B08_Solicitation_-_Att_8_-_Drawings_0001.pdf
PDF 4 MB Posted
- Attached to
- JEFF REPLACE COOLING TOWER AND BOILERS Federal contract opportunity
- Solicitation number
- 140P6026B0003
About this file
This document is a set of construction design drawings for a mechanical and electrical systems replacement project at Gateway Arch National Park's Maintenance Building located at 11 North 4th Street, St. Louis, Missouri 63102.
The project scope involves replacing existing cooling tower and boiler units at the facility. The mechanical work includes demolition and removal of existing cooling towers, boilers, pumps, expansion tanks, and associated piping and controls, with installation of new equipment including two cooling towers (CT-1 rated at 12,000 MBH capacity), two gas-fired hot water boilers (B-1 and B-2, each rated 650 MBH), three condensing pumps (CP-1, CP-2, CP-3), secondary loop pumps (P-1, P-2), and a radiant floor pump (P-6). The mechanical systems also include air/dirt separators, expansion tanks, heat exchangers, and variable air volume (VAV) terminal units serving multiple building spaces. The electrical work requires providing power connections for the new equipment, including new circuit breakers in existing panels (PP1, PP4, PP6) at 208V, 480V, and 120V as appropriate, with equipment ranging from 20-ampere receptacle circuits to 90-ampere three-phase connections for cooling tower fans. Construction phasing indicates that work on the Grounds Building cooling tower occurs during summer months with temporary cooling units required for occupied spaces, while Visitor Center cooling tower work occurs during winter months. The contractor must coordinate with National Park Service staff on construction scheduling, protect existing finishes, document site conditions prior to construction, and address potential hazardous materials encountered during demolition work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_MISC_Questions_Answers_0003.docx | DOCX document | |
| Sol_140P6026B0003_Amd_0003.pdf | ||
| Sol_140P6026B0003_Amd_0002.pdf | ||
| B12_MISC_Site_Visit_Sign_In_Sheet_0002.pdf | ||
| Sol_140P6026B0003_Amd_0001.pdf | ||
| B08_Solicitation_-_Att_2_-_Specifications_-_Division_1.pdf | ||
| B08_Solicitation_-_Att_4_-_Submittal_List.xlsx | XLSX spreadsheet | |
| Sol_140P6026B0003.pdf | ||
| B08_Solicitation_-_Att_3_-_Specfications_-_Addendum.pdf | ||
| B08_Solicitation_-_Att_5_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Att_7_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Att_1_-_Specifications.pdf | ||
| B08_Solicitation_-_Att_6_-_Notice_to_Contractors.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKSITE
WORKSITE
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
COVER SHEET
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 0- 0 COVER SHEET
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
MECHANICAL
M 00 MECHANICAL INFO SHEET
M001 DEMOLITION FLOOR PLAN - MECHANICAL
M002 DEMOLITION FLOOR PLAN - MECHANICAL
M101 FLOOR PLAN - MECHANICAL
M102 FLOOR PLAN - MECHANICAL
M401 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
ELECTRICAL
E 00 ELECTRICAL INFO SHEET
E 01 ELECTRICAL INFO SHEET
E001 FLOOR PLAN - DEMOLITION
E002 FLOOR PLAN - DEMOLITION
E201 FLOOR PLAN - POWER
E601 EQUIPMENT SCHEDULE
E701 ELECTRICAL PANEL SCHEDULES
DATE INITIAL
DRAWING INDEX
GATEWAY ARCH NATIONAL PARK MAINTENANCE BUILDING
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
NOT TO SCALE
REGION MAP
SCALE: 12" = 1'-0"
SITE MAP
GENERAL
0 COVER SHEET
0 - PH PHASING PLAN
NEW COOLING TOWER TO BE STAGED ON
LANDSCAPING WITH PROTECTION AT SQUARE
ON AERIAL VIEW.
GENERAL PHASING NOTES:
1. CONTRACTOR TO COORDINATE CONSTRUCTION SCHEDULE WITH NPS STAFF.
2. FOR AREAS THAT REQUIRE WORK ABOVE CEILINGS, CONTRACTOR TO DOCUMENT ANY DAMAGE PRIOR TO PROCEEDING WITH WORK.
A. TO ACCOMMODATE WORK REQUIRED ABOVE FINISH CEILINGS, REMOVE AND REINSTALL PORTIONS OF EXISTING SUSPENDED
ACOUSTICAL TILE CEILING SYSTEM TO RESTORE TO ORIGINAL CONDITION. IF ANY CEILING PADS OR CEILING GRID ELEMENTS
ARE DAMAGED DURING REMOVAL, REPLACE WITH NEW TO MATCH EXISTING.
3. WORK ASSOCIATED WITH GROUNDS BUILDING TO OCCUR DURING SUMMER SEASON. CONTRACTOR TO COORINDATE SCHEDULE
WITH NPS STAFF.
4. WORK ASSOCIATED WITH VISITORS CENTER COOLING TOWER TO OCCUR DURING WINTER MONTHS. CONTRACTOR TO COORINDATE
SCHEDULE WITH NPS STAFF.
5. CONTRACTOR TO PROVIDE PORTABLE AIR CONDITIONING UNITS TO SERVE SPACES LISTED ON TEMPORARY COOLING SCHEDULE
LOCATED ON SHEET 0-PH.
A. CAPACITY OF TEMPORARY COOLING REQUIRED IS LISTED ON TEMPORARY COOLING SCHEDULE.
B. CONTRACTOR TO COORDINATE LOCATIONS WITH NPS STAFF.
C. PORTABLE AIR CONDITIONING UNITS ARE TO DISCHARGE HOT AIR TO NEAREST CEILING PLENUM.
6. SEE AERIAL SITE LAYOUT VIEW ON 0-PH.
A. HATCHED LINE INDICATES USABLE PATHWAY TO COOLING TOWER LOCATION. CONTRACTOR TO COORDINATE ALLOWABLE
PATHWAYS TO DELIVER NEW COOLING TOWER AND REMOVE EXISTING UNIT PRIOR TO BEGINNING WORK.
B. SQUARE INDICATED IN VIEW IS TO BE LOCATION OF COOLING TOWER STAGING.
C. IN NO EVENT IS CONTRACTOR TO DRIVE OVER VISITOR CENTER ROOF.
D. CONTRACTOR RESPONSIBLE FOR DOCUMENTING SITE CONDITION PRIOR TO CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR
REPAIRING SITE TO CONDITION AT START OF CONSTRUCTION.
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
0 - PH
PHASING PLAN
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 0- 0 - PH PHASING PLAN
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
FCU-42 EMR 0.75
FCU-38 TC 0.5
FCU-36 TC 0.5
FCU-34 SW MECH 1
FCU-28 SOUTH ELEC 2
FCU-21 NORTH ELEC 1.5
FCU-20 MECH 6.5
FCU-19 ELEC 3
FCU-12 TC 0.5
FCU-11 TC 0.5
FCU-10 SOUTH EMR 6.5
FCU-8 NORTH EMR 3
FCU-7 TC 2
FCU-6 TC 2
FCU-5 TC 2
FCU-4 TC 2
FCU-3 TC 2
FCU-2 TC 2
FCU-1 TC 2
EXISTING FAN COIL UNIT
SERVING SPACE SPACE SERVED
TONNAGE
REQUIRED
TEMPORARY COOLING SCHEDULE
NOT TO SCALE
THERMOSTAT DETAIL
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND
LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER
OF ANY DISCREPANCIES OR VARIATIONS FROM THOSE SHOWN ON THE
DRAWINGS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT
NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL
NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF
DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE WORK
AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN.
FULL-TONE LINES INDICATED NEW OR RELOCATED CONSTRUCTION.
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH
STRUCTURE, CEILING, LIGHTING, AND PIPING.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL EQUIPMENT TO
ALLOW FOR MAINTENANCE ACCESS.
G. ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT RIGHT ANGLES AND
PARALLEL TO BUILDING WALLS UNLESS OTHERWISE INDICATED.
H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS. MAINTAIN
ALL CODE REQUIRED CLEARANCES.
I. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER
HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE
CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND
REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK
IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY
WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR.
J. ALL RUNOUTS TO AIR TERMINALS SHALL MATCH INLET SIZE UNLESS OTHERWISE
NOTED.
K. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING CONSTRUCTION
SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
L. THIS PROJECT UTILIZES A RETURN AIR PLENUM. ALL MATERIALS INSTALLED IN
RETURN AIR PLENUM SHALL BE NON-COMBUSTABLE OR SHALL HAVE A FLAME
SPREAD INDEX NOT TO EXCEED 25 AND SMOKE DEVELOPED INDEX NOT TO
EXCEED 50 IN ACCORDANCE WITH ASTM E84 OR UL 723.
M. CONTRACTOR RESPONSIBLE FOR PROTECTION OF ALL FINISHES AND WORK
AREAS.
N. TO ACCOMMODATE WORK REQUIRED ABOVE FINISH CEILINGS, REMOVE AND
REINSTALL PORTIONS OF EXISTING SUSPENDED ACOUSTICAL TILE CEILING
SYSTEM TO RESTORE TO ORIGINAL CONDITION. IF ANY CEILING PADS OR CEILING
GRID ELEMENTS ARE DAMAGED DURING REMOVAL, REPLACE WITH NEW TO
MATCH EXISTING.
O. SEE PHASING PLANS ON SHEET 0-PH. COORDINATE WORK WITH PHASING PLANS.
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.
DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED TO BE
REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL-TONE LINES. ALL
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN AS HALF-
TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED BELOW
OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION
AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL
EXTENT OF THE DEMOLITION REQUIRED AND AS LISTED BELOW.
C. THE REMOVAL OF FIRE PROTECTION, HVAC, AND PLUMBING EQUIPMENT FROM
FINISHED AREAS AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED
WITH ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE
MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS MADE TO
THE BUILDING.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL
OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES
TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH
THE OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.
E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE
CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND STORED OR
REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR SALVAGED ITEMS SHALL
REMAIN THE PROPERTY OF THE OWNER.
F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND CONTROLS
WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL REMOVALS.
G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER
HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE
CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND
REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK
IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY
WRITTEN AGREEMENT OF THE OWNER AND ARCHITECT.
H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION SHALL
BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
I. CONTRACTOR RESPONSIBLE FOR PROTECTION OF ALL FINISHES AND WORK
AREAS.
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M 00
MECHANICAL INFO SHEET
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M 00 MECHANICAL INFO SHEET
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
M 00 MECHANICAL INFO SHEET
M001 DEMOLITION FLOOR PLAN - MECHANICAL
M002 DEMOLITION FLOOR PLAN - MECHANICAL
M101 FLOOR PLAN - MECHANICAL
M102 FLOOR PLAN - MECHANICAL
M401 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
DATE INITIAL
SYMBOL LEGEND
VOLUME DAMPER
DEMO TO EXISTING CONNECTION
SPRINKLER DRAIN
FIRE SUPPRESSION PIPING
ISOLATION VALVE
TAMPER SWITCH
MANUAL BALANCING VALVE
FLOW SWITCH
FIRE DEPARTMENT CONNECTION
CONTROL VALVE (3 WAY)
CONTROL VALVE (2 WAY)
HOSE END DRAIN VALVE
PRESSURE REDUCING VALVE
AUTO FLOW CONTROL VALVE
CHECK VALVE
HVAC DUCTWORK AND SPECIALTIES
(CONT.)
MISCELLANEOUS SYMBOLS
RETURN DUCT DOWN
AIR TERMINAL (VERTICAL MOUNTING)
ROUND DUCT UP / DOUBLE LINE PIPE
ROUND DUCT DOWN / DOUBLE
LINE PIPE
RETURN DUCT UP
TURNING VANES
SUPPLY AND FRESH AIR DUCT DOWN
SUPPLY AND FRESH AIR DUCT UP
SIZE/TYPE
SIZE/TYPE
FLOW
FLOW
SIZE/TYPE
FLOW
SMOKE DAMPER
FIRE DAMPER-HORIZ FIRE SEPARATION
MOTORIZED DAMPER-OPPOSED BLADE
MOTORIZED DAMPER-PARALLEL BLADE
ROUND AIR TERMINAL
(HORIZONTAL MOUNTING)
GRAVITY DAMPER
(OR) SAFETY VALVE-STEAM
TEMP & PRESS RELIEF
FLOOR SINK
FLOOR DRAIN
GRADE CLEANOUT
PLUMBING VENT THRU ROOF
CLEANOUT / WALL CLEANOUT
THERMOSTATIC MIXING VALVE
M
M
MANHOLE
TRENCH DRAIN
OVERFLOW ROOF DRAIN
OXYGEN OUTLET
PIPE CAP
ELBOW UP
AIR OUTLET
TEE
ELBOW DOWN
VACUUM OUTLET
ROOF DRAIN
SIZE/TYPE
FLOW
HUMIDISTAT
THERMOSTAT
FLEXIBLE DUCT
S
H
T
TEMPERATURE SENSORUNION
TEE DOWN
STRAINER
EXPANSION JOINT
FLEXIBLE PIPE CONNECTION
AIR VENT
TEE UP
FIRE/SMOKE DAMPER
RECTANGULAR RETURN AIR TERMINAL
(HORIZONTAL MOUNTING)
RECTANGULAR SUPPLY AIR TERMINAL
(HORIZONTAL MOUNTING)
SOLENOID VALVE
F
D
TS
VALVES
FS
M
M
S
LPR
HPS
MPR
MPS
LPS
HVAC PIPING
GHWR
GHWS
HWR
HWS
PC
HPR
ES
BBD BOILER BLOW DOWN
EXHAUST STEAM
PUMPED CONDENSATE
HIGH PRESSURE RETURN
HIGH PRESSURE STEAM
MEDIUM PRESSURE RETURN
MEDIUM PRESSURE STEAM
LOW PRESSURE RETURN
LOW PRESSURE STEAM
GLYCOL HOT WATER RETURN
GLYCOL HOT WATER SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
FS-_
FD-_
CO
VTR
GCO
ORD-_
MH
X
A
V
RD-_
PIPING SPECIALTIES AND FITTINGS
WCO
FIRE PROTECTION
SIZE/TYPE
FLOW
RECTANGULAR EXHAUST AIR TERMINAL
(HORIZONTAL MOUNTING)
CWS
GCWS
CWR
CR
CS
RL
RDL
RS
GCWR GLYCOL CHILLED WATER RETURN
GLYCOL CHILLED WATER SUPPLY
REFRIGERANT LIQUID LINE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION LINE
HCWS
HCWR
HOT/CHILLED WATER SUPPLY
HOT/CHILLED WATER RETURN
DOMESTIC HOT WATER
RECIRCULATING (DHWR)
DOMESTIC COLD WATER (DCW)
DOMESTIC HOT WATER (DHW)
ST/OST
PLUMBING PIPING
ACID VENT
TW
AV
AW
W
DS
DSCW
TWR
DSHW
SANITARY VENT
BURIED EXTERIOR WATER
TEPID WATER RECIRCULATING
TEPID WATER
DISTILLED WATER
SOFTENED HOT WATER
SOFTENED COLD WATER
ACID WASTE
STORM DRAIN
SANITARY DRAIN (BELOW FLOOR)
SANITARY DRAIN (ABOVE FLOOR)
OXYGEN
VACUUM
OX
VAC
RO
A
REVERSE OSMOSIS WATER
COMPRESSED AIR
DEIONIZED WATERDI
AIR FLOW STATIONAFS
HPWR
HPWS
HEAT PUMP WATER RETURN
HEAT PUMP WATER SUPPLY
F
S
FS
NEW TO EXISTING CONNECTION
G NATURAL GAS
FOF
FOG
LPG
FOV
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL GAGE
FUEL OIL FILL
FUEL OIL VENT
LIQUEFIED PETROLEUM GAS
CD CONDENSATE DRAIN
EXHAUST DUCT DOWN
EXHAUST DUCT UP
CO CARBON MONOXIDE SENSOR
CO2 CARBON DIOXIDE SENSOR
NO2 NITROGEN DIOXIDE SENSOR
SENSOR WITH GUARD'X'
DOUBLE - GRADE CLEANOUTDGCO
ST/OST STORM DRAIN (BELOW FLOOR)
WASTE AND ANESTHETIC
GAS DISPOSAL
NITROGEN
WAGD
N
MEDICAL AIRMA
PIPE GUIDE
HOSE BIBB
THERMOMETER
PIPE ANCHOR
HB
STEAM TRAP
RHY
WH
ROOF HYDRANT
WALL HYDRANT
PRESSURE GAUGE
EXISTINGDEMO
EXISTINGNEW
18 Ø
18x10
18/10
ROUND DUCT
FLAT OVAL DUCT-1ST FIG IS SIDE
SHOWN
RECT DUCT-1ST FIG IS SIDE SHOWN
ACOUSTICAL DUCT LINER
HVAC DUCTWORK AND SPECIALTIES
HIGH EFFICIENCY TAKEOFF
HIGH EFFICIENCY TAKOFF
WITH VOLUME DAMPER
NITROGEN OUTLET
MEDICAL AIR OUTLET
WASTE AND ANESTHETIC GAS
DISPOSAL OUTLET
N
MA
V
FLEXIBLE DUCTWORK CONNECTION
ABBREVIATIONS
NORTH
ARROW
MATCHLINE
AREA A
AREA B
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XXXX
SIM/OPP
X
XXXX
XX-1
X
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
ROOM / SPACE
NUMBER
LETTER/NUMBER
INDICATES NEW
COLUMN LINE
LETTER/NUMBER
INDICATES EXISTING
COLUMN LINE
SECTION/DETAIL NUMBER
SHEET NUMBER
INDICATES DIRECTION OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION
REFERENCE LEGEND
NAME
ELEVATION
LEVEL
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
DRAWING/DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE DRAWING
XXX-1
PLUMBING
FIXTURES PLUMBING FIXTURE
DESIGNATION
X"PIPE
SIZE
PIPE SIZE (DIAMETER)
X"xX"
DUCT
SIZE
WIDTH x HEIGHT
X"/X" WIDTH / HEIGHT
X" DIAMETER
REF. DEMO NOTES ( ) XX REF. NOTES ( )
SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES. SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES.
GENERAL DEMOLITION NOTES GENERAL NOTES
MECHANICAL SHEET LIST
NORTH PLAN
NORTH
TRUE
NORTH
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPS
MD MOTORIZED DAMPER
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT
PROTECTION
MPR MEDIUM PRESSURE
RETURN
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
N NITROGEN
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPCW NONPOTABLE COLD WATER
NPHW NONPOTABLE HOT WATER
NPHWR NONPOTABLE HOT WATER
RECIRCULATING
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
OX OXYGEN
P PUMP
PHC PREHEAT COIL
PIV POST INDICATING VALVE
PRV PRESSURE REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH,
GAUGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF AREA DRAINS
RL REFRIGERANT DISCHARGE LINE
RF RETURN FAN
RH RELIEF HOOD
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RELIEF AIR
RLF RELIEF FAN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
S SINK
SA SUPPLY AIR
SAN SANITARY SEWER
SD SMOKE DAMPER
SF SUPPLY FAN
SFU SANITARY FIXTURE UNIT
SH SHOWER
SP STATIC PRESSURE
SSS SURGICAL SCRUB SINK
ST STORM WATER
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TONS TONS OF REFRIGERATION
TSP TOTAL STATIC PRESSURE
T THERMOSTAT
UH UNIT HEATER
UR URINAL
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
WB WET BULB
WC WATER CLOSETS
WCO WALL CLEANOUT
WF WASH FOUNTAINS
WFU WATER FIXTURE UNITS
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WS WATER SOFTENER
WSHP WATER SOURCE HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
YH YARD HYDRANT
A COMPRESSED AIR
AC AIR COMPRESSOR
AD AIR DOOR
AFCV AUTO FLOW CONTROL VALVE
AHU AIR HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
AS AIR SEPARATOR
AV ACID VENT
AW ACID WASTE
B BOILER
BC BLOWER COIL
BD BIDET
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BHP BRAKE HORSEPOWER
BLKG BLOCKING
BLV BALANCING VALVE
BT BATHTUB
BV BALL VALVE
BW BEDPAN WASHER
CH CHILLER
CC COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CUH CABINET HEATER
CI CAST IRON
CMU COMBINATION UNITS
CR CONDENSER WATER RETURN
CRAC COMPUTER ROOM AIR
CONDITIONER
CS CONDENSER WATER SUPPLY
CSS CLINICAL SERVICE SINKS
CT COOLING TOWER
CU CONDENSING UNIT - SPLIT SYSTEM
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
DB DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DEG DEGREE
DF DRINKING FOUNTAIN
DGCO DOUBLE GRADE CLEANOUT
DH EMERGENCY DRENCH HOSES
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER
RECIRCULATING
DI DEIONIZED WATER
DOAS DEDICATED OUTDOOR AIR SYSTEM
DS DISTILLED WATER
DSA DUCT SOUND ATTENUATORS
DSCW DOMESTIC SOFT COLD WATER
DSHW DOMESTIC SOFT HOT WATER
DSHWR DOMESTIC SOFT HOT WATER
RECIRCULATING
DST DOMESTIC STORAGE TANK
DTW DOMESTIC TEPID WATER
DTWR DOMESTIC TEPID WATER
RECIRCULATING
EA. EACH
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE
WASH/SHOWER
EF EXHAUST FAN
EFF EFFICIENCY
EFW EMERGENCY FACE WASH
EH EXHAUST HOOD
ERV ENERGY RECOVERY
VENTILATOR
ES EMERGENCY SHOWER
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER
TEMPERATURE
ET EXPANSION TANK
F FIRE SUPPRESSION PIPING
F-_ FURNACE
FCO FLOOR CLEANOUT
FC FLUID COOLER
FCU FAN COIL UNIT
FD FIRE DAMPER
FLA FULL LOAD AMPS
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FSD FIRE/SMOKE DAMPER
FT FINNED TUBE
G GAS
GCWR GLYCOL CHILLED
WATER RETURN
GCWS GLYCOL CHILLED
WATER SUPPLY
GD GARBAGE DISPOSAL
GDH GAS DUCT HEATER
GHCR GLYCOL HOT/CHILLED
WATER RETURN
GHCS GLYCOL HOT/CHILLED
WATER SUPPLY
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GI GREASE INTERCEPTOR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GAS VENT
GWH GAS WATER HEATER
HB HOSE BIBB
HC HEATING COIL
HCR HOT/CHILLED WATER RETURN
HCS HOT/CHILLED WATER SUPPLY
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
ASHP AIR SOURCE HEAT PUMP
ARU AIR ROTATION UNIT
OI OIL INTERCEPTOR
SOI SAND OIL INTERCEPTOR
DSS DUCTLESS SPLIT SYSTEM
SP SUMP PUMP
OST OVERFLOW STORM WATER
WMB WASHING MACHINE BOX
OB OUTLET BOX
RH ROOF HYDRANT
H HUMIDIFIER
DHWP DOMESTIC HOT WATER
RECIRCULATING PUMP
DWET DOMESTIC WATER EXPANSION
TANK
HP HORSEPOWER
HPR HIGH PRESSURE RETURN
HPS HIGH PRESURE STEAM
HRC HEAT RECOVERY COIL
HWR HOT WATER RETURN (HEATING)
HWS HOT WATER SUPPLY (HEATING)
HX HEAT EXCHANGER
HY HYDRANTS
HP-_ HEAT PUMP
HVLS HIGH VOLUME LOW SPEED
IH INTAKE HOOD
IRH INFRARED RADIANT HEATER
KH KITCHEN HOOD
KW KILOWATT
KWH KILOWATT HOURS
L LAVATORY
LAT LEAVING AIR TEMPERATURE
LPR LOW PRESSURE RETURN
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM
LRA LOCKED ROTOR AMPS
LS LAUNDRY SINK
LV LOUVER
LWT LEAVING WATER TEMPERATURE
PROJECT MECHANICAL REFERENCED DEMOLITION NOTES PROJECT MECHANICAL REFERENCED NOTES
2/3/26
T
T
T
T
T
T
T
T
T
MEN
KITCHEN
BREAKROOM
CORRIDOR
SUPPLIES
TRAINING
ROOM
OPEN OFFICE
OFFICE
WORK ROOM
TOOL ROOM
SUPPLIES
SHOP AREA
TRUCK BAYS
WAREHOUSE
RECEIVING
ENTRY
CORRIDOR
CORRIDOR
STAIR
SUPPLIES
DATA
JANITOR
WOMENS
LOCKER
MENS LOCKER
WOMEN
VAV-4
VAV-2
VAV-1
VAV-3
VAV-5
VAV-10
VAV-6
VAV-8
VAV-9
VAV-7
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M001
DEMOLITION FLOOR PLAN -
MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M001 DEMOLITION FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING VAV BOX AND ASSOCIATED PIPING SPECIALTIES. PROTECT
CONNECTED DUCTWORK FOR RECONNECTION TO NEW VAV BOX. SEE M101 FOR
ADDITIONAL INFORMATION. REMOVE ASSOCIATED THERMOSTAT.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - DEMO HVAC - OPTION 1
DATE INITIAL
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
AHU-1
P-1
P-2
B-2
B-1
UH-4
P-55
P-4
P-3
G
METER
MECHANICAL
151A
CT
CP-3
CP-2
CP-1
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M002
DEMOLITION FLOOR PLAN -
MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M002 DEMOLITION FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING COOLING TOWER. ASSOCIATED PIPING AND BY-PASS SYSTEM IS TO BE
REUSED. CONTRACTOR TO DOCUMENT PIPING LAYOUT PRIOR TO REMOVAL OF COOLING
TOWER.
2 REMOVE EXISTING PUMPS AND ASSOCIATED ACCESSORIES.
3 EXISTING WATER METER CONNECTED TO CONDENSER DRAIN LINE TO BE REUSED FOR
WITH NEW PUMPS. TEMPORARILY DISCONNECT DURING CONSTRUCTION.
4 REMOVE BOILER AND ASSOCIATED FLUE, CONDENSATE DRAIN LINE, AND ASSOCIATED
ACCESSORIES. REMOVE GAS PIPING BACK TO MAIN AND CAP. REMOVE GAS FLUE BACK
TO VERTICAL STACK. VERTICAL STACK TO BE REUSED.
5 EXISTING EQUIPMENT TO REMAIN.
6 REMOVE EXISTING AIR/DIRT SEPARATOR AND PREPARE FOR INSTALLATION OF NEW UNIT.
7 REMOVE EXISTING EXPANSION TANK AND PREPARE FOR INSTALLATION OF NEW UNIT.
8 REMOVE COMMON PIPE SECTION OF EXISTING IN-FLOOR RADIANT HEAT SYSTEM.
9 REMOVE EXISTING PUMP AND PREPARE FOR INSTALLATION OF NEW UNIT.
10 VERTICAL EXHAUST FLUE TO BE REUSED. PROTECT DURING CONSTRUCTION.
DATE INITIAL
SCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - DEMO HVAC
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - AREA 3.4 - DEMO HVAC
T
T
T
T
T
T
T
T
MEN
KITCHEN
BREAKROOM
CORRIDOR
SUPPLIES
TRAINING
ROOM
OPEN OFFICE
OFFICE
WORK ROOM
TOOL ROOM
SUPPLIES
SHOP AREA
TRUCK BAYS
WAREHOUSE
RECEIVING
ENTRY
CORRIDOR
CORRIDOR
STAIR
SUPPLIES
DATA
JANITOR
WOMENS
LOCKER
MENS LOCKER
WOMEN
VAV-2
VAV-4
VAV-3
VAV-5
VAV-10
VAV-6
VAV-8
VAV-7
VAV-9
VAV-1
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M101
FLOOR PLAN - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M101 FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC - OPTION 1
DATE INITIAL
REF. NOTES ( ):X
1 REPLACE VAV BOX AS SHOWN. PROVIDE NEW PIPING SPECIALTIES AND CONNECT TO
EXISTING PIPING AND DUCTWORK. INSTALL NEW THERMOSTAT IN PREVIOUS
THERMOSTAT LOCATION.
MECH ROOM
ELEC ROOM
ELEVATOR
EQUIPMENT
STAIR
WAREHOUSE
AHU-1
UH-4
HX-1
P-1
P-2
P-6
P-5
G
ET-2
AS-2
AS-1
ET-1
B-2
B-1
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
3" HWS
1" G
1" G
1 1/2" G
3" HWS
3" HWR
3" HWS
3" HWR
3 7
MECHANICAL
151A
METER
CT-1
CP-3
CP-2
CP-1
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M102
FLOOR PLAN - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M102 FLOOR PLAN - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. NOTES ( ):X
1 INSTALL EQUIPMENT ON EXISTING HOUSEKEEPING PAD.
2 SIZE AND INSTALL EXHAUST FLUE PIPING PER MANUFACTURER REQUIREMENTS.
CONNECT TO EXISTING 10" Ø FLUE UP THROUGH ROOF.
3 ROUTE FULL SIZE CONDENSATE FROM BOILER TO EXISTING FLOOR DRAIN. PROVIDE
CONDENSATE NEUTRALIZER FOR EACH BOILER.
4 INSTALL NEW COOLING TOWER IN PREVIOUS UNITS LOCATION. EXISTING PIPING TO BE
REUSED. CONTRACTOR TO MODIFY PIPING AS REQUIRED FOR NEW EQUIPMENT
CONNECTIONS. CONTRACTOR TO DOCUMENT ANY PIPING LAYOUTS PRIOR TO REMOVAL
OF COOLING TOWER. COOLING TOWER BYPASS LOOP TO BE USED FOR NEW COOLING
TOWER.
5 INSTALL NEW PUMPS ON EXISTING HOUSEKEEPING PAD.
6 REINSTALL CONDENSER WATER METER AS PREVIOUSLY INSTALLED.
7 CONTRACTOR TO VERIFY GAS PRESSURE AND NATURAL GAS PIPE SIZE WITH MOST
RECENT IFGC PRIOR TO INSTALLATION. PROVIDE PRESSURE REGULATOR AT EACH
BOILER.
DATE INITIAL
SCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - HVAC
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - AREA 3.4 - HVAC
CONCRETE OR MASONRY
PARTITION.
GROUT, SEE
SPECIFICATIONS.
1/4" CLEAR AROUND PIPE
OR INSULATION.
CAULKING, SEE
SPECIFICATIONS.
SLEEVE, SEE
SPECIFICATIONS.
NOTE:
1. CAULK FULL PERIMETER OF PIPE AT BOTH INSIDE &
OUTSIDE OF WALL.
1/4" CLEAR AROUND PIPE
OR INSULATION
RISER CLAMP
CONCRETE
FLOOR
CAULKING, SEE
SPECIFICATIONS.
NOTE:
1. CAULK FULL PERIMETER OF PIPE AT BOTH TOP AND BOTTOM
OF FLOOR.
DETAIL OF SLEEVE FOR PIPING PENETRATION OF FLOORDETAIL OF SLEEVE FOR PIPING PENETRATION OF VERTICAL
PARTITIONS
SLEEVE, SEE
SPECIFICATIONS.
SLEEVE HEIGHT SHALL BE
2" HIGH IN WET
LOCATIONS, AT FLOOR
LEVEL IN ALL OTHER
LOCATIONS
RISER CLAMP
LEG
INSULATION
THREADED ROD
INSULATION
THREADED ROD
HANGER, INSULATION ON PIPE
CONTINUOUS THROUGH HANGER
WITHOUT SWALLOWING
PIPE, 1"Ø MAX
BAND
THREADED ROD
HANGER
INSULATION
PIPE
SHIELD TO COVER 180° OF
PIPE, SEE CHART FOR
LENGTH
SEE CHART
SHIELD LENGTH
SEE CHART
SHIELD LENGTH,
SWIVEL
SHIELD LENGTH FOR PIPE - NOT LESS THAN THE FOLLOWING:
a. NPS 1/4" TO 3-1/2" 12" LONG AND .048" THICK
b. NPS 4" 12" LONG AND .06" THICK
c. NPS 5" TO 6" 18" LONG AND .06" THICK
d. NPS 8" TO 14" 24" LONG AND .075" THICK
e. NPS 16" TO 24" 24" LONG AND .105" THICK
NOTE:
1. PIPES NPS 8" AND LARGER: INCLUDE WOOD OR REINFORCED CALCIUM-SILICATE-INSULATION INSERTS OF LENGTH AT LEAST AS LONG AS
PROTECTIVE SHIELD.
2. THERMAL-HANGER SHIELDS: INSTALL WITH INSULATION SAME THICKNESS AS PIPING INSULATION.
SHIELD TO COVER 180°
OF PIPE, SEE CHART FOR
LENGTH
SHIELD TO COVER 180°
OF PIPE, SEE CHART FOR
LENGTH
THREADED ROD
U-BOLT (TYP.) UNISTRUT OR STEEL ANGLE
WITH LONG LEG DOWN
SHIELD TO COVER 360° OF
PIPE, SEE CHART FOR
LENGTH
HANGER, INSULATION ON PIPE
CONTINUOUS THROUGH HANGER
WITHOUT SWALLOWING
PIPE (TYP.)
DIRT LEG
TO EQUIPMENT
SHUT-OFF VALVE
REMOVABLE
CAP
UNION
SUPPLY PIPING
PRESSURE REGULATOR (IF REQUIRED)
STRAINER
(TYP.)
CHECK
VALVE (TYP.)
PRESSURE
GAUGE (TYP.)
ISOLATION VALVE (TYP.)
FLEXIBLE PIPE
CONNECTION (TYP.)
SUCTION
DIFFUSER
PIPE DIAMETER MIN.
3 STRAIGHT
FULLY GROUT PUMP
FRAME
BALANCE
VALVE (TYP.)
STRAINER
ISOLATION
VALVE (TYP.)
PRESSURE
GAUGE
CHECK
VALVE
BALANCING
VALVE
PUMP UNION
(TYP.)
SUPPORT PUMP
SEPARATE FROM
PIPING
FLEXIBLE PIPE
CONNECTION (TYP.)
REHEAT COIL
CONTROL
VALVE
UNION
(TYP.)
STRAINER
VALVE
(TYP.)
AUTOFLOW
VALVE
HWS
HWR
MANUAL AIR VENT
HOSE END DRAIN WITH CAP
NOTE: SEE PLANS FOR PIPE SIZE, MINIMUM 3/4".
FLOORS
E
E N
O T
E S
B E
L O
W
T Y
P
IC
A L
L Y
A
.F .F
TYPICAL HVAC CONTROL DEVICE INSTALLATION
THERMOSTAT
OR OTHER HVAC
CONTROL DEVICE
LIGHT
SWITCH
NOTES:
1. WHEN THERMOSTAT IS LOCATED ADJACENT TO LIGHT SWITCH OR OTHER
WALL MOUNTED ELECTRICAL OR CONTROL DEVICE, DEVICES TO BE
INSTALLED AT THE SAME ELEVATION.
2. ALL USER INPUT BUTTONS OR SWITCHES ON CONTORL DEVICE TO BE
LOCATED BELOW 48" A.F.F. TO MEET ADA REQUIREMENTS.
3. WHEN INSTALLED NEAR DOOR, LIGHT SWITCH SHALL BE DEVICE CLOSEST TO
DOOR FRAME.
4. IF DEVICE IS LOCATED ABOVE COUNTER, INSTALL AT 40" A.F.F.
CL
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M401
DETAILS - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M401 DETAILS - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
SCALE: NOT TO SCALE
INTERIOR PIPE SLEEVE DETAILS
SCALE: NOT TO SCALE
PIPE HANGER DETAIL
SCALE: NOT TO SCALE
TYPICAL GAS PIPING DETAIL
SCALE: NOT TO SCALE
BASE MOUNTED END SUCTION PUMP DETAIL
SCALE: NOT TO SCALE
IN-LINE CIRCULATING PUMP PIPING (VFD) DETAIL
SCALE: NOT TO SCALE
REHEAT COIL PIPING DETAIL
SCALE: 12" = 1'-0"
THERMOSTAT DETAIL
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \a p o s p is il\
D o c u m e n ts
\R e v it te m p \0
-M
E C
H
R a p o s p is il@ s c h e m m e r.
c o m .r v t
AJP
AJP
Checker
02/03/2026
09258.012
M501
SCHEDULE - MECHANICAL
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 6- M501 SCHEDULE - MECHANICAL
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
EXISTING BAS SYSTEM: ASVS, BACNET-IP AUTOMATED LOGIC SYSTEMS.
LOCAL PROVIDER: AUTOMATIC CONTROLS.
ALL NEW EQUIPIMENT IS TO BE PROGRAMMED TO MATCH EXISTING
CONTROL SEQUENCES.
7. CONNECT UNIT TO EXISTING BACNET-IP BAS SYSTEM.
6. PROVIDE ALL STAINLESS STEEL CONSTRUCTION OPTION.
5. PROVIDE INDIVIDUAL ELECTRICAL CONNECTIONS FOR EACH COOLING TOWER FAN, AND SINGLE POWER CONNECTION FOR AMBIENT HEATERS. SEE ELECTRICAL FOR ADDITIONAL INFORMATION
4. PROVIDE COOLING TOWER WITH BASIN FLOAT.
3.BASIN HEATER TO BE STAINLESS STEEL CONSTRUCTION WITH AUTOMATIC LOW VOLTAGE CONTROL AND TEMPERATURE SENSOR.
2. PROVIDE WITH ACCCESS LADDERS FOR TOWER MAINTENANCE. PROVIDE WITH JIB CRANE HOIST FOR MOTOR AND FAN REPLACEMENT
NOTES: 1. PROVIDE WITH SOUND REDUCING OULET, VIBRATION ISOLATION AND VIBRATION CUT-OFF SWITCH.
CT-1 SEE PLANS CH-1,2 170,300 2400 95 85 7.81 78 12,000 50 2 2x10 460 3 COUNTERFLOW 16'-2.25" 11'-10" 24'-0.5" 34,170 BAC VT1-800-Q 1-7
FAN HP FAN QTY
BASIN
HEATER
(kW) VOLT PH CONFIGURATION HEIGHT (FT) WIDTH (FT) DEPTH (FT)
OPERATING WEIGHT
(LB)MARK LOCATION SERVES FAN CFM
FLUID
FLOW
(GPM) EWT (°F) LWT (°F)
MAX PD
(PSI)
WET BULB
TEMP (°F)
TOTAL
CAPACITY (MBH)
ELECTRICAL PHYSICAL DATA
BASIS OF DESIGN REMARKS
COOLING TOWER SCHEDULE
ET-2 RADIANT FLOOR BOILER ROOM DIAPHRAGM 40-200 15 125 8 5 TACO CX30-125 ---
ET-1 HW SYSTEM BOILER ROOM DIAPHRAGM 40-200 15 125 57 27 TACO CX215-125 ---
MARK SERVES LOCATION TYPE TEMP RANGE (°F) FILL PRESSURE (PSIG)
MAX OPER.
PRESSURE (PSIG)
TANK VOLUME
(GAL)
ACCEPTANCE
VOLUME (GAL) BASIS OF DESIGN REMARKS
EXPANSION TANK SCHEDULE
7. CONNECT TO EXISTING BACNET-IP BAS SYSTEM.
6. CONFIGURE AS LEAD/LAG IN CASCADE MODE.
5. PROVIDE CSD-1 EMERGENCY SHUTOFF SWITCH(ES) AT EACH MECH ROOM EXIST. SWITCH TO SHUTOFF GAS AND ELECTRICAL TO BOILERS.
4. PROVIDE WITH SYSTEM TEMP SENSOR, OUTDOOR AIR SENSOR, SYSTEM PUMP RELAY AND ALARM BELL.
3. PROVIDE WITH ROOM AIR KIT FOR COMBUSTION AIR. CONTRACTOR TO VERIFY EXISTING COMBUSTION AIR INLET CONDITIONS MEET REQUIREMENTS OF BOILER.
2. BOILER TO OPERATE ON ITS OWN INTERNAL CONTROLS WITH CONNECTION TO BAS, SEE SEQUENCE OF OPERATIONS FOR DETAILS.
NOTES: 1. PROVIDE BOILER WITH CONDENSATE NEUTRILIZATION KIT. VENT AND COMBUSTION AIR TO BE INSTALLED PER THE MANUFACTURER'S REQUIREMENTS SEE PLANS FOR INSTALLATION.
B-1,2 MECH FIRETUBE NAT. GAS 650 625.95 48.15 13:1 96.3 62 160 180 3.23 120 1 8 29 27 74 674 FULTON ENDURA EXE-650 1-7
INPUT (MBH) OUTPUT (MBH) MIN OUTPUT (MBH) TURNDOWN MAX EFFICIENCY (%) GPM EWT (°F) LWT (°F) MAX PD (FT WAT) VOLT PHASE FLA LENGTH... WIDTH (IN) HEIGHT (IN) OPERATING WEIGH...MARK LOCATION TYPE FUEL
HEATING DATA WATERSIDE DATA ELECTRICAL DATA PHYSICAL DATA
BASIS OF DESIGN REMARKS
GAS FIRED HOT WATER BOILER SCHEDULE
3. VFD PROVIDED BY MECHANICAL CONTRACTOR. CONTRACTOR TO COORDINATE INSTALLATION WITH ELECTRICAL CONTRACTOR.
2. PROVIDE PUMP WITH UPRIGHT PIPING CONFIGURATION WITH 3 STRAIGTH DIAMETERS AT INLET AND OULET. PUMP TO BE LASTER ALIGNED AFTER INSTALLATION.
NOTES: 1. UNIT IS TO BE CONNECTED TO EXISTING BACNET-IP BAS SYSTEM.
P-6 GROUNDS RADIANT FLOOR INLINE WATER 8 30 5 3450 1/3 115 1 60 BAS TACO 2400-45 1
P-1,2 GROUNDS SECONDARY LOOP BASE MOUNTED END SUCTION WATER 86 65 56 1760 3 208 3 60 VFD TACO FI1209C 1,2,3
CP-1,2,3 ARCH CT-1 BASE MOUNTED END SUCTION WATER 1200 65 87 1160 25 460 3 60 VFD TACO FI6013D 1,2,3
RPM HP VOLTS PH HZMARK LOCATION SERVES TYPE FLUID TYPE FLOW GPM
HEAD FT
WG MIN % EFF
ELECTRICAL DATA
CONTROL TYPE
BASIS OF DESIGN REMARKS
PUMP SCHEDULE
HX-1 RADIANT FLOOR COUNTER-CURRENT 59.6 16 WATER 6.095 180 160 7 1.53 WATER 8 90 105 8 2.16 TACO TB10Tx16 ---
FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI) FLUID FLOWRATE (GPM) EWT (°F) LWT (°F) # OF PASSES MAX PD (PSI)MARK SERVES TYPE LOAD (MBH) # OF PLATES
HOT-SIDE DATA COLD-SIDE DATA MANUFACTURER AND MODEL
NUMBER REMARKS
BRAZED PLATE HEAT EXCHANGER SCHEDULE
2. CONNECT UNITS TO EXISTING BACNET-IP BAS SYSTEM.
NOTES: 1. PROVIDE UNIT WITH INSULATION AND FOIL FACED LINER, CROSS-FLOW AIR SENSOR, AND CONTROL ENCLOSURE.
VAV-11 AHU-11 08 500 250 0.15 1 16 19 250 55 92.5 10.2 1 0.1 159.1 1 0.56 KRUEGER LMHS 1,2
VAV-10 AHU-10 05 200 200 0.09 1 11 20 200 55 93 8.3 1 0.03 166.5 1.3 0.66 KRUEGER LMHS 1,2
VAV-9 AHU-9 09 600 250 0.11 1 12 15 250 55 96.9 11.4 1 0.07 156.7 1 0.13 KRUEGER LMHS 1,2
VAV-8 AHU-8 12 455 455 0.03 1 12 - 455 55 94.6 19.5 1 0.02 160 2 0.51 KRUEGER LMHS 1,2
VAV-7 AHU-7 10 370 370 0.04 1 - - 370 55 92.3 15 1 0.03 162.4 1.8 0.32 KRUEGER LMHS 1,2
VAV-6 AHU-6 12 1060 500 0.16 1 16 13 500 55 94.7 21.5 1 0.12 165.3 3 1.1 KRUEGER LMHS 1,2
VAV-5 AHU-5 12 960 960 0.23 1 15 11 960 55 100.2 47.1 2 0.19 141.3 2.5 0.48 KRUEGER LMHS 1,2
VAV-4 AHU-4 12 1080 960 0.28 1 15 13 960 55 100.2 47.1 2 0.23 141.3 2.5 0.48 KRUEGER LMHS 1,2
VAV-3 AHU-3 07 390 120 0.12 1 16 20 170 55 95.6 7.5 1 0.07 149.2 0.5 0.19 KRUEGER LMHS 1,2
VAV-2 AHU-2 07 410 200 0.13 1 16 20 200 55 97.4 9.2 1 0.07 161.1 1 0.56 KRUEGER LMHS 1,2
VAV-1 AHU-1 05 250 160 0.15 1 13 25 160 55 96.7 7.2 1 0.05 165.1 1 0.43 KRUEGER LMHS 1,2
MAX MIN MIN INLET RAD DIS CFM EAT (°F) LAT (°F) CAP (MBH) NO ROWS MAX PD LWT (°F) GPM PRESS DROP FT WATMARK AHU
INLET SIZE
(IN)
CFM
STATIC PRESSURE (IN
WG) NC LEVELS REHEAT COIL DATA
BASIS OF DESIGN REMARKS
AIR TERMINAL UNIT SCHEDULE
NOTES: 1. PROVIDE UNIT WITH ACCESSORIES TO SUPPORT UNIT FROM STRUCTURE.
AS-2 AIR SEPARATOR RADIANT FLOOR BOILER ROOM 8 GPM @ 0.1 FT WAT PD SPIROTHERM VDT-200 1
AS-1 AIR SEPARATOR HOT WATER SYSTEM BOILER ROOM 86 GPM @ 1 FT WAT PD SPIROTHERM VDT-300 1
MARK FUNCTION SERVES LOCATION OPERATING CONDITIONS BASIS OF DESIGN REMARKS
MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E 00
ELECTRICAL INFO SHEET
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E 00 ELECTRICAL INFO SHEET
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
DATE INITIAL
S
NORTH
ARROW
MATCHLINE
AREA A
AREA B
EXISTING
COLUMN
NEW COLUMN
X
X
X
XX-XX
SIM
X
XX-XX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE NOTE
REFERENCE
DEMOLITION NOTE
ROOM
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES EXISTING
COLUMN LINE
SECTION/DETAIL NUMBER
SHEET NUMBER
INDICATES DIRECTION OF
VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
REFERENCE LEGEND
NAME
ELEVATION
LEVEL
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE DRAWING
ABBREVIATIONS
ROOM NAME
150 SF
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION
ROOM AREA DESIGNATION
SYMBOL LEGEND
P C
J
J
O S
MS
IC
S
S
M
N
T V
VC
N E
N S
N
N D
N 2
G
K1
V
A
R
M
M
T
WALL MOUNTED STRIP LUMINAIRE
SYMBOL NOTES:
PHOTOCELL
VOICE AND DATA
JUNCTION BOX - CEILING MOUNT
JUNCTION BOX - WALL MOUNT
VOICE OUTLET
DATA OUTLET
OCCUPANCY SENSOR
MOTION SENSOR
CEILING FAN
POLE MOUNTED SITE LUMINAIRE
FLOOD LIGHT
NURSE CALL
SPEAKER
BEDSIDE STATION
INTERCOM SPEAKER STATION
VOLUME CONTROL STATION
MICROPHONE JACK
TELEVISION OUTLET
CCTV CAMERA
SOUND, TELEVISION, AND SECURITY
FUSE
EMERGENCY PULL STATION
DISCONNECT SWITCH
STAFF STATION
DUTY STATION
DOME LIGHT
MASTER STATION
EMERGENCY GENERATOR
POWER DISTRIBUTION ONE LINE
CONDUIT UP
CONDUIT DOWN
INDICATES BUSHED CONDUIT
VOICE/DATA OUTLET
DOUBLE BED BEDSIDE STATION
DRAW OUT VACUUM CIRCUIT BREAKER
LIGHTNING SURGE ARRESTOR
THERMAL OVERLOAD RELAY
PLUG-IN OR DRAWOUT CONNECTOR
CIRCUIT BREAKER
FUSED DISCONNECT SWITCH
VOLTMETER
AMMETER
X:Y CURRENT TRANSFORMER - (RATIO)
KIRK KEY INTERLOCK
"C" INDICATES CEILING MOUNTED
"F" INDICATES FLOOR MOUNTED
"S" INDICATES SURFACE MOUNTED
"G" INDICATES GROUND FAULT INTERRUPTING
"IG" INDICATES ISOLATED GROUND
"AC" INDICATES MOUNTING 6" ABOVE
COUNTERTOP OR BACKSPLASH
"WP" INDICATES WEATHERPROOF
"XP" INDICATES EXPLOSION PROOF
"U" INDICATES USB CHARGER
"R" INDICATES EXISTING DEVICE REMOVED
AND RELOCATED
LOWER CASE LETTER BY SWITCHES AND
FIXTURES
INDICATE ASSOCIATED UNIT FOR SWITCHING
LIGHTING
LUMINAIRE
WALL MOUNTED LUMINAIRE
RECESSED LUMINAIRE
WALL MOUNTED LUMINAIRE
SURFACE MOUNTED LUMINAIRE
TRACK LIGHTING
DIMMER SWITCH
TIMER SWITCH
WIRING DEVICES - SWITCHES
SINGLE POLE SWITCH
KEY OPERATED SWITCH
SINGLE POLE SWITCH WITH PILOT
THERMAL ELEMENT SWITCH
FOUR-WAY SWITCH
TWO POLE SWITCH
THREE-WAY SWITCH
STRIP / INDUSTRIAL LUMINAIRE
LUMINAIRE - NIGHT LIGHTING
LUMINAIRE - EMERGENCY SYSTEM
EMERGENCY BATTERY PACK LUMINAIRE
REMOTE EMERGENCY HEAD
WALL WASH LUMINAIRE
PENDANT MOUNTED LUMINAIRE
POWER POLE
METER SOCKET
POWER EQUIPMENT
WIRING DEVICES - RECEPTACLES
COMBINATION STARTER SAFETY
SWITCH
RELAY - CONTROL AS NOTED
PUSHBUTTON STATION
MOTOR CONNECTION
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE
EMERGENCY RECEPTACLE
SPECIAL PURPOSE RECEPTACLE, NEMA
CONFIGURATION NOTED
PLUG-IN STRIP - LENGTH AND
QUANTITY OF OUTLETS AS SHOWN
SAFETY SWITCH
DROP CORD RECEPTACLE ASSEMBLY
FUSIBLE SWITCH (FUSETRON)
PANELS AND CABINETS
DISTRIBUTION PANEL
SWITCHBOARD, SWITCHGEAR, MCC
EQUIPMENT OR TERMINAL CABINET
DRY TYPE TRANSFORMER
BRANCH CIRCUIT PANEL
CONDUIT AND BOXES
HORN (PA, PUBLIC
ADDRESS)
TRANSFORMER
EXIT LIGHT - WALL MOUNT WITH
DIRECTIONAL ARROWS AS
INDICATED, FILLED-IN QUARTERS
INDICATE ILLUMINATION SIDES
EXIT LIGHT - CEILING OR PENDANT
MOUNT WITH DIRECTIONAL ARROWS
AS INDICATED, FILLED-IN QUARTERS
INDICATE ILLUMINATION SIDES
EMERGENCY EXIT LIGHT COMBO
LOW VOLTAGE MOMENTARY
CONTACT SWITCH
N P PILLOW SPEAKER
FB FLOOR BOX
FP FLOOR POKE-THROUGH DEVICE
N M
WIRELESS ACCESS POINT
S
S2
S3
S4
SD
SK
SP
STE
ST
SFT
X
CONTROLLED RECEPTACLE
WB WALL AV BOX
F
F
F
F
F S
D
P S
T S
DH
STROBE
HORN
MANUAL PULL STATION
HORN STROBE
HEAT DETECTOR
SMOKE DETECTOR
REMOTE INDICATOR LIGHT
SPRINKLER TAMPER SWITCH
DUCT SMOKE DETECTOR
FLOW SWITCH
POST INDICATING VALVE SWITCH
MAGNETIC DOOR HOLDER
FIRE ALARM SYSTEM
H
S
S
F SPEAKER STROBES
F SPEAKERS
ACSR ALUMINUM CONDUCTOR
STEEL REINFORCED
AFF ABOVE FINISH FLOOR
AIC AMPS INTERRUPTING
CAPACITY (SYM RMS)
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
APPROX APPROXIMATE
AUTO AUTOMATIC
AVG AVERAGE
L ANGLE
BKR BREAKER
C OR CL CENTER LINE
C OR CND CONDUIT (ELECTRICAL
SHEETS)
CKT CIRCUIT
CLG CEILING
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CPT CONTROL POWER
TRANSFORMER
DC DIRECT CURRENT
DEG DEGREE
DEMO DEMOLITION
DIA DIAMETER
DIM DIMENSION
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DWG DRAWING
E EAST
EA EACH
EL OR
ELEV
ELEVATION - GRADE OR
BUILDING
ELEC ELECTRIC OR
ELECTRICAL
ELEV ELEVATOR
EMD ESTIMATED MAXIMUM
DEMAND
ENCL ENCLOSURE
EQUIP EQUIPMENT
EST ESTIMATE
EWC ELECTRIC WATER
COOLER
EXIST, EXTG EXISTING
EXP EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLUOR FLUORESCENT
AWG GAUGE
HP HORSE POWER
HR HOUR
HTG HEATING
HTR HEATER
HZ HERTZ
ID INSIDE DIAMETER
IES ILLUMINATING
ENGINEERING SOCIETY
IN INCH
INSUL INSULATION
INT INTERIOR
KCMIL KCM KILO CIRCULAR MIL
KV KILOVOLTS
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES
REACTIVE
KW KILOWATT
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FACP FIRE ALARM CONTROL PANEL
FAEP FIRE ALARM EXTENDER PANEL
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
CUH CABINET UNIT HEATER
EMI ELECTROMAGNETIC
INTERFERENCE
GFI GROUND FAULT CIRCUIT
INTERRUPTER
NON-SCHEDULED
EQUIPMENT
XXXX
SCHEDULED
EQUIPMENT EQUIPMENT NUMBER
XX-XX PANEL & CIRCUIT NUMBER
XX
EQUIPMENT SIZE
(WHERE APPLICABLE)
EQUIPMENT
XX-XX PANEL & CIRCUIT NUMBER
EQUIPMENT NAME/NUMBER
NORTH PLAN
NORTH
TRUE
NORTH
ELECTRICAL SHEET LIST
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MCCB MOLDED CASE CIRCUIT
BREAKER
QTY QUANTITY
REC RECEPTACLE
REFR REFRIGERATOR
REINF REINFORCEMENT
REQD REQUIRED
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL
CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE
PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NUMBER
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
OH OVERHEAD
OPNG OPENING
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
PSI POUNDS PER SQUARE IN.
OCPD OVERCURRENT PROTECTIVE
DEVICE
RFI RADIO FREQUENCY
INTERFERENCE
TEL TELEPHONE
TEMP TEMPERATURE
TVSS TRANSIENT VOLTAGE
SURGE SUPPRESSOR
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS
LABORATORIES
UPS UNINTERRUPTIBLE
POWER SYSTEM
VFD VARIABLE FREQUENCY
DRIVE
W WEST
W/ WITH
W/O WITHOUT
WHM WATTHOUR METER
WT WEIGHT
XFMR TRANSFORMER
SOUTH
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SPEC SPECIFICATIONS
SPKR SPEAKER
SQ SQUARE
STD STANDARD
STL STEEL
SW SWITCH
SWBD SWITCH BOARD
SYM SYMMETRICAL
S
SCCR SHORT CIRCUIT CURRENT
RATING
SPD SURGE PROTECTIVE DEVICE
SPDT SINGLE POLE, DOUBLE
THROW
VFC VARIABLE FREQUENCY
CONTROLLER
LBS POUNDS
LRA LOCKED ROTOR AMPS
LTG LIGHTING
E 00 ELECTRICAL INFO SHEET
E 01 ELECTRICAL INFO SHEET
E001 FLOOR PLAN - DEMOLITION
E002 FLOOR PLAN - DEMOLITION
E201 FLOOR PLAN - POWER
E601 EQUIPMENT SCHEDULE
E701 ELECTRICAL PANEL SCHEDULES
02/03/2026
A. ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR
SALVAGED ARE SHOWN AS FULL-TONE LINES ON DEMO PLANS.
ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE
SHOWN AS HALF-TONE.
B. DEMOLITION SHOWN IS AS REQUIRED FOR THE COMPLETE
PROJECT. COORDINATE DEMOLITION WITH THE WORK OF OTHER
TRADES. PROVIDE TEMPORARY POWER AND LIGHTS AS
REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO
PROCEED OR AS REQUIRED TO ALLOW THE OWNER TO OCCUPY
THE SPACE.
C. ALL OF THE EQUIPMENT AND DEVICES SHOWN ON THIS DRAWING
ARE EXISTING. THE LOCATIONS OF THE EQUIPMENT AND DEVICES
WERE OBTAINED FROM EXISTING DRAWING AND FIELD
INVESTIGATION. THE LOCATIONS OF THE EXISTING EQUIPMENT
AND DEVICES ARE SHOWN FOR THE CONVENIENCE. ACCURACY
OF THE INFORMATION SHOWN IS NOT GUARANTEED.
VERIFICATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING
BIDS IS ENCOURAGED. SITE VISITS PRIOR TO SUBMISSION OF BIDS
NEED TO BE FULLY COORDINATED WITH THE OWNER.
D. CIRCUIT INFORMATION FOR ALL AFFECTED CIRCUITS SHALL BE
VERIFIED PRIOR TO COMMENCING WORK. ACCURACY OF THE
INFORMATION SHOWN AND INCLUDED ON THE PANEL SCHEDULES
IS NOT GUARANTEED.
E. LUMINAIRES AND DEVICES INDICATED TO BE REMOVED, WHICH
ARE LOCATED ON CEILINGS OR WALLS, SHALL HAVE LUMINAIRES,
DEVICE AND ALL ASSOCIATED CIRCUIT WIRING AND CONDUIT
REMOVED BACK TO NEAREST JUNCTION BOX, OR DEVICE NOT
INDICATED TO BE REMOVED. ACTUAL CIRCUITING MUST BE
DETERMINED IN THE FIELD. THE CONTRACTOR SHALL PROVIDE
ALL NECESSARY WIRE, CONDUIT, DEVICES AND CONNECTIONS
NECESSARY TO ENSURE CIRCUIT CONTINUITY OF THE REMAINING
DEVICES.
F. THE OWNER HAS THE RIGHT TO RETAIN ALL SALVAGEABLE
MATERIAL. ANY MATERIAL THE OWNER CHOOSES NOT TO ACCEPT
SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED
OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REGULATIONS. REMOVE ALL PCB BALLAST OR HAZARDOUS
LAMPS.
G. LABEL ALL SPARE OR ABANDONED CIRCUITS AND/OR CIRCUIT
BREAKERS IN ALL PANELBOARDS AFFECTED BY THE DEMOLITION.
SPARE CIRCUITS AND/OR CIRCUIT BREAKERS MAY BE REUSED
FOR THE CIRCUITING OF THE NEW OR REMODELED AREA AS
SPACE AND PANEL LOADING WILL ALLOW.
H. RESTORE ALL EXISTING SURFACES REQUIRING PATCHING,
PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO THE
DEMOLITION WORK, UNDER THE TERMS OF THIS SPECIFICATION.
CLOSE AND SEAL ALL OPENINGS, REPAIR ALL SURFACES, ETC., AS
REQUIRED.
I. EXISTING FIRE ALARM DEVICES, EMERGENCY LIGHTS, AND EXIT
SIGNS SHALL BE COMPLETE AND OPERABLE AT ALL TIMES.
PROVIDE TEMPORARY DEVICES IN AREAS BEING WORKED ON TO
ALLOW FOR A WORKABLE SYSTEM DURING CONSTRUCTION.
J. PROVIDE MINIMUM [2] DAYS ADVANCE NOTICE OF OUTAGES.
COORDINATE WITH OWNER FOR ALL ANTICIPATED OUTAGES.
OWNER HAS FINAL APPROVAL ON TIME AND EXTENT OF POWER
OUTAGE.
K. PROTECT EXISTING FURNITURE, CARPET, EQUIPMENT, DEVICES,
AND OTHER APPURTENANCES FROM DAMAGE DURING THE
COURSE OF CONSTRUCTION. REPLACE DAMAGED ITEMS FREE OF
COST TO THE OWNER.
A. ALL DEVICES SHOWN SHALL BE MOUNTED AT 18" A.F.F. UNLESS
INDICATED OTHERWISE.
B. ALL AUXILIARY CABLE ABOVE CEILING SHALL BE PLENUM RATED
WHERE REQUIRED.
C. CEILING MOUNTED DEVICES SHALL BE CENTERED IN CEILING TILE
WHERE INSTALLED IN ACOUSTICAL TILE CEILING.
D. PROVIDE 120 VOLT POWER CIRCUIT(S) FOR AUXILIARY SYSTEMS
AS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS.
A. DRAWINGS DO NOT SHOW TOTAL NUMBER OF CONDUCTORS FOR
CIRCUITS REQUIRED. PROVIDE THE NUMBER OF CONDUCTORS
NEEDED TO COMPLETE INSTALLATION OF SPECIFIC EQUIPMENT
FURNISHED. A GREEN GROUND CONDUCTOR, SIZED PER NEC,
SHALL ALSO BE INCLUDED IN EACH CIRCUIT. ADJUST
CONDUCTOR SIZES AS NEEDED TO LIMIT VOLTAGE DROP TO
LEVELS RECOMMENDED BY NEC. COORDINATE INSPECTIONS
WITH THE OWNER AND AHJ.
B. SEE ARCHITECTURAL SHEETS FOR REFLECTED CEILING PLANS.
C. ALL CIRCUITS SHALL HAVE SEPARATE NEUTRAL WIRES BUT CAN
SHARE AN INSULATED GREEN GROUND WIRE IN MINIMUM 3/4"
EMT CONDUIT.
D. SEAL ALL PENETRATIONS THROUGH FIRE OR FIRE/SMOKE RATED
WALLS AND FLOORS.
E. ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY AND IN
ACCORDANCE WITH NEC PARAGRAPHS 230.8, 300.5(G) AND
300.7(A). ALL RACEWAYS SHALL BE SEALED AS REQUIRED BY NEC
AND NFPA.
F. CABLE AND CONDUIT SHALL NOT INTERFERE WITH EQUIPMENT
ACCESS.
G. ALL CABLING ABOVE CEILING SHALL BE PROPERLY SUPPORTED
(NOT FROM CEILING SYSTEM).
H. COORDINATE FINAL PANELBOARD DIRECTORIES WITH ENGINEER
AND OWNER.
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E 01
ELECTRICAL INFO SHEET
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E 01 ELECTRICAL INFO SHEET
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
GENERAL LIGHTING NOTES XREF. NOTES ( )
PROJECT ELECTRICAL REFERENCED NOTES
GENERAL NOTES REF. DEMO NOTES ( )
PROJECT ELECTRICAL REFERENCED DEMOLITION NOTES
DXGENERAL DEMO NOTES
GEN. POWER & AUX SYS. NOTES
D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL. EXISTING CIRCUIT MAY BE REUSED TO EXTENT
POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS
LOCATION.
D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING
AND DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK
ASSOCIATED WITH REMOVAL AND INSTALLATION OF VAVS BY
MECHANICAL.
D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL.
D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY
MECHANICAL. EXISTING CIRCUIT FOR BASIN HEATER MAY BE
REUSED TO EXTENT POSSIBLE FOR NEW EQUIPMENT
INSTALLATION AT THIS LOCATION.
1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY
SERVING EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE.
EXTEND CIRCUITING AS REQUIRED FOR NEW EQUIPMENT
CONNECTION.
2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY
DEMOLITION.
3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY
DEMOLITION TO SERVE NEW EQUIPMENT.
WAREHOUSE
RECEIVING
STAIR
SUPPLIES
JANITOR
DATA
CORRIDOR
BREAKROOM
MEN
WOMEN
MENS LOCKER
WOMENS LOCKER
SUPPLIES
TRAINING ROOM
ENTRY
WORK ROOM
OFFICE
OPEN OFFICE
TRUCK BAYS
D2 D2
D2
D2
D2
D2
VAV-4
VAV-2
VAV-1
VAV-3
VAV-10
VAV-5
VAV-6
VAV-8 VAV-9
VAV-7
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E001
FLOOR PLAN - DEMOLITION
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E001 FLOOR PLAN - DEMOLITION
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):DX
D2 REMOVE AND REINSTALL, OR PROVIDE SUPPORT FOR, LIGHTING AND
DEVICES IN/ON CEILING AS REQUIRED FOR CEILING WORK ASSOCIATED
WITH REMOVAL AND INSTALLATION OF VAVS BY MECHANICAL.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - OPTION 1
TOILET
STAIR
ELEVATOR EQUIPMENT
ELEC ROOM
MECH ROOM
EXTG PANEL 'PP1'
EXTG PANEL 'PP5'
EXTG PANEL 'RP1'
EXTG PANEL 'MDP'
D1
D1
D1
D1
D1
D3
MECHANICAL
151A
METER
EXTG PANEL 'PP4'
EXTG PANEL 'LP-11'
EXTG PANEL 'ELP-14'
EXTG PANEL 'PP6'
D4
D3
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E002
FLOOR PLAN - DEMOLITION
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E002 FLOOR PLAN - DEMOLITION
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. DEMO NOTES ( ):DX
D1 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
EXISTING CIRCUIT MAY BE REUSED TO EXTENT POSSIBLE FOR NEW
EQUIPMENT INSTALLATION AT THIS LOCATION.
D3 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
D4 DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY MECHANICAL.
EXISTING CIRCUIT FOR BASIN HEATER MAY BE REUSED TO EXTENT
POSSIBLE FOR NEW EQUIPMENT INSTALLATION AT THIS LOCATION.
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - AREA 3.4 - ELECTRICAL DEMOLITION
ALL POWERED RECEPTACLES, DEVICES, AND EQUIPMENT SHOWN SHALL BE
CIRCUITED AS OUTLINED IN THIS NOTE, UNLESS INDICATED OTHERWISE.
PANELBOARD CIRCUITING, INCLUDING IDENTIFYING SEPARATE
PANELBOARDS' BRANCH CIRCUIT AREAS, IS DELINEATED WITH A DASH-DOT
LINE BOUNDARY, WITH PANEL NAMES IDENTIFIED AT BOUNDARY LINE.
CIRCUIT NUMBERS ARE IDENTIFIED ADJACENT TO RECEPTACLE, DEVICE, OR
EQUIPMENT. REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION.
PANELBOARD CIRCUITING
STAIR
ELEVATOR EQUIPMENT
ELEC ROOM
MECH ROOM
EXTG PANEL 'MDP'
EXTG PANEL 'PP1'
EXTG PANEL 'PP5'
EXTG PANEL 'RP1'
PP1 - 25,27,29
P-1
PP1 - 31,33,35
P-2
PP1 - 28
P-6
PP1 - 11
B-1
PP1 - 26
B-2
MECHANICAL
151A
METER
PP4 - 3
CTF-1
PP4 - 2
CP-1
PP4 - 12
CP-2
PP4 - 1
CP-3
EXTG PANEL 'PP4'
EXTG PANEL 'LP-11'
EXTG PANEL 'ELP-14'
EXTG PANEL 'PP6'
PP4 - 5
CTF-2
PP6 - 3
BH-1 1
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs \j b in g e \D o c u m e n ts \R e v it te m p
\0
-E L
E C
R jb in g e .r v t
JCB
JCB
KJS
02/03/2026
09258.012
E201
FLOOR PLAN - POWER
REPLACE COOLING TOWER AND BOILER UNITS
009258012- 7- E201 FLOOR PLAN - POWER
GATEWAY ARCH NATIONAL PARK
11 NORTH 4TH STREET
ST. LOUIS, MO 63102
80034
320855
REF. NOTES ( ):X
1 REUSE EXISTING CONDUIT AND CONDUCTORS TO PREVIOUSLY SERVING
EQUIPMENT AT THIS LOCATION, TO EXTENT POSSIBLE. EXTEND
CIRCUITING AS REQUIRED FOR NEW EQUIPMENT CONNECTION.
2 CONNECT TO EXISTING CIRCUIT BREAKER MADE SPARE BY DEMOLITION.
3 PROVIDE NEW CIRCUIT BREAKER IN SPACE MADE AVAILABLE BY
DEMOLITION TO SERVE NEW EQUIPMENT.
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - POWER
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - AREA 3.4 - POWER
GENERAL EQUIPMENT SCHEDULE NOTES:
A. THIS SCHEDULE DISPLAYS SIZING INFORMATION THAT IS GENERIC IN
NATURE. SCHEDULE DOES NOT ITEMIZE ALL INSTANCES OF
EQUIPMENT. CONTRACTOR SHALL REFER TO THE PLANS FOR FINAL
QUANTITIES AND LOCATIONS.
B. MOUNT ALL DISCONNECTS AND STARTERS ON ASSOCIATED
EQUIPMENT UNLESS SHOWN OTHERWISE. MAINTAIN WORKING
CLEARANCES PER NEC; COORDINATE WITH MECHANICAL
CONTRACTOR.
C. NFD OR FD = NON-FUSED OR FUSED DISCONNECT SWITCH.
D. CS/NFD, FD = COMBINATION STARTER/ NON OR FUSED DISCONNECT
SWITCH.
E. INT = INTEGRAL DISCONNECT FURNISHED WITH EQUIPMENT.
F. EXP = DEVICE TO BE EXPLOSION-PROOF.
G. ALL SWITCHES, DISCONNECTS, ETC SHALL BE LOCKABLE.
H. ALL SWITCHES, DISCONNECTS, ETC SHALL BE NEMA 3R WHERE
REQUIRED.
I. PROVIDE FUSES AS SHOWN; REVISE SIZES PER ACTUAL NAMEPLATE
DATA.
J. STARTER ACCESSORIES:STARTER ACCESSORIES:
1. CONTROL TRANSFORMER
2. H-O-A SWITCH
3. RED RUN LIGHT
4. 2 NO CONTACTS; 2 NC CONTACTS
K. PROVIDE DUCT DETECTOR, SHUTDOWN RELAY, AND ACCESSORIES
AS REQUIRED TO SHUTDOWN HVAC EQUIPMENT 2000 CFM OR HIGHER
PER…