B08_Solicitation_-_Att_2_-_Drawings.pdf
PDF 12 MB Posted
- Attached to
- Pullman NHP - Renovation and Build-out
- Solicitation number
- 140P6226B0002
About this file
This file comprises Final Construction Documents (dated 08/13/2025) for the Pullman National Monument Administration Clock Tower Building's 2nd and 3rd Floor Renovation located at 11057 South Cottage Grove Avenue, Chicago, Illinois. The drawings include a comprehensive set of architectural plans, schedules, details, and specifications prepared by Schemmer Associates (Omaha, Nebraska) under Project No. 009258.009. The Base Bid scope encompasses elevator installation, partial 2nd Floor remodel, 2nd Floor restrooms, first floor access control and security, and elevator access. Six additional options are available: Option 1 provides NPS Office build-out on the 2nd Floor; Option 2 addresses 2nd Floor finishes with carpet in lieu of concrete sealer in specified rooms; Option 3 provides carpet finishes for additional spaces; Option 4 includes Partner Office build-out on the 2nd Floor; Option 5 covers 3rd Floor architectural demolition; and Option 6 encompasses 3rd Floor build-out. The project requires coordination with existing building conditions on a 3-story (75-foot) structure containing mixed-use occupancies (Assembly A-3, Business B, and Storage S-2) with a total gross area of approximately 28,500 square feet.
The construction documents detail demolition work including removal of existing walls, doors, frames, mezzanine assemblies, and miscellaneous blocking, with provisions for salvaging and reinstalling select items at the owner's discretion. New construction includes installation of multiple wall types (metal stud framing with gypsum board, furred insulated walls, fire-rated assemblies), interior partitions, hollow metal doors and frames, new floor finishes (luxury vinyl tile, concrete sealers, and carpet options depending on selections), ceiling systems (suspended acoustic tile and gypsum board), plumbing fixtures in restrooms, and millwork for kitchenettes and storage areas. Accessibility requirements per 2017 ABAAS are incorporated throughout, including grab bars, accessible restroom fixtures, and signage. The site logistics plan restricts contractor staging to designated areas, requires coordination with Illinois Department of Natural Resources and National Park Service, mandates protection of historic concrete slabs and limestone features, and limits building access to 6:30 AM–6:30 PM with special event restrictions. The drawings provide detailed specifications for material finishes, hardware sets, electrical rough-in locations, mechanical rough-ins, plumbing connections, and fire-rated construction assemblies designed to meet IBC 2024, IMC 2024, and NEC 2024 standards.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
COVER SHEET
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- 0 COVER SHEET
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
ARCHITECTURAL
A001 DEMOLITION PLAN - 1ST & 2ND FLOOR
A002 DEMOLITION PLAN - 3RD FLOOR
A101 ASSEMBLY TYPES AND MOUNTING HEIGHTS
A102 1ST FLOOR PLAN
A103 2RD FLOOR PLAN
A104 3RD FLOOR PLAN
A301 SCHEDULES, DOOR AND WINDOW DETAILS
A302 DETAILS
A501 ENLARGED ELEVATOR PLANS & SECTIONS
A502 ENLARGED PLANS & INTERIOR ELEVATIONS
A503 INTERIOR ELEVATIONS, DETAILS, & IMAGES
A601 REFLECTED CEILING PLANS AND DETAILS
A602 REFLECTED CEILING PLANS AND DETAILS
A901 FINISH PLANS
A902 FURNITURE PLANS
FIRE PROTECTION
FP 00 FIRE PROTECTION INFO SHEET
FP101 SECOND FLOOR PLAN - FIRE PROTECTION
FP102 THIRD FLOOR PLAN - FIRE PROTECTION
GENERAL
G001 SCOPE OF WORK
G100 ARCHITECTURAL INFO SHEET
G101 SITE LOGISTIC PLAN
G102 ARCHITECTURAL CODE COMPLIANCE
G103 ARCHITECTURAL CODE COMPLIANCE
G104 ACCESSIBILITY BUILDING PLANS - 2ND & 3RD LEVELS
PLUMBING
P 00 PLUMBING INFO SHEET
P001 FIRST FLOOR DEMOLITION FLOOR PLAN - PLUMBING
P100 BELOW GRADE FLOOR PLAN - PLUMBING
P101 FIRST FLOOR PLAN - PLUMBING
P102 SECOND FLOOR PLAN - PLUMBING
P103 THIRD FLOOR PLAN - PLUMBING
P301 DETAILS - PLUMBING
P401 SANITARY RISER & SCHEDULES - PLUMBING
MECHANICAL
M 00 MECHANICAL INFO SHEET
M001 SECOND FLOOR DEMOLITION FLOOR PLAN -
MECHANICAL
M002 THIRD FLOOR DEMOLITION FLOOR PLAN -
MECHANICAL
M003 ROOF DEMOLITION FLOOR PLAN - MECHANICAL
M101 SECOND FLOOR PLAN - MECHANICAL
M102 THIRD FLOOR PLAN - MECHANICAL
M103 ROOF FLOOR PLAN - MECHANICAL
M201 FIRST FLOOR PIPING PLAN - MECHANICAL
M202 SECOND FLOOR PIPING PLAN - MECHANICAL
M203 THIRD FLOOR PIPING PLAN - MECHANICAL
M301 ENLARGED PLAN & SECTION - MECHANICAL
M401 DETAILS - MECHANICAL
M402 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
ELECTRICAL
E 00 ELECTRICAL INFO SHEET
E 01 ELECTRICAL INFO SHEET
E001 SECOND FLOOR PLAN - DEMOLITION
E002 THIRD FLOOR PLAN - DEMOLITION - OPTION 6
E101 SECOND FLOOR PLAN - LIGHTING
E102 SECOND FLOOR PLAN - LIGHTING - OPTIONS 2 & 4
E103 THIRD FLOOR PLAN - LIGHTING - OPTION 6
E201 FIRST FLOOR PLAN - POWER & AUXILIARY SYSTEMS
E202 SECOND FLOOR PLAN - POWER & AUX. SYS. - OPTIONS 2 & 4
E203 THIRD FLOOR PLAN - POWER & AUXILIARY SYSTEMS - OPTION 6
E401 ELECTRICAL DETAILS
E402 ELECTRICAL DETAILS
E501 POWER RISER DIAGRAM
E601 LUMINAIRE & EQUIPMENT SCHEDULES
E701 ELECTRICAL PANEL SCHEDULES
E702 ELECTRICAL PANEL SCHEDULES
STRUCTURAL
S 00 STRUCTURAL INFO AND NOTES
S101 FLOOR PLANS & DETAILS
S102 FLOOR PLAN & DETAILS
DRAWING INDEX
ADMINISTRATION CLOCK TOWER BUILDING 2ND & 3RD FLOOR REMODEL
PULLMAN NATIONAL HISTORICAL PARK
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
FINAL CONSTRUCTION DOCUMENTS
08/13/2025
DATE INITIAL
SHANE L. ' %
;I 0 l 8/13/25
LICENSE EXP. 11/01/2026
A B C D E F
VESTBULE
WELCOME
LOBBY
ENTRY
EXHIBIT SPACE
MULTIPURPOSE
ROOM
OPEN OFFICE
108RETAIL SPACE
WELCOME
LOBBY
CONFERENCE
ROOM /
LIBRARY
FIRE
PROTECTION
A B C D E F
DISPLAY
PARTNER
OFFICE
NPS OFFICES
CORRIDOR
PRIVATE
COLLAB
OPEN NPS
COLLAB
ASST SUPT
SUPT
NPS
KITCHENETTE
PARTNER EXEC
OFFICE
OPEN COLLAB
CORRIDOR
KITCHENETTE
JANITOR
STORAGE
NPS RR
A B C D E F
5.6
B.4 D.6
LEASE AREA
POTENTIAL
LEASE AREA
POTENTIAL
NPS STORAGE
NPS STORAGE
NPS STORAGE
CORRIDOR
CORRIDOR
SCOPE OF WORK LEGEND
EXISTING
EXISTING TO REMAIN INDICATED HERE; NOT IN SCOPE
OPTION #1
OPTION #2
OPTION #3
OPTION #4
OPTION #5
OPTION #6
BASE BID
ELEVATOR, PARTIAL 2ND FLOOR REMODEL, & 2ND FLOOR
RESTROOMS
FIRST FLOOR ACCESS CONTROL AND SECURITY. SEE
ELECTRICAL
NPS OFFICE BUILD-OUT - 2ND FLOOR
2ND FLOOR FINISHES
PROVIDE CARPET IN LIEU CONCRETE SEALER IN THE
FOLLOWING ROOMS: 208, 207, 217, 218, 219, 220
PARTNER OFFICE BUILD-OUT - 2ND FLOOR
3RD FLOOR ARCHITECTURAL DEMOLITION
3RD FLOOR BUILD-OUT
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
G001
SCOPE OF WORK
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G001 SCOPE OF WORK
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
SCALE: 1/16" = 1'-0"
FIRST FLOOR PLAN - BASE BID/OPTIONS
SCALE: 1/16" = 1'-0"
SECOND FLOOR PLAN - BASE BID/OPTIONS
SCALE: 1/16" = 1'-0"
THIRD FLOOR PLAN - BASE BID/OPTIONS NORTH
DATE INITIAL
SHANE L. ' %
;I 0 l
LICENSE EXP. 11/01/26
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
G100
ARCHITECTURAL INFO SHEET
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G100 ARCHITECTURAL INFO SHEET
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL DRAWINGS
PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION. DIMENSIONS AND EXISTING
CONDITIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.
ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS
FULL-TONE DASHED LINES AND ARE LISTED IN THE REFERENCED DEMOLITION NOTES. ALL
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN HALF-TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS BELOW OR HERE-IN. THE
CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION
WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION
REQUIRED AND AS LISTED BELOW.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL
EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS
REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH
THE OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.
D. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE CAREFULLY
REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND STORED OR REINSTALLED ON THE
SITE AS DIRECTED. REMOVED AND SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE
OWNER.
E. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL REASONABLY
BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL
WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP
WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT THEREAFTER BE
RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR.
F. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF
ALL CONSTRUCTION BARRIERS.
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND LIMITED
FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO
DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL NOT BE ALLOWED EXTRA
COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE RESPONSIBLE FOR
SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL
EXPENSE TO OWNER. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER
TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. FULL-TONE
LINES INDICATE NEW OR RELOCATED CONSTRUCTION.
E. DIMENSIONS ARE TYPICALLY TO FINISH FACE OF MASONRY, CONCRETE, GYPSUM WALL
BOARD, AND METAL FRAMES; OR CENTER LINE OF COLUMN OR BEAMS, UNLESS NOTED
OTHERWISE.
F. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED TO
INSTALL EXPANSION JOINTS AND CONTROL JOINTS AS SHOWN.
TRUE
NORTH
PLAN
NORTH
NORTH
NORTH
ARROW
NAME
ELEVATION
LEVEL
MATCHLINE
AREA A
AREA B
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XX-XX
SIM
X
XX-XX
XXXX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
150 SF
ROOM
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES
EXISTING COLUMN LINE
SECTION/DETAIL
NUMBER
SHEET NUMBER
INDICATES DIRECTION
OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME
DESIGNATION
ROOM NUMBER
DESIGNATION
ROOM AREA
DESIGNATION
ROOM /
FRAMING
ELEVATION
EXTERIOR
ELEVATION
XX-XX
XX-XX
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
DOOR
NUMBER
DOOR NUMBER10
WINDOW
DESIGNATION
WINDOW DESIGNATION000
TA-X
TOILET
ACCESSORY
TOILET ACCESSORY
NUMBER
WALL
TYPE
LETTER
INDICATES
PARTITION OR
WALL TYPE
X
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE
DRAWING
ABBREVIATIONSREFERENCE LEGEND GENERAL NOTESGENERAL DEMO NOTES
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SB SECURITY BARS
SB SPLASH BLOCK
SCH SCHEDULE
SCHED SCHEDULE
SCR SCREW
SCT STRUCTURAL CLAY TILE
SCUT SCUTTLE
SCW SOFT COLD WATER
SD STORM DRAIN
SD SUBDRAIN
SDI STEEL DECK INSTITUTE
SECT SECTION
SECY SECRETARY
SEQ SEQUENCE
SF SQUARE FOOT (FEET)
SFU STRUCTURAL FACING
UNIT
SHLD SHOULDER
SHT SHEET
SHTG SHEATHING
SHW SOFT HOT WATER
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SL SNOW LOAD
SLBB SHORT LEG BACK TO
BACK
SM SPRINKLER MAIN
SOV SHUT OFF VALVE
SPA SPACE(ING)
SPEC SPECIFICATIONS
SPF SOUNDPROOF
SPH SPACE HEATER
SPKR SPEAKER
SPL SPECIAL
SQ SQUARE
SS SANITARY SEWER
SS STAINLESS STEEL
SSMR STANDING SEAM METAL
ROOFING
STA STATION
STAIR STAIRWAY
STC SOUND TRANSMISSION
COEFFICIENT
STD STANDARD
STGR STRINGER
STIFF STIFFENER
STIRR STIRRUPS
STL STEEL
STN STONE
STOR STORAGE
STR STRUCTURAL
SUB FL SUB FLOOR
SUCT SUCTION
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SW SWITCH
SWBD SWITCH BOARD
SYM SYMMETRICAL
T TREAD
T or TLT TOILET
TAN TANGENT
TBD TACK BOARD
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
TGL TOGGLE
TH THRESHOLD
THK THICK
THRD THREAD
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOJ TOP OF JOIST
TOPO TOPOGRAPHIC
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TW TEMPERED WATER
TWR TEMPERED WATER
RETURN
TYP TYPICAL
UC UNIT COOLER
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS
LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
UPS UNINTERRUPTIBLE
POWER SYSTEM
UR URINAL
UT UTILITY
UV UNIT VENTILATOR
V VOLT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VD VAULT DOOR
VEL VELOCITY
VENT VENTILATOR(ION)
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY
DRIVE
VOL VOLUME
VPC VERTICAL POINT OF
CURVATURE
VPI VERTICAL POINT OF
INTERSECTION
VPT VERTICAL POINT OF
TANGENCY
VS VENT STACK
VT VINYL-TILE
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W WIDE (WIDTH)
W WIRE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WC WATER COLUMN
WD WASTE DRAIN
WD WOOD
WD BLKG WOOD BLOCKING
WD DR WOOD DOOR
WDW WINDOW
WF WIDE FLANGE
WG WIRE GLASS
WH WALL HYDRANT
WHT WHITE
WI WROUGHT IRON
WKSH WORK SHOP
WL WIND LOAD
WNSCT WAINSCOT
WP WEATHER PROOF
WP WORK POINT
WPF WATER PROOF
WPFG WATER PROOFING
WRB WARDROBE
WS WASTE STACK
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WOVEN WIRE MESH
XFMR TRANSFORMER
YD YARD or YARD DRAIN
LBS POUNDS
LD LOAD
LDG LOADING
LE LEFT END
LG LENGTH (LONG)
LIN LINEAR
LIS LAWN IRRIGATION
SYSTEM
LL LIVE LOAD
LLBB LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LNTL LINTEL
LP LOW POINT
LPG LIQUIFIED PETROLEUM
GAS
LPS LOW PRESSURE STEAM
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVT LUXURY VINYL TILE
M MIDDLE
M THOUSAND
M & B MATCHED AND BEADED
MA MAKE-UP AIR
MACH MACHINE
MAS MASONRY
MAT or
MATL
MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBH 1000 BTUH
MC MEDICINE CABINET
MC MISCELLANEOUS
CHANNELS
MECH MECHANICAL
MER MECHANICAL EQUIPMENT
ROOM
MET METAL
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML METAL LATH
MLDG MOULDING
MO MASONRY OPENING
MONO MONOLITHIC
MT METAL THRESHOLD
MTD MOUNTED
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL
CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE
PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NUMBER
NR NOT REQUIRED
NS NEAR SIDE
NTS NOT TO SCALE
OA OUTSIDE AIR
OB WG OBSCURE WIRE GLASS
OBGL OBSCURE GLASS
OBSC OBSCURE
OC ON CENTER(S)
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPS OPERATIONS
OS & Y OUTSIDE SCREW & YOKE
OSF OUTSIDE FACE
OV OVERFLOW VALVE
OX OXYGEN
OZ OUNCE
P PAINT
PA PUBLIC ADDRESS
PBS PUSH BUTTON STATION
PC PIECE
PC POINT OF CURVATURE
PC PRECAST
PCC PORTLAND CEMENT
CONCRETE
PCT PORCELAIN CERAMIC TILE
PD PRESSURE DROP
PE POLYETHYLENE
PEN PENETRATION
PERF PERFORATED
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIV POST INDICATING VALVE
PL or P PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLATF PLATFORM
PLBG PLUMBING
PLG PILING
PLWD PLYWOOD
PNL PANEL
POL POLISH(ED)
PORC PORCELAIN
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PRESS PRESSURE
PROJ PROJECT
PRV PRESSURE REGULATING
VALVE
PS PRESSED STEEL
PSFT POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT POINT
PT POINT OF TANGENCY
PTD PAINTED
PTN PARTITION
PVC POLYVINYL-CHLORIDE
PVMT PAVEMENT
PW PASS WINDOW
1/4 RD QUARTER ROUND
QT QUARRY TILE
QT QUART
QTRS QUARTERS
QTY QUANTITY
QTZ QUARTZ
R REGISTER
R RISER
RA RETURN AIR
RAD OR
R
RADIUS
RB RESILIENT BASE
RC REMOTE CONTROL
RCP REINFORCED CONCRETE
PIPE
RD ROOF DRAIN
RE RIGHT END
REC RECEIVER
RECP RECEPTACLE
RECR RECREATION
RECT RECTIFIER
REF REFERENCE
REFR REFRIGERANT
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEMENT
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
REV REVISIONS
RFG ROOFING
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RM ROOM
RND ROUND
RO ROUGH OPENING
RPM REVOLUTIONS PER
MINUTE
RT RUBBER TILE
RTU ROOF TOP UNIT
RUB RUBBER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DISC DISCONNECT
DIST DISTRIBUTION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DAMP PROOFING
DPT DEW POINT
DR DOOR
DRN DRAIN
DS DOWN SPOUT
DV DENTAL VACUUM
DWG DRAWING
DWLS DOWELS
DX DIRECT EXPANSION
E EAST
EA EACH
EA EXHAUST AIR
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY
RATIO
EJ EXPANSION JOINT
EL OR
ELEV
ELEVATION - GRADE OR
BUILDING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENT ENTERING
ENT ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
EVAP EVAPORATOR
EW EACH WAY
EWC ELECTRIC WATER
COOLER
EXC EXCAVATE
EXD EXIT DEVICE
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXPL EXPLOSION
EXPN EXPANSION
EXT EXTERIOR
F FAHRENHEIT
F FIRE
FA FRESH AIR
FCG FACING
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER
BRACKET
FEC FIRE EXTINGUISHER
CABINET
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL or FLR FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG FLOORING
FLUOR FLUORESCENT
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPRF FIRE PROOF
FR FRAME
FRG FURRING
FS FAR SIDE
FS FLOOR SINK
FS FULL SIZE
FT FEET (FOOT)
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G GRILLE
G NATURAL GAS
GA GAGE OR GAUGE
GAL GALLON
GALV GALVANIZED
GEN GENERAL
GFE GOVERNMENT FURNISHED
EQUIPMENT
GFE/CI GOVERNMENT FURNISHED
EQUIPMENT/CONTRACTOR
INSTALLED
GFI GROUND FAULT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GND GROUND
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRADE
GRS GALVANIZED RIGID STEEL
CONDUIT
GRTG GRATING
GSU GLAZED STRUCTURAL
UNITS
GWB GYPSUM WALLBOARD
GWT GLAZED WALL TILE
GYP GYPSUM
H or HT HEIGHT (HIGH)
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HD HEAD
HDPE HIGH DENSITY
POLYETHYLENE
HDR HEADER
HDW HARDWARE
HIP HIGH PRESSURE
HM HOLLOW METAL
HORIZ HORIZONTAL(LY)
HP HORSE POWER
HPS HIGH PRESURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH STRENGTH GYPSUM
PLASTER
HTG HEATING
HTR HEATER
HW HEAD WALL
HW HOT WATER
HWH HOT WATER HEATER
HWR HOT WATER RETURN
(HEATING)
HWS HOT WATER SUPPLY
(HEATING)
HYD HYDRAULIC
I or FE IRON
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IES ILLUMINATING
ENGINEERING SOCIETY
IN INCH
INSUL INSULATION
INT INTERIOR
INV INVERT OR INVERTER
IP IRON PIPE
ISF INSIDE FACE
JB JUNCTION BOX
JBOX JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JST JOIST
JT JOINT
K KEY
KCP KEENE'S CEMENT
PLASTER
KIP or K KILOPOUND (1000 LBS)
KIT KITCHEN
KL KEY LOCK
KP KICK PLATE
KV KILOVOLTS
KVA KILOVOLT AMPERES
KW KILOWATT
LAB LABORATORY
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
A COMPRESSED AIR
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTAD
STYRENE
AC ALTERNATING CURRENT
ACI AMERICAN CONCRETE
INSTITUTE
ACSR ALUMINUM CONDUCTOR
STEEL REINFORCED
ACST ACOUSTIC
AD ACCESS DOOR
AD AREA DRAIN
ADMIN ADMIN ADMINISTRATION
(IVE)
AFF ABOVE FINISH FLOOR
AFFF AQUEOUS FILM FORMING
FOAM
AGG AGGREGATE
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPS INTERRUPTING
CAPACITY (SYM RMS)
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
AL ACTIVE LEAF
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL OR
ARCHITECT
ARI AMERICAN
REFRIGERATION
INSTITUTE
ASB ASBESTOS
ASPH ASPHALT
APC ACOUSTICAL PANEL
CEILING
AUTO AUTOMATIC
AV ACID VENT
AVG AVERAGE
AW ACID WASTE
AWC ACOUSTICAL WALL
COVERING
AWG AMERICAN WIRE GAUGE
L ANGLE
BATT BATT INSULATION
BB BULLETIN BOARD
BBO BOILER BLOW OFF
BC BOOKCASE
BD BOARD
BDY BOUNDARY
BEJ BRICK EXPANSION JOINT
BIT BITUMINOUS
BKR BREAKER
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BM BENCH MARK
BO BOTTOM OF
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
BUR BUILT-UP ROOFING
BW BOTH WAYS
C CENTER
C OR
CND
CONDUIT (ELECTRICAL
SHEETS)
C TO C CENTER TO CENTER
CAP CAPACITY
CB CATCH BASIN (OR CIRCUIT
BREAKER)
CC CENTER TO CENTER
CCT CIRCUIT
CD CONDENSATE DRAIN
CE COVER ELEVATION
CEM CEMENT
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHIM CHIMNEY
CI CAST IRON
CI CURB INLET
CIP CAST IN PLACE
CIR CIRCULAR
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE
CL WG CLEAR WIRE GLASS
CLG CEILING
CLKG CAULKING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY
UNIT
CNTR COUNTER
CO CLEAN OUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION
COMB COMBUSTION
COMP COMPRESSIBLE
COMPR COMPRESSOR
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONSTR
JT
CONSTRUCTION JOINT
CONT CONTINUOUS
(CONTINUATION)
CONTR CONTRACTOR
COR CORNER
CORR COVERED
COV CORRIDOR
CPL CEMENT PLASTER
CPS CYCLES PER SECOND
(HERTZ)
CPT CARPET
CR CONDENSER WATER
RETURN
CRES CORROSIVE RESISTANT
STEEL
CRG CARRIAGE
CRSE COURSE
CS CONDENSER WATER
SUPPLY
CS COUNTER SINK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
CTL CARPET TILE
CU CONDENSING UNIT
CU YD CUBIC YARDS
CUH CABINET UNIT HEATER
CV CEILING VENT
CW COLD WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CYL CYLINDER
D DEPTH (DEEP)
D DIFFUSER
d PENNY (as in nail - 10d)
D&M DRESSED AND MATCHED
DA DOUBLE ACTING
DB DRY BULB
dB DECIBEL
DBL DOUBLE
DC DIRECT CURRENT
DCJ DOWELED CONTROL
JOINT
DCJT DUMMY CONTROL JOINT
DCL DOOR CLOSER
DCW DOMESTIC COLD WATER
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DHW DOMESTIC HOT WATER
DI DEIONIZED WATER
DIA DIAMETER
CLO CLOSET
FR FIRE RATED
U/C UNDER CABINET
SYMBOL LEGEND
PLAN VIEW
SECTION / ELEVATION VIEW
SHEAR WALL
MASONRY-CMU
CONCRETE
GRAVEL
EARTH / COMPACTED
EARTH /
NONCOMPACTED
RIGID INSULATION
JOINT FILLER
STEEL
GYPSUM
MASONRY-VENEER
STUD WALL
FLEXIBLE INSULATION
GROUT
PLYWOOD
WOOD (FINISH)
MASONRY-CMU FACE
MASONRY-CMU
MASONRY-VENEER
REF. DEMO NOTES ( )
PROJECT ARCHITECTURAL REFERENCED DEMOLITION NOTES
XDX
PROJECT ARCHITECTURAL REFERENCED NOTES
REF. NOTES ( )
D1 REMOVE DOOR AND FRAME
D2 REMOVE EXISTING WALL/CMU INFILL. COORDINATE ROUGH OPENING WITH ELEVATOR
REQUIREMENTS. SEE STRUCTURE FOR HEADER DETAILS. SEE STRUCTURE FOR HEADER DETAILS
D3 BRICK TO BE CAREFULLY DEMOLISHED, GATHERED, CLEANED AND STORE FOR RE-USE. SALVAGE
ENOUGH FOR RE-USE IN THIS PROJECT. SEE STRUCTURE FOR HEADER DETAILS. REMOVE
MASONRY 3" BELOW TOP OF CONCRETE FLOOR LEVEL.
D4 REMOVE STEEL THRESHOLD & MISC WOOD OR MASONRY. SUPPORT LINTEL/PLATE TO REMAIN
D5 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN
D6 REMOVE MEZZANINE BEAMS AND FLOOR ASSEMBLY. FILL BEAM POCKETS WITH MORTAR
D7 REMOVE SPIRAL STAIR ASSEMBLY TO MEZZANINE
D8 REMOVE CABLE AND PLATES. INFILL OPENINGS WITH MORTAR. SEE IMAGES ON SHEET A503
D9 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN. REMOVE MASONRY
3" BELOW TOP OF CONCRETE FLOOR LEVEL
D10 REMOVE NON STRUCTURAL METAL FRAMING AND GWB ELEVATOR CEILING
D11 DEMO CONCRETE SLAB TO ACCESS SANITARY LINES. SEE PLUMBING TO COORDINATE. INFILL WITH
NEW CONCRETE AFTER PLUMBING CONNECTION
D12 RELOCATE SUMP PUMP. SEE PLUMBING. FILL IN EXISTING SUMP PIT WITH CONCRETE
D13 FILL EXISTING SUMP PIT WITH CONCRETE. SEE PLUMBING FOR SUMP PUMP RELOCATION
D14 DEMO CONCRETE FLOOR SLAB FOR MECHANICAL CHASE. SEE STRUCTURAL
D15 RELOCATE AUTOMATED EXTERNAL DEFIBRILLATOR CABINET
D16 RELOCATE FIRE EXTINGUISHER CABINET
D17 ELEVATOR WORK AREA. PROVIDE TEMPORARY WALL AND ACCESS DOOR
D18 RELOCATE ELECTRICAL DEVICES FOR REVISED DOOR LOCATION
D19 REMOVE CMU. SEE STRUCTURE FOR HEADER DETAILS. REMOVE CMU 3" BELOW TOP OF CONCRETE
FLOOR LEVEL.
D20 PARTIAL MEZZANINE REMOVAL. COORDINATE WITH SHAFT LOCATION
D21 PARTIAL DEMO OF GWB CEILINGS. SEE PLUMBING TO COORDINATE
1 CONCRETE INFILL @ THRESHOLD. LEVEL CONCRETE TO ADJACENT FLOOR LEVELS. FLOAT
CONCRETE OUT IF NEEDED WITH SLOPE NO GREATER THAN 2%. SEE DETAIL 3/A302
3 FURRED WALL. TERMINATE AT WINDOW SILL. APPROX. 5'-6" ABOVE FINISH FLOOR
6 PROVIDE SPRAY FOAM ABOVE WINDOW HEADS. COAT SPRAY FOAM WITH INTUMESCENT PAINT.
SPRAY FOAM TRIMMED FLUSH WITH INSIDE FACE OF EXTERIOR WALL PRIOR TO INTUMESCENT
PAINT. SEE IMAGES ON SHEET A503
7 PROVIDE FURRED OUT AND INSULATED WALL (SIM TO F2) FROM BOTTOM OF WINDOW SILL TO
UNDERSIDE OF ROOF DECK. APPROX. HEIGHT OF 10'-0". SEE IMAGES ON SHEET A503
8 WALL TYPE A1 ABOVE GLASS PARTITION
11 ALL DUCTWORK TO BE PAINTED. PAINT UNDERSIDE OF FIREPROOFING @ 3RD FLOOR DECK (2ND FLOOR CEILING), BEAMS, AND COLUMNS. IN ROOMS WITH ACT CEILINGS PAINT EXTENDS IN MIN. 4'
FROM EDGE OF SUSPENDED CEILING (APPROX. 8' IN FROM EXTERIOR WALL)
12 HOISTWAY BEAMS: LIFE-LINE BEAM (5000 LB NET LIVE LOAD & STANDARD HOISTWAY BEAM (7500
LBS NET LIVE LOAD). SEE STRUCTURAL
13 STEEL PIT LADDER
14 RELOCATED SUMP PIT LOCATION. COORDINATE WITH ELEVATOR CONFIGURATION . SEE PLUMBING
15 LOCKABLE CABINETS AND DRAWERS
16 REPAIR CONCRETE SLAB AND FLOOR FINISHES
17 PROVIDE WINDOW SHADES AT EXTERIOR WINDOWS. SEE SCHEDULE ON SHEET A301
18 BOND BEAM. SEE STRUCTURAL
19 PREFIN. ELEVATOR DOOR AND FRAME
20 EDGE TRIM @ SUSPENDED CEILING
21 FURNITURE PROVIDED BY OTHERS
22 PROVIDE SIGNAGE #7
23 RELOCATED AUTOMATED EXTERNAL DEFIBRILLATOR
24 RELOCATED FIRE EXTINGUISHER CABINET
26 PROTECT EXISTING WOOD CEILING FINISH IN CENTRAL CORRIDOR. NO PENETRATIONS ALLOWED
27 CONCRETE OVER NON-COMPOSITE DECK. 2HR RATED PER UL DESIGN NO. D988
28 ALL DUCTWORK TO BE PAINTED. PAINT UNDERSIDE OF FIREPROOFING @ ROOF DECK (3RD FLOOR
CEILING), BEAMS, AND COLUMNS
29 EXTEND WALL TYPE A4 FROM TOP OF ELEVATOR SHAFT TO UNDERSIDE OF ROOF ASSEMBLY
31 RATED WALL TO EXTEND TO DECKING ABOVE. GWB TO BE CONTINUOUS TO DECKING, BOTH SIDES.
COORDINATE WITH EXISTING BEAM LOCATION
33 MASONRY INFILL IN EXISTING OPENING ABOVE NEW DOOR. SEE STRUCTURAL. SEE IMAGES ON
SHEET A503
34 MASONRY INFILL IN EXISTING OPENING
35 PROVIDE ELECTRICAL, GRAB BAR BLOCKING, BACKING BOARD, AND GWB IN BASE BID
36 PROVIDE UTILITY SINK RAISED BASE AND WATER HEATER SUPPORT FRAME. SEE DETAIL 4/A503
37 PAINT STAIR STRINGERS, GUARDRAILS, HANDRAILS, AND UNDERSIDE OF TREADS AND LANDINGS
(PT-6)
38 CONCRETE SEALER @ EXISTING CONCRETE TREADS AND LANDINGS
DATE INITIAL
SHANE L. ' %
;I 0 l
NORTH FACTORY WING ADMINISTRATION
CLOCK TOWER
BUILDING
CONTRACTOR STAGING AND DELIVERIES. NO
ANCHORED POSTS IN THIS AREA. EXISTING
AGGREGATE BASE PROTECTS HISTORIC
CONCRETE SLAB THAT SHOULD NOT BE
SUBJECTED TO EXCESSIVE WEIGHTS. SEE
NOTE 11
SIDEWALK CAN BE CLOSED
DURING CONSTRUCTION
LOCKED GATE,
COORDINATE ALL
ACCESS WITH COR AS
MUCH IN ADVANCE AS
POSSIBLE
CONTRACTOR
ACCESS TO INTERIOR
OF BUILDING
PUBLIC TEMPORARY
RESTROOM LOCATIONSPROTECT HISTORIC
LIMESTONE ON EACH SIDE
PROTECT PERIMETER
CURB AROUND
AGGREGATE BASE
OPTIONAL CRANE
LOCATION
OPTIONAL CRANE
LOCATION
PAVERS CAN BE
DRIVEN ON BUT ARE 18"
LOWER THAN
ADJACENT SIDEWALKS
WITH RAMP ON EACH
END
EXISTING 4" CONCRETE
SIDEWALKS
EXISTING 4" CONCRETE
SIDEWALKS
CONTRACTOR PARKING
JOB TRAILER
DUMPSTER LOCATION
VEHICLE ACCESS
ROUTES
EXISTING SIDEWALK IS
4" CONCRETE AND NOT
DESIGNED FOR
VEHICULAR TRAFFIC
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
G101
SITE LOGISTIC PLAN
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G101 SITE LOGISTIC PLAN
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
NOT TO SCALE
SITE LOGISTIC PLAN
GENERAL NOTES
1. PROPERTY OUTSIDE OF THE ADMINISTRATIVE CLOCK TOWER BUILDING IS OWNED BY THE
ILLINOIS DEPARTMENT OF NATURAL RESOURCES (IDNR) AND ANY DEVIATION FROM THE
ESTABLISHED STAGING AREAS/ACCESS/ETC NEEDS TO BE APPROVED BY THEM &
COORDINATED THROUGH THE COR.
2. PROPERTY ACCESS: GENERAL ACCESS TO AND EGRESS FROM THE PROJECT SITE WILL BE
COORDINATED THROUGHOUT THE CONSTRUCTION DURATION. ALL GATES WILL REMAIN
CLOSED AND LOCKED WHEN NOT BEING USED FOR ACCESS.
3. VEHICULAR ACCESS WITHIN THE SITE: PARKING OF PERSONAL VEHICLES IS NOT ALLOWED
ONSITE. CONSTRUCTION VEHICLE PARKING AND STAGING SHOULD BE LIMITED TO THE
IDENTIFIED STAGING AREAS.. TO THE EXTENT POSSIBLE, CONSTRUCTION VEHICLES SHOULD
USE EXISTING OR ESTABLISHED ACCESS ROADS AND AVOID TRAVERSING OTHER PORTIONS
OF THE SITE WHICH MAY IMPACT ARCHEOLOGICAL RESOURCES.
4. STAGING AREAS: EACH GENERAL CONTRACTOR IS RESPONSIBLE FOR
ESTABLISHING THEIR OWN STAGING AREA AT THE LOCATION INDICATED ON THE SITE
UTILIZATION PLAN. THE EXACT CONFIGURATION AND LOCATION OF THESE AREA NEEDS TO BE
ESTABLISHED ON SITE BY IDNR AND NPS. STAGING AREAS SHOULD INCLUDE A TEMPORARY
FENCE WITH ACCESS GATES AS APPROPRIATE. THIS AREA MAY BE USED FOR TEMPORARY
TRAILERS, MATERIAL STORAGE, LAY-DOWN WORK AREA, DUMPSTERS, AND SANITARY
FACILITIES. EACH GENERAL CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF EXISTING
CONCRETE AND EMBEDDED RAILS WITHIN THE STAGING AREA.
5. EMERGENCY ACCESS: IDNR AND NPS WILL HAVE EMERGENCY ACCESS TO ALL
AREAS OF THE SITE AND STRUCTURES AT ALL TIMES.
6. NON—EMERGENCY ACCESS: IDNR, NPS, AND OTHERS WITH PROPER AUTHORIZATION MAY
HAVE ACCESS TO THE CONSTRUCTION AND STAGING AREAS. ALL MUST HAVE PERSONAL
PROTECTIVE EQUIPMENT AND CONTRACTOR—PRESCRIBED SAFETY TRAINING TO BE ALLOWED
IN THE CONSTRUCTION AREAS, OR BE ACCOMPANIED BY AUTHORIZED PERSONNEL WITH
PROPER SAFETY TRAINING.
7. REAR ERECTING SHOPS: ACCESS WITHIN THE REAR ERECTING SHOPS STRUCTURE IS NOT
PERMITTED
8. NORTH FACTORY WING: ACCESS WITHIN THE NORTH FACTORY WING IS NOT PERMITTED.
9. WORK HOURS AND ACCESS TO BUILDING: CONTRACTOR CAN ACCESS BUILDING FROM
6:30AM TO 6:30PM. WORK SCHEDULE MUST BE COORDINATED WITH COR. CONSTRUCTION
ACTIVITIES MAY BE LIMITED BY COR DURING LARGE SPECIAL EVENTS (LABOR DAY
CELEBRATION, RAILROAD DAYS (MAY, ETC). BUILDING ACCESS TO BE PROVIDED BY COR.
10. CONTRACTOR SITE LOGISTICS, STAGING AND ACCESS PLAN WILL REQUIRE CIRP REVIEW
BY IDNR PRIOR TO START OF CONSTRUCTION. PLAN SHALL INDICATE MAXIMUM APPLIED LOADS
OF EQUIPMENT AND MATERIALS, ACCESS PATHS, STAGING AREAS, TEMPORARY FACILITIES,
ETC.
11. PROTECT THE HISTORIC SOUTH SLAB WITH PLYWOOD (OR OTHER MEANS, INCLUDING
AGGREGATE BASE MATERIAL TO MATCH EXISTING) TO DIFFUSE POINT LOADS FROM VEHICLES
PARKING ON THE SLAB OR MAKING DELIVERIES AND MATERIALS STORED ON SITE. PROTECT
BOUNDARY CURBS AND ADA SIDEWALKS WHERE VEHICLES ARE CROSSING TO THE SOUTH AND
WEST OF THE SOUTH SLAB. PROHIBIT VEHICLES FROM CROSSING THE RETAINING/BARRIER-
TYPE CURB EAST OF THE SOUTH SLAB. NO PENETRATIONS (FOR FENCING, STABILIZING
MACHINERY, ETC.) ARE PERMITTED UNLESS APPROVED BY THE STATE HISTORIC
PRESERVATION OFFICERS.
NORTH
DATE INITIAL
SHANE L. ' %
;I 0 l
UPDN
OCCUPANCY CLASSIFICATION
(none)
ASSEMBLY (A-3)
BUSINESS (B)
STORAGE (S-2)
A B C D E F
5.6
EXHIBIT SPACE
WELCOME
LOBBY
CORRIDOR.
SERV.
STORAGE
KITCHENETTE.
STORAGE.
CONFERENCE
ROOM /
LIBRARY
STORAGE.
OFFICE
OFFICE
OPEN OFFICE
RETAIL SPACE
STOR.
ELECTRICAL
FIRE
PROTECTION
VESTBULE
ENTRY
MULTIPURPOSE
ROOM
EXISTING 2-HR WALL
EXISTING 2-HR WALL
EXISTING 2-HR WALL
EXISTING 3-HR WALL
ACCESSORY TO MAIN USE
A B
MECH / BOILER
M01
D E F
MECH / BOILER
M02
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
Checker
08/13/2025
009258.009
G102
ARCHITECTURAL CODE
COMPLIANCE
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G102 ARCHITECTURAL CODE COMPLIANCE
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
FIRST FLOOR - CODE REVIEW PLAN
XX FIRE BARRIER (X HOURS)
XX FIRE PARTITION (X HOURS)
XX SMOKE BARRIER (X HOURS)
XX SMOKE PARTITION (X HOURS)
XX BUILDING SEPARATION
(X HOURS)
E
CODE COMPLIANCE
LEGEND
NOTES:
• CONTRACTOR SHALL PROVIDE PERMANENT
SIGNAGE OR STENCILING WITHIN CEILING
PLENUM AT ALL FIRE RATED WALLS, SMOKE
BARRIERS & SMOKE PARTITIONS. LETTERING
SHALL BE AT LEAST 3" IN HEIGHT WITH THE
WORDING: "FIRE AND/OR SMOKE BARRIER -
PROTECT ALL OPENINGS:. REPEAT AT
INTERVALS NOT EXCEEDING 30'-0" MEASURED
HORIZONTALLY ALONG THE PARTITION WALL.
• SEAL PENETRATIONS IN FIRE RATED SMOKE
BARRIERS, FIRE RATED BARRIERS & SMOKE
BARRIERS.
ACCESSORY OCCUPANCY
INCIDENTAL OCCUPANCY
NOT HABITABLE
OCCUPANCY
36" 90" DOOR RATING (MIN)180 9
ANTICIPATED LOAD
EXIT CAPACITY
DOOR WIDTH (IN)
9 ANTICIPATED LOAD36" 180
EXIT CAPACITY
STAIR WIDTH (IN)
TRAVEL DISTANCE
XXX'-XX"
DEAD-END DISTANCE
XXX'-XX"
EXIT LOCATION SYMBOL
NEW FIRE
EXTINGUISHER- INSIDE
RECESSED CABINET -
(FE1)
75'
CODE SUMMARY
APPLICABLE CODES
BUILDING :
ACCESSIBILITY :
LIFE SAFETY :
ENERGY :
MECHANICAL :
PLUMBING :
ELECTRICAL :
OCCUPANCY GROUP :
TYPE OF CONSTRUCTION :
MAXIMUM ALLOWED HEIGHT
MAXIMUM ALLOWED AREA
MIXED USE SEPARATIONS :
HEIGHT AND AREA LIMITS
FIRE SEPARATION ASSEMBLIES
EXITS
SHAFTS / HOISTWAYS
DWELLING UNIT SEPARATIONS
INTERIOR LOAD BEARING
WALLS, COLUMNS, FRAMING
ROOF CONSTRUCTION
FLOOR CONSTRUCTION
FIRE WALLS
EXTERIOR WALL OPENING LIMITS :
DRAFTSTOPS :
FIRE PROTECTIVE SYSTEMS
AUTO FIRE SUPPRESSION :
STANDPIPE :
FIRE ALARM SYSTEM :
AUTO FIRE DETECTION :
SMOKE DETECTION :
FIRE RESISTANCE OF STRUCTURAL
ELEMENTS
RATING
(HOURS)
DESIGN
NUMBER
EXTERIOR WALLS
LOAD BEARING WALLS
NON-LOAD BEARING WALLS
CALCULATIONS
DOOR
STAIR
EXISTING :
A-3, B, S-2
II-B (EXISTING)
3 STORIES (75 FT)
28,500 SF
NONSEPARATED
2017 ABAAS
NA
NA
NA
NFPA 13
PROVIDED
NFPA 72
NFPA 13
NFPA 72
NFPA 101/2024 IFC
2024 IECC
2024 IMC
2024 UPC
2023 NEC
2024 IBC
EXISTING
EXISTING
NA
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
NA
0.15" / OCC
0.2" / OCC
2024 IEBC
FIRST FLOOR
SECOND FLOOR
TOTAL
AREA (GROSS SQUARE FOOTAGE) :
BUILDING STATISTICS
NUMBER OF STORIES :
THIRD FLOOR
MEZZANINE
30310 SF
9620 SF
9620 SF
9620 SF
1450 SF
SCALE: 3/32" = 1'-0"
MEZZANINE NORTH - CODE REVIEW PLAN
SCALE: 3/32" = 1'-0"
MEZZANINE SOUTH - CODE REVIEW PLAN
SUPPLEMENTAL CODE NOTES
CHAPTER 5 GENERAL BUILDING HEIGHTS AND AREAS
508.3.3 SEPARATION. NO SEPARATION S REQUIRED BETWEEN NON-SEPARATED OCCUPANCIES.
504.3 MIXED OCCUPANCY
THE MAXIMUM HEIGHT OF A BUILDING SHALL NOT EXCEED THE LIMITS SPECIFIED IN TABLE 504.3 (75') EXCEPTION: TOWERS SHALL BE CONSTRUCTED OF MATERIALS CONSISTENT WITH THE REQUIRED TYPE OF CONSTRUCTION OF THE BUILDING EXCEPT WHERE OTHER CONSTRUCTION IS PERMITTED BY SECTION 1511.2.4. SUCH STRUCTURES SHALL NOT BE USED FOR HABITATION OR STORAGE. THE STRUCTURES SHALL BE UNLIMITED IN HEIGHT WHERE NONCOMBUSTIBLE MATERIALS AND SHALL NOT EXTEND MORE THAN 20' ABOVE THE ALLOWABLE BUILDING
HEIGHT WHERE COMBUSTIBLE MATERIALS.
CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES
SECTION 713 SHAFT ENCLOSURES
713.4 FIRE RESISTANCE RATING. SHAFT ENCLOSURES SHALL HAVE A FIRE RESISTANCE RATING OF NOT LESS THAN 2 HOURS WHERE CONNECTING 4 STORIES OR MORE AND NOT LESS THAN 1 HOUR WHERE CONNECTING LESS THAN 4
STORIES.
713.11 ENCLOSURE AT THE BOTTOM. EXCEPTION #3: THE FIRE RESISTANCE RATED ROOM SEPARATION AND THE PROTECTION AT THE BOTTOM OF THE SHAFT ARE NOT REQUIRED PROVIDED THAT THERE ARE NO COMBUSTIBLES IN THE SHAFT AND THERE ARE NO OPENINGS OR OTHER PENETRATIONS THROUGH THE SHAFT ENCLOSURE.
CHAPTER 10 MEANS OF EGRESS
1005.3.1 STAIRWAYS
EGRESS SIZING IS 0.2" PER OCCUPANT (W/ SPRINKLERS PER EXCEPTION #1).
THE EXISTING STAIRS ARE BOTH 44 1/2" WIDE. THEREFORE THE MAX OCCUPANT LOAD FOR EACH UPPER FLOOR IS 89"
X (1/0.2) = 445 OCCUPANTS.
1005.3.2 OTHER EGRESS COMPONENT; EXCEPTIONS 1: THE CAPACITY IN INCHES OF OTHER EGRESS COMPONENTS (DOORS) WILL HAVE A FACTOR OF 0.15 INCH PER OCCUPANT. THEREFORE, 36" DOOR = 33" CLEAR WIDTH / 0.15 PER
OCC = 220 OCCUPANTS. 220 X 2 = 440 OCCUPANTS.
TABLE 1006.2.1 SPACES WITH ONE EXIT OR EXIT ACCESS DOORWAY
A, E OCCUPANCY | OCCUPANT LOAD 49 | 75' WITH SPRINKLER
B OCCUPANCY | MAX OCC LOAD 49 | 100' WITH SPRINKLER
S OCCUPANCY | MAX 29 OCC LOAD | 100' WITH SPRINKLER
1007.1.1 TWO EXITS OR EXIT ACCESS DOORWAYS
EXCEPTIONS: 2. WHERE A BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 903.3.1.1 OR 903.3.1.2 THE SEPARATION DISTANCE SHALL BE NOT LESS THAN ONE-THIRD
OF THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE AREA SERVED.
TABLE 1017.2 EXIT ACCESS TRAVEL DISTANCE
A,E OCCUPANCY | 250' WITH SPRINKLER
B OCCUPANCY | 300' WITH SPRINKLER
S-2 OCCUPANCY | 400' WITH SPRINKLER
1020.5 DEAD END
WHERE MORE THAN ONE EXIT OR EXIT ACCESS DOORWAY IS REQUIRED, THE EXIT ACCESS SHALL BE ARRANGED
SUCH THAT DEAD-END CORRIDORS DO NOT EXCEED 20'.
EXCEPTION: 3. A DEAD-END CORRIDOR SHALL NOT BE LIMITED IN LENGTH WHERE THE LENGTH OF THE DEAD-END
CORRIDOR IS LESS THAN 2.5 TIMES THE LEAST WIDTH OF THE DEAD-END CORRIDOR.
CHAPTER 29 PLUMBING SYSTEMS
2902.1.2 FIXTURES IN SINGLE-USER TOILET ROOMS
THE NUMBER OF FIXTURES IN SINGLE-USER TOILET FACILITIES SHALL BE DEDUCTED PROPORTIONATELY FROM THE REQUIRED GENDER RATIOS OF TABLE 2902.1. SINGLE-USER ROOMS SHALL BE IDENTIFIED AS BEING AVAILABLE FOR
USE BY ALL PERSONS REGARDLESS OF SEX.
2902.2 SEPARATE FACILITIES
WHERE PLUMBING FIXTURES ARE REQUIRED, SEPARATE FACILITIES SHALL BE PROVIDED FOR EACH SEX.
EXCEPTIONS: 6) SEPARATE TOILET FACILITIES SHALL NOT BE REQUIRED WHERE ROOMS HAVING BOTH WATER CLOSETS AND LAVATORY FIXTURES ARE DESIGNED FOR USE BY ALL PERSONS REGARDLESS OF SEX AND PRIVACY IS
PROVIDED FOR WATER CLOSETS IN ACCORDANCE WITH SECTION 405.3.4 OF THE IPC.
CHAPTER 30 ELEVATORS
3003.2 FIRE FIGHTERS EMERGENCY OPERATION. ELEVATORS SHALL BE PROVIDED WITH PHASE I EMERGENCY RECALL OPERATION AND PHASE II EMERGENCY IN-CAR OPERATION IN ACCORDANCE WITH ASME A17.1/CSA B44.
3006.2 ELEVATOR HOISTWAY DOOR PROTECTION. ELEVATOR HOISTWAY DOORS SHALL BE PROTECTED WHERE AN ELEVATOR HOISTWAY CONNECTS MORE THAN THREE STORIES. HOISTWAY PROTECTION IS NOT REQUIRED.
NORTH
DATE INITIAL
SHANE L. ' %
;I 0 l
DISPLAY
PRIVATE
COLLAB
NPS
KITCHENETTE
JANITOR
STORAGE
OCCUPANCY CLASSIFICATION
(none)
ASSEMBLY (A-3)
BUSINESS (B)
STORAGE (S-2)
NPS OFFICES
OPEN NPS
COLLAB
ASST SUPT
SUPT
PARTNER
OFFICE
OPEN COLLAB
PARTNER EXEC
OFFICE
CORRIDOR
CORRIDOR
KITCHENETTE
NPS RR
RR
RR
RR
RR
14'-0 1/2"
47' COMMON PATH/ 60'
TRAVEL DISTANCE
73' COMMON PATH/ 100'
TRAVEL DISTANCE
53'-7"
83'-2 1/4"
SEE NOTE
1020.5
EXISTING 2-
HR SHAFT
EXISTING 2-
HR SHAFT
EXISTING 2-HR
SHAFT
EXISTING 2-HR
SHAFT
EXISTING F.E.C.
EXISTING F.E.C.
ACCESSORY TO MAIN USE
A B C D E F
B.4
OCCUPANCY CLASSIFICATION
(none)
BUSINESS (B)
STORAGE (S-1)
STORAGE (S-2)
D.6
80' COMMON PATH DISTANCE
\150' TRAVEL DISTANCE
60' COMMON PATH/90'
TRAVEL DISTANCE
EXISTING 2-HR
SHAFT
EXISTING 2-HR
SHAFT
EXISTING 2-HR
SHAFT
EXISTING 2-HR
SHAFT
NEW 1-HR
SHAFT OPEN
TO 2ND FLOOR
BELOW
ACCESSORY TO MAIN USE
1-HR FIRE BARRIER
1-HR FIRE
BARRIER
LEASE AREA
POTENTIAL
LEASE AREA
POTENTIAL
CORRIDOR
NPS STORAGE
NPS STORAGE
NPS STORAGE
NPS STORAGE
CORRIDOR
CORRIDOR
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
G103
ARCHITECTURAL CODE
COMPLIANCE
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G103 ARCHITECTURAL CODE COMPLIANCE
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
SCALE: 3/32" = 1'-0"
SECOND FLOOR - CODE REVIEW PLAN
PLUMBING FIXTURE
REQUIREMENTS
MEN - REQUIRED
WOMEN - REQUIRED
MEN - PROVIDED
WOMEN - PROVIDED
NUMBER OF OCCUPANTS
MEN
WOMEN
WC LAV URINALS
TUB/
SHOWER
DRINKING FOUNTAINS
REQUIRED
PROVIDED
A-3
1 PER 125/65 1 PER 200 - - 1 PER 8
1 PER 500
2.04 1.28
3.92 1.28
1.02
ACC_ROOM SCHEDULE - 1ST & 2ND LEVELS
ROOM NO ROOM NAME FUNCTION OF SPACE CALC (SQF/OCC) OCCUPANT LOAD
AREA / OCC
FIRST FLOOR
101 WELCOME LOBBY ASSEMBLY EXHIBIT GALLERY & MUSEUM 1365 SF / 30 NET SF 46
103 EXHIBIT SPACE ASSEMBLY EXHIBIT GALLERY & MUSEUM 2380 SF / 30 NET SF 79
104 RETAIL SPACE MERCANTILE 868 SF / 60 SF 14
105 FIRE PROTECTION ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
203 SF / 300 SF 1
106 ELECTRICAL ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
87 SF / 300 SF 0
107 STOR. ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
87 SF / 300 SF 0
108 OPEN OFFICE BUSINESS AREAS 715 SF / 100 NET SF 7
109 OFFICE BUSINESS AREAS 125 SF / 100 NET SF 1
110 OFFICE BUSINESS AREAS 132 SF / 100 NET SF 1
111 STORAGE. BUSINESS AREAS 107 SF / 100 NET SF 1
112 CONFERENCE
ROOM / LIBRARY
BUSINESS AREAS 274 SF / 100 NET SF 3
112 KITCHENETTE. BUSINESS AREAS 100 SF / 100 NET SF 1
113 STORAGE. ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
112 SF / 300 SF 0
114 JAN. ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
16 SF / 300 SF 0
115 STORAGE ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
20 SF / 300 SF 0
116 SERV. ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
42 SF / 300 SF 0
121 MULTIPURPOSE
ROOM
ASSEMBLY WITHOUT FIXED SEATS
CONCENTRATED (CHAIRS ONLY - NOT FIXED)
911 SF / 7 NET SF 130
122 STORAGE. ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
148 SF / 300 SF 0
FIRST FLOOR: 18 286
SECOND FLOOR
201 NPS KITCHENETTE BUSINESS AREAS 230 SF / 100 NET SF 2
202 STORAGE ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
124 SF / 300 SF 0
204 JANITOR ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
119 SF / 300 SF 0
205 KITCHENETTE BUSINESS AREAS 117 SF / 100 NET SF 1
207 PRIVATE COLLAB ASSEMBLY WITHOUT FIXED SEATS
UNCONCENTRATED (TABLES AND CHAIRS)
205 SF / 15 NET SF 14
208 DISPLAY ASSEMBLY WITHOUT FIXED SEATS
UNCONCENTRATED (TABLES AND CHAIRS)
3558 SF / 15 NET SF 237
209 PARTNER EXEC
OFFICE
BUSINESS AREAS 240 SF / 100 NET SF 2
210 OPEN COLLAB BUSINESS AREAS 415 SF / 100 NET SF 4
211 PARTNER OFFICE BUSINESS AREAS 756 SF / 100 NET SF 8
217 NPS OFFICES BUSINESS AREAS 857 SF / 100 NET SF 9
218 OPEN NPS COLLAB BUSINESS AREAS 148 SF / 100 NET SF 1
219 ASST SUPT BUSINESS AREAS 156 SF / 100 NET SF 2
220 SUPT BUSINESS AREAS 235 SF / 100 NET SF 2
221 ELEC 37 SF / 20 2
SECOND FLOOR: 14 285
TOTALS:: 32 571
SCALE: 3/32" = 1'-0"
THIRD FLOOR - CODE REVIEW PLAN
ACC_ROOM SCHEDULE - 3RD LEVEL
ROOM NO ROOM NAME FUNCTION OF SPACE CALC (SQF/OCC) OCCUPANT LOAD
AREA / OCC
THIRD FLOOR
302 NPS STORAGE BUSINESS AREAS 134 SF / 100 NET SF 1
303 NPS STORAGE BUSINESS AREAS 310 SF / 100 NET SF 3
310 NPS STORAGE BUSINESS AREAS 1366 SF / 100 NET SF 14
311 LEASE AREA
POTENTIAL
BUSINESS AREAS 1920 SF / 100 NET SF 19
313 JAN ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
33 SF / 300 SF 0
315 LEASE AREA
POTENTIAL
BUSINESS AREAS 1571 SF / 100 NET SF 16
317 NPS STORAGE BUSINESS AREAS 1387 SF / 100 NET SF 14
319 MECH ACCESSORY STORAGE AREAS, MECHANICAL,
EQUIPMENT ROOM
36 SF / 300 SF 0
THIRD FLOOR: 8 67
TOTALS:: 8 67
PLUMBING FIXTURE
REQUIREMENTS
MEN - REQUIRED
WOMEN - REQUIRED
MEN - PROVIDED
WOMEN - PROVIDED
NUMBER OF OCCUPANTS
MEN
WOMEN
WC LAV URINALS
TUB/
SHOWER
DRINKING FOUNTAINS
REQUIRED
PROVIDED
B
1 PER 25 1 PER 40 - - NA
1 PER 100
2.64 1.65
2.64 1.65
1.31
PLUMBING FIXTURE
REQUIREMENTS
MEN - REQUIRED
WOMEN - REQUIRED
MEN - PROVIDED
WOMEN - PROVIDED
NUMBER OF OCCUPANTS
MEN
WOMEN
WC LAV URINALS
TUB/
SHOWER
DRINKING FOUNTAINS
REQUIRED
PROVIDED
TOTAL
-- -- - - NA
4.68 2.93 0 NA
5 6 2 NA
6.56 2.93 NA
8 7 NA
2.33
NORTH
DATE INITIAL
SHANE L. ' %
;I 0 l
SEE NOTE
404.2.4.1
SEE NOTE
603.2.3
SEE NOTE
404.2.4.1
A B C D E F
B.4 D.6
3'-4"
EXISTING
CONDITION
SEE NOTE
603.2.3
5'-8 1/4"
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
SLL
Checker
08/13/2025
009258.009
G104
ACCESSIBILITY BUILDING PLANS -
2ND & 3RD LEVELS
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 0- G104 ACCESSIBILITY BUILDING PLANS - 2ND & 3RD LEVELS
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
SCALE: 3/32" = 1'-0"
SECOND FLOOR - ACCESSIBILITY PLAN
SCALE: 3/32" = 1'-0"
THIRD FLOOR - ACCESSIBILITY PLAN
SUPPLEMENTAL 2017 ABASS NOTES
CHAPTER 4
404.2.4.1 SWINGING DOORS
PUSH SIDE DOORS ARE NOT REQUIRED TO HAVE 12" FROM PUSH SIDE IF THEY ARE NOT PROVIDED WITH CLOSER AND
LATCH. FIGURE 404.2.4.1.
CHAPTER 6
603.2.3 DOOR SWING
DOORS SHALL NOT SWING INTO THE CLEAR FLOOR SPACE OR CLEARANCE REQUIRED FOR ANY FIXTURE. DOORS
SHALL BE PERMITTED TO SWING INTO THE REQUIRED TURNING SPACE.
EXCEPTIONS 2: WHERE THE TOILET ROOM OR BATHING ROOM IS FOR INDIVIDUAL USE AND A CLEAR FLOOR SPACE
COMPLYING WITH 305.3 IS PROVIDED WITHIN THE ARC OF THE DOOR SWING, DOORS SHALL BE PERMITTED TO SWING
INTO THE CLEAR FLOOR SPACE OR CLEARANCE REQUIRED FOR ANY FIXTURE.
NORTH
DATE INITIAL
SHANE L. ' %
;I 0 l
N2
S
F E
C
FIRE
PROTECTION
ELECTRICAL
STOR.
OPEN OFFICE
OFFICE OFFICE
STORAGE.
CONFERENCE
ROOM /
LIBRARY
STORAGE.
KITCHENETTE.
STORAGESERV.
TOILET ROOM
JAN.
TOILET ROOMTOILET ROOM
STORAGE.
MULTIPURPOSE
ROOM
RETAIL SPACE
VESTBULE
STAIRS-S
STAIRS-N
EXHIBIT SPACE
WELCOME
LOBBY
ENTRY
ELEVATOR
D1D2
D12
D2
D17D17
D11
D21
D21
A B C D E F
D2
D3D3
D2
D4
D4
D1
D5
D9
/4
" D2
/4
/2
D5
D15
D3
D8
D16
/4
/4
D19
/4
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
SLL
SLL
08/13/2025
009258.009
A001
DEMOLITION PLAN - 1ST & 2ND
FLOOR
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 2- A001 DEMOLITION PLAN - 1ST & 2ND FLOOR
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - DEMOLITION
SCALE: 1/8" = 1'-0"
SECOND FLOOR - DEMOLITION
NORTH
ARCHITECTURAL DEMO NOTES
D1 REMOVE DOOR AND FRAME
D2 REMOVE EXISTING WALL/CMU INFILL. COORDINATE ROUGH OPENING WITH ELEVATOR REQUIREMENTS. SEE STRUCTURE FOR
HEADER DETAILS. SEE STRUCTURE FOR HEADER DETAILS
D3 BRICK TO BE CAREFULLY DEMOLISHED, GATHERED, CLEANED AND STORE FOR RE-USE. SALVAGE ENOUGH FOR RE-USE IN THIS
PROJECT. SEE STRUCTURE FOR HEADER DETAILS. REMOVE MASONRY 3" BELOW TOP OF CONCRETE FLOOR LEVEL.
D4 REMOVE STEEL THRESHOLD & MISC WOOD OR MASONRY. SUPPORT LINTEL/PLATE TO REMAIN
D5 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN
D8 REMOVE CABLE AND PLATES. INFILL OPENINGS WITH MORTAR. SEE IMAGES ON SHEET A503
D9 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN. REMOVE MASONRY 3" BELOW TOP OF CONCRETE
FLOOR LEVEL
D11 DEMO CONCRETE SLAB TO ACCESS SANITARY LINES. SEE PLUMBING TO COORDINATE. INFILL WITH NEW CONCRETE AFTER
PLUMBING CONNECTION
D12 RELOCATE SUMP PUMP. SEE PLUMBING. FILL IN EXISTING SUMP PIT WITH CONCRETE
D15 RELOCATE AUTOMATED EXTERNAL DEFIBRILLATOR CABINET
D16 RELOCATE FIRE EXTINGUISHER CABINET
D17 ELEVATOR WORK AREA. PROVIDE TEMPORARY WALL AND ACCESS DOOR
D19 REMOVE CMU. SEE STRUCTURE FOR HEADER DETAILS. REMOVE CMU 3" BELOW TOP OF CONCRETE FLOOR LEVEL.
D21 PARTIAL DEMO OF GWB CEILINGS. SEE PLUMBING TO COORDINATE
DATE INITIAL
SHANE L. ' %
;I 0 l
F
C
F
C
F
5.6
B.4 D.6
S T
R U
C T
U R
E A
B O
V E
E X
IS
T
IN
G
S T
E E
L M
E Z
A A
N
IN
E
D7
D6
D8
D9 D9
D4
D3
D8
D15
D9
/4
/4
/4
D3
D5
D4
D3
A B C D E F
5.6
B.4 D.6
D2D2
S T
R U
C T
U R
E A
B O
V E
T O
R E
M A
IN
E X
IS
T
IN
G
S T
E E
L M
E Z
Z A
N
IN
E
D7
D8
D14
3'-9"
/2
D20
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.com
FINAL CONSTRUCTION DOCUMENTS - 08/13/2025
C U s e rs \j b lo o m
\D o c u m e n ts
\R e v it te m p \0
-A
R C
H
R jb lo o m s c h e m m e r.
c o m .r v t
JMB
JMB
SLL
08/13/2025
009258.009
A002
DEMOLITION PLAN - 3RD FLOOR
PULLMAN NATIONAL MONUMENT ADIMINISTRATION CLOCK TOWER
BUILDING 2ND & 3RD FLOOR RENOVATION
009258009- 2- A002 DEMOLITION PLAN - 3RD FLOOR
11057 SOUTH COTTAGE GROVE AVENUE
CHICAGO, ILLINOIS 60628
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800
80000
307087
SCALE: 1/8" = 1'-0"
THIRD FLOOR - DEMOLITION - OPTION #5
ARCHITECTURAL DEMO NOTES
D2 REMOVE EXISTING WALL/CMU INFILL. COORDINATE ROUGH OPENING WITH ELEVATOR REQUIREMENTS. SEE STRUCTURE FOR HEADER
DETAILS. SEE STRUCTURE FOR HEADER DETAILS
D3 BRICK TO BE CAREFULLY DEMOLISHED, GATHERED, CLEANED AND STORE FOR RE-USE. SALVAGE ENOUGH FOR RE-USE IN THIS
PROJECT. SEE STRUCTURE FOR HEADER DETAILS. REMOVE MASONRY 3" BELOW TOP OF CONCRETE FLOOR LEVEL.
D4 REMOVE STEEL THRESHOLD & MISC WOOD OR MASONRY. SUPPORT LINTEL/PLATE TO REMAIN
D5 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN
D6 REMOVE MEZZANINE BEAMS AND FLOOR ASSEMBLY. FILL BEAM POCKETS WITH MORTAR
D7 REMOVE SPIRAL STAIR ASSEMBLY TO MEZZANINE
D8 REMOVE CABLE AND PLATES. INFILL OPENINGS WITH MORTAR. SEE IMAGES ON SHEET A503
D9 REMOVE MISC WOOD INFILL OR BLOCKING. SUPPORT LINTEL/PLATE TO REMAIN. REMOVE MASONRY 3" BELOW TOP OF CONCRETE
FLOOR LEVEL
D14 DEMO CONCRETE FLOOR SLAB FOR MECHANICAL CHASE. SEE STRUCTURAL
D15 RELOCATE AUTOMATED EXTERNAL DEFIBRILLATOR CABINET
D20 PARTIAL MEZZANINE REMOVAL. COORDINATE WITH SHAFT LOCATION NORTH
SCALE: 1/8" = 1'-0"
THIRD FLOOR - DEMOLITION
DATE INITIAL
SHANE L. ' %
;I 0 l
TA-3TA-3
TA-2TA-2
TA-1TA-1
TA-10 TA-50
TA-6
TA-21
TA-61
TA-42
TA-63
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" TYPE X GWB
EACH SIDE
3 5/8" METAL STUD (20 GA) AT
16" O.C.
WALL BASE, SEE FINISH
SCHEDULE
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
SOUND BATT (TYPE A1 ONLY)
SEALANT, TYP.
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" GWB EACH SIDE
3 5/8" METAL STUD (20 GA) AT
16" O.C.
WALL BASE
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
SOUND BATT (TYPE A3 ONLY)
SEALANT, TYP.
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" GWB
3 5/8" METAL STUD (20 GA) AT 16"
O.C. SHIM STUDS FROM EXISTING
MASONRY MIN. 1/4" (6" METAL
STUD 20 GA @ TYPE F3)
WALL BASE
SEALANT, TYP.
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
EXISTING MASONRY WALL
SPRAYED INSULATION @ FULL
DEPTH OF STUD CAVITY (TYPE
F2 ONLY)
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
NOTE: RETURN GWB AT SILLS, JAMBS,
AND HEAD CONDITIONS. MATCH
EXISTING WINDOWS
FINISH FLOOR
EXISTING STRUCTURE
EXISTING MASONRY WALL
1 LAYER 5/8" TYPE 'X' GWB
1 5/8" METAL STUD (20 GA) AT
16" O.C. SHIM STUDS FROM
EXISTING MASONRY MIN. 1/4"
WALL BASE
SEALANT, TYP.
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
16" - 18"
M
IN
T .O
B
A R
/2
M
IN
18" 24" MINALLOWABLE AREA FOR
ACCESSORY
INSTALLATION
42"
MAX
12"
39" - 41"
17" - 19" TO TOP OF SEAT
@ ACCESSIBLE
18" MIN
UNOBSTRUCTED
REACH
M
IN
36" MIN
MIN
12" 24" MIN
1 1/2" MIN FROM
BOTTOM OF GRAB
BAR
3'-6" MAX
CONTINUOUS
BLOCKING IN WALLS
CONTINUOUS
BLOCKING IN WALLS
48" MAX TO TOP OF OPERABLE
PARTS
34" MAX TO TOP OF WORK
SURFACE
CONTINUOUS
BLOCKING IN WALLS
48" MAX TO TOP OF OPERABLE
PARTS
AED FEC FEB
K N
E E
S P
A C
E
M
IN
REQUIRED KNEE &
TOE SPACE
BASE
MIN
15"
M A
X
40" TO BOTTOM OF
REFLECTIVE
SURFACE
8" MIN 4
48" TO TOP OF OPERABLE
PARTS
MIRRORED SURFACE (TA-30)
VANITY SINK WALL-
HUNG
FRONT SINK VENT
PIPE
11" MIN
6" MAX
UNDERSIDE PIPE
INSULATION
M
IN
ELECTRICAL OUTLET FOR
FAUCET. SEE ELECTRICAL
48" MAX TO TOP OF OPERABLE PARTS OR
CENTER OF OPENINGS
TA-62
38" - 43"
SPOUT HEIGHT
36" MAX HEIGHT @
ACCESSIBLE
REQUIRED KNEE
& TOE SPACE
17" - 19"
K N
E E
S P
A C
E
M
IN
8" MIN
6" MAX
11" MIN
M
IN
BOTTLE FILLER.
SEE PLUMBING
48" MAX TO TOP OF OPERABLE
PARTS
AREA OF
REFUGE
M
IN
M A
X
18" CLR @ SIGN
DOOR SIGNAGE
M
IN
/2
M
IN
C
M
IN
M A
X
M
IN
DOORS ELEVATOR SIGNALS, CALL BUTTONS, & CAR
IDENTIFICATION
FLOOR MAXIMUM
OCCUPANCY
BRAILLE
S6
DISPLAY ROOM
MAXIMUM OCCUPANCY
BRAILLE
S7
9"
9"
FINISH FLOOR
8"X8"X16" CMU. SEE
STRUCTURAL
NOTE: BEARING/NONBEARING WALL RATING - 2HR.
UL DESIGN NO. U905
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" TYPE X GWB
EACH SIDE
6" STEEL C-T STUDS (18 GA)
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
SOUND BATT
SEALANT, TYP.
NOTE: UL DESIGN U417 - 1 HR
1 LAYER 1"X24" TYPE X GWB
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" TYPE X GWB
EACH SIDE
6" METAL STUD (18 GA) AT 16"
O.C.
WALL BASE, SEE FINISH
SCHEDULE
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
SOUND BATT
SEALANT, TYP.
NOTE: UL DESIGN W415 - 1 HR
REQUIRED WHERE INDICATED ON
CODE SHEET
FINISH FLOOR
EXISTING STRUCTURE
1 LAYER 5/8" GWB EACH SIDE
3 5/8" METAL STUD (20 GA) AT
24" O.C. EVENLY STAGGER
TWO ROWS OF STUDS. NO
BRIDGING OF STUDS
WALL BASE. SEE FINISH
SCHEDULE
ANCHOR TOP RUNNER
DEFLECTION TRACK TO
EXISTING STRUCTURAL SLAB
ABOVE CEILING FRAMING
SYSTEM
FASTEN TOP AND BOTTOM
RUNNERS 24" O.C. AND
WITHIN 2" OF ENDS
SOUND BATT
SEALANT, TYP.
NOTE: PER SOUND TEST USG-160901
THE STC RAING IS 54
1"
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .