This is a design and construction document package for the rehabilitation of Cedar Pass Lodge Cabin Road in Badlands National Park, Interior, South Dakota. The project involves demolition of existing gravel surfacing, construction of a new 6-inch gravel-surfaced roadway, installation of concrete valley gutters, grading and drainage improvements, an earthen berm, and comprehensive erosion control measures. The design includes approximately 37 stations of new road construction with associated utility coordination, drainage channel development extending approximately 1.2 miles, and storm water pollution prevention planning.

The scope encompasses site preparation including stabilized construction entrance installation, removal and stockpiling of existing materials at an NPS-designated soil waste site, placement of imported fill for berm construction in lifts compacted to 95% maximum dry density per ASTM D698, installation of erosion control blankets and silt fencing around perimeter areas, seeding and hydromulching of disturbed areas, and maintenance of temporary erosion controls throughout construction. The contractor is responsible for obtaining the stormwater permit from the South Dakota Department of Agriculture & Natural Resources, conducting all inspections and modifications to the Storm Water Pollution Prevention Plan, and submitting notice of termination upon final project stabilization. Control survey data is provided with horizontal datum NAD83 South Dakota South and vertical datum NAVD88, with nine survey control points established by 5/8-inch rebar with caps.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIDGE

PINE

RESERVATION

RESERVATION

PINE

RIDGE

PROJECT SITE:

CEDAR PASS LODGE CABIN ROAD

SOUTH DAKOTA

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

MIDWEST REGIONAL OFFICE

REHABILITATE CEDAR PASS LODGE CABIN ROAD

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA 29

MJS

DGD

RMD

05-16-25

80117

NATIONAL

SERVICE

PARK

5/16/2025

CONTROL TABLE

Point #

Northing

519879.01

519752.21

519782.13

519043.17

519898.22

518711.52

517471.65

518452.50

518759.80

Easting

1543115.98

1543081.55

1543261.25

1543392.42

1543837.03

1543942.07

1544084.50

1544129.88

1543159.69

Elevation

2437.58

2436.14

2433.88

2429.15

2437.75

2426.97

2415.20

2434.82

2441.57

Description

5/8" RB

5/8" RB

5/8" RB

5/8" RB

5/8" RB

5/8" RB

5/8" RB

5/8" RB

5/8" RB

GAS

E

G

4"

E

E G

G

GE

G

G

"12

G

6"

G

G

E

6"

" 1 8"

E

E

E

E

"12

"18

" 12

6"10

"16 "14 "18

"24

"30

"18

" 36

7"

5" 8" 14

6"

7"

" 26

" 14

" 18

" 18 "12

" 30

FO

UGE

UGE

UGE

UGE

FO

FO

W

W

WWWW

W

W

W

W W

FO

FO

FO

FO

FO

FO

FO

W W W W W

FO

W

W

W W

W

FO

FO FO

FO UGE

UGEUGE UGE UGE UGE UGE UGE

FO

FO

FO

UGE UGE UGE UGEFO

FO

FO FO

FO

FO

W W

WWWWWWWWWWWWWWWWW

W

O O

O

O

O O

W W

W

W W

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS GAS

GAS

GAS GAS GAS

GAS

GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

W W

W W

W

W W W W W W W W W FO

FO

FO

UG

E

W W

W W

W

W

W W

W W

W W

W

W

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO FO FO

UGE

UGE UGE

FO

FO

FO

FO

FO

FO

FO

W

W

W

W

W

W W

GAS

GAS

GAS

GAS

GAS

GAS

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN SAN SAN SAN SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

W

W W

W W

W

W

W

W W W W W W

W

W W

W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

GAS GAS

GAS

GA

S

GA

S

GA

S

UGE

UGE

UGEUGE

UGE

UGE

W W

W

W W

W W

W

W

W W

W W

W W

W W

W

W

W

W

WW

W W

W W

W W

W

W

W W

W

W

W

W

W

W

W

W

W

W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

W W

W W

W

W

W

W

WW

W W

W W

W W

W W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FOFO

FO

FO

W W

W W W

SAN SAN SAN SAN

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWWWWWWWWWWWWW

GAS

GAS

GAS

GAS

GAS

G

G

GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

G

G

GAS

GAS GAS

G

G

G

G

G

G

GAS

GAS

W

W

W

W

W

W

W

W

W

W

W W

W

W

WWWW

W

W

W

GAS

W

W

W

W

W

G

G

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

0100 100

NOTE:

UNDERGROUND UTILITY LOCATIONS SHOWN ARE FROM

INFORMATION PROVIDED TO US FROM UTILITY

COMPANIES. UTILITY COMPANIES MAKE NO

WARRANTIES OR GUARANTEES REGARDING THE

ACCURACY OF THE INFORMATION CONTAINED IN THEIR

DOCUMENTS AND PROVIDES IT ONLY AS GENERAL

INFORMATION TO THE RECEIVER.

TOPOGRAPHIC SURVEY

(FOR REFERENCE ONLY)C1

HORIZONTAL DATUM: NAD83 SOUTH DAKOTA SOUTH

4002 WITH A SCALE FACTOR OF 1.00020102

VERTICAL DATUM: NAVD88

- CHAIN-LINK FENCE

- ELECTRIC MANHOLE

D - STORM SEWER MANHOLE

- PROPERTY LINE

H Y D

W

- CORNERS SET (#5 Rebar With Cap)

- FIRE HYDRANT

- POWER PEDESTAL

- GUY WIRE/ POLE

- TELEPHONE POLE

- WATER MANHOLE

- CONIFEROUS TREE w/trunk size

- STORM SEWER FLARED-END-SECTION

- ELECTRICAL TRANSFORMER

LEGEND

- GAS VALVE

- SANITARY SEWER MANHOLES

- CABLE TV MANHOLE

- TELEPHONE/ COMMUNICATIONS MANHOLE

E

- DUAL LIGHT POLE

- SURVEY CONTROL POINT

- STORM GRATE INLET ROUND

- BARBED-WIRE FENCE

- GAS LINE

- GUARDRAIL

- CORNERS FOUND (As Noted)

O

X

GAS

T

- SANITARY SEWER LINESAN

- STORM SEWER LINE WITHOUT INVERT SIZESD

- OVERHEAD TELEPHONE LINEOHT

- UNDERGROUND TELEPHONE LINEUGT

- OVERHEAD POWER LINEOHE

- UNDERGROUND POWER LINEUGE

- FIBER OPTIC LINEFO

- IRRIGATION LINEIRRG

- SHRUB

- BOLLARD

- SECTION CORNER

- SECTION CORNER TIE

- MONITORING WELL

- RIGHT-OF-WAY MARKERR.O.W.

- BOARD FENCE[][]

- STORM SEWER LINE WITH INVERT SIZE

- WATER LINEW

- SPRINKLER VALVE

- CABLE TV PEDESTAL

- WATER VALVE

- IRRIGATION VALVE

- TELEPHONE PEDESTAL

- METER (As Noted)

- SIGN

- DECORATIVE LIGHT POLE

- POWER POLE

- LIGHT POLE

- CLEANOUT

C

- DECIDUOUS TREE w/trunk size

- STORM GRATE INLET SQUARE

- PULLBOX

- STUMP

G - GAS METER

WETLANDS

WETLANDS

WETLANDS

WETLANDS

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

0500 500

LOCATION MAPC2

PROJECT LOCATION

BEN REIFEL ROAD

CEDAR PASS LODGE CABIN ROAD

PROPOSED DRAINAGE CHANNEL

CONTRACTOR STAGING AND

SOIL WASTE SITE

SEE SHEET C3

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

CONTRACTOR STAGING

AREA PLANC3

CEDAR PASS LODGE

BEN REIFEL ROAD

BEN REIFEL VISITOR CENTER

SOIL WASTE AREA

(INSET 1)

HWY 240

HWY 240

HWY 377

HWY 240

1 SOIL WASTE AREA

NORTH

1 inch = ft.

0500 500

NORTH

1 inch = ft.

0100 100

THE PARK WILL PROVIDE ADEQUATE SPACE NEAR THE WASTEWATER

LAGOONS FOR CONTRACTOR STAGING AND SOIL STOCKPILING

19"

34"12"

40"

12"

6"

10"

16"

20"

12"16" 14"18"18"24"30"

18"18"

12"

20"

36"

10"

24"

22"

7"

5" 8"

14" 6"

W W

W W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

FO FO FO FO FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W W

W W

W

W

W W

W W

W W

W W

W

W

UGE

UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

W

W W W W W W W

W

W

W

W

W

W

W

W

W

W W

W W

W

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

CEDAR PASS LODGE CABIN

ROAD DEMOLITION PLANC4

XREF. DEMO NOTES ( )

1 REMOVE GRAVEL SURFACING.

2 PROTECT EXISTING UTILITY TO REMAIN.

3 PROTECT EXISTING TREE TO REMAIN.

4 PROTECT EXISTING BOLLARD TO REMAIN.

LEGEND

REMOVE GRAVEL SURFACING

22222

3333333

19"

34"12"

40"

12"

6"

10"

16"

20"

12"16" 14"18"18"24"30"

18"18"

12"

20"

36"

10"

24"

22"

7"

5" 8"

14" 6"

W W

W W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

FO FO FO FO FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W W

W W

W

W

W W

W W

W W

W W

W

W

UGE

UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

W

W W W W W W W

W

W

W

W

W

W

W

W

W

W W

W W

W

24+00

25+00

26+00

27+00

PI: 24+69.54

PC: 23+69.98

PT: 23+84.12

PT: 23+47.68

25+00

26+00

27+00

28+00

BP: 25+00.00

24 25

LAYOUT COORDINATES

POINT #

NORTHING

519127.32

519133.83

519095.63

519099.11

519070.44

519074.67

519086.13

519091.36

519121.33

519130.49

519265.21

519270.50

519266.08

519263.38

519259.93

519247.36

519287.08

519282.26

519285.99

519288.69

519292.17

519305.60

519398.97

519408.73

519408.61

EASTING

1543301.50

1543319.85

1543313.40

1543332.88

1543382.43

1543389.23

1543374.35

1543380.38

1543384.85

1543407.04

1543321.75

1543308.92

1543296.75

1543289.22

1543279.60

1543273.44

1543258.48

1543270.77

1543281.10

1543288.63

1543298.27

1543304.04

1543263.09

1543260.91

1543285.07

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

CEDAR PASS LODGE CABIN

ROAD LAYOUT PLANC5

XREF. NOTES ( )

1 CONSTRUCT 6" GRAVEL SURFACING, SEE 1/C14.

2 CONSTRUCT CONCRETE VALLEY GUTTER, SEE 2/C14.

LEGEND

GRAVEL SURFACING

P.C.C. PAVEMENT

24.0'

24.0'

24.0'

8.0'

8.0'

10.0'

R10.0'

R1 0.0

R10.0'

R10 .0'

R28.3'

R50.0'

6"

"16

"14

"18

7"

5" 8"

6"

W W

W

W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

W W

W

SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W W

W W

W

W

W W

W W

W W

W W

W

W

W W

W W

W W

W

W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE

UGE

UGE

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

WWWWW

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

25+00

26+00

27+00

28+00

PI: 24+69.54

25+00

26+00

27+00

28+00

BP: 25+00.00

2429.32 GR

2429.68 GR*

2429.26 GR

2429.70 GR

2430.01 GR*

2429.47 GR*

2430.70 GR* 2430.38 GR

2430.39 GR

2430.62 GR

2430.84 GR*

2430.50 GR

2430.22 GR

2430.38 GR*

2430.04 GR*

2430.07 GR*

2429.65 GR

2430.27 GR*

2430.15 GR*

2430.62 GR*

2430.89 GR*

2431.06 GR

2430.97 GR*

2430.67 GR

2430.59 GR

2430.84 GR

2431.10 GR*

2431.21 GR*

2430.89 GR*

2431.49 GR

2431.90 GR*

2431.60 GR* 2432.05 GR

2432.39 GR*

2431.57 GR* 2431.64 GR*

2431.54 GR

2432.17 GR*

2431.65 GR*

2432.04 PFG*

2432.05 PFG*

2432.06 PFG*

2431.80 PFG

2431.23 PFG

2430.72 PFG

2430.24 PFG

2429.82 PFG

2429.38 PFG

2430.18 PFG*

2430.27 PFG*

2426.70 PFG*

2426.68 PFG*

2430.91 PFG*

2431.12 PFG*

2431.12 PFG*

2431.21 PFG*

2431.31 PFG*

2431.66 PFG*

2431.66 PFG*

2431.81 PFG*

2431.79 PFG*

2430.91 PFG*

2431.63 PFG*

2431.01 PFG

2429.43 PFG

2428.58 PFG

2427.56 PFG

2427.20 PFG

2426.90 PFG*

2428.04 PFG*

2429.35 PFG*

2430.24 PFG*

2426.00 PFG*

2427.87 PFG*

2427.98 PFG*

2428.29 PFG*

2428.87 PFG*

2430.44 TS

2430.38 TS

2430.44 TS

2430.13 TS

2430.19 TS

2430.19 TS

2428.25 TS

2428.03 TS2427.93 TS

2428.01 TS

2428.11 TS

2428.20 TS

2429.75 GR

2429.54 GR

2429.32 PFG*

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

CEDAR PASS LODGE CABIN

ROAD GRADING & DRAINAGE

PLANC6

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

TS TOP OF SLAB ELEVATION

GR GRAVEL SURFACING ELEVATION

* MATCH EXISTING ELEVATION

XX

XX

XREF. NOTES ( )

1 ADJUST WATER VALVE TO GRADE.

SEE DRAINAGE

CHANNEL PLAN

SEE BERM PLAN

GAS

E

G

4"

E

E G

G

GE

G

G

"12

G

6"

G

G

E

6"

" 1 8"

E

E

E

E

"12

"18

" 12

6"10

"16 "14 "18

"24

"30

"18

" 36

7"

5" 8" 14

6"

7"

" 26

" 14

" 18

" 18 "12

" 30

FO

UGE

UGE

UGE

UGE

FO

FO

W

W

WWWW

W

W

W

W W

FO

FO

FO

FO

FO

FO

FO

W W W W W

FO

W

W

W W

W

FO

FO FO

FO UGE

UGEUGE UGE UGE UGE UGE UGE

FO

FO

FO

UGE UGE UGE UGEFO

FO

FO FO

FO

FO

W W

WWWWWWWWWWWWWWWWW

W

W W

W

W

GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS GAS

GAS

GAS GAS GAS

GAS

GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

W W W W W W W W W FO

FO

FO

UG

E

W W

W W

W

W

W W

W W

W W

W

W

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO FO FO

UGE

UGE UGE

FO

FO

FO

FO

FO

FO

FO

W

W

W

W

W

W W

GAS

GAS

GAS

GAS

GAS

GAS

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN SAN SAN SAN SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SANSANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

W W

W

W W

W

W

W

W W W W W W

W

W W

W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

GAS GAS

GAS

GA

S

GA

S

GA

S

UGE

UGE

UGEUGE

UGE

UGE

W W

W

W W

W W

W

W

W W

W W

W W

W W

W

W

W

W

WW

W W

W W

W W

W

W

W W

W

W

W

W

W

W

W

W

W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

W W

W W

W

W

W

W

WW

W W

W W

W W

W W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FOFO

FO

FO

W W

W W W

SAN SAN SAN SAN

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWWWWWWWWWWWWW

GAS

GAS

GAS

GAS

GAS

G

G

GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

G

G

GAS

GAS GAS

G

G

G

G

G

G

GAS

GAS

W

W

W

W

W

W

W

W

W

W

W W

W

W

WWWW

W

W

W

GAS

W

W

W

W

W

G

G

0+

1+00 2+00 3+

4+00

5+

6+00

7+00

8+

9+

10+00

11+00

+0

13+00

14+00

15+00 16+00 17+00

18+00

+0

+0

21+00

22+00

23+00 24+00

25+00

26+00

27+00

28+00 29+00 30+00

31+00

32+00

33+00 34+00

35+00 36+00

37+00 37+40

25+00

26+00

27+00

28+00

29+00 30+00

31+00 32+00

32+59

-2.00:1

2.00:1

-2.00:1

2.00:1

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

0100 100

DRAINAGE CHANNEL

KEY MAPC7

SEE SHEET C8 FOR

PLAN & PROFILE

SEE SHEET C9 FOR

PLAN & PROFILE

SEE SHEET C10 FOR

PLAN & PROFILE

SEE SHEET C12 FOR

PLAN & PROFILE

SEE SHEET C11 FOR

PLAN & PROFILE

WETLANDS

WETLANDS

WETLANDS

WETLANDS

SEE SHEET C12 AND

C13 FOR BERM PLAN

6.0'

CHANNEL CENTERLINE

TYPICAL SECTION

DRAINAGE CHANNEL NOTES:

A

EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE

EARTHEN BERM. ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE

LOCATION.

B

PRIOR TO SEEDING, THE DRAINAGE CHANNEL BOTTOM AND SIDE SLOPES SHALL BE SCARIFIED

UNIFORMLY TO A DEPTH OF 5" (SEE SPECIFICATIONS).

C ALL AREAS DISTURBED BY CHANNEL CONSTRUCTION SHALL BE SEEDED (SEE SPECIFICATIONS).

D PLACE TEMPORARY EROSION CONTROL BLANKET ON SIDE SLOPES OF CHANNEL AFTER SEEDING.

FO

FO

FO

FO

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

STREAM

BEN REIFEL ROAD

AS

PH

AL

T

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN. MANHOLE

RIM ELEV: 2424.31

(NW) 8" HDPE I.E.: 2412.96

(SE) 8" HDPE I.E.: 2413.16

13+00

14+00

15+00 16+00

17+00

18+00

PI: 17+82.03

PI

: 1

3+

.42

PI:

+2 2.3

PI: 14+62.47

PC: 18+49.76

PC

: 1

6+

.36

PC

: 1

4+

.23

PT: 16+82.32

PT

: 1

5+

.69

24242424

+0

0.0

13+50.00

14+00.00

14+50.00

+0

0.0

+5

0.0

+0

0.0

+5

0.0

17+00.00

17+50.00

18+00.00

18+50.00 19+00.00

L5

L4

L3

L2

L1

C2

C1

CHANNEL

0.75%

GR

AD

E

BR

EA

K

ST

A

+4 6.7

EL

EV

0.5

12+50

.0

13+00

.2

.3

.54

14+00

.5

.92

.8

.29

15+00

.4

.67

.7

.04

16+00

.1

.41

.5

.79

17+00

.9

.16

.1

.53

18+00

.4

.91

18+50

.7

.28

EXISTING 8" HDPE SANITARY LINE

STA:14+39.24

ELEV:2412.72

LINE TABLE

NO.

L1

L2

L3

L4

L5

LENGTH

118.05

31.77

132.67

99.70

67.73

DIRECTION

N54° 18' 01"E

N37° 47' 32"E

N5° 07' 41"W

N34° 32' 31"W

N22° 44' 10"W

START STATION

13+44.42

14+62.47

15+31.69

16+82.32

17+82.03

END STATION

14+62.47

14+94.23

16+64.36

17+82.03

18+49.76

START COORD.

N: 518266.43 E: 1543866.53

N: 518335.32 E: 1543962.40

N: 518395.53 E: 1543992.15

N: 518544.39 E: 1543974.27

N: 518626.51 E: 1543917.73

END COORD.

N: 518335.32 E: 1543962.40

N: 518360.42 E: 1543981.87

N: 518527.67 E: 1543980.30

N: 518626.51 E: 1543917.73

N: 518688.98 E: 1543891.56

CURVE TABLE

NO.

C1

C2

P.C. STA.

14+94.23

16+64.36

P.I. STA.

15+13.89

16+73.54

P.T. STATION

15+31.69

16+82.32

RADIUS

50.00

35.00

LENGTH

37.46

17.97

DELTA

42°55'13"

29°24'51"

TANGENT

19.66

9.19

CHORD DIRECTION

N16° 19' 56"E

N19° 50' 06"W

CHORD

36.59

17.77

P.C. COORD.

N: 518360.42 E: 1543981.87

N: 518527.67 E: 1543980.30

P.I. COORD.

N: 518375.95 E: 1543993.91

N: 518536.82 E: 1543979.48

P.T. COORD.

N: 518395.53 E: 1543992.15

N: 518544.39 E: 1543974.27

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

X

NORTH

1 inch = ft.

020 20

REF. NOTES ( )

1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.

2 PROPOSED CHANNEL CENTERLINE.

DRAINAGE CHANNEL

PLAN & PROFILEC8

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C9

EXISTING GRADE @ CL

PROPOSED GRADE @ CL

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING WETLANDS

XX

XX

NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE

NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.

SCALE:

HORIZ: 1"=20'

VERT: 1"=4'

W

W

W

W

FO

FO

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

FO

FO

FO

W

W

W

W

W

STREAM

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

UGE

UGE

UGE

UGE

UGE

W W

W W

W W

W W

W W

W W

SAN

SAN

SAN

SAN

12" CMP

FL ELEV: 2424.86

SAN. MANHOLE

RIM ELEV: 2426.18

(N) 8" HDPE I.E.: 2419.69

(S) 8" HDPE I.E.: 2419.18

19+00

20+00

21+00

22+00

23+00

24+00

PI: 19+93.96

PC: 23+69.98

PC

: 2

3+

.56

PC

: 2

2+

.87

PC

: 2

2+

.67

PC: 21+82.24

PC: 21+32.87

PC

: 2

0+

.71

PC

: 1

8+

.76

PT

: 2

3+

.12

PT: 23+47.68

PT

: 2

2+

.79

PT

: 2

2+

.48

PT

: 2

2+

.00

PT: 21+58.43

PT: 21+10.61

PT: 18+91.38

24272427

24282428

+5

0.0

19+00.00

19+50.00

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

23+50.00

+0

0.0

L14

L13

L12

L11

L10 L9

L8

L7

L6

C10

C9

C8

C7

C6

C5

C4

C3

SF

CHANNEL

18+50

.7

.28

19+00

.9

.66

.9

.03

20+00

.7

.40

.0

.78

21+00

.2

.14

.3

.46

22+00

.9

.78

.3

.10

23+00

.4

.42

.7

.73

24+00

.8

.04

24+50

.4

.32

GR

AD

E

BR

EA

K

ST

A

+8 8.0

EL

EV

6.0

GR

AD

E

BR

EA

K

ST

A

+7 9.0

EL

EV

7.9

0.64%

EXISTING 8" HDPE SANITARY LINE

STA:19+67.67

ELEV:2419.92

EXISTING WATER LINE

STA:24+27.32

ELEV:2423.63

LINE TABLE

NO.

L6

L7

L8

L9

L10

L11

L12

L13

L14

LENGTH

102.58

97.75

22.26

23.81

21.68

36.39

30.77

22.30

85.42

DIRECTION

N70° 25' 43"W

N50° 22' 31"W

N3° 46' 42"E

N69° 26' 39"W

N12° 49' 36"W

N58° 06' 48"W

N18° 57' 10"W

N9° 03' 58"E

N23° 20' 33"W

START STATION

18+91.38

19+93.96

21+10.61

21+58.43

22+02

22+39.48

22+99.79

23+47.68

23+84.12

END STATION

19+93.96

20+91.71

21+32.87

21+82.24

22+23.67

22+75.87

23+30.56

23+69.98

24+69.54

START COORD.

N: 518716.77 E: 1543862.19

N: 518751.13 E: 1543765.54

N: 518830.20 E: 1543683.04

N: 518872.45 E: 1543671.58

N: 518895.09 E: 1543636.81

N: 518928.77 E: 1543623.06

N: 518966.34 E: 1543577.55

N: 519012.33 E: 1543566.10

N: 519048.20 E: 1543567.88

END COORD.

N: 518751.13 E: 1543765.54

N: 518813.47 E: 1543690.25

N: 518852.40 E: 1543684.51

N: 518880.81 E: 1543649.29

N: 518916.23 E: 1543632.00

N: 518947.99 E: 1543592.16

N: 518995.44 E: 1543567.56

N: 519034.35 E: 1543569.61

N: 519126.63 E: 1543534.03

CURVE TABLE

NO.

C3

C4

C5

C6

C7

C8

C9

C10

P.C. STA.

18+49.76

20+91.71

21+32.87

21+82.24

22+23.67

22+75.87

23+30.56

23+69.98

P.I. STA.

18+71.86

21+01.93

21+47.73

21+93.01

22+32.02

22+88.32

23+39.29

23+77.25

P.T. STATION

18+91.38

21+10.61

21+58.43

22+02

22+39.48

22+99.79

23+47.68

23+84.12

RADIUS

50.00

20.00

20.00

20.00

20.00

35.00

35.00

25.00

LENGTH

41.62

18.90

25.56

19.76

15.81

23.92

17.12

14.14

DELTA

47°41'33"

54°09'13"

73°13'20"

56°37'03"

45°17'12"

39°09'38"

28°01'08"

32°24'30"

TANGENT

22.10

10.22

14.86

10.77

8.34

12.45

8.73

7.27

CHORD DIRECTION

N46° 34' 57"W

N23° 17' 55"W

N32° 49' 59"W

N41° 08' 07"W

N35° 28' 12"W

N38° 31' 59"W

N4° 56' 36"W

N7° 08' 18"W

CHORD

40.43

18.21

23.86

18.97

15.40

23.46

16.95

13.95

P.C. COORD.

N: 518688.98 E: 1543891.56

N: 518813.47 E: 1543690.25

N: 518852.40 E: 1543684.51

N: 518880.81 E: 1543649.29

N: 518916.23 E: 1543632.00

N: 518947.99 E: 1543592.16

N: 518995.44 E: 1543567.56

N: 519034.35 E: 1543569.61

P.I. COORD.

N: 518709.36 E: 1543883.01

N: 518819.99 E: 1543682.37

N: 518867.23 E: 1543685.49

N: 518884.59 E: 1543639.20

N: 518924.36 E: 1543630.14

N: 518954.57 E: 1543581.59

N: 519003.70 E: 1543564.72

N: 519041.52 E: 1543570.75

P.T. COORD.

N: 518716.77 E: 1543862.19

N: 518830.20 E: 1543683.04

N: 518872.45 E: 1543671.58

N: 518895.09 E: 1543636.81

N: 518928.77 E: 1543623.06

N: 518966.34 E: 1543577.55

N: 519012.33 E: 1543566.10

N: 519048.20 E: 1543567.88

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

C9

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C10MA

TC

HL

INE

- S

TA

+5 0 S

HE

ET

C8

DRAINAGE CHANNEL

PLAN & PROFILE

EXISTING GRADE @ CL

PROPOSED GRADE @ CL

XREF. NOTES ( )

1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.

2 PROPOSED CHANNEL CENTERLINE.

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING WETLANDS

XX

XX

NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE

NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.

SCALE:

HORIZ: 1"=20'

A/C

A/CA/CA/CA/CA/CA/C

A/C

A/C

6"

8"

6"

FO

FO

FO

FO

FO

FO FO

FO

W W

W

FO

DECK, TYP.

DECK, TYP.

OVERHEAD CANOPY, TYP.

RAMP, TYP.

STREAM

2431 243

GR

AV

EL

GR

AV

EL

SAN

SAN

WWWWWWWWW

W

W

W W

W W

W W

W WW

W W

W W

W W

WW

W W

W W

W W

W WWW

W W

W W

W W

WW

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN

FO

FO

FO

FO

FO

FO

25+00 26+00

27+00 28+00

29+00

PI

: 2

4+

.54

PI

: 2

8+

.11

243224 +5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

25+00 26+00

27+00 28+00

29+00

BP

: 2 5+

.00

2432 2432

243425 +0

0.0 0 (

+5

0.0 0 (

+0

0.0 0 (

+5

0.0 0 (

+0

0.0 0 (

+5

0.0 0 (

+0

0.0 0 (

+5

0.0 0 (

+0

0.0 0 (

L16

L15

CHANNEL

24+50

.4

.32

25+00

.6

.60

.9

.88

26+00

.1

.17

.4

.45

27+00

.6

.73

.8

.01

28+00

.5

.30

.8

.58

29+00

.1

.86

29+50

.3

.09

0.56%

GR

AD

E

BR

EA

K

ST

A

+1 2.9

EL

EV

0.9

LINE TABLE

NO.

L15

L16

LENGTH

379.57

108.63

DIRECTION

N24° 41' 32"W

N7° 41' 31"W

START STATION

24+69.54

28+49.11

END STATION

28+49.11

29+57.74

START COORD.

N: 519126.63 E: 1543534.03

N: 519471.49 E: 1543375.47

END COORD.

N: 519471.49 E: 1543375.47

N: 519579.14 E: 1543360.93

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

C10

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C11

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C9

DRAINAGE CHANNEL

PLAN & PROFILE

EXISTING GRADE @ CL

PROPOSED GRADE @ CL

XREF. NOTES ( )

1 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION

AND DEPTH.

2 PROPOSED CHANNEL CENTERLINE.

3 PROPOSED BERM.

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING WETLANDS

XX

XX

NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE

HAULED AND STOCKPILED AT THE NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3

FOR NPS SOIL WASTE SITE LOCATION.

SCALE:

HORIZ: 1"=20'

DECK, TYP.

STREAM

30+00

31+00

32+00

33+00

34+00 35+00

PI: 33+98.46

PI

: 3

3+

.99

PI

: 3

3+

.42PI:

+7 0.2

PI

: 3

1+

.61

PI

: 3

0+

.11

PI

: 3

0+

.26

PI: 29+57.74

PC

: 3

5+

.28

PT: 35+18.35

2435 2435

2435 2435

2432 2432

2433 2433

2434 2434

24342434

2436 2436

29+50.00

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

+5

0.0

+0

0.0

35+50.00 30+00

30+00.00 (20)

L24

L23

L22 L21

L20

L19

L18

L17

C11

CHANNEL

29+50

.3

.09

30+00

.5

.29

.8

.50

31+00

.2

.71

.4

.91

32+00

.3

.12

.7

.33

33+00

.0

.53

.4

.74

34+00

.7

.95

.6

.15

35+00

.9

.36

35+50

.6

.57

0.41%

LINE TABLE

NO.

L17

L18

L19

L20

L21

L22

L23

L24

LENGTH

52.52

75.85

106.50

77.63

39.18

48.57

40.47

105.82

DIRECTION

N16° 32' 02"E

N36° 42' 20"E

N24° 40' 46"E

N54° 54' 02"E

N39° 34' 45"E

N16° 41' 20"E

N0° 15' 51"E

N20° 35' 28"E

START STATION

29+57.74

30+10.26

30+86.11

31+92.61

32+70.24

33+09.42

33+57.99

33+98.46

END STATION

30+10.26

30+86.11

31+92.61

32+70.24

33+09.42

33+57.99

33+98.46

35+04.28

START COORD.

N: 519579.14 E: 1543360.93

N: 519629.49 E: 1543375.87

N: 519690.30 E: 1543421.21

N: 519787.07 E: 1543465.68

N: 519831.71 E: 1543529.19

N: 519861.90 E: 1543554.15

N: 519908.43 E: 1543568.10

N: 519948.90 E: 1543568.29

END COORD.

N: 519629.49 E: 1543375.87

N: 519690.30 E: 1543421.21

N: 519787.07 E: 1543465.68

N: 519831.71 E: 1543529.19

N: 519861.90 E: 1543554.15

N: 519908.43 E: 1543568.10

N: 519948.90 E: 1543568.29

N: 520047.96 E: 1543605.51

CURVE TABLE

NO.

C11

P.C. STA.

35+04.28

P.I. STA.

35+11.62

P.T. STATION

35+18.35

RADIUS

20.00

LENGTH

14.07

DELTA

40°17'37"

TANGENT

7.34

CHORD DIRECTION

N0° 26' 40"E

CHORD

13.78

P.C. COORD.

N: 520047.96 E: 1543605.51

P.I. COORD.

N: 520054.83 E: 1543608.09

P.T. COORD.

N: 520061.73 E: 1543605.61

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

C11

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C12

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C10

DRAINAGE CHANNEL

PLAN & PROFILE

EXISTING GRADE @ CL

PROPOSED GRADE @ CL

XREF. NOTES ( )

1 PROPOSED CHANNEL CENTERLINE.

2 PROPOSED BERM.

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING WETLANDS

XX

XX

NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE

NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.

SCALE:

HORIZ: 1"=20'

W

W

2439 24

BOX CULVERT

FL: 2436.10

BOX CULVERT

FL: 2436.23

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

36+00

37+00

37+40

EP

: 3

7+

.00

PI

: 3

6+

.70

24352434 24342436

+5 0.0

+0

0.0 0 36

+5 0.0

+0

0.0

L26

L25

CHANNEL

35+50

.6

.57

36+00

.8

.77

.0

.98

37+00

.6

.18

37+40

.5

.35

GR

AD

E

BR

EA

K

ST

A

+4 0.0

EL

EV

4.3

EXISTING WATER LINE

STA:37+07.70

ELEV:2429.29

LINE TABLE

NO.

L25

L26

LENGTH

111.36

110.30

DIRECTION

N19° 42' 09"W

N9° 18' 49"W

START STATION

35+18.35

36+29.70

END STATION

36+29.70

37+40

START COORD.

N: 520061.73 E: 1543605.61

N: 520166.57 E: 1543568.07

END COORD.

N: 520166.57 E: 1543568.07

N: 520275.42 E: 1543550.22

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

X

NORTH

1 inch = ft.

020 20

REF. NOTES ( )

1 CLEAN OUT DOUBLE-BOX CULVERT TO EXISTING FLOW LINE.

2 PROTECT EXISTING UTILITY. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH.

3 PROPOSED CHANNEL CENTERLINE.

C12

MA

TC

HL

INE

- S

TA

+5

0 S

HE

ET

C11

DRAINAGE CHANNEL

PLAN & PROFILE

EXISTING GRADE @ CL

PROPOSED GRADE @ CL

1 LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING WETLANDS

XX

XX

NOTE: ALL EXCESS EXCAVATED MATERIAL FROM THIS PROJECT SHALL BE HAULED AND STOCKPILED AT THE

NPS-PROVIDED SOIL WASTE SITE. SEE SHEET C3 FOR NPS SOIL WASTE SITE LOCATION.

SCALE:

HORIZ: 1"=20'

A/C

A/C

A/C

A/C

A/C

6"

"16

"14

"18

8"

6"

W

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

W W

W

DECK, TYP.

OVERHEAD CANOPY, TYP.

RAMP, TYP.

STREAM

GR

AV

EL

GR

AV

EL

SAN SAN SAN SAN SAN

W W

W W

W W

W W

W W

W

W W

W W

W W W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W W

W W

W

W

W W

W W

W W

W

W

W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

W

SAN. MANHOLE

RIM ELEV: 2430.01

(N) 6" HDPE I.E.: 2422.76

(S) 6" HDPE I.E.: 2422.81

26+00

27+00

28+00

29+00

PI

: 2

9+

.74

PI: 28+49.11

25+00

26+00

27+00

28+00

29+00

30+00

BP: 25+00.00

PI: 29+42.16

25+00.00 (10)

25+50.00 (11)

26+00.00 (12)

26+50.00 (13)

27+00.00 (14)

27+50.00 (15)

28+00.00 (16)

28+50.00 (17)

29+00.00 (18)

+5

0.0 0 (

L27

LINE TABLE

NO.

L27

LENGTH

442.16

DIRECTION

N24° 41' 32"W

START STATION

25+00

END STATION

29+42.16

START COORD.

N: 519140.99 E: 1543492.37

END COORD.

N: 519542.72 E: 1543307.66

BERM

2.31%

0.67%

GR

AD

E

BR

EA

K

ST

A

+0 0.0

EL

EV

0.4

GR

AD

E

BR

EA

K

ST

A

+6 7.4

EL

EV

2.0

GR

AD

E

BR

EA

K

ST

A

+4 2.1

EL

EV

4.5

25+00

.5

.49

.9

.65

26+00

.1

.27

.4

.61

27+00

.8

.94

.9

.27

28+00

.3

.61

.4

.94

29+00

.2

.27

.2

.55

30+00

.2

.55

-3.00:1

3.00:1

-3.00:1

3.00:1

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

C13

BERM PLAN

MA

TC

HL

INE

- S

TA

+0

0 S

HE

ET

C14

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

XX

XX

PROPOSED BERM CENTERLINE

6.0' @ 2.0%

BERM CENTERLINE

TYPICAL SECTION

EARTHEN BERM NOTES:

A WITHIN THE FOOTPRINT OF THE PROPOSED BERM, STRIP ALL VEGETATION AND TOPSOIL MATERIAL.

SCARIFY AND RECOMPACT THE TOP 6" OF EXISTING MATERIAL PRIOR TO CONSTRUCTING FILL.

B

EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE

EATHERN BERM. MATERIAL USED FOR CONSTRUCTION OF THE BERM SHALL BE IMPORTED FROM

OFFSITE, SEE SPECIFICATIONS FOR IMPORTED FILL MATERIAL REQUIREMENTS.

C PLACE FILL IN LIFTS OF NOT MORE THAN 8" LOOSE THICKNESS AND COMPACT TO AT LEAST 95% OF THE MAXIMUM DRY UNIT WEIGHT OF THE SOIL, AS DETERMINED BY ASTM D698 STANDARD PROCTOR

TEST.

D PRIOR TO SEEDING AND HYDROMULCHING, THE BERM SHALL BE SCARIFIED UNIFORMLY TO A DEPTH

OF 2" (SEE SPECIFICATIONS).

E BERM SHALL BE SEEDED AND HYDROMULCHED (SEE SPECIFICATIONS).

SCALE:

HORIZ: 1"=20'

VERT: 1"=5'

PROPOSED TOP OF BERM @ CL

EXISTING GRADE

DECK, TYP.

OVERHEAD CANOPY, TYP.

DECK, TYP.

CONCRETE SIDEWALK

SAN

SAN

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W30+00

PI:

+8 6.1

PI

: 3

0+

.26

30+00

31+00

32+00

32+59

EP: 32+59.18

PI

: 3

0+

.64

PI

: 3

1+

.28

+0

0.0 0 (

+5

0.0 0 (

+0

0.0 0 (

+5

0.0 0 (

) 32+00.00 (24)

32+50.00 (25)

2435243524352434

L18

L17

L28

L29

L30

LINE TABLE

NO.

L28

L29

L30

LENGTH

151.48

94.64

70.90

DIRECTION

N9° 06' 18"W

N11° 17' 12"E

N36° 49' 15"W

START STATION

29+42.16

30+93.64

31+88.28

END STATION

30+93.64

31+88.28

32+59.18

START COORD.

N: 519542.72 E: 1543307.66

N: 519692.29 E: 1543283.69

N: 519785.11 E: 1543302.21

END COORD.

N: 519692.29 E: 1543283.69

N: 519785.11 E: 1543302.21

N: 519841.87 E: 1543259.72

BERM

30+00

.2

.55

.5

.55

31+00

.9

.59

.5

.91

32+00

.0

.18

.1

.28

32+59.18

.3

.30

0.00% 0.63% 0.19%

GR

AD

E

BR

EA

K

ST

A

+9 3.6

EL

EV

4.5

GR

AD

E

BR

EA

K

ST

A

+8 8.9

EL

EV

5.1

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

NORTH

1 inch = ft.

020 20

C14

BERM PLAN

MA

TC

HL

INE

- S

TA

+0

0 S

HE

ET

C13

LEGEND

EXISTING CONTOUR

PROPOSED CONTOUR

XX

XX

EARTHEN BERM NOTES:

A WITHIN THE FOOTPRINT OF THE PROPOSED BERM, STRIP ALL VEGETATION AND TOPSOIL MATERIAL.

SCARIFY AND RECOMPACT THE TOP 6" OF EXISTING MATERIAL PRIOR TO CONSTRUCTING FILL.

B

EXISTING ONSITE MATERIAL FROM EXCAVATION IS NOT SUITABLE FOR CONSTRUCTION OF THE

EATHERN BERM. MATERIAL USED FOR CONSTRUCTION OF THE BERM SHALL BE IMPORTED FROM

OFFSITE, SEE SPECIFICATIONS FOR IMPORTED FILL MATERIAL REQUIREMENTS.

C PLACE FILL IN LIFTS OF NOT MORE THAN 8" LOOSE THICKNESS AND COMPACT TO AT LEAST 95% OF THE MAXIMUM DRY UNIT WEIGHT OF THE SOIL, AS DETERMINED BY ASTM D698 STANDARD PROCTOR

TEST.

D PRIOR TO SEEDING AND HYDROMULCHING, THE BERM SHALL BE SCARIFIED UNIFORMLY TO A DEPTH

OF 2" (SEE SPECIFICATIONS).

E BERM SHALL BE SEEDED AND HYDROMULCHED (SEE SPECIFICATIONS).

PROPOSED BERM CENTERLINE

SCALE:

HORIZ: 1"=20'

VERT: 1"=5'

PROPOSED TOP OF BERM @ CL

EXISTING GRADE

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

SITE DETAILS & TYPICAL

SECTIONSC15

1 GRANULAR SURFACING

NO SCALE

A B

A. 6" GRANULAR MATERIAL

B. 6" PREPARED SUBGRADE SCARIFY AND RECOMPACT TO A

MINIMUM OF 95% OF MAXIMUM DENSITY PER ASTM D698

EXISTING EARTH

2 CONCRETE VALLEY GUTTER

NO SCALE

4 EROSION CONTROL BLANKET

NO SCALE 5 SILT FENCE

NO SCALE 6 ROCK CHECK DAM

NO SCALE

NOTES:

1. ALL REBAR SHALL BE EPOXY COATED

2. REFER TO PLANS FOR LENGTH OF VALLEY GUTTER

3. ALL REBAR WILL BE TIED AND IN PLACE.

#4 DEFORMED REBAR AT

12" ON CENTER BOTH WAYS. REINFORCED CONCRETE

VALLEY GUTTER.

2" GRAVEL CUSHION

OR BASE COURSESection A-A

1 1 2"

7- 1/2

2"

6" SCARIFIED AND RECOMPACTED SUBGRADE,

COMPACT TO A MINIMUM OF 95% OF MAXIMUM

DENSITY PER ASTM D698

PROFILE

PLAN VIEW

CONSTRUCTION SPECIFICATIONS:

1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.

2. LENGTH - AS REQUIRED, BUT NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE

LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY).

3. THICKNESS - NOT LESS THAN SIX (6) INCHES.

4. WIDTH - TWENTY FIVE (25) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS

WHERE INGRESS OR EGRESS OCCURS.

5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.

FILTER WILL NOT BE REQUIRED ON A SINGLE FAMILY RESIDENCE LOT.

6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION

ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A

MOUNTABLE BERM WITH 5H:1V SLOPES WILL BE PERMITTED.

7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL

PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY

REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND

REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT

SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE

REMOVED IMMEDIATELY.

8. WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO

PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA

STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING

DEVICE.

9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.

EXISTING PAVEMENT

MOUNTABLE BERM (OPTIONAL)

EXISTING PVMT.

EXISTING

GROUND

FILTER CLOTH

50' MIN.

' M

IN

10'

6" M

IN

50' MIN.

3 STABILIZED CONSTRUCTION ENTRANCE

NO SCALE

3- 3/4

12+00.00

12+50.00

13+00.00

.4

.0

.2

13+50.00

.3

.54

14+00.00

14+50.00

15+00.00

15+50.00

.5

.92

.8

.29

.4

.67

.7

.04

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C16

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

VERT: 1"=5'

16+00.00

16+50.00

17+00.00

17+50.00

.1

.41

.5

.79

.9

.16

.1

.53

18+00.00

18+50.00

19+00.00

19+50.00

.4

.91

.7

.28

.9

.66

.9

.03

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C17

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

20+00.00

20+50.00

21+00.00

21+50.00

.7

.40

.0

.78

.2

.14

.3

.46

22+00.00

.9

.78

22+50.00

23+00.00

23+50.00

.3

.10

.4

.42

.7

.73

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C18

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

24+00.00

24+50.00

25+00.00

25+50.00

.8

.04

.4

.32

.6

.60

.9

.88

26+00.00

26+50.00

.1

.17

.4

.45

27+00.00

27+50.00

.6

.73

.8

.01

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C19

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

28+00.00

28+50.00

29+00.00

29+50.00

.5

.30

.8

.58

.1

.86

.3

.09

30+00.00

30+50.00

31+00.00

.5

.29

.8

.50

.2

.71

31+50.00

.4

.91

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C20

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

32+00.00

32+50.00

33+00.00

33+50.00

.3

.12

.7

.33

.0

.53

.4

.74

34+00.00

34+50.00

35+00.00

35+50.00

.7

.95

.6

.15

.9

.36

.6

.57

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C21

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

36+00.00

36+50.00

37+00.00

.8

.77

.0

.98

.6

.18

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C22

DRAINAGE CHANNEL

CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

25+00.00

25+50.00

26+00.00

26+50.00

27+00.00

27+50.00

28+00.00

28+50.00

.5

.49

.9

.65

.1

.27

.4

.61

.8

.94

.9

.27

.3

.61

.4

.94

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C23 BERM CROSS SECTIONS

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

29+00.00

29+50.00

30+00.00

30+50.00

31+00.00

31+50.00

32+00.00

32+50.00

.2

.27

.2

.55

.2

.55

.5

.55

.9

.59

.5

.91

.0

.18

.1

.28

DATE:

TECH. REVIEW:

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

BERM CROSS SECTIONSC24

EXISTING GRADE (TYP.)

PROPOSED GRADE (TYP.)

SCALE:

HORIZ: 1"=20'

SUB SHEET NO. TITLE OF SHEET

PMIS NO.

DRAWING NO.

SHEET

OF

DRAWN BY:

DESIGNED:

MJS

DGD

RMD

05-16-2025

BADLANDS NATIONAL PARK;

INTERIOR, SOUTH DAKOTA

80117

239351

C25

STORM WATER

POLLUTION PREVENTION

PLAN NOTES

SWPPP CHECKLIST

(The numbers left of the title headings are reference numbers to the

GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED

WITH CONSTRUCTION ACTIVITIES (Stormwater Permit))

5.3 (2): STAFF TRAINING/SWPPP IMPLEMENTATION

To promote stormwater management awareness specific for this project, the Contractor’s Erosion Control Supervisor shall provide correspondence of how the SWPPP will be implemented. The Contractor’s Erosion Control Supervisor is responsible for providing this information at the preconstruction meeting, and subsequently completing an attendance log, which should identify site-specific implementation of the SWPPP and the names of the personnel who attended the preconstruction meeting. Documentation of the preconstruction meeting will be filed with the SWPPP documents.

5.3 (3): DESCRIPTION OF CONSTRUCTION ACTIVITIES

5.3 (3a): Project Limits (See C2)

5.3 (3a): Project Description (Minor grading and gravel surfacing for rehabilitation of existing earthen roadway)

5.3 (4): Site Map(s) (See C3) Major Soil Disturbing Activities (check all that apply) Clearing and grubbing Excavation/borrow Grading and shaping Filling Other (describe):

5.3 (3b): Total Project Area: 31.65 AC

5.3 (3b): Total Area to be Disturbed: 3.36 AC

5.3 (3c): Maximum Area Disturbed at One Time: 3.36 AC

5.3 (3d): Existing Vegetative Cover (%): 10

5.3 (3d): Description of Vegetative Cover: Western Wheatgrass

5.3 (3e): Soil Properties: Mainly fine silty loam soils Hydrologic Soil Group B

5.3 (3f): Name of Receiving Water Body/Bodies: unnamed tributary to White River

5.3 (3g): Location of Construction Support Activity Areas: within project boundary

5.3 (3h): ORDER OF CONSTRUCTION ACTIVITIES

Special sequencing requirements (see sheet).

The Contractor will enter the Estimated Start Date.

Description Estimated Start Date

Install stabilized construction entrance(s).

Install perimeter protection where runoff may exit site.

Install perimeter protection around stockpiles.

Install channel and ditch bottom protection.

Clearing and grubbing.

Remove and stockpile topsoil.

Stabilize disturbed areas.

Install utilities, storm sewers, curb and gutter.

Install inlet and culvert protection after completing storm drainage and other utility installations.

Final grading.

Final paving.

Removal of protection devices.

Reseed areas disturbed by removal activities.

5.3 (5): DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES

All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report. Include the technical reasoning for selecting each control. (check all that apply)

Perimeter Controls (See Detail Plan Sheets)

Description Estimated Start Date

Natural Buffers (within 50 ft of Waters of State) Silt Fence Erosion Control Wattles Temporary Berm / Windrow Floating Silt Curtain Stabilized Construction Entrances Entrance/Exit Equipment Tire Wash Other:

Structural Erosion and Sediment Controls

Description Estimated Start Date

Silt Fence Temporary Berm/Windrow Erosion Control Wattles Temporary Sediment Barriers Erosion Bales Temporary Slope Drain Turf Reinforcement Mat Riprap Gabions Rock Check Dams Sediment Traps/Basins Culvert Inlet Protection Transition Mats Median/Area Drain Inlet Protection Curb Inlet Protection Interceptor Ditch Concrete Washout Facility Work Platform Temporary Water Barrier Temporary Water Crossing Permanent Stormwater Ponds Permanent Open Vegetated Swales Natural Depressions to allow for Infiltration Sequential Systems that combine several practices Other:

Dust Controls

Description Estimated Start Date

Tarps & Wind impervious fabrics Watering Stockpile location/orientation Dust Control Chlorides Other

SWPPP CHECKLIST

Dewatering BMPs

Description Estimated Start Date

Sediment Basins Dewatering bags Weir tanks Temporary Diversion Channel Other:

Stabilization Practices (See Detail Plan Sheets) (Stabilization measures shall begin the following work day whenever earth disturbing activity on any portion of the site has temporarily or permanently ceased. Temporary stabilization shall be completed as soon as practicable but no later than 14 days after initiating soil stabilization activities (3.18))

Description Estimated Start Date

Vegetation Buffer Strips Temporary Seeding (Cover Crop Seeding) Permanent Seeding Sodding Planting (Woody Vegetation for Soil Stabilization) Mulching (Grass Hay or Straw) Fiber Mulching (Wood Fiber Mulch) Soil Stabilizer Bonded Fiber Matrix Fiber Reinforced Matrix Erosion Control Blankets Surface Roughening (e.g. tracking) Other:

Wetland Avoidance Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes No If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with the USACE.

5.3 (6): PROCEDURES FOR INSPECTIONS

• Inspections will be conducted at least once every 7 days or once every 14 calendar days and within 24 hours of precipitation that exceeds 0.25 inches or snowmelt that generates runoff.

• All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report.

• Silt fence will be inspected for depth of sediment and for tears to ensure the fabric is securely attached to the posts and that the posts are well anchored.

Sediment buildup will be removed from the silt fence when it reaches 1/3 of the height of the silt fence.

• Sediment basins and traps will be checked. Sediment will be removed when depth reaches approximately 50 percent of the structure’s capacity, and at the conclusion of the construction.

• Check dams will be inspected for stability. Sediment will be removed when depth reaches ½ the height of the dam.

• All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.

• Inspection and maintenance reports will be prepared on the erosion control inspection form for each site inspection, this form will also be used to document changes to the SWPPP. A copy of the completed inspection form will be filed with the SWPPP documents.

• The Contractor is responsible for inspections. Maintenance and repair activities are the responsibility of the Contractor. The Contractor will complete the inspection and maintenance reports and distribute copies per the instructions on the erosion control inspection form.

5.3 (7): POST CONSTRUCTION STORMWATER MANAGEMENT

Stormwater management will be handled by temporary controls outlined in “DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES” above, and any permanent controls needed to meet permanent stormwater management needs in the post construction period will be shown in the plans and noted as permanent.

5.3 (8): POLLUTION PREVENTION PROCEDURES

5.3 (8a): Spill Prevention and Response Procedures Material Management Housekeeping

• Only needed products will be stored on-site by the Contractor.

• Except for bulk materials the contractor will store all materials under cover and/or in appropriate containers.

• Products must be stored in original containers and labeled.

• Material mixing will be conducted in accordance with the manufacturer’s recommendations.

• When possible, all products will be completely used before properly disposing of the container off-site.

• The manufacturer’s directions for disposal of materials and containers will be followed.

• The Contractor’s site superintendent will inspect materials storage areas regularly to ensure proper use and disposal.

• Dust generated will be controlled in an environmentally safe manner.

SWPPP CHECKLIST

Hazardous Materials

• Products will be kept in original containers unless the container is not resealable and provide secondary containment as applicable.

• Original labels and material safety data sheets will be retained in a safe place to relay important product information.

• If surplus product must be disposed of, manufacturer’s label directions for disposal will be followed.

• Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground.

• Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any stormwater system or stormwater treatment system.

• Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, residuals from concrete saw cutting (either wet or dry), and mixer washout waters will be collected on site and managed to prevent contamination of stormwater runoff.

Spill Control Practices In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed.

• For all hazardous materials stored on site, the manufacturer’s recommended methods for spill cleanup will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.

• Appropriate cleanup materials and equipment will be maintained by the Contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for cleanup purposes.

• All spills will be cleaned immediately after discovery and the materials disposed of properly.

• The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.

• After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences.

• The Contractor’s site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coordinator.

Spill Response The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into stormwater runoff and conveyance systems. If the release has impacted on-site stormwater, it is critical to contain the released materials on-site and prevent their release into receiving waters. If a spill of pollutants threatens stormwater or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants.

• The Contractor’s site superintendent will be notified immediately when a spill or the threat of a spill is observed. The superintendent will assess the situation and determine the appropriate response.

• If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized.

• Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the Contractor at the site.

• If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The Contractor will use appropriate materials to contain and absorb the spill. The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases.

• If a spill occurs the superintendent or the superintendent’s designee will be responsible for completing the spill reporting form and for reporting the spill to SDDENR.

• Personnel with primary responsibility for spill response and cleanup will receive training by the Contractor’s site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.

• Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.

5.3 (8b): WASTE MANAGEMENT PROCEDURES Waste Disposal

• All liquid waste materials will be collected and stored in approved sealed containers. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal and notices stating proper practices will be posted. The Contractor is responsible for ensuring waste disposal procedures are followed.

Hazardous Waste

• All hazardous waste materials will be disposed of in a manner specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the Contractor will be responsible for seeing that these practices are followed.

Sanitary Waste

• Portable sanitary facilities will be provided on all construction sites. Sanitary waste will be collected from the portable units which must be secured to prevent tipping and serviced in a timely manner by a licensed waste management Contractor or as required by any local regulations.

SWPPP CHECKLIST

5.3 (9): CONSTRUCTION SITE POLLUTANTS

The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the heading “POLLUTION PREVENTION PROCEDURES” (check all that apply).

Concrete and Portland Cement Detergents Paints Metals Bituminous Materials Petroleum Based Products Diesel Exhaust Fluid Cleaning Solvents Wood Cure Texture Chemical Fertilizers Other:

Product Specific Practices

• Petroleum Products All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.

• Fertilizers Fertilizers will be applied only in the amounts specified or recommended by the supplier. Once applied, fertilizers will be worked into the soil to limit the exposure to stormwater. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.

• Paints All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer’s instructions and any applicable state and local regulations.

• Concrete Trucks Contractors will provide designated truck washout facilities on the site. These areas must be self-contained and not connected to any stormwater outlet of the site. Upon completion of construction, the area at the washout facility will be properly stabilized.

5.3 (10): NON-STORMWATER DISCHARGES

The following non-stormwater discharges are anticipated during the course of this project (check all that apply).

Discharges from water line flushing.

Pavement wash-water, where no spills or leaks of toxic or hazardous materials have occurred.

Uncontaminated ground water associated with dewatering activities.

5.3 (11): INFEASIBILITY DOCUMENTATION

If it is determined to be infeasible to comply with any of the requirements of the Stormwater Permit, the infeasibility determination must be thoroughly documented in the SWPPP.

7.0: SPILL NOTIFICATION

In the event of a spill, the Contractor’s site superintendent will make the appropriate notification(s), consistent with the following procedures:

A release or spill of a regulated substance (includes petroleum and petroleum products) must be reported to SDDENR immediately if any one of the following conditions exists:

• The release or spill threatens or is able to threaten waters of the state (surface water or ground water)

• The release or spill causes an immediate danger to human health or safety

• The release or spill exceeds 25 gallons

• The release or spill causes a sheen on surface water

• The release or spill of any substance that exceeds the ground water quality standards of ARSD Chapter 74:54:01

• The release or spill of any substance that exceeds the surface water quality standards of ARSD Chapter 74:51:01

• The release or spill of any substance that harms or threatens to harm wildlife or aquatic life

• The release or spill is required to be reported according to Superfund Amendments and Reauthorization Act (SARA) Title III List of Lists, Consolidated List of Chemicals Subject to Reporting Under the Emergency Planning and Community Right to Know Act, US Environmental Protection Agency.

To report a release or spill, call SDDENR at 605-773-3296 during regular office hours (8 a.m. to 5 p.m. Central Standard Time). To report the release after hours, on weekends or holidays, call South Dakota Emergency Management at 605-773-3231. Reporting the release to SDDENR does not meet any obligation for reporting to other state, local, or federal agencies.

Therefore, you must also contact local authorities to determine the local reporting requirements for…