3
.09
30+00.00
30+50.00
31+00.00
.5
.29
.8
.50
.2
.71
31+50.00
.4
.91
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C20
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
32+00.00
32+50.00
33+00.00
33+50.00
.3
.12
.7
.33
.0
.53
.4
.74
34+00.00
34+50.00
35+00.00
35+50.00
.7
.95
.6
.15
.9
.36
.6
.57
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C21
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
36+00.00
36+50.00
37+00.00
.8
.77
.0
.98
.6
.18
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C22
DRAINAGE CHANNEL
CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
25+00.00
25+50.00
26+00.00
26+50.00
27+00.00
27+50.00
28+00.00
28+50.00
.5
.49
.9
.65
.1
.27
.4
.61
.8
.94
.9
.27
.3
.61
.4
.94
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C23 BERM CROSS SECTIONS
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
29+00.00
29+50.00
30+00.00
30+50.00
31+00.00
31+50.00
32+00.00
32+50.00
.2
.27
.2
.55
.2
.55
.5
.55
.9
.59
.5
.91
.0
.18
.1
.28
DATE:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
BERM CROSS SECTIONSC24
EXISTING GRADE (TYP.)
PROPOSED GRADE (TYP.)
SCALE:
HORIZ: 1"=20'
SUB SHEET NO. TITLE OF SHEET
PMIS NO.
DRAWING NO.
SHEET
OF
DRAWN BY:
DESIGNED:
MJS
DGD
RMD
05-16-2025
BADLANDS NATIONAL PARK;
INTERIOR, SOUTH DAKOTA
80117
239351
C25
STORM WATER
POLLUTION PREVENTION
PLAN NOTES
SWPPP CHECKLIST
(The numbers left of the title headings are reference numbers to the
GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED
WITH CONSTRUCTION ACTIVITIES (Stormwater Permit))
5.3 (2): STAFF TRAINING/SWPPP IMPLEMENTATION
To promote stormwater management awareness specific for this project, the Contractor’s Erosion Control Supervisor shall provide correspondence of how the SWPPP will be implemented. The Contractor’s Erosion Control Supervisor is responsible for providing this information at the preconstruction meeting, and subsequently completing an attendance log, which should identify site-specific implementation of the SWPPP and the names of the personnel who attended the preconstruction meeting. Documentation of the preconstruction meeting will be filed with the SWPPP documents.
5.3 (3): DESCRIPTION OF CONSTRUCTION ACTIVITIES
5.3 (3a): Project Limits (See C2)
5.3 (3a): Project Description (Minor grading and gravel surfacing for rehabilitation of existing earthen roadway)
5.3 (4): Site Map(s) (See C3) Major Soil Disturbing Activities (check all that apply) Clearing and grubbing Excavation/borrow Grading and shaping Filling Other (describe):
5.3 (3b): Total Project Area: 31.65 AC
5.3 (3b): Total Area to be Disturbed: 3.36 AC
5.3 (3c): Maximum Area Disturbed at One Time: 3.36 AC
5.3 (3d): Existing Vegetative Cover (%): 10
5.3 (3d): Description of Vegetative Cover: Western Wheatgrass
5.3 (3e): Soil Properties: Mainly fine silty loam soils Hydrologic Soil Group B
5.3 (3f): Name of Receiving Water Body/Bodies: unnamed tributary to White River
5.3 (3g): Location of Construction Support Activity Areas: within project boundary
5.3 (3h): ORDER OF CONSTRUCTION ACTIVITIES
Special sequencing requirements (see sheet).
The Contractor will enter the Estimated Start Date.
Description Estimated Start Date
Install stabilized construction entrance(s).
Install perimeter protection where runoff may exit site.
Install perimeter protection around stockpiles.
Install channel and ditch bottom protection.
Clearing and grubbing.
Remove and stockpile topsoil.
Stabilize disturbed areas.
Install utilities, storm sewers, curb and gutter.
Install inlet and culvert protection after completing storm drainage and other utility installations.
Final grading.
Final paving.
Removal of protection devices.
Reseed areas disturbed by removal activities.
5.3 (5): DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES
All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report. Include the technical reasoning for selecting each control. (check all that apply)
Perimeter Controls (See Detail Plan Sheets)
Description Estimated Start Date
Natural Buffers (within 50 ft of Waters of State) Silt Fence Erosion Control Wattles Temporary Berm / Windrow Floating Silt Curtain Stabilized Construction Entrances Entrance/Exit Equipment Tire Wash Other:
Structural Erosion and Sediment Controls
Description Estimated Start Date
Silt Fence Temporary Berm/Windrow Erosion Control Wattles Temporary Sediment Barriers Erosion Bales Temporary Slope Drain Turf Reinforcement Mat Riprap Gabions Rock Check Dams Sediment Traps/Basins Culvert Inlet Protection Transition Mats Median/Area Drain Inlet Protection Curb Inlet Protection Interceptor Ditch Concrete Washout Facility Work Platform Temporary Water Barrier Temporary Water Crossing Permanent Stormwater Ponds Permanent Open Vegetated Swales Natural Depressions to allow for Infiltration Sequential Systems that combine several practices Other:
Dust Controls
Description Estimated Start Date
Tarps & Wind impervious fabrics Watering Stockpile location/orientation Dust Control Chlorides Other
SWPPP CHECKLIST
Dewatering BMPs
Description Estimated Start Date
Sediment Basins Dewatering bags Weir tanks Temporary Diversion Channel Other:
Stabilization Practices (See Detail Plan Sheets) (Stabilization measures shall begin the following work day whenever earth disturbing activity on any portion of the site has temporarily or permanently ceased. Temporary stabilization shall be completed as soon as practicable but no later than 14 days after initiating soil stabilization activities (3.18))
Description Estimated Start Date
Vegetation Buffer Strips Temporary Seeding (Cover Crop Seeding) Permanent Seeding Sodding Planting (Woody Vegetation for Soil Stabilization) Mulching (Grass Hay or Straw) Fiber Mulching (Wood Fiber Mulch) Soil Stabilizer Bonded Fiber Matrix Fiber Reinforced Matrix Erosion Control Blankets Surface Roughening (e.g. tracking) Other:
Wetland Avoidance Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes No If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with the USACE.
5.3 (6): PROCEDURES FOR INSPECTIONS
• Inspections will be conducted at least once every 7 days or once every 14 calendar days and within 24 hours of precipitation that exceeds 0.25 inches or snowmelt that generates runoff.
• All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report.
• Silt fence will be inspected for depth of sediment and for tears to ensure the fabric is securely attached to the posts and that the posts are well anchored.
Sediment buildup will be removed from the silt fence when it reaches 1/3 of the height of the silt fence.
• Sediment basins and traps will be checked. Sediment will be removed when depth reaches approximately 50 percent of the structure’s capacity, and at the conclusion of the construction.
• Check dams will be inspected for stability. Sediment will be removed when depth reaches ½ the height of the dam.
• All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.
• Inspection and maintenance reports will be prepared on the erosion control inspection form for each site inspection, this form will also be used to document changes to the SWPPP. A copy of the completed inspection form will be filed with the SWPPP documents.
• The Contractor is responsible for inspections. Maintenance and repair activities are the responsibility of the Contractor. The Contractor will complete the inspection and maintenance reports and distribute copies per the instructions on the erosion control inspection form.
5.3 (7): POST CONSTRUCTION STORMWATER MANAGEMENT
Stormwater management will be handled by temporary controls outlined in “DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES” above, and any permanent controls needed to meet permanent stormwater management needs in the post construction period will be shown in the plans and noted as permanent.
5.3 (8): POLLUTION PREVENTION PROCEDURES
5.3 (8a): Spill Prevention and Response Procedures Material Management Housekeeping
• Only needed products will be stored on-site by the Contractor.
• Except for bulk materials the contractor will store all materials under cover and/or in appropriate containers.
• Products must be stored in original containers and labeled.
• Material mixing will be conducted in accordance with the manufacturer’s recommendations.
• When possible, all products will be completely used before properly disposing of the container off-site.
• The manufacturer’s directions for disposal of materials and containers will be followed.
• The Contractor’s site superintendent will inspect materials storage areas regularly to ensure proper use and disposal.
• Dust generated will be controlled in an environmentally safe manner.
SWPPP CHECKLIST
Hazardous Materials
• Products will be kept in original containers unless the container is not resealable and provide secondary containment as applicable.
• Original labels and material safety data sheets will be retained in a safe place to relay important product information.
• If surplus product must be disposed of, manufacturer’s label directions for disposal will be followed.
• Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground.
• Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any stormwater system or stormwater treatment system.
• Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, residuals from concrete saw cutting (either wet or dry), and mixer washout waters will be collected on site and managed to prevent contamination of stormwater runoff.
Spill Control Practices In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed.
• For all hazardous materials stored on site, the manufacturer’s recommended methods for spill cleanup will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.
• Appropriate cleanup materials and equipment will be maintained by the Contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for cleanup purposes.
• All spills will be cleaned immediately after discovery and the materials disposed of properly.
• The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.
• After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences.
• The Contractor’s site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coordinator.
Spill Response The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into stormwater runoff and conveyance systems. If the release has impacted on-site stormwater, it is critical to contain the released materials on-site and prevent their release into receiving waters. If a spill of pollutants threatens stormwater or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants.
• The Contractor’s site superintendent will be notified immediately when a spill or the threat of a spill is observed. The superintendent will assess the situation and determine the appropriate response.
• If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized.
• Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the Contractor at the site.
• If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The Contractor will use appropriate materials to contain and absorb the spill. The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases.
• If a spill occurs the superintendent or the superintendent’s designee will be responsible for completing the spill reporting form and for reporting the spill to SDDENR.
• Personnel with primary responsibility for spill response and cleanup will receive training by the Contractor’s site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.
• Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.
5.3 (8b): WASTE MANAGEMENT PROCEDURES Waste Disposal
• All liquid waste materials will be collected and stored in approved sealed containers. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal and notices stating proper practices will be posted. The Contractor is responsible for ensuring waste disposal procedures are followed.
Hazardous Waste
• All hazardous waste materials will be disposed of in a manner specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the Contractor will be responsible for seeing that these practices are followed.
Sanitary Waste
• Portable sanitary facilities will be provided on all construction sites. Sanitary waste will be collected from the portable units which must be secured to prevent tipping and serviced in a timely manner by a licensed waste management Contractor or as required by any local regulations.
SWPPP CHECKLIST
5.3 (9): CONSTRUCTION SITE POLLUTANTS
The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the heading “POLLUTION PREVENTION PROCEDURES” (check all that apply).
Concrete and Portland Cement Detergents Paints Metals Bituminous Materials Petroleum Based Products Diesel Exhaust Fluid Cleaning Solvents Wood Cure Texture Chemical Fertilizers Other:
Product Specific Practices
• Petroleum Products All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.
• Fertilizers Fertilizers will be applied only in the amounts specified or recommended by the supplier. Once applied, fertilizers will be worked into the soil to limit the exposure to stormwater. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.
• Paints All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer’s instructions and any applicable state and local regulations.
• Concrete Trucks Contractors will provide designated truck washout facilities on the site. These areas must be self-contained and not connected to any stormwater outlet of the site. Upon completion of construction, the area at the washout facility will be properly stabilized.
5.3 (10): NON-STORMWATER DISCHARGES
The following non-stormwater discharges are anticipated during the course of this project (check all that apply).
Discharges from water line flushing.
Pavement wash-water, where no spills or leaks of toxic or hazardous materials have occurred.
Uncontaminated ground water associated with dewatering activities.
5.3 (11): INFEASIBILITY DOCUMENTATION
If it is determined to be infeasible to comply with any of the requirements of the Stormwater Permit, the infeasibility determination must be thoroughly documented in the SWPPP.
7.0: SPILL NOTIFICATION
In the event of a spill, the Contractor’s site superintendent will make the appropriate notification(s), consistent with the following procedures:
A release or spill of a regulated substance (includes petroleum and petroleum products) must be reported to SDDENR immediately if any one of the following conditions exists:
• The release or spill threatens or is able to threaten waters of the state (surface water or ground water)
• The release or spill causes an immediate danger to human health or safety
• The release or spill exceeds 25 gallons
• The release or spill causes a sheen on surface water
• The release or spill of any substance that exceeds the ground water quality standards of ARSD Chapter 74:54:01
• The release or spill of any substance that exceeds the surface water quality standards of ARSD Chapter 74:51:01
• The release or spill of any substance that harms or threatens to harm wildlife or aquatic life
• The release or spill is required to be reported according to Superfund Amendments and Reauthorization Act (SARA) Title III List of Lists, Consolidated List of Chemicals Subject to Reporting Under the Emergency Planning and Community Right to Know Act, US Environmental Protection Agency.
To report a release or spill, call SDDENR at 605-773-3296 during regular office hours (8 a.m. to 5 p.m. Central Standard Time). To report the release after hours, on weekends or holidays, call South Dakota Emergency Management at 605-773-3231. Reporting the release to SDDENR does not meet any obligation for reporting to other state, local, or federal agencies.
Therefore, you must also contact local authorities to determine the local reporting requirements for…