This document is a set of construction design drawings for a mechanical and electrical systems replacement project at Gateway Arch National Park's Maintenance Building located at 11 North 4th Street, St. Louis, Missouri 63102.

The project scope involves replacing existing cooling tower and boiler units at the facility. The mechanical work includes demolition and removal of existing cooling towers, boilers, pumps, expansion tanks, and associated piping and controls, with installation of new equipment including two cooling towers (CT-1 rated at 12,000 MBH capacity), two gas-fired hot water boilers (B-1 and B-2, each rated 650 MBH), three condensing pumps (CP-1, CP-2, CP-3), secondary loop pumps (P-1, P-2), and a radiant floor pump (P-6). The mechanical systems also include air/dirt separators, expansion tanks, heat exchangers, and variable air volume (VAV) terminal units serving multiple building spaces. The electrical work requires providing power connections for the new equipment, including new circuit breakers in existing panels (PP1, PP4, PP6) at 208V, 480V, and 120V as appropriate, with equipment ranging from 20-ampere receptacle circuits to 90-ampere three-phase connections for cooling tower fans. Construction phasing indicates that work on the Grounds Building cooling tower occurs during summer months with temporary cooling units required for occupied spaces, while Visitor Center cooling tower work occurs during winter months. The contractor must coordinate with National Park Service staff on construction scheduling, protect existing finishes, document site conditions prior to construction, and address potential hazardous materials encountered during demolition work.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORKSITE

WORKSITE

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

COVER SHEET

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 0- 0 COVER SHEET

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

MECHANICAL

M 00 MECHANICAL INFO SHEET

M001 DEMOLITION FLOOR PLAN - MECHANICAL

M002 DEMOLITION FLOOR PLAN - MECHANICAL

M101 FLOOR PLAN - MECHANICAL

M102 FLOOR PLAN - MECHANICAL

M401 DETAILS - MECHANICAL

M501 SCHEDULE - MECHANICAL

ELECTRICAL

E 00 ELECTRICAL INFO SHEET

E 01 ELECTRICAL INFO SHEET

E001 FLOOR PLAN - DEMOLITION

E002 FLOOR PLAN - DEMOLITION

E201 FLOOR PLAN - POWER

E601 EQUIPMENT SCHEDULE

E701 ELECTRICAL PANEL SCHEDULES

DATE INITIAL

DRAWING INDEX

GATEWAY ARCH NATIONAL PARK MAINTENANCE BUILDING

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

NOT TO SCALE

REGION MAP

SCALE: 12" = 1'-0"

SITE MAP

GENERAL

0 COVER SHEET

0 - PH PHASING PLAN

NEW COOLING TOWER TO BE STAGED ON

LANDSCAPING WITH PROTECTION AT SQUARE

ON AERIAL VIEW.

GENERAL PHASING NOTES:

1. CONTRACTOR TO COORDINATE CONSTRUCTION SCHEDULE WITH NPS STAFF.

2. FOR AREAS THAT REQUIRE WORK ABOVE CEILINGS, CONTRACTOR TO DOCUMENT ANY DAMAGE PRIOR TO PROCEEDING WITH WORK.

A. TO ACCOMMODATE WORK REQUIRED ABOVE FINISH CEILINGS, REMOVE AND REINSTALL PORTIONS OF EXISTING SUSPENDED

ACOUSTICAL TILE CEILING SYSTEM TO RESTORE TO ORIGINAL CONDITION. IF ANY CEILING PADS OR CEILING GRID ELEMENTS

ARE DAMAGED DURING REMOVAL, REPLACE WITH NEW TO MATCH EXISTING.

3. WORK ASSOCIATED WITH GROUNDS BUILDING TO OCCUR DURING SUMMER SEASON. CONTRACTOR TO COORINDATE SCHEDULE

WITH NPS STAFF.

4. WORK ASSOCIATED WITH VISITORS CENTER COOLING TOWER TO OCCUR DURING WINTER MONTHS. CONTRACTOR TO COORINDATE

SCHEDULE WITH NPS STAFF.

5. CONTRACTOR TO PROVIDE PORTABLE AIR CONDITIONING UNITS TO SERVE SPACES LISTED ON TEMPORARY COOLING SCHEDULE

LOCATED ON SHEET 0-PH.

A. CAPACITY OF TEMPORARY COOLING REQUIRED IS LISTED ON TEMPORARY COOLING SCHEDULE.

B. CONTRACTOR TO COORDINATE LOCATIONS WITH NPS STAFF.

C. PORTABLE AIR CONDITIONING UNITS ARE TO DISCHARGE HOT AIR TO NEAREST CEILING PLENUM.

6. SEE AERIAL SITE LAYOUT VIEW ON 0-PH.

A. HATCHED LINE INDICATES USABLE PATHWAY TO COOLING TOWER LOCATION. CONTRACTOR TO COORDINATE ALLOWABLE

PATHWAYS TO DELIVER NEW COOLING TOWER AND REMOVE EXISTING UNIT PRIOR TO BEGINNING WORK.

B. SQUARE INDICATED IN VIEW IS TO BE LOCATION OF COOLING TOWER STAGING.

C. IN NO EVENT IS CONTRACTOR TO DRIVE OVER VISITOR CENTER ROOF.

D. CONTRACTOR RESPONSIBLE FOR DOCUMENTING SITE CONDITION PRIOR TO CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR

REPAIRING SITE TO CONDITION AT START OF CONSTRUCTION.

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

0 - PH

PHASING PLAN

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 0- 0 - PH PHASING PLAN

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

DATE INITIAL

FCU-42 EMR 0.75

FCU-38 TC 0.5

FCU-36 TC 0.5

FCU-34 SW MECH 1

FCU-28 SOUTH ELEC 2

FCU-21 NORTH ELEC 1.5

FCU-20 MECH 6.5

FCU-19 ELEC 3

FCU-12 TC 0.5

FCU-11 TC 0.5

FCU-10 SOUTH EMR 6.5

FCU-8 NORTH EMR 3

FCU-7 TC 2

FCU-6 TC 2

FCU-5 TC 2

FCU-4 TC 2

FCU-3 TC 2

FCU-2 TC 2

FCU-1 TC 2

EXISTING FAN COIL UNIT

SERVING SPACE SPACE SERVED

TONNAGE

REQUIRED

TEMPORARY COOLING SCHEDULE

NOT TO SCALE

THERMOSTAT DETAIL

A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND

LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER

OF ANY DISCREPANCIES OR VARIATIONS FROM THOSE SHOWN ON THE

DRAWINGS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT

NO ADDITIONAL EXPENSE TO THE OWNER.

B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF

DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL

NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF

DOCUMENTS.

C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE

RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD

CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE WORK

AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.

D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN.

FULL-TONE LINES INDICATED NEW OR RELOCATED CONSTRUCTION.

E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH

STRUCTURE, CEILING, LIGHTING, AND PIPING.

F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL EQUIPMENT TO

ALLOW FOR MAINTENANCE ACCESS.

G. ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT RIGHT ANGLES AND

PARALLEL TO BUILDING WALLS UNLESS OTHERWISE INDICATED.

H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS. MAINTAIN

ALL CODE REQUIRED CLEARANCES.

I. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL

REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER

HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE

CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND

REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK

IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY

WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR.

J. ALL RUNOUTS TO AIR TERMINALS SHALL MATCH INLET SIZE UNLESS OTHERWISE

NOTED.

K. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING CONSTRUCTION

SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.

L. THIS PROJECT UTILIZES A RETURN AIR PLENUM. ALL MATERIALS INSTALLED IN

RETURN AIR PLENUM SHALL BE NON-COMBUSTABLE OR SHALL HAVE A FLAME

SPREAD INDEX NOT TO EXCEED 25 AND SMOKE DEVELOPED INDEX NOT TO

EXCEED 50 IN ACCORDANCE WITH ASTM E84 OR UL 723.

M. CONTRACTOR RESPONSIBLE FOR PROTECTION OF ALL FINISHES AND WORK

AREAS.

N. TO ACCOMMODATE WORK REQUIRED ABOVE FINISH CEILINGS, REMOVE AND

REINSTALL PORTIONS OF EXISTING SUSPENDED ACOUSTICAL TILE CEILING

SYSTEM TO RESTORE TO ORIGINAL CONDITION. IF ANY CEILING PADS OR CEILING

GRID ELEMENTS ARE DAMAGED DURING REMOVAL, REPLACE WITH NEW TO

MATCH EXISTING.

O. SEE PHASING PLANS ON SHEET 0-PH. COORDINATE WORK WITH PHASING PLANS.

A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL

DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.

DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR

SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED TO BE

REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL-TONE LINES. ALL

OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN AS HALF-

TONE.

B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED BELOW

OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION

AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL

EXTENT OF THE DEMOLITION REQUIRED AND AS LISTED BELOW.

C. THE REMOVAL OF FIRE PROTECTION, HVAC, AND PLUMBING EQUIPMENT FROM

FINISHED AREAS AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED

WITH ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE

MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS MADE TO

THE BUILDING.

D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL

OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES

TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH

THE OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.

E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE

CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND STORED OR

REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR SALVAGED ITEMS SHALL

REMAIN THE PROPERTY OF THE OWNER.

F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND CONTROLS

WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL REMOVALS.

G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL

REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER

HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE

CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND

REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK

IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY

WRITTEN AGREEMENT OF THE OWNER AND ARCHITECT.

H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION SHALL

BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.

I. CONTRACTOR RESPONSIBLE FOR PROTECTION OF ALL FINISHES AND WORK

AREAS.

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M 00

MECHANICAL INFO SHEET

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M 00 MECHANICAL INFO SHEET

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

M 00 MECHANICAL INFO SHEET

M001 DEMOLITION FLOOR PLAN - MECHANICAL

M002 DEMOLITION FLOOR PLAN - MECHANICAL

M101 FLOOR PLAN - MECHANICAL

M102 FLOOR PLAN - MECHANICAL

M401 DETAILS - MECHANICAL

M501 SCHEDULE - MECHANICAL

DATE INITIAL

SYMBOL LEGEND

VOLUME DAMPER

DEMO TO EXISTING CONNECTION

SPRINKLER DRAIN

FIRE SUPPRESSION PIPING

ISOLATION VALVE

TAMPER SWITCH

MANUAL BALANCING VALVE

FLOW SWITCH

FIRE DEPARTMENT CONNECTION

CONTROL VALVE (3 WAY)

CONTROL VALVE (2 WAY)

HOSE END DRAIN VALVE

PRESSURE REDUCING VALVE

AUTO FLOW CONTROL VALVE

CHECK VALVE

HVAC DUCTWORK AND SPECIALTIES

(CONT.)

MISCELLANEOUS SYMBOLS

RETURN DUCT DOWN

AIR TERMINAL (VERTICAL MOUNTING)

ROUND DUCT UP / DOUBLE LINE PIPE

ROUND DUCT DOWN / DOUBLE

LINE PIPE

RETURN DUCT UP

TURNING VANES

SUPPLY AND FRESH AIR DUCT DOWN

SUPPLY AND FRESH AIR DUCT UP

SIZE/TYPE

SIZE/TYPE

FLOW

FLOW

SIZE/TYPE

FLOW

SMOKE DAMPER

FIRE DAMPER-HORIZ FIRE SEPARATION

MOTORIZED DAMPER-OPPOSED BLADE

MOTORIZED DAMPER-PARALLEL BLADE

ROUND AIR TERMINAL

(HORIZONTAL MOUNTING)

GRAVITY DAMPER

(OR) SAFETY VALVE-STEAM

TEMP & PRESS RELIEF

FLOOR SINK

FLOOR DRAIN

GRADE CLEANOUT

PLUMBING VENT THRU ROOF

CLEANOUT / WALL CLEANOUT

THERMOSTATIC MIXING VALVE

M

M

MANHOLE

TRENCH DRAIN

OVERFLOW ROOF DRAIN

OXYGEN OUTLET

PIPE CAP

ELBOW UP

AIR OUTLET

TEE

ELBOW DOWN

VACUUM OUTLET

ROOF DRAIN

SIZE/TYPE

FLOW

HUMIDISTAT

THERMOSTAT

FLEXIBLE DUCT

S

H

T

TEMPERATURE SENSORUNION

TEE DOWN

STRAINER

EXPANSION JOINT

FLEXIBLE PIPE CONNECTION

AIR VENT

TEE UP

FIRE/SMOKE DAMPER

RECTANGULAR RETURN AIR TERMINAL

(HORIZONTAL MOUNTING)

RECTANGULAR SUPPLY AIR TERMINAL

(HORIZONTAL MOUNTING)

SOLENOID VALVE

F

D

TS

VALVES

FS

M

M

S

LPR

HPS

MPR

MPS

LPS

HVAC PIPING

GHWR

GHWS

HWR

HWS

PC

HPR

ES

BBD BOILER BLOW DOWN

EXHAUST STEAM

PUMPED CONDENSATE

HIGH PRESSURE RETURN

HIGH PRESSURE STEAM

MEDIUM PRESSURE RETURN

MEDIUM PRESSURE STEAM

LOW PRESSURE RETURN

LOW PRESSURE STEAM

GLYCOL HOT WATER RETURN

GLYCOL HOT WATER SUPPLY

HOT WATER RETURN

HOT WATER SUPPLY

FS-_

FD-_

CO

VTR

GCO

ORD-_

MH

X

A

V

RD-_

PIPING SPECIALTIES AND FITTINGS

WCO

FIRE PROTECTION

SIZE/TYPE

FLOW

RECTANGULAR EXHAUST AIR TERMINAL

(HORIZONTAL MOUNTING)

CWS

GCWS

CWR

CR

CS

RL

RDL

RS

GCWR GLYCOL CHILLED WATER RETURN

GLYCOL CHILLED WATER SUPPLY

REFRIGERANT LIQUID LINE

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION LINE

HCWS

HCWR

HOT/CHILLED WATER SUPPLY

HOT/CHILLED WATER RETURN

DOMESTIC HOT WATER

RECIRCULATING (DHWR)

DOMESTIC COLD WATER (DCW)

DOMESTIC HOT WATER (DHW)

ST/OST

PLUMBING PIPING

ACID VENT

TW

AV

AW

W

DS

DSCW

TWR

DSHW

SANITARY VENT

BURIED EXTERIOR WATER

TEPID WATER RECIRCULATING

TEPID WATER

DISTILLED WATER

SOFTENED HOT WATER

SOFTENED COLD WATER

ACID WASTE

STORM DRAIN

SANITARY DRAIN (BELOW FLOOR)

SANITARY DRAIN (ABOVE FLOOR)

OXYGEN

VACUUM

OX

VAC

RO

A

REVERSE OSMOSIS WATER

COMPRESSED AIR

DEIONIZED WATERDI

AIR FLOW STATIONAFS

HPWR

HPWS

HEAT PUMP WATER RETURN

HEAT PUMP WATER SUPPLY

F

S

FS

NEW TO EXISTING CONNECTION

G NATURAL GAS

FOF

FOG

LPG

FOV

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL GAGE

FUEL OIL FILL

FUEL OIL VENT

LIQUEFIED PETROLEUM GAS

CD CONDENSATE DRAIN

EXHAUST DUCT DOWN

EXHAUST DUCT UP

CO CARBON MONOXIDE SENSOR

CO2 CARBON DIOXIDE SENSOR

NO2 NITROGEN DIOXIDE SENSOR

SENSOR WITH GUARD'X'

DOUBLE - GRADE CLEANOUTDGCO

ST/OST STORM DRAIN (BELOW FLOOR)

WASTE AND ANESTHETIC

GAS DISPOSAL

NITROGEN

WAGD

N

MEDICAL AIRMA

PIPE GUIDE

HOSE BIBB

THERMOMETER

PIPE ANCHOR

HB

STEAM TRAP

RHY

WH

ROOF HYDRANT

WALL HYDRANT

PRESSURE GAUGE

EXISTINGDEMO

EXISTINGNEW

18 Ø

18x10

18/10

ROUND DUCT

FLAT OVAL DUCT-1ST FIG IS SIDE

SHOWN

RECT DUCT-1ST FIG IS SIDE SHOWN

ACOUSTICAL DUCT LINER

HVAC DUCTWORK AND SPECIALTIES

HIGH EFFICIENCY TAKEOFF

HIGH EFFICIENCY TAKOFF

WITH VOLUME DAMPER

NITROGEN OUTLET

MEDICAL AIR OUTLET

WASTE AND ANESTHETIC GAS

DISPOSAL OUTLET

N

MA

V

FLEXIBLE DUCTWORK CONNECTION

ABBREVIATIONS

NORTH

ARROW

MATCHLINE

AREA A

AREA B

EXISTING

COLUMN

NEW

COLUMN

X

X

X

XXXX

SIM/OPP

X

XXXX

XX-1

X

X

SECTION/

DETAIL

PLAN

DETAIL

REFERENCE

NOTE

REFERENCE

DEMOLITION

NOTE

EQUIPMENT

NUMBER

ROOM NAME

ROOM / SPACE

NUMBER

LETTER/NUMBER

INDICATES NEW

COLUMN LINE

LETTER/NUMBER

INDICATES EXISTING

COLUMN LINE

SECTION/DETAIL NUMBER

SHEET NUMBER

INDICATES DIRECTION OF VIEW

DETAIL NUMBER

SHEET NUMBER

REFERENCE

DESIGNATION

DEMOLITION

DESIGNATION

EQUIPMENT

NUMBER

ROOM NAME DESIGNATION

ROOM NUMBER DESIGNATION

REFERENCE LEGEND

NAME

ELEVATION

LEVEL

TITLE

MARKER

VIEW NAME

SCALE: 1/8" = 1'-0"

DRAWING/DETAIL NUMBER

LEVEL CALLOUT

DESIGNATION

ELEVATION

DESIGNATION

GRAPHIC AREA FOR

DRAWING

TITLE

SCALE OF THE DRAWING

XXX-1

PLUMBING

FIXTURES PLUMBING FIXTURE

DESIGNATION

X"PIPE

SIZE

PIPE SIZE (DIAMETER)

X"xX"

DUCT

SIZE

WIDTH x HEIGHT

X"/X" WIDTH / HEIGHT

X" DIAMETER

REF. DEMO NOTES ( ) XX REF. NOTES ( )

SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES. SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES.

GENERAL DEMOLITION NOTES GENERAL NOTES

MECHANICAL SHEET LIST

NORTH PLAN

NORTH

TRUE

NORTH

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM CIRCUIT AMPS

MD MOTORIZED DAMPER

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT

PROTECTION

MPR MEDIUM PRESSURE

RETURN

MPS MEDIUM PRESSURE STEAM

MS MOP SINK

N NITROGEN

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPCW NONPOTABLE COLD WATER

NPHW NONPOTABLE HOT WATER

NPHWR NONPOTABLE HOT WATER

RECIRCULATING

OA OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

OX OXYGEN

P PUMP

PHC PREHEAT COIL

PIV POST INDICATING VALVE

PRV PRESSURE REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH,

GAUGE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RA RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF AREA DRAINS

RL REFRIGERANT DISCHARGE LINE

RF RETURN FAN

RH RELIEF HOOD

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RELIEF AIR

RLF RELIEF FAN

RO REVERSE OSMOSIS WATER

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION LINE

RTU ROOF TOP UNIT

RV RELIEF VALVE

S SINK

SA SUPPLY AIR

SAN SANITARY SEWER

SD SMOKE DAMPER

SF SUPPLY FAN

SFU SANITARY FIXTURE UNIT

SH SHOWER

SP STATIC PRESSURE

SSS SURGICAL SCRUB SINK

ST STORM WATER

TD TRENCH DRAIN

TMV THERMOSTATIC MIXING VALVE

TONS TONS OF REFRIGERATION

TSP TOTAL STATIC PRESSURE

T THERMOSTAT

UH UNIT HEATER

UR URINAL

V VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

WB WET BULB

WC WATER CLOSETS

WCO WALL CLEANOUT

WF WASH FOUNTAINS

WFU WATER FIXTURE UNITS

WH WALL HYDRANT

WPD WATER PRESSURE DROP

WS WATER SOFTENER

WSHP WATER SOURCE HEAT PUMP

WWHP WATER TO WATER HEAT PUMP

YH YARD HYDRANT

A COMPRESSED AIR

AC AIR COMPRESSOR

AD AIR DOOR

AFCV AUTO FLOW CONTROL VALVE

AHU AIR HANDLING UNIT

AMP AMPERE

APD AIR PRESSURE DROP

AS AIR SEPARATOR

AV ACID VENT

AW ACID WASTE

B BOILER

BC BLOWER COIL

BD BIDET

BFP BACKFLOW PREVENTER

BFV BUTTERFLY VALVE

BHP BRAKE HORSEPOWER

BLKG BLOCKING

BLV BALANCING VALVE

BT BATHTUB

BV BALL VALVE

BW BEDPAN WASHER

CH CHILLER

CC COOLING COIL

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CUH CABINET HEATER

CI CAST IRON

CMU COMBINATION UNITS

CR CONDENSER WATER RETURN

CRAC COMPUTER ROOM AIR

CONDITIONER

CS CONDENSER WATER SUPPLY

CSS CLINICAL SERVICE SINKS

CT COOLING TOWER

CU CONDENSING UNIT - SPLIT SYSTEM

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

DB DRY-BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DEG DEGREE

DF DRINKING FOUNTAIN

DGCO DOUBLE GRADE CLEANOUT

DH EMERGENCY DRENCH HOSES

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER

RECIRCULATING

DI DEIONIZED WATER

DOAS DEDICATED OUTDOOR AIR SYSTEM

DS DISTILLED WATER

DSA DUCT SOUND ATTENUATORS

DSCW DOMESTIC SOFT COLD WATER

DSHW DOMESTIC SOFT HOT WATER

DSHWR DOMESTIC SOFT HOT WATER

RECIRCULATING

DST DOMESTIC STORAGE TANK

DTW DOMESTIC TEPID WATER

DTWR DOMESTIC TEPID WATER

RECIRCULATING

EA. EACH

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EEW EMERGENCY EYE WASH

EEWS EMERGENCY EYE

WASH/SHOWER

EF EXHAUST FAN

EFF EFFICIENCY

EFW EMERGENCY FACE WASH

EH EXHAUST HOOD

ERV ENERGY RECOVERY

VENTILATOR

ES EMERGENCY SHOWER

ESP EXTERNAL STATIC PRESSURE

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER

TEMPERATURE

ET EXPANSION TANK

F FIRE SUPPRESSION PIPING

F-_ FURNACE

FCO FLOOR CLEANOUT

FC FLUID COOLER

FCU FAN COIL UNIT

FD FIRE DAMPER

FLA FULL LOAD AMPS

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOOR SINK

FSD FIRE/SMOKE DAMPER

FT FINNED TUBE

G GAS

GCWR GLYCOL CHILLED

WATER RETURN

GCWS GLYCOL CHILLED

WATER SUPPLY

GD GARBAGE DISPOSAL

GDH GAS DUCT HEATER

GHCR GLYCOL HOT/CHILLED

WATER RETURN

GHCS GLYCOL HOT/CHILLED

WATER SUPPLY

GHWR GLYCOL HOT WATER RETURN

GHWS GLYCOL HOT WATER SUPPLY

GI GREASE INTERCEPTOR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GV GAS VENT

GWH GAS WATER HEATER

HB HOSE BIBB

HC HEATING COIL

HCR HOT/CHILLED WATER RETURN

HCS HOT/CHILLED WATER SUPPLY

ACC AIR COOLED CONDENSER

ACCU AIR COOLED CONDENSING UNIT

ASHP AIR SOURCE HEAT PUMP

ARU AIR ROTATION UNIT

OI OIL INTERCEPTOR

SOI SAND OIL INTERCEPTOR

DSS DUCTLESS SPLIT SYSTEM

SP SUMP PUMP

OST OVERFLOW STORM WATER

WMB WASHING MACHINE BOX

OB OUTLET BOX

RH ROOF HYDRANT

H HUMIDIFIER

DHWP DOMESTIC HOT WATER

RECIRCULATING PUMP

DWET DOMESTIC WATER EXPANSION

TANK

HP HORSEPOWER

HPR HIGH PRESSURE RETURN

HPS HIGH PRESURE STEAM

HRC HEAT RECOVERY COIL

HWR HOT WATER RETURN (HEATING)

HWS HOT WATER SUPPLY (HEATING)

HX HEAT EXCHANGER

HY HYDRANTS

HP-_ HEAT PUMP

HVLS HIGH VOLUME LOW SPEED

IH INTAKE HOOD

IRH INFRARED RADIANT HEATER

KH KITCHEN HOOD

KW KILOWATT

KWH KILOWATT HOURS

L LAVATORY

LAT LEAVING AIR TEMPERATURE

LPR LOW PRESSURE RETURN

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPS

LS LAUNDRY SINK

LV LOUVER

LWT LEAVING WATER TEMPERATURE

PROJECT MECHANICAL REFERENCED DEMOLITION NOTES PROJECT MECHANICAL REFERENCED NOTES

2/3/26

T

T

T

T

T

T

T

T

T

MEN

KITCHEN

BREAKROOM

CORRIDOR

SUPPLIES

TRAINING

ROOM

OPEN OFFICE

OFFICE

WORK ROOM

TOOL ROOM

SUPPLIES

SHOP AREA

TRUCK BAYS

WAREHOUSE

RECEIVING

ENTRY

CORRIDOR

CORRIDOR

STAIR

SUPPLIES

DATA

JANITOR

WOMENS

LOCKER

MENS LOCKER

WOMEN

VAV-4

VAV-2

VAV-1

VAV-3

VAV-5

VAV-10

VAV-6

VAV-8

VAV-9

VAV-7

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M001

DEMOLITION FLOOR PLAN -

MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M001 DEMOLITION FLOOR PLAN - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. DEMO NOTES ( ):X

1 REMOVE EXISTING VAV BOX AND ASSOCIATED PIPING SPECIALTIES. PROTECT

CONNECTED DUCTWORK FOR RECONNECTION TO NEW VAV BOX. SEE M101 FOR

ADDITIONAL INFORMATION. REMOVE ASSOCIATED THERMOSTAT.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - DEMO HVAC - OPTION 1

DATE INITIAL

MECH ROOM

ELEC ROOM

ELEVATOR

EQUIPMENT

STAIR

AHU-1

P-1

P-2

B-2

B-1

UH-4

P-55

P-4

P-3

G

METER

MECHANICAL

151A

CT

CP-3

CP-2

CP-1

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M002

DEMOLITION FLOOR PLAN -

MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M002 DEMOLITION FLOOR PLAN - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. DEMO NOTES ( ):X

1 REMOVE EXISTING COOLING TOWER. ASSOCIATED PIPING AND BY-PASS SYSTEM IS TO BE

REUSED. CONTRACTOR TO DOCUMENT PIPING LAYOUT PRIOR TO REMOVAL OF COOLING

TOWER.

2 REMOVE EXISTING PUMPS AND ASSOCIATED ACCESSORIES.

3 EXISTING WATER METER CONNECTED TO CONDENSER DRAIN LINE TO BE REUSED FOR

WITH NEW PUMPS. TEMPORARILY DISCONNECT DURING CONSTRUCTION.

4 REMOVE BOILER AND ASSOCIATED FLUE, CONDENSATE DRAIN LINE, AND ASSOCIATED

ACCESSORIES. REMOVE GAS PIPING BACK TO MAIN AND CAP. REMOVE GAS FLUE BACK

TO VERTICAL STACK. VERTICAL STACK TO BE REUSED.

5 EXISTING EQUIPMENT TO REMAIN.

6 REMOVE EXISTING AIR/DIRT SEPARATOR AND PREPARE FOR INSTALLATION OF NEW UNIT.

7 REMOVE EXISTING EXPANSION TANK AND PREPARE FOR INSTALLATION OF NEW UNIT.

8 REMOVE COMMON PIPE SECTION OF EXISTING IN-FLOOR RADIANT HEAT SYSTEM.

9 REMOVE EXISTING PUMP AND PREPARE FOR INSTALLATION OF NEW UNIT.

10 VERTICAL EXHAUST FLUE TO BE REUSED. PROTECT DURING CONSTRUCTION.

DATE INITIAL

SCALE: 1/4" = 1'-0"

SUB-GRADE PLAN - DEMO HVAC

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - AREA 3.4 - DEMO HVAC

T

T

T

T

T

T

T

T

MEN

KITCHEN

BREAKROOM

CORRIDOR

SUPPLIES

TRAINING

ROOM

OPEN OFFICE

OFFICE

WORK ROOM

TOOL ROOM

SUPPLIES

SHOP AREA

TRUCK BAYS

WAREHOUSE

RECEIVING

ENTRY

CORRIDOR

CORRIDOR

STAIR

SUPPLIES

DATA

JANITOR

WOMENS

LOCKER

MENS LOCKER

WOMEN

VAV-2

VAV-4

VAV-3

VAV-5

VAV-10

VAV-6

VAV-8

VAV-7

VAV-9

VAV-1

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M101

FLOOR PLAN - MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M101 FLOOR PLAN - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - HVAC - OPTION 1

DATE INITIAL

REF. NOTES ( ):X

1 REPLACE VAV BOX AS SHOWN. PROVIDE NEW PIPING SPECIALTIES AND CONNECT TO

EXISTING PIPING AND DUCTWORK. INSTALL NEW THERMOSTAT IN PREVIOUS

THERMOSTAT LOCATION.

MECH ROOM

ELEC ROOM

ELEVATOR

EQUIPMENT

STAIR

WAREHOUSE

AHU-1

UH-4

HX-1

P-1

P-2

P-6

P-5

G

ET-2

AS-2

AS-1

ET-1

B-2

B-1

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

3" HWS

1" G

1" G

1 1/2" G

3" HWS

3" HWR

3" HWS

3" HWR

3 7

MECHANICAL

151A

METER

CT-1

CP-3

CP-2

CP-1

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M102

FLOOR PLAN - MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M102 FLOOR PLAN - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. NOTES ( ):X

1 INSTALL EQUIPMENT ON EXISTING HOUSEKEEPING PAD.

2 SIZE AND INSTALL EXHAUST FLUE PIPING PER MANUFACTURER REQUIREMENTS.

CONNECT TO EXISTING 10" Ø FLUE UP THROUGH ROOF.

3 ROUTE FULL SIZE CONDENSATE FROM BOILER TO EXISTING FLOOR DRAIN. PROVIDE

CONDENSATE NEUTRALIZER FOR EACH BOILER.

4 INSTALL NEW COOLING TOWER IN PREVIOUS UNITS LOCATION. EXISTING PIPING TO BE

REUSED. CONTRACTOR TO MODIFY PIPING AS REQUIRED FOR NEW EQUIPMENT

CONNECTIONS. CONTRACTOR TO DOCUMENT ANY PIPING LAYOUTS PRIOR TO REMOVAL

OF COOLING TOWER. COOLING TOWER BYPASS LOOP TO BE USED FOR NEW COOLING

TOWER.

5 INSTALL NEW PUMPS ON EXISTING HOUSEKEEPING PAD.

6 REINSTALL CONDENSER WATER METER AS PREVIOUSLY INSTALLED.

7 CONTRACTOR TO VERIFY GAS PRESSURE AND NATURAL GAS PIPE SIZE WITH MOST

RECENT IFGC PRIOR TO INSTALLATION. PROVIDE PRESSURE REGULATOR AT EACH

BOILER.

DATE INITIAL

SCALE: 1/4" = 1'-0"

SUB-GRADE PLAN - HVAC

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - AREA 3.4 - HVAC

CONCRETE OR MASONRY

PARTITION.

GROUT, SEE

SPECIFICATIONS.

1/4" CLEAR AROUND PIPE

OR INSULATION.

CAULKING, SEE

SPECIFICATIONS.

SLEEVE, SEE

SPECIFICATIONS.

NOTE:

1. CAULK FULL PERIMETER OF PIPE AT BOTH INSIDE &

OUTSIDE OF WALL.

1/4" CLEAR AROUND PIPE

OR INSULATION

RISER CLAMP

CONCRETE

FLOOR

CAULKING, SEE

SPECIFICATIONS.

NOTE:

1. CAULK FULL PERIMETER OF PIPE AT BOTH TOP AND BOTTOM

OF FLOOR.

DETAIL OF SLEEVE FOR PIPING PENETRATION OF FLOORDETAIL OF SLEEVE FOR PIPING PENETRATION OF VERTICAL

PARTITIONS

SLEEVE, SEE

SPECIFICATIONS.

SLEEVE HEIGHT SHALL BE

2" HIGH IN WET

LOCATIONS, AT FLOOR

LEVEL IN ALL OTHER

LOCATIONS

RISER CLAMP

LEG

INSULATION

THREADED ROD

INSULATION

THREADED ROD

HANGER, INSULATION ON PIPE

CONTINUOUS THROUGH HANGER

WITHOUT SWALLOWING

PIPE, 1"Ø MAX

BAND

THREADED ROD

HANGER

INSULATION

PIPE

SHIELD TO COVER 180° OF

PIPE, SEE CHART FOR

LENGTH

SEE CHART

SHIELD LENGTH

SEE CHART

SHIELD LENGTH,

SWIVEL

SHIELD LENGTH FOR PIPE - NOT LESS THAN THE FOLLOWING:

a. NPS 1/4" TO 3-1/2" 12" LONG AND .048" THICK

b. NPS 4" 12" LONG AND .06" THICK

c. NPS 5" TO 6" 18" LONG AND .06" THICK

d. NPS 8" TO 14" 24" LONG AND .075" THICK

e. NPS 16" TO 24" 24" LONG AND .105" THICK

NOTE:

1. PIPES NPS 8" AND LARGER: INCLUDE WOOD OR REINFORCED CALCIUM-SILICATE-INSULATION INSERTS OF LENGTH AT LEAST AS LONG AS

PROTECTIVE SHIELD.

2. THERMAL-HANGER SHIELDS: INSTALL WITH INSULATION SAME THICKNESS AS PIPING INSULATION.

SHIELD TO COVER 180°

OF PIPE, SEE CHART FOR

LENGTH

SHIELD TO COVER 180°

OF PIPE, SEE CHART FOR

LENGTH

THREADED ROD

U-BOLT (TYP.) UNISTRUT OR STEEL ANGLE

WITH LONG LEG DOWN

SHIELD TO COVER 360° OF

PIPE, SEE CHART FOR

LENGTH

HANGER, INSULATION ON PIPE

CONTINUOUS THROUGH HANGER

WITHOUT SWALLOWING

PIPE (TYP.)

DIRT LEG

TO EQUIPMENT

SHUT-OFF VALVE

REMOVABLE

CAP

UNION

SUPPLY PIPING

PRESSURE REGULATOR (IF REQUIRED)

STRAINER

(TYP.)

CHECK

VALVE (TYP.)

PRESSURE

GAUGE (TYP.)

ISOLATION VALVE (TYP.)

FLEXIBLE PIPE

CONNECTION (TYP.)

SUCTION

DIFFUSER

PIPE DIAMETER MIN.

3 STRAIGHT

FULLY GROUT PUMP

FRAME

BALANCE

VALVE (TYP.)

STRAINER

ISOLATION

VALVE (TYP.)

PRESSURE

GAUGE

CHECK

VALVE

BALANCING

VALVE

PUMP UNION

(TYP.)

SUPPORT PUMP

SEPARATE FROM

PIPING

FLEXIBLE PIPE

CONNECTION (TYP.)

REHEAT COIL

CONTROL

VALVE

UNION

(TYP.)

STRAINER

VALVE

(TYP.)

AUTOFLOW

VALVE

HWS

HWR

MANUAL AIR VENT

HOSE END DRAIN WITH CAP

NOTE: SEE PLANS FOR PIPE SIZE, MINIMUM 3/4".

FLOORS

E

E N

O T

E S

B E

L O

W

T Y

P

IC

A L

L Y

A

.F .F

TYPICAL HVAC CONTROL DEVICE INSTALLATION

THERMOSTAT

OR OTHER HVAC

CONTROL DEVICE

LIGHT

SWITCH

NOTES:

1. WHEN THERMOSTAT IS LOCATED ADJACENT TO LIGHT SWITCH OR OTHER

WALL MOUNTED ELECTRICAL OR CONTROL DEVICE, DEVICES TO BE

INSTALLED AT THE SAME ELEVATION.

2. ALL USER INPUT BUTTONS OR SWITCHES ON CONTORL DEVICE TO BE

LOCATED BELOW 48" A.F.F. TO MEET ADA REQUIREMENTS.

3. WHEN INSTALLED NEAR DOOR, LIGHT SWITCH SHALL BE DEVICE CLOSEST TO

DOOR FRAME.

4. IF DEVICE IS LOCATED ABOVE COUNTER, INSTALL AT 40" A.F.F.

CL

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M401

DETAILS - MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M401 DETAILS - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

DATE INITIAL

SCALE: NOT TO SCALE

INTERIOR PIPE SLEEVE DETAILS

SCALE: NOT TO SCALE

PIPE HANGER DETAIL

SCALE: NOT TO SCALE

TYPICAL GAS PIPING DETAIL

SCALE: NOT TO SCALE

BASE MOUNTED END SUCTION PUMP DETAIL

SCALE: NOT TO SCALE

IN-LINE CIRCULATING PUMP PIPING (VFD) DETAIL

SCALE: NOT TO SCALE

REHEAT COIL PIPING DETAIL

SCALE: 12" = 1'-0"

THERMOSTAT DETAIL

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M

E C

H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

AJP

Checker

02/03/2026

09258.012

M501

SCHEDULE - MECHANICAL

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 6- M501 SCHEDULE - MECHANICAL

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

DATE INITIAL

EXISTING BAS SYSTEM: ASVS, BACNET-IP AUTOMATED LOGIC SYSTEMS.

LOCAL PROVIDER: AUTOMATIC CONTROLS.

ALL NEW EQUIPIMENT IS TO BE PROGRAMMED TO MATCH EXISTING

CONTROL SEQUENCES.

7. CONNECT UNIT TO EXISTING BACNET-IP BAS SYSTEM.

6. PROVIDE ALL STAINLESS STEEL CONSTRUCTION OPTION.

5. PROVIDE INDIVIDUAL ELECTRICAL CONNECTIONS FOR EACH COOLING TOWER FAN, AND SINGLE POWER CONNECTION FOR AMBIENT HEATERS. SEE ELECTRICAL FOR ADDITIONAL INFORMATION

4. PROVIDE COOLING TOWER WITH BASIN FLOAT.

3.BASIN HEATER TO BE STAINLESS STEEL CONSTRUCTION WITH AUTOMATIC LOW VOLTAGE CONTROL AND TEMPERATURE SENSOR.

2. PROVIDE WITH ACCCESS LADDERS FOR TOWER MAINTENANCE. PROVIDE WITH JIB CRANE HOIST FOR MOTOR AND FAN REPLACEMENT

NOTES: 1. PROVIDE WITH SOUND REDUCING OULET, VIBRATION ISOLATION AND VIBRATION CUT-OFF SWITCH.

CT-1 SEE PLANS CH-1,2 170,300 2400 95 85 7.81 78 12,000 50 2 2x10 460 3 COUNTERFLOW 16'-2.25" 11'-10" 24'-0.5" 34,170 BAC VT1-800-Q 1-7

FAN HP FAN QTY

BASIN

HEATER

(kW) VOLT PH CONFIGURATION HEIGHT (FT) WIDTH (FT) DEPTH (FT)

OPERATING WEIGHT

(LB)MARK LOCATION SERVES FAN CFM

FLUID

FLOW

(GPM) EWT (°F) LWT (°F)

MAX PD

(PSI)

WET BULB

TEMP (°F)

TOTAL

CAPACITY (MBH)

ELECTRICAL PHYSICAL DATA

BASIS OF DESIGN REMARKS

COOLING TOWER SCHEDULE

ET-2 RADIANT FLOOR BOILER ROOM DIAPHRAGM 40-200 15 125 8 5 TACO CX30-125 ---

ET-1 HW SYSTEM BOILER ROOM DIAPHRAGM 40-200 15 125 57 27 TACO CX215-125 ---

MARK SERVES LOCATION TYPE TEMP RANGE (°F) FILL PRESSURE (PSIG)

MAX OPER.

PRESSURE (PSIG)

TANK VOLUME

(GAL)

ACCEPTANCE

VOLUME (GAL) BASIS OF DESIGN REMARKS

EXPANSION TANK SCHEDULE

7. CONNECT TO EXISTING BACNET-IP BAS SYSTEM.

6. CONFIGURE AS LEAD/LAG IN CASCADE MODE.

5. PROVIDE CSD-1 EMERGENCY SHUTOFF SWITCH(ES) AT EACH MECH ROOM EXIST. SWITCH TO SHUTOFF GAS AND ELECTRICAL TO BOILERS.

4. PROVIDE WITH SYSTEM TEMP SENSOR, OUTDOOR AIR SENSOR, SYSTEM PUMP RELAY AND ALARM BELL.

3. PROVIDE WITH ROOM AIR KIT FOR COMBUSTION AIR. CONTRACTOR TO VERIFY EXISTING COMBUSTION AIR INLET CONDITIONS MEET REQUIREMENTS OF BOILER.

2. BOILER TO OPERATE ON ITS OWN INTERNAL CONTROLS WITH CONNECTION TO BAS, SEE SEQUENCE OF OPERATIONS FOR DETAILS.

NOTES: 1. PROVIDE BOILER WITH CONDENSATE NEUTRILIZATION KIT. VENT AND COMBUSTION AIR TO BE INSTALLED PER THE MANUFACTURER'S REQUIREMENTS SEE PLANS FOR INSTALLATION.

B-1,2 MECH FIRETUBE NAT. GAS 650 625.95 48.15 13:1 96.3 62 160 180 3.23 120 1 8 29 27 74 674 FULTON ENDURA EXE-650 1-7

INPUT (MBH) OUTPUT (MBH) MIN OUTPUT (MBH) TURNDOWN MAX EFFICIENCY (%) GPM EWT (°F) LWT (°F) MAX PD (FT WAT) VOLT PHASE FLA LENGTH... WIDTH (IN) HEIGHT (IN) OPERATING WEIGH...MARK LOCATION TYPE FUEL

HEATING DATA WATERSIDE DATA ELECTRICAL DATA PHYSICAL DATA

BASIS OF DESIGN REMARKS

GAS FIRED HOT WATER BOILER SCHEDULE

3. VFD PROVIDED BY MECHANICAL CONTRACTOR. CONTRACTOR TO COORDINATE INSTALLATION WITH ELECTRICAL CONTRACTOR.

2. PROVIDE PUMP WITH UPRIGHT PIPING CONFIGURATION WITH 3 STRAIGTH DIAMETERS AT INLET AND OULET. PUMP TO BE LASTER ALIGNED AFTER INSTALLATION.

NOTES: 1. UNIT IS TO BE CONNECTED TO EXISTING BACNET-IP BAS SYSTEM.

P-6 GROUNDS RADIANT FLOOR INLINE WATER 8 30 5 3450 1/3 115 1 60 BAS TACO 2400-45 1

P-1,2 GROUNDS SECONDARY LOOP BASE MOUNTED END SUCTION WATER 86 65 56 1760 3 208 3 60 VFD TACO FI1209C 1,2,3

CP-1,2,3 ARCH CT-1 BASE MOUNTED END SUCTION WATER 1200 65 87 1160 25 460 3 60 VFD TACO FI6013D 1,2,3

RPM HP VOLTS PH HZMARK LOCATION SERVES TYPE FLUID TYPE FLOW GPM

HEAD FT

WG MIN % EFF

ELECTRICAL DATA

CONTROL TYPE

BASIS OF DESIGN REMARKS

PUMP SCHEDULE

HX-1 RADIANT FLOOR COUNTER-CURRENT 59.6 16 WATER 6.095 180 160 7 1.53 WATER 8 90 105 8 2.16 TACO TB10Tx16 ---

FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI) FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI)MARK SERVES TYPE LOAD (MBH) # OF PLATES

HOT-SIDE DATA COLD-SIDE DATA MANUFACTURER AND MODEL

NUMBER REMARKS

BRAZED PLATE HEAT EXCHANGER SCHEDULE

2. CONNECT UNITS TO EXISTING BACNET-IP BAS SYSTEM.

NOTES: 1. PROVIDE UNIT WITH INSULATION AND FOIL FACED LINER, CROSS-FLOW AIR SENSOR, AND CONTROL ENCLOSURE.

VAV-11 AHU-11 08 500 250 0.15 1 16 19 250 55 92.5 10.2 1 0.1 159.1 1 0.56 KRUEGER LMHS 1,2

VAV-10 AHU-10 05 200 200 0.09 1 11 20 200 55 93 8.3 1 0.03 166.5 1.3 0.66 KRUEGER LMHS 1,2

VAV-9 AHU-9 09 600 250 0.11 1 12 15 250 55 96.9 11.4 1 0.07 156.7 1 0.13 KRUEGER LMHS 1,2

VAV-8 AHU-8 12 455 455 0.03 1 12 - 455 55 94.6 19.5 1 0.02 160 2 0.51 KRUEGER LMHS 1,2

VAV-7 AHU-7 10 370 370 0.04 1 - - 370 55 92.3 15 1 0.03 162.4 1.8 0.32 KRUEGER LMHS 1,2

VAV-6 AHU-6 12 1060 500 0.16 1 16 13 500 55 94.7 21.5 1 0.12 165.3 3 1.1 KRUEGER LMHS 1,2

VAV-5 AHU-5 12 960 960 0.23 1 15 11 960 55 100.2 47.1 2 0.19 141.3 2.5 0.48 KRUEGER LMHS 1,2

VAV-4 AHU-4 12 1080 960 0.28 1 15 13 960 55 100.2 47.1 2 0.23 141.3 2.5 0.48 KRUEGER LMHS 1,2

VAV-3 AHU-3 07 390 120 0.12 1 16 20 170 55 95.6 7.5 1 0.07 149.2 0.5 0.19 KRUEGER LMHS 1,2

VAV-2 AHU-2 07 410 200 0.13 1 16 20 200 55 97.4 9.2 1 0.07 161.1 1 0.56 KRUEGER LMHS 1,2

VAV-1 AHU-1 05 250 160 0.15 1 13 25 160 55 96.7 7.2 1 0.05 165.1 1 0.43 KRUEGER LMHS 1,2

MAX MIN MIN INLET RAD DIS CFM EAT (°F) LAT (°F) CAP (MBH) NO ROWS MAX PD LWT (°F) GPM PRESS DROP FT WATMARK AHU

INLET SIZE

(IN)

CFM

STATIC PRESSURE (IN

WG) NC LEVELS REHEAT COIL DATA

BASIS OF DESIGN REMARKS

AIR TERMINAL UNIT SCHEDULE

NOTES: 1. PROVIDE UNIT WITH ACCESSORIES TO SUPPORT UNIT FROM STRUCTURE.

AS-2 AIR SEPARATOR RADIANT FLOOR BOILER ROOM 8 GPM @ 0.1 FT WAT PD SPIROTHERM VDT-200 1

AS-1 AIR SEPARATOR HOT WATER SYSTEM BOILER ROOM 86 GPM @ 1 FT WAT PD SPIROTHERM VDT-300 1

MARK FUNCTION SERVES LOCATION OPERATING CONDITIONS BASIS OF DESIGN REMARKS

MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

JCB

JCB

KJS

02/03/2026

09258.012

E 00

ELECTRICAL INFO SHEET

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 7- E 00 ELECTRICAL INFO SHEET

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

DATE INITIAL

S

NORTH

ARROW

MATCHLINE

AREA A

AREA B

EXISTING

COLUMN

NEW COLUMN

X

X

X

XX-XX

SIM

X

XX-XX

DX

X

SECTION/

DETAIL

PLAN

DETAIL

REFERENCE NOTE

REFERENCE

DEMOLITION NOTE

ROOM

NUMBER

LETTER INDICATES

NEW COLUMN LINE

LETTER INDICATES EXISTING

COLUMN LINE

SECTION/DETAIL NUMBER

SHEET NUMBER

INDICATES DIRECTION OF

VIEW

DETAIL NUMBER

SHEET NUMBER

REFERENCE

DESIGNATION

DEMOLITION

DESIGNATION

REFERENCE LEGEND

NAME

ELEVATION

LEVEL

TITLE

MARKER

VIEW NAME

SCALE: 1/8" = 1'-0"

DETAIL NUMBER

LEVEL CALLOUT

DESIGNATION

ELEVATION DESIGNATION

GRAPHIC AREA FOR

DRAWING

TITLE

SCALE OF THE DRAWING

ABBREVIATIONS

ROOM NAME

150 SF

ROOM NAME DESIGNATION

ROOM NUMBER DESIGNATION

ROOM AREA DESIGNATION

SYMBOL LEGEND

P C

J

J

O S

MS

IC

S

S

M

N

T V

VC

N E

N S

N

N D

N 2

G

K1

V

A

R

M

M

T

WALL MOUNTED STRIP LUMINAIRE

SYMBOL NOTES:

PHOTOCELL

VOICE AND DATA

JUNCTION BOX - CEILING MOUNT

JUNCTION BOX - WALL MOUNT

VOICE OUTLET

DATA OUTLET

OCCUPANCY SENSOR

MOTION SENSOR

CEILING FAN

POLE MOUNTED SITE LUMINAIRE

FLOOD LIGHT

NURSE CALL

SPEAKER

BEDSIDE STATION

INTERCOM SPEAKER STATION

VOLUME CONTROL STATION

MICROPHONE JACK

TELEVISION OUTLET

CCTV CAMERA

SOUND, TELEVISION, AND SECURITY

FUSE

EMERGENCY PULL STATION

DISCONNECT SWITCH

STAFF STATION

DUTY STATION

DOME LIGHT

MASTER STATION

EMERGENCY GENERATOR

POWER DISTRIBUTION ONE LINE

CONDUIT UP

CONDUIT DOWN

INDICATES BUSHED CONDUIT

VOICE/DATA OUTLET

DOUBLE BED BEDSIDE STATION

DRAW OUT VACUUM CIRCUIT BREAKER

LIGHTNING SURGE ARRESTOR

THERMAL OVERLOAD RELAY

PLUG-IN OR DRAWOUT CONNECTOR

CIRCUIT BREAKER

FUSED DISCONNECT SWITCH

VOLTMETER

AMMETER

X:Y CURRENT TRANSFORMER - (RATIO)

KIRK KEY INTERLOCK

"C" INDICATES CEILING MOUNTED

"F" INDICATES FLOOR MOUNTED

"S" INDICATES SURFACE MOUNTED

"G" INDICATES GROUND FAULT INTERRUPTING

"IG" INDICATES ISOLATED GROUND

"AC" INDICATES MOUNTING 6" ABOVE

COUNTERTOP OR BACKSPLASH

"WP" INDICATES WEATHERPROOF

"XP" INDICATES EXPLOSION PROOF

"U" INDICATES USB CHARGER

"R" INDICATES EXISTING DEVICE REMOVED

AND RELOCATED

LOWER CASE LETTER BY SWITCHES AND

FIXTURES

INDICATE ASSOCIATED UNIT FOR SWITCHING

LIGHTING

LUMINAIRE

WALL MOUNTED LUMINAIRE

RECESSED LUMINAIRE

WALL MOUNTED LUMINAIRE

SURFACE MOUNTED LUMINAIRE

TRACK LIGHTING

DIMMER SWITCH

TIMER SWITCH

WIRING DEVICES - SWITCHES

SINGLE POLE SWITCH

KEY OPERATED SWITCH

SINGLE POLE SWITCH WITH PILOT

THERMAL ELEMENT SWITCH

FOUR-WAY SWITCH

TWO POLE SWITCH

THREE-WAY SWITCH

STRIP / INDUSTRIAL LUMINAIRE

LUMINAIRE - NIGHT LIGHTING

LUMINAIRE - EMERGENCY SYSTEM

EMERGENCY BATTERY PACK LUMINAIRE

REMOTE EMERGENCY HEAD

WALL WASH LUMINAIRE

PENDANT MOUNTED LUMINAIRE

POWER POLE

METER SOCKET

POWER EQUIPMENT

WIRING DEVICES - RECEPTACLES

COMBINATION STARTER SAFETY

SWITCH

RELAY - CONTROL AS NOTED

PUSHBUTTON STATION

MOTOR CONNECTION

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE

EMERGENCY RECEPTACLE

SPECIAL PURPOSE RECEPTACLE, NEMA

CONFIGURATION NOTED

PLUG-IN STRIP - LENGTH AND

QUANTITY OF OUTLETS AS SHOWN

SAFETY SWITCH

DROP CORD RECEPTACLE ASSEMBLY

FUSIBLE SWITCH (FUSETRON)

PANELS AND CABINETS

DISTRIBUTION PANEL

SWITCHBOARD, SWITCHGEAR, MCC

EQUIPMENT OR TERMINAL CABINET

DRY TYPE TRANSFORMER

BRANCH CIRCUIT PANEL

CONDUIT AND BOXES

HORN (PA, PUBLIC

ADDRESS)

TRANSFORMER

EXIT LIGHT - WALL MOUNT WITH

DIRECTIONAL ARROWS AS

INDICATED, FILLED-IN QUARTERS

INDICATE ILLUMINATION SIDES

EXIT LIGHT - CEILING OR PENDANT

MOUNT WITH DIRECTIONAL ARROWS

AS INDICATED, FILLED-IN QUARTERS

INDICATE ILLUMINATION SIDES

EMERGENCY EXIT LIGHT COMBO

LOW VOLTAGE MOMENTARY

CONTACT SWITCH

N P PILLOW SPEAKER

FB FLOOR BOX

FP FLOOR POKE-THROUGH DEVICE

N M

WIRELESS ACCESS POINT

S

S2

S3

S4

SD

SK

SP

STE

ST

SFT

X

CONTROLLED RECEPTACLE

WB WALL AV BOX

F

F

F

F

F S

D

P S

T S

DH

STROBE

HORN

MANUAL PULL STATION

HORN STROBE

HEAT DETECTOR

SMOKE DETECTOR

REMOTE INDICATOR LIGHT

SPRINKLER TAMPER SWITCH

DUCT SMOKE DETECTOR

FLOW SWITCH

POST INDICATING VALVE SWITCH

MAGNETIC DOOR HOLDER

FIRE ALARM SYSTEM

H

S

S

F SPEAKER STROBES

F SPEAKERS

ACSR ALUMINUM CONDUCTOR

STEEL REINFORCED

AFF ABOVE FINISH FLOOR

AIC AMPS INTERRUPTING

CAPACITY (SYM RMS)

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

APPROX APPROXIMATE

AUTO AUTOMATIC

AVG AVERAGE

L ANGLE

BKR BREAKER

C OR CL CENTER LINE

C OR CND CONDUIT (ELECTRICAL

SHEETS)

CKT CIRCUIT

CLG CEILING

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CPT CONTROL POWER

TRANSFORMER

DC DIRECT CURRENT

DEG DEGREE

DEMO DEMOLITION

DIA DIAMETER

DIM DIMENSION

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DWG DRAWING

E EAST

EA EACH

EL OR

ELEV

ELEVATION - GRADE OR

BUILDING

ELEC ELECTRIC OR

ELECTRICAL

ELEV ELEVATOR

EMD ESTIMATED MAXIMUM

DEMAND

ENCL ENCLOSURE

EQUIP EQUIPMENT

EST ESTIMATE

EWC ELECTRIC WATER

COOLER

EXIST, EXTG EXISTING

EXP EXPOSED

EXT EXTERIOR

FA FIRE ALARM

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FLUOR FLUORESCENT

AWG GAUGE

HP HORSE POWER

HR HOUR

HTG HEATING

HTR HEATER

HZ HERTZ

ID INSIDE DIAMETER

IES ILLUMINATING

ENGINEERING SOCIETY

IN INCH

INSUL INSULATION

INT INTERIOR

KCMIL KCM KILO CIRCULAR MIL

KV KILOVOLTS

KVA KILOVOLT AMPERES

KVAR KILOVOLT AMPERES

REACTIVE

KW KILOWATT

FAAP FIRE ALARM ANNUNCIATOR

PANEL

FACP FIRE ALARM CONTROL PANEL

FAEP FIRE ALARM EXTENDER PANEL

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

CUH CABINET UNIT HEATER

EMI ELECTROMAGNETIC

INTERFERENCE

GFI GROUND FAULT CIRCUIT

INTERRUPTER

NON-SCHEDULED

EQUIPMENT

XXXX

SCHEDULED

EQUIPMENT EQUIPMENT NUMBER

XX-XX PANEL & CIRCUIT NUMBER

XX

EQUIPMENT SIZE

(WHERE APPLICABLE)

EQUIPMENT

XX-XX PANEL & CIRCUIT NUMBER

EQUIPMENT NAME/NUMBER

NORTH PLAN

NORTH

TRUE

NORTH

ELECTRICAL SHEET LIST

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MCCB MOLDED CASE CIRCUIT

BREAKER

QTY QUANTITY

REC RECEPTACLE

REFR REFRIGERATOR

REINF REINFORCEMENT

REQD REQUIRED

N NORTH

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL

CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATION

NFPA NATIONAL FIRE

PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NO NUMBER

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OH OVERHEAD

OPNG OPENING

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PSI POUNDS PER SQUARE IN.

OCPD OVERCURRENT PROTECTIVE

DEVICE

RFI RADIO FREQUENCY

INTERFERENCE

TEL TELEPHONE

TEMP TEMPERATURE

TVSS TRANSIENT VOLTAGE

SURGE SUPPRESSOR

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS

LABORATORIES

UPS UNINTERRUPTIBLE

POWER SYSTEM

VFD VARIABLE FREQUENCY

DRIVE

W WEST

W/ WITH

W/O WITHOUT

WHM WATTHOUR METER

WT WEIGHT

XFMR TRANSFORMER

SOUTH

SCHED SCHEDULE

SF SQUARE FOOT (FEET)

SPEC SPECIFICATIONS

SPKR SPEAKER

SQ SQUARE

STD STANDARD

STL STEEL

SW SWITCH

SWBD SWITCH BOARD

SYM SYMMETRICAL

S

SCCR SHORT CIRCUIT CURRENT

RATING

SPD SURGE PROTECTIVE DEVICE

SPDT SINGLE POLE, DOUBLE

THROW

VFC VARIABLE FREQUENCY

CONTROLLER

LBS POUNDS

LRA LOCKED ROTOR AMPS

LTG LIGHTING

E 00 ELECTRICAL INFO SHEET

E 01 ELECTRICAL INFO SHEET

E001 FLOOR PLAN - DEMOLITION

E002 FLOOR PLAN - DEMOLITION

E201 FLOOR PLAN - POWER

E601 EQUIPMENT SCHEDULE

E701 ELECTRICAL PANEL SCHEDULES

02/03/2026

A. ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR

SALVAGED ARE SHOWN AS FULL-TONE LINES ON DEMO PLANS.

ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE

SHOWN AS HALF-TONE.

B. DEMOLITION SHOWN IS AS REQUIRED FOR THE COMPLETE

PROJECT. COORDINATE DEMOLITION WITH THE WORK OF OTHER

TRADES. PROVIDE TEMPORARY POWER AND LIGHTS AS

REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO

PROCEED OR AS REQUIRED TO ALLOW THE OWNER TO OCCUPY

THE SPACE.

C. ALL OF THE EQUIPMENT AND DEVICES SHOWN ON THIS DRAWING

ARE EXISTING. THE LOCATIONS OF THE EQUIPMENT AND DEVICES

WERE OBTAINED FROM EXISTING DRAWING AND FIELD

INVESTIGATION. THE LOCATIONS OF THE EXISTING EQUIPMENT

AND DEVICES ARE SHOWN FOR THE CONVENIENCE. ACCURACY

OF THE INFORMATION SHOWN IS NOT GUARANTEED.

VERIFICATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING

BIDS IS ENCOURAGED. SITE VISITS PRIOR TO SUBMISSION OF BIDS

NEED TO BE FULLY COORDINATED WITH THE OWNER.

D. CIRCUIT INFORMATION FOR ALL AFFECTED CIRCUITS SHALL BE

VERIFIED PRIOR TO COMMENCING WORK. ACCURACY OF THE

INFORMATION SHOWN AND INCLUDED ON THE PANEL SCHEDULES

IS NOT GUARANTEED.

E. LUMINAIRES AND DEVICES INDICATED TO BE REMOVED, WHICH

ARE LOCATED ON CEILINGS OR WALLS, SHALL HAVE LUMINAIRES,

DEVICE AND ALL ASSOCIATED CIRCUIT WIRING AND CONDUIT

REMOVED BACK TO NEAREST JUNCTION BOX, OR DEVICE NOT

INDICATED TO BE REMOVED. ACTUAL CIRCUITING MUST BE

DETERMINED IN THE FIELD. THE CONTRACTOR SHALL PROVIDE

ALL NECESSARY WIRE, CONDUIT, DEVICES AND CONNECTIONS

NECESSARY TO ENSURE CIRCUIT CONTINUITY OF THE REMAINING

DEVICES.

F. THE OWNER HAS THE RIGHT TO RETAIN ALL SALVAGEABLE

MATERIAL. ANY MATERIAL THE OWNER CHOOSES NOT TO ACCEPT

SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED

OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL

REGULATIONS. REMOVE ALL PCB BALLAST OR HAZARDOUS

LAMPS.

G. LABEL ALL SPARE OR ABANDONED CIRCUITS AND/OR CIRCUIT

BREAKERS IN ALL PANELBOARDS AFFECTED BY THE DEMOLITION.

SPARE CIRCUITS AND/OR CIRCUIT BREAKERS MAY BE REUSED

FOR THE CIRCUITING OF THE NEW OR REMODELED AREA AS

SPACE AND PANEL LOADING WILL ALLOW.

H. RESTORE ALL EXISTING SURFACES REQUIRING PATCHING,

PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO THE

DEMOLITION WORK, UNDER THE TERMS OF THIS SPECIFICATION.

CLOSE AND SEAL ALL OPENINGS, REPAIR ALL SURFACES, ETC., AS

REQUIRED.

I. EXISTING FIRE ALARM DEVICES, EMERGENCY LIGHTS, AND EXIT

SIGNS SHALL BE COMPLETE AND OPERABLE AT ALL TIMES.

PROVIDE TEMPORARY DEVICES IN AREAS BEING WORKED ON TO

ALLOW FOR A WORKABLE SYSTEM DURING CONSTRUCTION.

J. PROVIDE MINIMUM [2] DAYS ADVANCE NOTICE OF OUTAGES.

COORDINATE WITH OWNER FOR ALL ANTICIPATED OUTAGES.

OWNER HAS FINAL APPROVAL ON TIME AND EXTENT OF POWER

OUTAGE.

K. PROTECT EXISTING FURNITURE, CARPET, EQUIPMENT, DEVICES,

AND OTHER APPURTENANCES FROM DAMAGE DURING THE

COURSE OF CONSTRUCTION. REPLACE DAMAGED ITEMS FREE OF

COST TO THE OWNER.

A. ALL DEVICES SHOWN SHALL BE MOUNTED AT 18" A.F.F. UNLESS

INDICATED OTHERWISE.

B. ALL AUXILIARY CABLE ABOVE CEILING SHALL BE PLENUM RATED

WHERE REQUIRED.

C. CEILING MOUNTED DEVICES SHALL BE CENTERED IN CEILING TILE

WHERE INSTALLED IN ACOUSTICAL TILE CEILING.

D. PROVIDE 120 VOLT POWER CIRCUIT(S) FOR AUXILIARY SYSTEMS

AS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS.

A. DRAWINGS DO NOT SHOW TOTAL NUMBER OF CONDUCTORS FOR

CIRCUITS REQUIRED. PROVIDE THE NUMBER OF CONDUCTORS

NEEDED TO COMPLETE INSTALLATION OF SPECIFIC EQUIPMENT

FURNISHED. A GREEN GROUND CONDUCTOR, SIZED PER NEC,

SHALL ALSO BE INCLUDED IN EACH CIRCUIT. ADJUST

CONDUCTOR SIZES AS NEEDED TO LIMIT VOLTAGE DROP TO

LEVELS RECOMMENDED BY NEC. COORDINATE INSPECTIONS

WITH THE OWNER AND AHJ.

B. SEE ARCHITECTURAL SHEETS FOR REFLECTED CEILING PLANS.

C. ALL CIRCUITS SHALL HAVE SEPARATE NEUTRAL WIRES BUT CAN

SHARE AN INSULATED GREEN GROUND WIRE IN MINIMUM 3/4"

EMT CONDUIT.

D. SEAL ALL PENETRATIONS THROUGH FIRE OR FIRE/SMOKE RATED

WALLS AND FLOORS.

E. ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY AND IN

ACCORDANCE WITH NEC PARAGRAPHS 230.8, 300.5(G) AND

300.7(A). ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY NEC

AND NFPA.

F. CABLE AND CONDUIT SHALL NOT INTERFERE WITH EQUIPMENT

ACCESS.

G. ALL CABLING ABOVE CEILING SHALL BE PROPERLY SUPPORTED

(NOT FROM CEILING SYSTEM).

H. COORDINATE FINAL PANELBOARD DIRECTORIES WITH ENGINEER

AND OWNER.

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

JCB

JCB

KJS

02/03/2026

09258.012

E 01

ELECTRICAL INFO SHEET

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 7- E 01 ELECTRICAL INFO SHEET

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

GENERAL LIGHTING NOTES XREF. NOTES ( )

PROJECT ELECTRICAL REFERENCED NOTES

GENERAL NOTES REF. DEMO NOTES ( )

PROJECT ELECTRICAL REFERENCED DEMOLITION NOTES

DXGENERAL DEMO NOTES

GEN. POWER & AUX SYS. NOTES

D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY

MECHANICAL. EXISTING CIRCUIT MAY BE REUSED TO EXTENT

POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS

LOCATION.

D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING

AND DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK

ASSOCIATED WITH REMOVAL AND INSTALLATION OF VAVS BY

MECHANICAL.

D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY

MECHANICAL.

D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY

MECHANICAL. EXISTING CIRCUIT FOR BASIN HEATER MAY BE

REUSED TO EXTENT POSSIBLE FOR NEW EQUIPMENT

INSTALLATION AT THIS LOCATION.

1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY

SERVING EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE.

EXTEND CIRCUITING AS REQUIRED FOR NEW EQUIPMENT

CONNECTION.

2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY

DEMOLITION.

3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY

DEMOLITION TO SERVE NEW EQUIPMENT.

WAREHOUSE

RECEIVING

STAIR

SUPPLIES

JANITOR

DATA

CORRIDOR

BREAKROOM

MEN

WOMEN

MENS LOCKER

WOMENS LOCKER

SUPPLIES

TRAINING ROOM

ENTRY

WORK ROOM

OFFICE

OPEN OFFICE

TRUCK BAYS

D2 D2

D2

D2

D2

D2

VAV-4

VAV-2

VAV-1

VAV-3

VAV-10

VAV-5

VAV-6

VAV-8 VAV-9

VAV-7

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

JCB

JCB

KJS

02/03/2026

09258.012

E001

FLOOR PLAN - DEMOLITION

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 7- E001 FLOOR PLAN - DEMOLITION

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. DEMO NOTES ( ):DX

D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING AND

DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK ASSOCIATED

WITH REMOVAL AND INSTALLATION OF VAVS BY MECHANICAL.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - OPTION 1

TOILET

STAIR

ELEVATOR EQUIPMENT

ELEC ROOM

MECH ROOM

EXTG PANEL 'PP1'

EXTG PANEL 'PP5'

EXTG PANEL 'RP1'

EXTG PANEL 'MDP'

D1

D1

D1

D1

D1

D3

MECHANICAL

151A

METER

EXTG PANEL 'PP4'

EXTG PANEL 'LP-11'

EXTG PANEL 'ELP-14'

EXTG PANEL 'PP6'

D4

D3

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

JCB

JCB

KJS

02/03/2026

09258.012

E002

FLOOR PLAN - DEMOLITION

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 7- E002 FLOOR PLAN - DEMOLITION

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. DEMO NOTES ( ):DX

D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.

EXISTING CIRCUIT MAY BE REUSED TO EXTENT POSSIBLE FOR NEW

EQUIPMENT INSTALLATION AT THIS LOCATION.

D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.

D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.

EXISTING CIRCUIT FOR BASIN HEATER MAY BE REUSED TO EXTENT

POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS LOCATION.

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - AREA 3.4 - ELECTRICAL DEMOLITION

ALL POWERED RECEPTACLES, DEVICES, AND EQUIPMENT SHOWN SHALL BE

CIRCUITED AS OUTLINED IN THIS NOTE, UNLESS INDICATED OTHERWISE.

PANELBOARD CIRCUITING, INCLUDING IDENTIFYING SEPARATE

PANELBOARDS' BRANCH CIRCUIT AREAS, IS DELINEATED WITH A DASH-DOT

LINE BOUNDARY, WITH PANEL NAMES IDENTIFIED AT BOUNDARY LINE.

CIRCUIT NUMBERS ARE IDENTIFIED ADJACENT TO RECEPTACLE, DEVICE, OR

EQUIPMENT. REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION.

PANELBOARD CIRCUITING

STAIR

ELEVATOR EQUIPMENT

ELEC ROOM

MECH ROOM

EXTG PANEL 'MDP'

EXTG PANEL 'PP1'

EXTG PANEL 'PP5'

EXTG PANEL 'RP1'

PP1 - 25,27,29

P-1

PP1 - 31,33,35

P-2

PP1 - 28

P-6

PP1 - 11

B-1

PP1 - 26

B-2

MECHANICAL

151A

METER

PP4 - 3

CTF-1

PP4 - 2

CP-1

PP4 - 12

CP-2

PP4 - 1

CP-3

EXTG PANEL 'PP4'

EXTG PANEL 'LP-11'

EXTG PANEL 'ELP-14'

EXTG PANEL 'PP6'

PP4 - 5

CTF-2

PP6 - 3

BH-1 1

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

JCB

JCB

KJS

02/03/2026

09258.012

E201

FLOOR PLAN - POWER

REPLACE COOLING TOWER AND BOILER UNITS

009258012- 7- E201 FLOOR PLAN - POWER

GATEWAY ARCH NATIONAL PARK

11 NORTH 4TH STREET

ST. LOUIS, MO 63102

80034

320855

REF. NOTES ( ):X

1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY SERVING

EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE. EXTEND

CIRCUITING AS REQUIRED FOR NEW EQUIPMENT CONNECTION.

2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY DEMOLITION.

3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY

DEMOLITION TO SERVE NEW EQUIPMENT.

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN - POWER

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - AREA 3.4 - POWER

GENERAL EQUIPMENT SCHEDULE NOTES:

A. THIS SCHEDULE DISPLAYS SIZING INFORMATION THAT IS GENERIC IN

NATURE. SCHEDULE DOES NOT ITEMIZE ALL INSTANCES OF

EQUIPMENT. CONTRACTOR SHALL REFER TO THE PLANS FOR FINAL

QUANTITIES AND LOCATIONS.

B. MOUNT ALL DISCONNECTS AND STARTERS ON ASSOCIATED

EQUIPMENT UNLESS SHOWN OTHERWISE. MAINTAIN WORKING

CLEARANCES PER NEC; COORDINATE WITH MECHANICAL

CONTRACTOR.

C. NFD OR FD = NON-FUSED OR FUSED DISCONNECT SWITCH.

D. CS/NFD, FD = COMBINATION STARTER/ NON OR FUSED DISCONNECT

SWITCH.

E. INT = INTEGRAL DISCONNECT FURNISHED WITH EQUIPMENT.

F. EXP = DEVICE TO BE EXPLOSION-PROOF.

G. ALL SWITCHES, DISCONNECTS, ETC SHALL BE LOCKABLE.

H. ALL SWITCHES, DISCONNECTS, ETC SHALL BE NEMA 3R WHERE

REQUIRED.

I. PROVIDE FUSES AS SHOWN; REVISE SIZES PER ACTUAL NAMEPLATE

DATA.

J. STARTER ACCESSORIES:STARTER ACCESSORIES:

1. CONTROL TRANSFORMER

2. H-O-A SWITCH

3. RED RUN LIGHT

4. 2 NO CONTACTS; 2 NC CONTACTS

K. PROVIDE DUCT DETECTOR, SHUTDOWN RELAY, AND ACCESSORIES

AS REQUIRED TO SHUTDOWN HVAC EQUIPMENT 2000 CFM OR HIGHER

PER…