B08_Solicitation_-_Att_4_-_Submittal_List.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
JEFF REPLACE COOLING TOWER AND BOILERS Federal contract opportunity
Solicitation number
140P6026B0003
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a submittal list and review estimate template for construction services related to the replacement of cooling tower and boiler units at Jefferson National Expansion Memorial (JEFF, PMIS 320855) under the National Park Service Denver Service Center.

The document serves as a procedural guide for managing construction submittals during both the design (Construction Documents phase) and construction phases of the project. It establishes submittal requirements for 16 specification sections covering HVAC components, including meters and gauges, valves, hangers and supports, piping insulation, instrumentation and control devices, natural gas piping, hydronic piping and specialties, hydronic pumps, air terminal units, condensing boilers, heat exchangers, and forced draft cooling towers. Submittals are categorized as either "Action" (requiring Government responsive review) or "Informational" (reviewed by Construction Management Representative only). The template includes a review estimate section for the Architect/Engineer to indicate hours required per discipline (Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager, Landscape Architect) for each action submittal. The current estimate totals 12 hours for mechanical engineering review across all line items. This template is used to negotiate the submittal review portion of the Architect/Engineer Construction Services task order and to apply hourly rates from the associated IDIQ contract to formulate Government cost estimates for submittal reviews.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:JEFF - 320855(Complete this portion for Architect / Engineer (A/E)
Project Title:Replace Cooling Tower and Boiler Unitsconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
2305191.02Meters and gauges for HVAC PipingX0.5
2305231.02General Duty Valves for HVAC PipingXX0.5
2305291.04Hangers and SupportsX0.5
2305531.02Identification for HVAC Piping and EquipmentXX0.5
2305931.02Tab ReportX1
2307191.01HVAC Piping InsulationXX0.5
2309131.03Instrumentation and control devices for HVACX1
2311231.02Faciliity natural gas pipingXX0.5
2321131.03Hydronic PipingXX0.5
2321141.03Hydronic SpecialtiesXX1
2321231.02Hydronic pumpsXX1
2336001.03Air terminal unitsXX1.5
2352161.03Condensing boilersXX1
2357001.02Heat exchangersXX1
2365131.02Forced draft cooling towersXX1

Total: 0 0 0 12 0 0 0

Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N