B08_Section_J__Attachment_2_Answers_to_FY2022_Site_Visit_Questions___Requests_for_Information.pdf
PDF 124 KB Posted
- Attached to
- QUARTZVILLE CULVERT REPLACEMENT AND ROAD REPAIR
- Solicitation number
- 140L4323R0013
About this file
This document contains answers to questions posed during a site visit for a federal contract to replace culverts and repair roads on Quartzville Creek Road in Linn County, Oregon. The solicitation was issued by the Bureau of Land Management Oregon-Washington under solicitation number 140L4323R0013.
The site visit questions and answers provide clarification on contract requirements such as start dates, traffic control plans, material specifications, survey responsibilities, waste disposal locations, borrow sites and culvert construction details. Temporary road closures will be required during culvert replacements 2 and 3, with designated detour routes. The contractor must maintain two-way traffic on the road except during specified closures. Pricing will be based on unit prices for items such as asphalt, aggregate and erosion control that exceed the estimated quantities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUARTZVILLE CULVERT REPLACEMENT AND ROAD REPAIR MATOC Task Order RFP No. HMATOC-2022-0022
LINN COUNTY, OR
BLM NORTHWEST OREGON DISTRICT Page 1 of 8
Requests for Information
09/01/2022
Contractor Questions (Q#) Posed During Site Visit on 08/23/2022 with Government
Answers (A#):
Q1: What is the start date for the project?
A1: Per Section F, FAR 52.211-10, “The Contractor shall be required to (a) commence work under this contract within thirty (30) calendar days after the date the Contractor receives the notice to proceed…”
Q2: Are their danger trees associated with this contract? Will BLM be cutting any of the trees identified in the plans?
A2: BLM has plans to remove the hazard tree; however, if BLM is not able to remove the tree before work is being performed, the contractor may remove the tree if they feel unsafe to perform work under it. See sheet 6 for reference to this location.
Q3: Does Quartzville Rd have to stay open during construction?
A3: Yes, aside from sheet 14 and sheet 15 where sections of Quartzville Rd will be closed during the construction of culvert 2 and culvert 3 with the bypass roads remaining open, Quartzville Rd will have to stay open during construction.
Q4: Is there a bid item for flagging or traffic control?
A4: Per special contract requirement 635.25 “Temporary Traffic Control shall be considered incidental to Sections 203, 204, 208, 301, 403, 602, 617, 618, and 634; no additional payment will be made.”
Q5: Do fog lines start getting painted at MP 12?
A5: Fog lines start at the start of the project, at MP 11.95. See sheet 3 for reference.
Q6: Is there sections of guardrail that are new or is it all being replaced?
A6: Yes, there are new sections of guardrail that are being installed along with sections that are being replaced. See sheet 4 for reference to these locations.
Q7: Is the type of K-rail style spelled out in the specs (20’ vs 10’)?
A7: Per special contract requirement 618.04 “Provide new precast K-Rail barriers comparative to
ODOT Std Dwg RD500/501, 12’-6” Length.”
BLM NORTHWEST OREGON DISTRICT Page 2 of 8
Q8: For the bypass road, is there another landowner aside from the BLM to coordinate with?
A8: The bypass road for culvert 2 is on BLM land and needs to be constructed prior to the removal of culvert 2. The bypass road at culvert 3 on sheets 11 and 15 is existing and runs through a Linn County Campground. Limited time is available to close the campground and use as a bypass road. Contractor shall coordinate with the COR when the construction can take place and the COR will request the park closure with Linn County. Closure will occur in the second summer of the contract but needs to be arranged immediately to avoid conflicts with camp reservations.
Q9: Culvert 3, is there an agreement to use Linn County Campground traffic lanes as a bypass road? Including installing speed bumps?
A9: Upon discussion with Linn County, currently they do not wish to have the campground open during construction. Due to this, speed bumps and signs within the campground would be minimal. Linn County wants to limit the campground closure as much as possible. See answer to question 8.
Q10: Is the bypass road for culvert 2 different than culvert 3?
A10: Yes, the bypass road for culvert 2 will need to be constructed and is part of the work that is required to be completed with culvert 2. The bypass road for culvert 3 is existing and runs through a Linn County Campground.
Q11: Can we close Quartzville Rd at Culvert 3 while construction is taking place for the culvert?
A11: Per the temporary traffic control plan on sheet 15, Quartzville Rd is to be closed during the construction of culvert 3 with traffic being diverted onto the bypass road. Please see previous answers to this question.
Q12: For the speed bumps, are speed bump ahead signs required?
A12: Appropriate traffic control signage is required per the MUTCD. Please refer to sheet 15 of the project plans for specific traffic control through this area.
Q13: At MP 14.3 heave in road, does the contractor have to maintain two-way traffic or are flaggers required?
A13: The contractor is required to maintain 2-way traffic, one travel lane must always remain open with appropriate traffic control in place to accommodate 2-way traffic. Traffic may be placed on finish rock grade, however a ramp between the existing asphalt and the rocked lane must be kept and maintained by the contractor. Any damage to asphalt outside the excavation limits is to be removed and replaced at the Contractors expense.
BLM NORTHWEST OREGON DISTRICT Page 3 of 8
Q14: Are signs allowed stating one-way traffic? Are rock/ACP ramps allowed onto finished rock grade for traffic?
A14: See answer to question 13.
Q15: Is FP-14 being used for this project.
A15: Yes, FP-14 specifications are being used for this project.
Q16: At MP 14.3, what detail is referenced for the heave repair?
A16: See sheet 16, Full Width Slump Repair Typical Section for reference to treatment for heave repair.
Q17: Can the contractor fill all road repairs with 1 ½ - 0” aggregate instead of what is prescribed in details on sheet 16.
A17: The Contractor is to fill road repairs per designated details in the plans. Any deviation from typical sections will need to be approved by the COR.
Q18: At MP 15.3, is there a 3” overlay on partial slump repair? Says pave patches, not removing entire width.
A18: At this location, the partial slump section will need to be removed and replaced per partial width slump repair detail on sheet 16. The overlay for this section will then be performed once the slump section has been fully repaired and repaved.
Q19: At the slump repair at MP 15.3, can the contractor saw cut per detail, then overlay entire site?
A19: Please see answer to question 18.
Q20: Is overnight flagging allowed? Can traffic be put on finish rock grade? Can single lane be closed overnight?
A20: Traffic may be placed on finish rock grade, a ramp between the existing asphalt and the rocked lane must be kept and maintained by the contractor. Any damage to asphalt outside the excavation limits is to be removed and replaced at the Contractors expense. See answer to
Question 13.
Q21: Will the contractor be paid per ton on the asphalt? What happens if the contractor goes over quantity on bid items?
A21: The contractor is to be paid for asphalt on items as indicated in the special contract requirements. However, for items the contractor is paid per ton on asphalt, the contractor is to
BLM NORTHWEST OREGON DISTRICT Page 4 of 8 stick to the design quantity, only to exceed it under extenuating circumstances. When the contractor is approaching the design quantity indicated, the contractor is to speak with the COR for approval prior to exceeding the designed quantity.
Q22: Is the contractor paid per unit price on any contract item where quantities exceed contract quantity?
A22: For sections where the quantities for a bid item exceed the contract quantity, contract clause 52.211-18 will apply.
Q23: Is erosion control fencing needed? What sites require erosion control?
A23: Erosion control fencing will be required depending on the weather and erosion control will need to be in place to control the water quality of Quartzville creek and other waterways. Per special contract requirement 157.10 (a) “The contractor shall submit an Erosion Control Plan for approval...” and 157.10 (b) “The contractor shall submit a Dewatering Plan for approval…”.
Q24: Is asphalt included in the lump sum bid items for slump repair?
A24: Yes, per special contract requirement 418.09 “Supply and application of asphalt concrete pavement shall be considered incidental to sections 204, 208, 403, and 602; no additional payment will be made”.
Q25: Can all asphalt be moved to being paid by the ton?
A25: Asphalt is to be paid as indicated in the special contract requirements sections 403 and 418.
Q26: What is the legal time frame for holding traffic?
A26: The maximum time traffic is allowed to be held on Quartzville Rd is 20 minutes with priority being given to commercial vehicles.
Q27: Is there active logging planned during construction?
A27: The BLM and FS does not have active logging planned during the period of performance for this project. However, private industry may have logging taking place during the period of performance for the project.
Q28: Has there been any bores performed within the project limits? Is the asphalt thickness known on slump repairs?
A28: There have not been any bores performed within the project limits. The existing thickness of the asphalt on slump repairs is unknown.
Q29: Is the contractor responsible for surveying? Is it a pay item?
BLM NORTHWEST OREGON DISTRICT Page 5 of 8
A29: There are current BLM survey control points in place at each of the culvert locations. Per special contract requirement 152.06 “Contractor Construction Surveying and Staking is considered incidental to Pay Items under Sections 107, 203, 204, 208, 251, 301, 403, 602, 614, 617, 618, and 634, no additional payment will be made.
Q30: Will the locations listed on the plan sheets be staked prior to start of construction?
A30: Locations listed on the plan sheets will be staked by the COR prior to the start of construction. After the start of the project, it will be the contractor’s responsibility to maintain these stakes for reference to these locations.
Q31: What all can be placed in designated waste areas in the plans?
A31: Natural material including organics is allowed to be placed in designated waste areas in the plans. No petroleum-based material is allowed to be placed in waste areas and must be removed from the site and properly disposed of.
Q32: Can boulders at MP 16.4 be used for riprap? Do they belong to BLM recreation or road maintenance?
A32: As indicated in the plans, boulders at certain locations are allowed to be used as riprap for this project. See sheets 4 and 5 for reference to these locations.
Q33: At MP 16.85, what are the limits on rock removal? Is it where the asphalt is damaged?
A33: The rock removal is in the vicinity above the damaged road, along with any obvious overhead hazards adjacent to this area.
Q34: At culvert 1, what is the total asphalt placement that is required here?
A34: The total asphalt placement at culvert 1 is unknown as the asphalt thickness at this location is not known. The expectation for placement of asphalt at this location is to match the thickness of the existing asphalt present.
Q35: For culverts 1 and 4, are there alternate roads that can be used to access sites further down them or can the roads be closed during construction?
A35: There are no alternate roads that can be used to access sites further down for culverts 1 and
4. Please refer to sheet 14 for temporary traffic control at each of these locations.
Q36: Are the trees removed at culvert 1 required to be decked?
BLM NORTHWEST OREGON DISTRICT Page 6 of 8
A36: Logs can be decked temporarily on site, out of excavation limits as necessary, to be scattered after. COR to help designate location for decking, intended to be in immediate vicinity of excavation limits.
Q37: Is BLM marking the trees for removal or is this the contractor’s responsibility?
A37: If the trees are within the excavation limits, it is the contractor’s responsibility for removing, decking, and scattering them.
Q38: Is there a waste area located near culvert 1?
A38: There is a waste area shown on sheet 5, at MP 0.2 on BLM Rd 11-4E-19.
Q39: Does the contractor have a designated borrow site for material needed to fill culverts?
A39: All borrow sites are for either riprap as designated in the project plans, or for structural fill as designated by the COR. No BLM stockpiled aggregate is allowed for use. It is expected that approximately 70% of the material excavated from each culvert will be acceptable fill material for the new culverts. Excavated material is to be inspected by the COR prior to being allowed for use as fill.
Q40: Where exactly are the borrow sites for riprap located?
A40: The borrow sites for riprap are shown on sheets 4 and 5 of the project plans. Please reference these sheets for locations.
Q41: How much area around culvert 4 is BLM land? What borrow material can be used for construction of this culvert?
A41: All the land in the immediate vicinity of culvert 4 is BLM land. For information on what borrow material can be used in the construction of this culvert, please refer to the answer to question 39.
Q42: Is there survey data for each site? Are there control points or benchmarks? If so, will they be marked prior to start of construction?
A42: There are control points currently set at each of the culvert locations, along with survey data available (see sheets 6, 11, and 12). These control points will be marked out by the COR prior to construction.
Q43: Does the BLM designate a decking site for logs?
A43: Logs can be decked temporarily on site, out of excavation limits as necessary, to be scattered after. COR to help designate location for decking, intended to be in immediate vicinity of excavation limits.
BLM NORTHWEST OREGON DISTRICT Page 7 of 8
Q44: Is there a waste area for stumps? Where can these be placed?
A44: Stumps are to be scattered when possible, including the root wad, evenly throughout the disturbed areas.
Q45: Do brush and limbs get scattered on slopes or get placed in a designated waste area?
A45: Brush and limbs are to be scattered evenly throughout disturbed, woodland areas.
Q46: At the bridge at MP 28, what is the size of the repair at this location?
A46: The size of the repair is to be 4’ long by the entire width of the roadway (approximately
25ft). Refer to treatment for previous bridge approach on sheet 3.
Q47: What is the asphalt thickness at the bridge repair locations?
A47: The paving thickness at bridge repair locations is to be 4” depth HMAC. Refer to bridge approach note on sheet 3.
Requests for information regarding this RFP submitted in writing no later than August 25, 2022, 12:00 p.m. Pacific Time:
Q48: Please consider changing the specification on the riprap, base rock & all concrete mixes to
ODOT specifications.
A48: Riprap and Aggregate Base Rock that meets the requirements of Oregon Department of
Transportation (ODOT) specifications is acceptable based on an acceptable material submittal and meeting the other requirements of the Special Contract Requirements. Delete requirements for Soundness using Sodium Sulfate AASHTO T-104 Test Method from the FP-14 specifications.
Concrete that meets the requirements of Oregon Department of Transportation (ODOT) specifications and is free of Fly Ash additive is acceptable based on an acceptable material submittal and meeting the other requirements of the Special Contract Requirements. Delete requirements for Alkali-Silica Reactivity ASTM C1260 requirement and addition of fly ash additive in concrete from the FP-14 specifications.
Q49: Task Order lists the project in Lane County. According to your location drawing sheet 1, the project is in Linn County. Cover letter error stating Lane County instead of Linn County
A49: This project is in Linn County.
Q50: Will the CO stake out location of new culverts prior to start of work?
BLM NORTHWEST OREGON DISTRICT Page 8 of 8
A50: The COR will stake out locations of new culverts prior to start of work. Refer to site visit question and answer #30.
Q51: Drawing 8 of 20, Drawing shows Rd # 11-4E-19, Notes refer to #11-3E-19 twice. No 11-
3E-19 shown, however a partially named -19.3 is shown. Please clarify.
A51: On Drawing 5 of 20, the Drawing shows Rd 11-4E-19 and the notes refer to 11-3E-19. This is a typo in the notes section. The Drawing is correct, and the notes should reference 11-4E-19.
This is also true for the note that refers to BLM Rd 11-3E-19, with MP 0.2 – Culvert 4 following
it. It should read BLM Rd 11-4E-19.3, with MP 0.2 – Culvert 4 following it.
Q52: Is bypass road paid for under Culvert 2?
A52: Yes, the bypass road is paid as part of special contract requirement pay item 208 (03).
Q53: Is bypass road at Culvert 3 existing?
A53: Yes, the bypass road at Culvert 3 is existing and runs through a Linn County Campground.
See answer to site visit question and answer #9.
Q54: Is the contractor to remove Bypass Road at Culvert 3 at as part of completion of this item?
A54: No, this bypass road is existing and runs through a Linn County Campground. It will remain following the construction of culvert 3. See note for MP 15.9 on sheet 4, along with site visit question and answer #9.
Q55: Will there be active logging during the construction period?
A55: See site visit question and answer #27.
Q56: Clarification is needed to identify the overhead hazard at MP 16.85. It is not apparent onsite.
A56: See site visit question and answer #33