About this file
This document is Addendum No. 1 to the bidding documents for the NPS Gateway National Park Maintenance Building project (Schemmer Project No. 009258.012), issued by The Schemmer Associates on March 11, 2026. The addendum modifies the original contract documents and must be acknowledged on the Bid Form, with failure to do so potentially resulting in bidder disqualification. The addendum consists of two pages of written items and twelve pages of supplemental drawings.
The mechanical changes include modifications to six sheets: Sheet M001 (Demolition Floor Plan) with updated view titles to include Contract Line Item Numbers (CLINs), modified keynotes, and added VAV-11 scope; Sheet M002 (Demolition Floor Plan) with similar CLIN updates and modified demolition tags; Sheet M101 (Floor Plan) with CLIN updates and VAV-11 scope details; Sheet M102 (Floor Plan) with CLIN updates and new-to-existing symbols; Sheet M401 (Details) adding a gas flue through roof detail; and Sheet M501 (Schedules) revising notes for gas-fired hot water boiler and pump schedules with corrected AHU designations in the Air Terminal Unit Schedule. The electrical changes affect seven sheets: Sheet E01 with updated referenced notes; Sheet E001 with CLIN view title changes; Sheet E002 with CLIN updates; Sheet E201 with CLIN updates, referenced notes, and added boiler shut-off emergency switches; Sheet E601 updating cooling tower starters to VFD/disconnects with mechanical contractor responsibility noted; and Sheet E701 adding a circuit to panel PP-1 for contactor control power.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_MISC_Questions_Answers_0003.docx | DOCX document | |
| Sol_140P6026B0003_Amd_0003.pdf | ||
| Sol_140P6026B0003_Amd_0002.pdf | ||
| B12_MISC_Site_Visit_Sign_In_Sheet_0002.pdf | ||
| B08_Solicitation_-_Att_8_-_Drawings_0001.pdf | ||
| Sol_140P6026B0003_Amd_0001.pdf | ||
| B08_Solicitation_-_Att_2_-_Specifications_-_Division_1.pdf | ||
| B08_Solicitation_-_Att_4_-_Submittal_List.xlsx | XLSX spreadsheet | |
| Sol_140P6026B0003.pdf | ||
| B08_Solicitation_-_Att_5_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Att_7_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Att_1_-_Specifications.pdf | ||
| B08_Solicitation_-_Att_6_-_Notice_to_Contractors.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 11th 2026r Addendum No. 1 - 1 009258.012
DATE: March 11th, 2026
FROM: The Schemmer Associates
1044 North 115th Street, Suite 300 Omaha, Nebraska 68154 Phone: (402) 493-4800
TO: Prospective Bidders and Plan Holders
RE: Addendum No. 1 to the Bidding Documents for:
NPS Gateway National Park Maintenance Building Schemmer Project No. 009258.012
This addendum is issued by the Architect to the Contractor. This Addendum shall be made a part of the Contract Documents. Acknowledge receipt of this Addendum shall be provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This addendum consists of two (2) pages of written addendum items and twelve (12) pages of supplemental drawings.
THE SCHEMMER ASSOCIATES INC.
March 11th 2026r Addendum No. 1 - 2 009258.012
DRAWINGS
MECHANICAL
Item No. DM-1, Sheet M001
Changed view title to include the Contract Line Item Number (CLIN) associated with the work depicted in the view.
Modified keynotes, added view showing VAV-11 scope, removed tags from equipment being removed.
Item No. DM-2, Sheet M002
Changed view title to include the Contract Line Item Number (CLIN) associated with the work depicted in the view.
Modified keynotes, modified demo to existing tags, removed tags from equipment being removed.
Item No. DM-3, Sheet M101
Changed view title to include the Contract Line Item Number (CLIN) associated with the work depicted in the view.
Modified keynotes, added view showing VAV-11 scope, Item No. DM-4, Sheet M102
Changed view title to include the Contract Line Item Number (CLIN) associated with the work depicted in the view.
Modified keynotes and new to existing symbols.
Item No. DM-5, Sheet M401
Added detail for gas flue through roof.
Item No. DM-6, Sheet M501
Revised notes for gas-fired hot water boiler and pump schedules. Corrected associated AHU designation in Air Terminal Unit Schedule.
ELECTRICAL
Item No. DE-1, Sheet E 01 Updated and added referenced notes.
Item No. DE-2, Sheet E001 Changed view title to include the Contract Line Item Number (CLIN) associated with the work depicted in the view.
Item No. DE-3, Sheet E002 Changed view titles to include the CLIN associated with the work depicted in the views.
Item No. DE-4, Sheet E201 Changed view titles to include the CLIN associated with the work depicted in the views.
Updated and added referenced notes.
Item No. DE-5, Sheet E201 Added boiler shut-off emergency switches.
Item No. DE-6, Sheet E601 Updated cooling tower starters to VFD/disconnects, added notes VFD/disconnects to be provided by Mech, And to provide non-fused disconnect if VFD’s were not installed within sight of cooling tower.
Item No. DE-5, Sheet E701 Added circuit to panel “PP-1” for contactor control power.
END OF ADDENDUM NO. 1
T
T
T
T
T
T
T
T
T
T
MEN
KITCHEN
BREAKROOM
CORRIDOR
SUPPLIES
TRAINING
ROOM
OPEN OFFICE
OFFICE
WORK ROOM
TOOL ROOM
SUPPLIES
SHOP AREA
TRUCK BAYS
WAREHOUSE
RECEIVING
ENTRY
CORRIDOR
CORRIDOR
STAIR
SUPPLIES
DATA
JANITOR
WOMENS
LOCKER
MENS LOCKER
WOMEN
1 1
HWS
HWRHWR
HWS
1 1
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M001
DEMOLITION FLOOR PLAN -
MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M001 DEMOLITION FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING VAV BOX AND ASSOCIATED PIPING SPECIALTIES. PROTECT
CONNECTED DUCTWORK FOR RECONNECTION TO NEW VAV BOX. SEE M101 FOR
ADDITIONAL INFORMATION. REMOVE ASSOCIATED THERMOSTAT. PROVIDE BLANK OFF
PLATE OVER EXISTING THERMOSTAT OPENING IF REQUIRED FOR NEW THERMOSTAT.
2 CONTRACTOR TO FIELD VERIFY VAV-11 THERMOSTAT LOCATION.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - DEMO HVAC - CLIN 3
DATE INITIAL
03/11/2026
SCALE: 1/8" = 1'-0"
SUB-GRADE PLAN - DEMO HVAC - CLIN 3
3/11/26
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
AHU-1
UH-4
P-55
G
1 1
METER
MECHANICAL
151A
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M002
DEMOLITION FLOOR PLAN -
MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M002 DEMOLITION FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING COOLING TOWER. ASSOCIATED PIPING AND BY-PASS SYSTEM IS TO BE
REUSED. CONTRACTOR TO DOCUMENT PIPING LAYOUT PRIOR TO REMOVAL OF COOLING
TOWER. CONTRACTOR TO BE RESPONSIBLE FOR MODIFICATIONS TO EXISTING STEEL
STRUCTURE FOR NEW COOLING TOWER.
2 REMOVE EXISTING PUMPS AND ASSOCIATED ACCESSORIES.
3 EXISTING WATER METER CONNECTED TO CONDENSER DRAIN LINE TO BE REUSED FOR
WITH NEW PUMPS. TEMPORARILY DISCONNECT DURING CONSTRUCTION.
4 REMOVE BOILER AND ASSOCIATED FLUE, CONDENSATE DRAIN LINE, AND ASSOCIATED
ACCESSORIES. REMOVE GAS PIPING BACK TO MAIN AND CAP. REMOVE GAS FLUE BACK
TO VERTICAL STACK. VERTICAL STACK TO BE REUSED.
5 EXISTING EQUIPMENT TO REMAIN.
6 REMOVE EXISTING AIR/DIRT SEPARATOR AND PREPARE FOR INSTALLATION OF NEW UNIT.
7 REMOVE EXISTING EXPANSION TANK AND PREPARE FOR INSTALLATION OF NEW UNIT.
8 REMOVE COMMON PIPE SECTION OF EXISTING IN-FLOOR RADIANT HEAT SYSTEM.
9 REMOVE EXISTING PUMP AND PREPARE FOR INSTALLATION OF NEW UNIT.
10 REMOVE FLUE UP TO ROOF. EXISTING PENETRATIONS ARE TO BE REUSED FOR NEW
BOILER EXHAUST FLUE. COORDINATE ASSOCIATED WORK WITH OWNER.
11 REMOVE EXISTING PUMP AND ALL ASSOCIATED ACCESSORIES.
DATE INITIAL
03/11/2026
SCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - DEMO HVAC - CLIN 2
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - DEMO HVAC - CLIN 1
T
T
T
T
T
T
T
T
T
MEN
KITCHEN
BREAKROOM
CORRIDOR
SUPPLIES
TRAINING
ROOM
OPEN OFFICE
OFFICE
WORK ROOM
TOOL ROOM
SUPPLIES
SHOP AREA
TRUCK BAYS
WAREHOUSE
RECEIVING
ENTRY
CORRIDOR
CORRIDOR
STAIR
SUPPLIES
DATA
JANITOR
WOMENS
LOCKER
MENS LOCKER
WOMEN
VAV-2
VAV-4
VAV-3
VAV-5
VAV-10
VAV-6
VAV-8
VAV-7
VAV-9
VAV-1
HWR
HWS
HWR
HWS
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
VAV-11
WAREHOUSE
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M101
FLOOR PLAN - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M101 FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC - CLIN 3
DATE INITIAL
03/11/2026
REF. NOTES ( ):X
1 REPLACE VAV BOX AS SHOWN. PROVIDE NEW PIPING SPECIALTIES AND CONNECT TO
EXISTING PIPING AND DUCTWORK. PIPING CONNECTIONS FOR EVERY VAV BOX IS TO BE
3/4". INSTALL NEW THERMOSTAT IN PREVIOUS THERMOSTAT LOCATION. PROVIDE BLANK
OFF PLATE OVER EXISTING THERMOSTAT OPENING IF REQUIRED FOR NEW THERMOSTAT.
2 CONTRACTOR TO FIELD VERIFY VAV-11 THERMOSTAT LOCATION.
SCALE: 1/8" = 1'-0"
SUB-GRADE PLAN - HVAC - CLIN 3
MECHANICAL
151A
METER
CT-1
CP-3
CP-2
CP-1
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
AHU-1
UH-4
HX-1
P-1
P-2
P-6
P-5
G
ET-2
AS-2
AS-1
ET-1
B-2
B-1
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
3" HWS
1" G
1" G
1 1/2" G
3" HWS
3" HWR
3" HWS
3" HWR
6 7
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M102
FLOOR PLAN - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M102 FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. NOTES ( ):X
1 INSTALL NEW COOLING TOWER IN PREVIOUS UNITS LOCATION. EXISTING PIPING TO BE
REUSED. CONTRACTOR TO MODIFY PIPING AS REQUIRED FOR NEW EQUIPMENT
CONNECTIONS. CONTRACTOR TO DOCUMENT ANY PIPING LAYOUTS PRIOR TO REMOVAL
OF COOLING TOWER. COOLING TOWER BYPASS LOOP TO BE USED FOR NEW COOLING
TOWER. CONTRACTOR TO BE RESPONSIBLE FOR MODIFICATIONS TO EXISTING STEEL
STRUCTURE FOR NEW COOLING TOWER.
2 INSTALL NEW PUMPS ON EXISTING HOUSEKEEPING PAD.
3 REINSTALL CONDENSER WATER METER AS PREVIOUSLY INSTALLED.
4 INSTALL EQUIPMENT ON EXISTING HOUSEKEEPING PAD.
5 SIZE AND INSTALL EXHAUST FLUE PIPING PER MANUFACTURER REQUIREMENTS.
MATERIAL TO BE AL 29-4C OR 316L STAINLESS STEEL LISTED AND LABELED TO UL-1738
/C-UL S636 FOR USE WITH CATEGORY II/IV APPLIANCES. ROUTE FLUE UP TO ROOF
THROUGH EXISTING OPENING. ALL PENETRATIONS SHALL BE MADE WATER TIGHT. ANY
ROOF FLASHING REQUIRED SHALL BE DONE CLEAN AND NEAT AND SHALL NOT VOID
ROOF WARRANTY. PROVIDE MANUFACTURER APPROVED FLUE TERMINATION ON ROOF.
6 ROUTE FULL SIZE CONDENSATE FROM BOILER TO EXISTING FLOOR DRAIN. PROVIDE
CONDENSATE NEUTRALIZER FOR EACH BOILER.
7 CONTRACTOR TO VERIFY GAS PRESSURE AND NATURAL GAS PIPE SIZE WITH MOST
RECENT IFGC PRIOR TO INSTALLATION. PROVIDE PRESSURE REGULATOR AT EACH
BOILER.
DATE INITIAL
03/11/2026
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - HVAC - CLIN 1
SCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - HVAC - CLIN 2
CONCRETE OR MASONRY
PARTITION.
GROUT, SEE
SPECIFICATIONS.
1/4" CLEAR AROUND PIPE
OR INSULATION.
CAULKING, SEE
SPECIFICATIONS.
SLEEVE, SEE
SPECIFICATIONS.
NOTE:
1. CAULK FULL PERIMETER OF PIPE AT BOTH INSIDE &
OUTSIDE OF WALL.
1/4" CLEAR AROUND PIPE
OR INSULATION
RISER CLAMP
CONCRETE
FLOOR
CAULKING, SEE
SPECIFICATIONS.
NOTE:
1. CAULK FULL PERIMETER OF PIPE AT BOTH TOP AND BOTTOM
OF FLOOR.
DETAIL OF SLEEVE FOR PIPING PENETRATION OF FLOORDETAIL OF SLEEVE FOR PIPING PENETRATION OF VERTICAL
PARTITIONS
SLEEVE, SEE
SPECIFICATIONS.
SLEEVE HEIGHT SHALL BE
2" HIGH IN WET
LOCATIONS, AT FLOOR
LEVEL IN ALL OTHER
LOCATIONS
RISER CLAMP
LEG
INSULATION
THREADED ROD
INSULATION
THREADED ROD
HANGER, INSULATION ON PIPE
CONTINUOUS THROUGH HANGER
WITHOUT SWALLOWING
PIPE, 1"Ø MAX
BAND
THREADED ROD
HANGER
INSULATION
PIPE
SHIELD TO COVER 180° OF
PIPE, SEE CHART FOR
LENGTH
SEE CHART
SHIELD LENGTH
SEE CHART
SHIELD LENGTH,
SWIVEL
SHIELD LENGTH FOR PIPE - NOT LESS THAN THE FOLLOWING:
a. NPS 1/4" TO 3-1/2" 12" LONG AND .048" THICK
b. NPS 4" 12" LONG AND .06" THICK
c. NPS 5" TO 6" 18" LONG AND .06" THICK
d. NPS 8" TO 14" 24" LONG AND .075" THICK
e. NPS 16" TO 24" 24" LONG AND .105" THICK
NOTE:
1. PIPES NPS 8" AND LARGER: INCLUDE WOOD OR REINFORCED CALCIUM-SILICATE-INSULATION INSERTS OF LENGTH AT LEAST AS LONG AS
PROTECTIVE SHIELD.
2. THERMAL-HANGER SHIELDS: INSTALL WITH INSULATION SAME THICKNESS AS PIPING INSULATION.
SHIELD TO COVER 180°
OF PIPE, SEE CHART FOR
LENGTH
SHIELD TO COVER 180°
OF PIPE, SEE CHART FOR
LENGTH
THREADED ROD
U-BOLT (TYP.) UNISTRUT OR STEEL ANGLE
WITH LONG LEG DOWN
SHIELD TO COVER 360° OF
PIPE, SEE CHART FOR
LENGTH
HANGER, INSULATION ON PIPE
CONTINUOUS THROUGH HANGER
WITHOUT SWALLOWING
PIPE (TYP.)
DIRT LEG
TO EQUIPMENT
SHUT-OFF VALVE
REMOVABLE
CAP
UNION
SUPPLY PIPING
PRESSURE REGULATOR (IF REQUIRED)
STRAINER
(TYP.)
CHECK
VALVE (TYP.)
PRESSURE
GAUGE (TYP.)
ISOLATION VALVE (TYP.)
FLEXIBLE PIPE
CONNECTION (TYP.)
SUCTION
DIFFUSER
PIPE DIAMETER MIN.
3 STRAIGHT
FULLY GROUT PUMP
FRAME
BALANCE
VALVE (TYP.)
STRAINER
ISOLATION
VALVE (TYP.)
PRESSURE
GAUGE
CHECK
VALVE
BALANCING
VALVE
PUMP UNION
(TYP.)
SUPPORT PUMP
SEPARATE FROM
PIPING
FLEXIBLE PIPE
CONNECTION (TYP.)
REHEAT COIL
CONTROL
VALVE
UNION
(TYP.)
STRAINER
VALVE
(TYP.)
AUTOFLOW
VALVE
HWS
HWR
MANUAL AIR VENT
HOSE END DRAIN WITH CAP
NOTE: SEE PLANS FOR PIPE SIZE, MINIMUM 3/4".
FLOORS
E
E N
O T
E S
B E
L O
W
T Y
P
IC
A L
L Y
A
.F .F
TYPICAL HVAC CONTROL DEVICE INSTALLATION
THERMOSTAT
OR OTHER HVAC
CONTROL DEVICE
LIGHT
SWITCH
NOTES:
1. WHEN THERMOSTAT IS LOCATED ADJACENT TO LIGHT SWITCH OR OTHER
WALL MOUNTED ELECTRICAL OR CONTROL DEVICE, DEVICES TO BE
INSTALLED AT THE SAME ELEVATION.
2. ALL USER INPUT BUTTONS OR SWITCHES ON CONTORL DEVICE TO BE
LOCATED BELOW 48" A.F.F. TO MEET ADA REQUIREMENTS.
3. WHEN INSTALLED NEAR DOOR, LIGHT SWITCH SHALL BE DEVICE CLOSEST TO
DOOR FRAME.
4. IF DEVICE IS LOCATED ABOVE COUNTER, INSTALL AT 40" A.F.F.
CL
SPECIFIED
DUCT SIZE
VENTILATING ROOF
THIMBLE
FLASHING AND
STORM COLLAR
ROOFING
ROOF DECK
RAIN PROOF, LISTED CAP
BIRD PROOF, LISTED CAP
METAL CHIMNEY
M
IN
T E
R M
IN
A
T E
O P
E N
IN
G
'-0
A
B O
V E
T H
E H
IG
H
E S
P O
IN
T
W H
E R
E T
H E
V E
N T
P A
S S
E S
T H
R U
T H
E
R O
O F
A N
D N
O T
L E
S S
T H
A N
'-0
A
B O
V E
O R
0'
-0
A W
A Y
F R
O M
A N
Y P
O R
T
IO
N O
F T
H E
B U
IL
D
IN
G
NOTE:
GAS FLUE AND TERMINATION SHALL COMPLY WITH ALL LOCAL CODES
AND MANUFACTURERS RECOMMENDATION.
CANT
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M401
DETAILS - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M401 DETAILS - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
03/11/2026
SCALE: NOT TO SCALE
INTERIOR PIPE SLEEVE DETAILS
SCALE: NOT TO SCALE
PIPE HANGER DETAIL
SCALE: NOT TO SCALE
TYPICAL GAS PIPING DETAIL
SCALE: NOT TO SCALE
BASE MOUNTED END SUCTION PUMP DETAIL
SCALE: NOT TO SCALE
IN-LINE CIRCULATING PUMP PIPING (VFD) DETAIL
SCALE: NOT TO SCALE
REHEAT COIL PIPING DETAIL
SCALE: 12" = 1'-0"
THERMOSTAT DETAIL
SCALE: NOT TO SCALE
GAS FLUE THRU ROOF DETAIL
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M501
SCHEDULE - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M501 SCHEDULE - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
03/11/2026
EXISTING BAS SYSTEM: ASVS, BACNET-IP AUTOMATED LOGIC SYSTEMS.
LOCAL PROVIDER: AUTOMATIC CONTROLS.
ALL NEW EQUIPIMENT IS TO BE PROGRAMMED TO MATCH EXISTING
CONTROL SEQUENCES.
7. CONNECT UNIT TO EXISTING BACNET-IP BAS SYSTEM.
6. PROVIDE ALL STAINLESS STEEL CONSTRUCTION OPTION.
5. PROVIDE INDIVIDUAL ELECTRICAL CONNECTIONS FOR EACH COOLING TOWER FAN, AND SINGLE POWER CONNECTION FOR AMBIENT HEATERS. PROVIDE FAN WITH VFD WITH INTERGRAL DISCONNECT. SEE ELECTRICAL FOR ADDITIONAL INFORMATION
4. PROVIDE COOLING TOWER WITH BASIN FLOAT.
3.BASIN HEATER TO BE STAINLESS STEEL CONSTRUCTION WITH AUTOMATIC LOW VOLTAGE CONTROL AND TEMPERATURE SENSOR.
2. PROVIDE WITH ACCCESS LADDERS FOR TOWER MAINTENANCE. PROVIDE WITH JIB CRANE HOIST FOR MOTOR AND FAN REPLACEMENT
NOTES: 1. PROVIDE WITH SOUND REDUCING OULET, VIBRATION ISOLATION AND VIBRATION CUT-OFF SWITCH.
CT-1 SEE PLANS CH-1,2 170,300 2400 95 85 7.81 78 12,000 50 2 2x10 460 3 COUNTERFLOW 16'-2.25" 11'-10" 24'-0.5" 34,170 BAC VT1-800-Q 1-7
FAN HP FAN QTY
BASIN
HEATER
(kW) VOLT PH CONFIGURATION HEIGHT (FT) WIDTH (FT) DEPTH (FT)
OPERATING WEIGHT
(LB)MARK LOCATION SERVES FAN CFM
FLUID
FLOW
(GPM) EWT (°F) LWT (°F)
MAX PD
(PSI)
WET BULB
TEMP (°F)
TOTAL
CAPACITY (MBH)
ELECTRICAL PHYSICAL DATA
BASIS OF DESIGN REMARKS
COOLING TOWER SCHEDULE
ET-2 RADIANT FLOOR BOILER ROOM DIAPHRAGM 40-200 15 125 8 5 TACO CX30-125 ---
ET-1 HW SYSTEM BOILER ROOM DIAPHRAGM 40-200 15 125 57 27 TACO CX215-125 ---
MARK SERVES LOCATION TYPE TEMP RANGE (°F) FILL PRESSURE (PSIG)
MAX OPER.
PRESSURE (PSIG)
TANK VOLUME
(GAL)
ACCEPTANCE
VOLUME (GAL) BASIS OF DESIGN REMARKS
EXPANSION TANK SCHEDULE
7. CONNECT TO EXISTING BACNET-IP BAS SYSTEM.
6. CONFIGURE AS LEAD/LAG IN CASCADE MODE.
5. PROVIDE CSD-1 EMERGENCY SHUTOFF SWITCH(ES) AT EACH MECH ROOM EXIST. SWITCH TO SHUTOFF GAS AND ELECTRICAL TO BOILERS.
4. PROVIDE WITH SYSTEM TEMP SENSOR, OUTDOOR AIR SENSOR, SYSTEM PUMP RELAY AND ALARM BELL.
3. PROVIDE WITH ROOM AIR KIT FOR COMBUSTION AIR. CONTRACTOR TO VERIFY EXISTING COMBUSTION AIR INLET CONDITIONS MEET REQUIREMENTS OF BOILER.
2. BOILER TO OPERATE ON ITS OWN INTERNAL CONTROLS WITH CONNECTION TO BAS. BOILER SEQUENCES ARE TO MATCH EXISTING BOILER SEQUENCE OF OPERATIONS.
NOTES: 1. PROVIDE BOILER WITH CONDENSATE NEUTRILIZATION KIT. VENT AND COMBUSTION AIR TO BE INSTALLED PER THE MANUFACTURER'S REQUIREMENTS SEE PLANS FOR INSTALLATION.
B-1,2 MECH FIRETUBE NAT. GAS 650 625.95 48.15 13:1 96.3 62 160 180 3.23 120 1 8 29 27 74 674 FULTON ENDURA EXE-650 1-7
INPUT (MBH) OUTPUT (MBH) MIN OUTPUT (MBH) TURNDOWN MAX EFFICIENCY (%) GPM EWT (°F) LWT (°F) MAX PD (FT WAT) VOLT PHASE FLA LENGTH (IN) WIDTH (IN) HEIGHT (IN)
OPERATING WEIGHT
(LB)MARK LOCATION TYPE FUEL
HEATING DATA WATERSIDE DATA ELECTRICAL DATA PHYSICAL DATA
BASIS OF DESIGN REMARKS
GAS FIRED HOT WATER BOILER SCHEDULE
3. VFD WITH INTEGRAL DISCONNECT TO BE PROVIDED BY MECHANICAL CONTRACTOR. CONTRACTOR TO COORDINATE INSTALLATION WITH ELECTRICAL CONTRACTOR.
2. PROVIDE PUMP WITH UPRIGHT PIPING CONFIGURATION WITH 3 STRAIGTH DIAMETERS AT INLET AND OULET. PUMP TO BE LASTER ALIGNED AFTER INSTALLATION.
NOTES: 1. UNIT IS TO BE CONNECTED TO EXISTING BACNET-IP BAS SYSTEM.
P-6 GROUNDS RADIANT FLOOR INLINE WATER 8 30 5 3450 1/3 115 1 60 BAS TACO 2400-45 1
P-1,2 GROUNDS SECONDARY LOOP BASE MOUNTED END SUCTION WATER 86 65 56 1760 3 208 3 60 VFD TACO FI1209C 1,2,3
CP-1,2,3 ARCH CT-1 BASE MOUNTED END SUCTION WATER 1200 65 87 1160 25 460 3 60 VFD TACO FI6013D 1,2,3
RPM HP VOLTS PH HZMARK LOCATION SERVES TYPE FLUID TYPE FLOW GPM
HEAD FT
WG MIN % EFF
ELECTRICAL DATA
CONTROL TYPE
BASIS OF DESIGN REMARKS
PUMP SCHEDULE
HX-1 RADIANT FLOOR COUNTER-CURRENT 59.6 16 WATER 6.095 180 160 7 1.53 WATER 8 90 105 8 2.16 TACO TB10Tx16 ---
FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI) FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI)MARK SERVES TYPE LOAD (MBH) # OF PLATES
HOT-SIDE DATA COLD-SIDE DATA MANUFACTURER AND MODEL
NUMBER REMARKS
BRAZED PLATE HEAT EXCHANGER SCHEDULE
2. CONNECT UNITS TO EXISTING BACNET-IP BAS SYSTEM.
NOTES: 1. PROVIDE UNIT WITH INSULATION AND FOIL FACED LINER, CROSS-FLOW AIR SENSOR, AND CONTROL ENCLOSURE.
VAV-11 AHU-1 08 500 250 0.15 1 16 19 250 55 92.5 10.2 1 0.1 159.1 1 0.56 KRUEGER LMHS 1,2
VAV-10 AHU-1 05 200 200 0.09 1 11 20 200 55 93 8.3 1 0.03 166.5 1.3 0.66 KRUEGER LMHS 1,2
VAV-9 AHU-1 09 600 250 0.11 1 12 15 250 55 96.9 11.4 1 0.07 156.7 1 0.13 KRUEGER LMHS 1,2
VAV-8 AHU-1 12 455 455 0.03 1 12 - 455 55 94.6 19.5 1 0.02 160 2 0.51 KRUEGER LMHS 1,2
VAV-7 AHU-1 10 370 370 0.04 1 - - 370 55 92.3 15 1 0.03 162.4 1.8 0.32 KRUEGER LMHS 1,2
VAV-6 AHU-1 12 1060 500 0.16 1 16 13 500 55 94.7 21.5 1 0.12 165.3 3 1.1 KRUEGER LMHS 1,2
VAV-5 AHU-1 12 960 960 0.23 1 15 11 960 55 100.2 47.1 2 0.19 141.3 2.5 0.48 KRUEGER LMHS 1,2
VAV-4 AHU-1 12 1080 960 0.28 1 15 13 960 55 100.2 47.1 2 0.23 141.3 2.5 0.48 KRUEGER LMHS 1,2
VAV-3 AHU-1 07 390 120 0.12 1 16 20 170 55 95.6 7.5 1 0.07 149.2 0.5 0.19 KRUEGER LMHS 1,2
VAV-2 AHU-1 07 410 200 0.13 1 16 20 200 55 97.4 9.2 1 0.07 161.1 1 0.56 KRUEGER LMHS 1,2
VAV-1 AHU-1 05 250 160 0.15 1 13 25 160 55 96.7 7.2 1 0.05 165.1 1 0.43 KRUEGER LMHS 1,2
MAX MIN MIN INLET RAD DIS CFM EAT (°F) LAT (°F) CAP (MBH) NO ROWS MAX PD LWT (°F) GPM PRESS DROP FT WATMARK AHU
INLET SIZE
(IN)
CFM
STATIC PRESSURE (IN
WG) NC LEVELS REHEAT COIL DATA
BASIS OF DESIGN REMARKS
AIR TERMINAL UNIT SCHEDULE
NOTES: 1. PROVIDE UNIT WITH ACCESSORIES TO SUPPORT UNIT FROM STRUCTURE.
AS-2 AIR SEPARATOR RADIANT FLOOR BOILER ROOM 8 GPM @ 0.1 FT WAT PD SPIROTHERM VDT-200 1
AS-1 AIR SEPARATOR HOT WATER SYSTEM BOILER ROOM 86 GPM @ 1 FT WAT PD SPIROTHERM VDT-300 1
MARK FUNCTION SERVES LOCATION OPERATING CONDITIONS BASIS OF DESIGN REMARKS
MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE
A. ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR
SALVAGED ARE SHOWN AS FULL-TONE LINES ON DEMO PLANS.
ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE
SHOWN AS HALF-TONE.
B. DEMOLITION SHOWN IS AS REQUIRED FOR THE COMPLETE
PROJECT. COORDINATE DEMOLITION WITH THE WORK OF OTHER
TRADES. PROVIDE TEMPORARY POWER AND LIGHTS AS
REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO
PROCEED OR AS REQUIRED TO ALLOW THE OWNER TO OCCUPY
THE SPACE.
C. ALL OF THE EQUIPMENT AND DEVICES SHOWN ON THIS DRAWING
ARE EXISTING. THE LOCATIONS OF THE EQUIPMENT AND DEVICES
WERE OBTAINED FROM EXISTING DRAWING AND FIELD
INVESTIGATION. THE LOCATIONS OF THE EXISTING EQUIPMENT
AND DEVICES ARE SHOWN FOR THE CONVENIENCE. ACCURACY
OF THE INFORMATION SHOWN IS NOT GUARANTEED.
VERIFICATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING
BIDS IS ENCOURAGED. SITE VISITS PRIOR TO SUBMISSION OF BIDS
NEED TO BE FULLY COORDINATED WITH THE OWNER.
D. CIRCUIT INFORMATION FOR ALL AFFECTED CIRCUITS SHALL BE
VERIFIED PRIOR TO COMMENCING WORK. ACCURACY OF THE
INFORMATION SHOWN AND INCLUDED ON THE PANEL SCHEDULES
IS NOT GUARANTEED.
E. LUMINAIRES AND DEVICES INDICATED TO BE REMOVED, WHICH
ARE LOCATED ON CEILINGS OR WALLS, SHALL HAVE LUMINAIRES,
DEVICE AND ALL ASSOCIATED CIRCUIT WIRING AND CONDUIT
REMOVED BACK TO NEAREST JUNCTION BOX, OR DEVICE NOT
INDICATED TO BE REMOVED. ACTUAL CIRCUITING MUST BE
DETERMINED IN THE FIELD. THE CONTRACTOR SHALL PROVIDE
ALL NECESSARY WIRE, CONDUIT, DEVICES AND CONNECTIONS
NECESSARY TO ENSURE CIRCUIT CONTINUITY OF THE REMAINING
DEVICES.
F. THE OWNER HAS THE RIGHT TO RETAIN ALL SALVAGEABLE
MATERIAL. ANY MATERIAL THE OWNER CHOOSES NOT TO ACCEPT
SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED
OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REGULATIONS. REMOVE ALL PCB BALLAST OR HAZARDOUS
LAMPS.
G. LABEL ALL SPARE OR ABANDONED CIRCUITS AND/OR CIRCUIT
BREAKERS IN ALL PANELBOARDS AFFECTED BY THE DEMOLITION.
SPARE CIRCUITS AND/OR CIRCUIT BREAKERS MAY BE REUSED
FOR THE CIRCUITING OF THE NEW OR REMODELED AREA AS
SPACE AND PANEL LOADING WILL ALLOW.
H. RESTORE ALL EXISTING SURFACES REQUIRING PATCHING,
PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO THE
DEMOLITION WORK, UNDER THE TERMS OF THIS SPECIFICATION.
CLOSE AND SEAL ALL OPENINGS, REPAIR ALL SURFACES, ETC., AS
REQUIRED.
I. EXISTING FIRE ALARM DEVICES, EMERGENCY LIGHTS, AND EXIT
SIGNS SHALL BE COMPLETE AND OPERABLE AT ALL TIMES.
PROVIDE TEMPORARY DEVICES IN AREAS BEING WORKED ON TO
ALLOW FOR A WORKABLE SYSTEM DURING CONSTRUCTION.
J. PROVIDE MINIMUM [2] DAYS ADVANCE NOTICE OF OUTAGES.
COORDINATE WITH OWNER FOR ALL ANTICIPATED OUTAGES.
OWNER HAS FINAL APPROVAL ON TIME AND EXTENT OF POWER
OUTAGE.
K. PROTECT EXISTING FURNITURE, CARPET, EQUIPMENT, DEVICES,
AND OTHER APPURTENANCES FROM DAMAGE DURING THE
COURSE OF CONSTRUCTION. REPLACE DAMAGED ITEMS FREE OF
COST TO THE OWNER.
A. ALL DEVICES SHOWN SHALL BE MOUNTED AT 18" A.F.F. UNLESS
INDICATED OTHERWISE.
B. ALL AUXILIARY CABLE ABOVE CEILING SHALL BE PLENUM RATED
WHERE REQUIRED.
C. CEILING MOUNTED DEVICES SHALL BE CENTERED IN CEILING TILE
WHERE INSTALLED IN ACOUSTICAL TILE CEILING.
D. PROVIDE 120 VOLT POWER CIRCUIT(S) FOR AUXILIARY SYSTEMS
AS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS.
A. DRAWINGS DO NOT SHOW TOTAL NUMBER OF CONDUCTORS FOR
CIRCUITS REQUIRED. PROVIDE THE NUMBER OF CONDUCTORS
NEEDED TO COMPLETE INSTALLATION OF SPECIFIC EQUIPMENT
FURNISHED. A GREEN GROUND CONDUCTOR, SIZED PER NEC,
SHALL ALSO BE INCLUDED IN EACH CIRCUIT. ADJUST
CONDUCTOR SIZES AS NEEDED TO LIMIT VOLTAGE DROP TO
LEVELS RECOMMENDED BY NEC. COORDINATE INSPECTIONS
WITH THE OWNER AND AHJ.
B. SEE ARCHITECTURAL SHEETS FOR REFLECTED CEILING PLANS.
C. ALL CIRCUITS SHALL HAVE SEPARATE NEUTRAL WIRES BUT CAN
SHARE AN INSULATED GREEN GROUND WIRE IN MINIMUM 3/4"
EMT CONDUIT.
D. SEAL ALL PENETRATIONS THROUGH FIRE OR FIRE/SMOKE RATED
WALLS AND FLOORS.
E. ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY AND IN
ACCORDANCE WITH NEC PARAGRAPHS 230.8, 300.5(G) AND
300.7(A). ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY NEC
AND NFPA.
F. CABLE AND CONDUIT SHALL NOT INTERFERE WITH EQUIPMENT
ACCESS.
G. ALL CABLING ABOVE CEILING SHALL BE PROPERLY SUPPORTED
(NOT FROM CEILING SYSTEM).
H. COORDINATE FINAL PANELBOARD DIRECTORIES WITH ENGINEER
AND OWNER.
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E 01
ELECTRICAL INFO SHEET
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E 01 ELECTRICAL INFO SHEET
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
GENERAL LIGHTING NOTES XREF. NOTES ( )
PROJECT ELECTRICAL REFERENCED NOTES
GENERAL NOTES REF. DEMO NOTES ( )
PROJECT ELECTRICAL REFERENCED DEMOLITION NOTES
DXGENERAL DEMO NOTES
GEN. POWER & AUX SYS. NOTES
D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL. EXISTING CIRCUIT MAY BE REUSED TO EXTENT
POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS
LOCATION.
D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING
AND DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK
ASSOCIATED WITH REMOVAL AND INSTALLATION OF VAVS BY
MECHANICAL.
D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL.
D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL. EXISTING CIRCUIT FOR BASIN HEATER MAY BE
REUSED TO EXTENT POSSIBLE FOR NEW EQUIPMENT
INSTALLATION AT THIS LOCATION.
1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY
SERVING EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE.
EXTEND CIRCUITING AS REQUIRED FOR NEW EQUIPMENT
CONNECTION.
2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY
DEMOLITION.
3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY
DEMOLITION TO SERVE NEW EQUIPMENT. PROVIDE NEW BRANCH
CIRCUIT WIRING.
4 PROVIDE 4-POLE (2-ACTIVE, 2 SPARE) 120V COIL ELECTRICALLY
HELD CONTACTOR FOR CONTROL OF BOILER POWER CIRCUITS.
PROVIDE TWO (2) MUSHROOM STYLE, TWIST TO RELEASE PUSH
BUTTONS WITH NORMALLY CLOSED CONTACTS. PROVIDE
CONDUIT, BOXES, CLEAR BUTTON COVERS AND WIRING AS
NECESSARY FOR COMPLETE EMERGENCY SHUTDOWN FOR
BOILERS. PROVIDE LABELS FOR BUTTONS TO READ "EMERGENCY
BOILER SHUT-OFF".
DATE INITIAL
03/11/2026
03/11/2026
WAREHOUSE
RECEIVING
STAIR
SUPPLIES
JANITOR
DATA
CORRIDOR
BREAKROOM
MEN
WOMEN
MENS LOCKER
WOMENS LOCKER
SUPPLIES
TRAINING ROOM
ENTRY
WORK ROOM
OFFICE
OPEN OFFICE
TRUCK BAYS
D2 D2
D2
D2
D2
D2
VAV-4
VAV-2
VAV-1
VAV-3
VAV-10
VAV-5
VAV-6
VAV-8 VAV-9
VAV-7
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E001
FLOOR PLAN - DEMOLITION
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E001 FLOOR PLAN - DEMOLITION
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):DX
D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING AND
DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK ASSOCIATED
WITH REMOVAL AND INSTALLATION OF VAVS BY MECHANICAL.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - CLIN 3
DATE INITIAL
03/11/2026
TOILET
STAIR
ELEVATOR EQUIPMENT
ELEC ROOM
MECH ROOM
EXTG PANEL 'PP1'
EXTG PANEL 'PP5'
EXTG PANEL 'RP1'
EXTG PANEL 'MDP'
D1
D1
D1
D1
D1
D3
MECHANICAL
151A
METER
EXTG PANEL 'PP4'
EXTG PANEL 'LP-11'
EXTG PANEL 'ELP-14'
EXTG PANEL 'PP6'
D4
D3
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E002
FLOOR PLAN - DEMOLITION
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E002 FLOOR PLAN - DEMOLITION
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):DX
D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
EXISTING CIRCUIT MAY BE REUSED TO EXTENT POSSIBLE FOR NEW
EQUIPMENT INSTALLATION AT THIS LOCATION.
D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
EXISTING CIRCUIT FOR BASIN HEATER MAY BE REUSED TO EXTENT
POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS LOCATION.
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION - CLIN 2
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - CLIN 1
DATE INITIAL
03/11/2026
1 1
ALL POWERED RECEPTACLES, DEVICES, AND EQUIPMENT SHOWN SHALL BE
CIRCUITED AS OUTLINED IN THIS NOTE, UNLESS INDICATED OTHERWISE.
PANELBOARD CIRCUITING, INCLUDING IDENTIFYING SEPARATE
PANELBOARDS' BRANCH CIRCUIT AREAS, IS DELINEATED WITH A DASH-DOT
LINE BOUNDARY, WITH PANEL NAMES IDENTIFIED AT BOUNDARY LINE.
CIRCUIT NUMBERS ARE IDENTIFIED ADJACENT TO RECEPTACLE, DEVICE, OR
EQUIPMENT. REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION.
PANELBOARD CIRCUITING
STAIR
ELEVATOR EQUIPMENT
ELEC ROOM
MECH ROOM
EXTG PANEL 'MDP'
EXTG PANEL 'PP1'
EXTG PANEL 'PP5'
EXTG PANEL 'RP1'
PP1 - 25,27,29
P-1
PP1 - 31,33,35
P-2
PP1 - 28
P-6
PP1 - 11
B-1
PP1 - 26
B-2
PP1 - 22
CONTACTOR
MECHANICAL
151A
METER
PP4 - 3
CTF-1
PP4 - 2
CP-1
PP4 - 12
CP-2
PP4 - 1
CP-3
EXTG PANEL 'PP4'
EXTG PANEL 'LP-11'
EXTG PANEL 'ELP-14'
EXTG PANEL 'PP6'
PP4 - 5
CTF-2
PP6 - 3
BH-1 1
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E201
FLOOR PLAN - POWER
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E201 FLOOR PLAN - POWER
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. NOTES ( ):X
1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY SERVING
EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE. EXTEND
CIRCUITING AS REQUIRED FOR NEW EQUIPMENT CONNECTION.
2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY DEMOLITION.
3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY
DEMOLITION TO SERVE NEW EQUIPMENT. PROVIDE NEW BRANCH CIRCUIT
WIRING.
4 PROVIDE 4-POLE (2-ACTIVE, 2 SPARE) 120V COIL ELECTRICALLY HELD
CONTACTOR FOR CONTROL OF BOILER POWER CIRCUITS. PROVIDE TWO
(2) MUSHROOM STYLE, TWIST TO RELEASE PUSH BUTTONS WITH
NORMALLY CLOSED CONTACTS. PROVIDE CONDUIT, BOXES, CLEAR
BUTTON COVERS AND WIRING AS NECESSARY FOR COMPLETE
EMERGENCY SHUTDOWN FOR BOILERS. PROVIDE LABELS FOR BUTTONS
TO READ "EMERGENCY BOILER SHUT-OFF".
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - POWER - CLIN 2
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - POWER - CLIN 1
DATE INITIAL
03/11/2026
GENERAL EQUIPMENT SCHEDULE NOTES:
A. THIS SCHEDULE DISPLAYS SIZING INFORMATION THAT IS GENERIC IN
NATURE. SCHEDULE DOES NOT ITEMIZE ALL INSTANCES OF
EQUIPMENT. CONTRACTOR SHALL REFER TO THE PLANS FOR FINAL
QUANTITIES AND LOCATIONS.
B. MOUNT ALL DISCONNECTS AND STARTERS ON ASSOCIATED
EQUIPMENT UNLESS SHOWN OTHERWISE. MAINTAIN WORKING
CLEARANCES PER NEC; COORDINATE WITH MECHANICAL
CONTRACTOR.
C. NFD OR FD = NON-FUSED OR FUSED DISCONNECT SWITCH.
D. CS/NFD, FD = COMBINATION STARTER/ NON OR FUSED DISCONNECT
SWITCH.
E. INT = INTEGRAL DISCONNECT FURNISHED WITH EQUIPMENT.
F. EXP = DEVICE TO BE EXPLOSION-PROOF.
G. ALL SWITCHES, DISCONNECTS, ETC SHALL BE LOCKABLE.
H. ALL SWITCHES, DISCONNECTS, ETC SHALL BE NEMA 3R WHERE
REQUIRED.
I. PROVIDE FUSES AS SHOWN; REVISE SIZES PER ACTUAL NAMEPLATE
DATA.
J. STARTER ACCESSORIES:STARTER ACCESSORIES:
1. CONTROL TRANSFORMER
2. H-O-A SWITCH
3. RED RUN LIGHT
4. 2 NO CONTACTS; 2 NC CONTACTS
K. PROVIDE DUCT DETECTOR, SHUTDOWN RELAY, AND ACCESSORIES
AS REQUIRED TO SHUTDOWN HVAC EQUIPMENT 2000 CFM OR HIGHER
PER NFPA AND AHJ.
EQUIPMENT SCHEDULE NOTES:
1. VFD PROVIDED BY MECH, INSTALLED BY ELEC.
2. VERIFY LOCATION OF VFD/DISCONNECT WITH MECH. IF MECH
PROVIDED VFD/DICONNECT IS LOCATED REMOTELY NOT WITHN SIGHT
OF COOLING TOWER, PROVIDE 100/3 NFD DISCONNECT AT TOWER.
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E601
EQUIPMENT SCHEDULE
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E601 EQUIPMENT SCHEDULE
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
EQUIPMENT SCHEDULE
DEVICE DEVICE DESCRIPTION VOLTAGE PH KW FLA HP
STARTER / DISCONNECT
PLUG CONFIG
RECEPT
CONFIG FEEDER SIZE NOTES TYPE SIZE FUSE
B-1 BOILER 120 V 1 - 8 - NFD 30A/2P - - - 2#12, 1#12G - 3/4"C
B-2 BOILER 120 V 1 - 8 - NFD 30A/2P - - - 2#12, 1#12G - 3/4"C
BH-1 BASIN HEATER 480 V 3 20 - - INT - - - - 3#8, 1#10G - 1"C
CP-1 CONDENSING PUMP 480 V 3 - - 25 VFD - - - - 3#4, 1#10G - 1-1/4"C 1
CP-2 CONDENSING PUMP 480 V 3 - - 25 VFD - - - - 3#4, 1#10G - 1-1/4"C 1
CP-3 CONDENSING PUMP 480 V 3 - - 25 VFD - - - - 3#4, 1#10G - 1-1/4"C 1
CTF-1 COOLING TOWER 480 V 3 - - 50 VFD - - - - 3#2, 1#8G - 1-1/4"C 1,2
CTF-2 COOLING TOWER 480 V 3 - - 50 VFD - - - - 3#2, 1#8G - 1-1/4"C 1,2
P-1 SECONDARY LOOP PUMP 208 V 3 - - 3 VFD - - - - 3#10, 1#10G - 3/4"C 1
P-2 SECONDARY LOOP PUMP 208 V 3 - - 3 VFD - - - - 3#10, 1#10G - 3/4"C 1
P-6 RADIANT FLOOR PUMP 120 V 1 - - 1/3 CS/FD NEMA 0/1P 15 - - 2#12, 1#12G - 3/4"C
DATE INITIAL
03/11/2026
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E701
ELECTRICAL PANEL SCHEDULES
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E701 ELECTRICAL PANEL SCHEDULES
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
MCB: Main Circuit Breaker
LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker
GFI: GFCI Circuit Breaker MLO: Main Lug Only
FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker 1. VERIFY CIRCUIT LOADS AND CONFIRM EACH CIRCUIT IS IN ACTIVE USE. SUBMIT
FINDINGS TO PROJECT ENGINEER PRIOR TO FINAL LOAD ASSESSMENT AND BALANCING.
2. EXISITNG LOADS ARE SHOWN FOR CONVENIENCE AND ARE NOT CALCULATED IN
FINAL LOADING.
3. NEW LOADS/CIRCUIT BREAKERS SHOWN IN BOLD TEXT.
Legend: Notes:
Total Est. Demand Current (80% Rated): 13 A
Continuous Current @ 125%: 13 A
Non-Cont. Current @ 100%: 0 A
Total Est. Demand Current (100% Rated): 11 A
EQP_CONT 3884 VA 100.00% 3884 VA Total Est. Demand: 3884 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 11 A 11 A 11 A
Total Load: 1293 VA 1297 VA 1293 VA
41 EXT. RECEPTACLE 20 A 1 0 0 -- -- -- 42
39 EWC 20 A 1 0 0 -- -- -- 40
37 SF1 20 A 1 0 0 3 20 A ROLLING GRILLE 38
35 -- -- -- 167 0 -- -- -- 36
33 -- -- -- 167 0 -- -- -- 34
31 EQP_CONT MECH ROOM 105 P-2 30 A 3 167 0 3 30 A RF1 32
29 -- -- -- 167 0 1 20 A P5 30
27 -- -- -- 167 864 1 20 A EQP_CONT MECH ROOM 105 P-6 28
25 EQP_CONT MECH ROOM 105 P-1 30 A 3 167 960 1 20 A EQP_CONT MECH ROOM 105 B-2 26
23 -- -- -- 0 0 1 20 A BIG FAN 24
21 -- -- -- 0 100 1 20 A EQP_CONT CONTACTOR MECH ROOM 105 22
19 EF1 30 A 3 0 0 1 20 A AC CONTROL UNIT 20
17 RP1, UH-1,2,3,4,CUH1 20 A 1 0 0 1 20 A ELEVATOR SHAFT LIGHTS 18
15 ELEVATOR PIT RECEPTACLE / FLAG LIGHT 20 A 1 0 0 1 20 A ELEVATOR CAR LIGHTS 16
13 CCTV 20 A 1 0 0 1 20 A LIGHTING 14
11 EQP_CONT MECH ROOM 105 B-1 20 A 1 960 0 1 20 A LIGHTING 12
9 DOCK LOCKS 20 A 1 0 0 1 20 A LIGHTING 10
7 O.H. DOORS 20 A 1 0 0 1 20 A LIGHTING 8
5 RECEPTACLES 20 A 1 0 0 1 20 A LIGHTING 6
3 RECEPTACLES 20 A 1 0 0 1 20 A FACP 4
1 RECEPTACLES 20 A 1 0 0 1 20 A ACCESS CONTROL 2
CKT Circuit Description Trip P A B C P Trip Circuit Description CKT
Mounting: SURFACE Wires: 4 FCB / MCB Rating: 225 A
Supply From: MDP Phases: 3 MLO / MCB: MLO
Location: ELEC ROOM 104 Volts: 208Y/120 A.I.C. Rating: UNKNOWN
Extg Branch Panel: PP1
DATE INITIAL
03/11/2026
MCB: Main Circuit Breaker
LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker
GFI: GFCI Circuit Breaker MLO: Main Lug Only
FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker 1. VERIFY CIRCUIT LOADS AND CONFIRM EACH CIRCUIT IS IN ACTIVE USE. SUBMIT
FINDINGS TO PROJECT ENGINEER PRIOR TO FINAL LOAD ASSESSMENT AND BALANCING.
2. EXISITNG LOADS ARE SHOWN FOR CONVENIENCE AND ARE NOT CALCULATED IN
FINAL LOADING.
3. NEW LOADS/CIRCUIT BREAKERS SHOWN IN BOLD TEXT.
Legend: Notes:
Total Est. Demand Current (80% Rated): 290 A
Continuous Current @ 125%: 290 A
Non-Cont. Current @ 100%: 0 A
Total Est. Demand Current (100% Rated): 232 A
EQP_CONT 192762 VA 100.00% 192762 VA Total Est. Demand: 192762 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
232 A
192762 VA
12 EQP_CONT MECHANICAL 151A CP-2 3 45 A 28254 VA
11 SPACE HEATER GEN. BLDG. 3 40 A 0 VA
10 SPARE 3 20 A 0 VA
9 NW GEN. BLDG. WALL DISCONNECT 3 100 A 0 VA
8 DAYTON HEATER 3 50 A 0 VA
7 SPARE 3 40 A 0 VA
6 SPARE 3 30 A 0 VA
5 EQP_CONT COOLING TOWER FAN 2 3 90 A 54000 VA
4 T3 / LP11 3 40 A 0 VA
3 EQP_CONT COOLING TOWER FAN 1 3 90 A 54000 VA
2 EQP_CONT MECHANICAL 151A CP-1 3 45 A 28254 VA
1 EQP_CONT MECHANICAL 151A CP-3 3 45 A 28254 VA
CKT Circuit Description # of Poles Trip Rating Load Remarks
Mounting: Wires: 4 FCB / MCB Rating: 400 A
Supply From: Phases: 3 MLO / MCB: MLO
Location: METER 151 Volts: 480Y/277 A.I.C. Rating: UNKNOWN
Extg Power Panel: PP4
MCB: Main Circuit Breaker
LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker
GFI: GFCI Circuit Breaker MLO: Main Lug Only
FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker 1. VERIFY CIRCUIT LOADS AND CONFIRM EACH CIRCUIT IS IN ACTIVE USE. SUBMIT
FINDINGS TO PROJECT ENGINEER PRIOR TO FINAL LOAD ASSESSMENT AND
BALANCING.
2. EXISITNG LOADS ARE SHOWN FOR CONVENIENCE AND ARE NOT CALCULATED IN
FINAL LOADING.
3. NEW LOADS/CIRCUIT BREAKERS SHOWN IN BOLD TEXT.
Legend: Notes:
Total Est. Demand Current (80% Rated): 30 A
Continuous Current @ 125%: 30 A
Non-Cont. Current @ 100%: 0 A
Total Est. Demand Current (100% Rated): 24 A
EQP_CONT 20000 VA 100.00% 20000 VA Total Est. Demand: 20000 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
24 A
20000 VA
6 TRANFORMER T-5 GENERATOR BUILDING 3 20 A 0 VA
5 TRANSFORMER T-4 PUMP ROOM 3 30 A 0 VA
4 WATER HEATER 3 60 A 0 VA
3 COOLING TOWER BASIN HEATER BH-1 3 40 A 20000 VA
2 CHILL WATER RECIRCULATING PUMP 3 30 A 0 VA
1 NORTH STORM PUMP PANEL 3 125 A 0 VA
CKT Circuit Description # of Poles Trip Rating Load Remarks
Mounting: Wires: 3 FCB / MCB Rating: 150 A
Supply From: Phases: 3 MLO / MCB: MCB
Location: METER 151 Volts: 480 A.I.C. Rating: UNKNOWN
Extg Power Panel: PP6
File details come from the government source that posted it. Updated .