QUALITY ASSURANCE SURVEILLANCE PLAN (QASP):

FY2021 FLORIDA EXOTICS IDIQ

CONTRACT NO.: TBD

CONTRACTOR: TBD

CONTRACTING OFFICER: Constance Fields

INSPECTOR(S): CORs, Field Project Inspectors (FPI), or Site Representatives (Site Rep) will be identified at task order (station) level

TASK

DESCRIPTION

WHAT

WHO

WHEN

WHERE

METHOD

Coincides with Task Number under Paragraph of the PWS.

Description as identified under appropriate Task Number.

Example: “mop floors”

Specify what you are inspecting, e.g., “floor cleanliness”
Specify who is conduct- ing the inspect- tion, e.g.,

“COR”

Specify when the inspection will be conducted, e.g., “daily before 8 a.m.”
Specify where the inspection will be conducted, e.g., “offices”
Specify how the inspection will be conducted, e.g., “direct observation; random room selection”
C.2 All E.2.5-6 F.3.1-2
Comply with work schedule except excusable delays
Contractor present for duration of project
COR, FPI, or Site Rep
Daily

Office and field Direct observation; COR logs and scheduled and unscheduled inspections

C.8.1-3
Work 40 hours per week
Contractor present daily at work location
COR, FPI, or Site Rep
Daily
Field
Direct observation; COR logs and scheduled and unscheduled inspections

C.2.3 – C.2.12 C.5.21E.2.2 – 16 F.2 – F.4

Comply with Performance Requirements and Work Standards
Project completed before end of Period of Performance (POP); Receipt of deliverables; Acceptance Criteria met
COR, FPI, or Site Rep
As needed throughout the POP after project begins

Office and field Direct observation; COR logs and scheduled and unscheduled inspections

C.2.3C.5.10 E.2.14 F.3.12 F.4.1-2
Treat 100% of delineated project area, 100% of all native invasive and non-native invasive plants identified in the PWS, and achieve a 95% stem kill rate four months post-treatment
Treatment and control of all identified invasive native and non-native plants within the delineated treatment area
COR, FPI, or Site Rep
When Contractor notifies COR for site inspection and when project has been completed

Field Direct observation; interim, Preliminary and Final inspections

C.5.10

F.3.19

Contractor shall re-treat (and be held liable for at their own expense) any areas or plants not responding to initial or follow up treatments
Contractor re-treatments until Acceptance Criteria met
COR, FPI, or Site Rep
As needed and at final inspection
Field
Direct observation; COR logs and scheduled and unscheduled inspections

C.5.21

E.2.6

F.2

F.3.7

Contractor will implement a Quality Assurance/Quality Control Surveillance Plan to meet all Work Requirements and Performance Standards
Contractor’s QA/QC plan; Contractor’s daily work performance in meeting Acceptance Criteria and Deliverables
Contractor
Daily
Office and field
Responsibility of Contractor to oversee their operations and advise the GR when job performance is unsatisfactory or crew issues arise

C.5.1.1

F.3.13

Maintain and ensure crew continuity for duration of project
Observing same crew and personnel
COR, FPI, or Site Rep
Daily, weekly, monthly
Field
Direct observation; COR logs and scheduled and unscheduled site inspections

C.5.11- C.5.11.5

F.3.9-10

F.3.15

All herbicides, adjuvants, and surfactants (HAS) approved for refuge specific usage via the FWS Pesticide Use Proposal System, and Contractor possesses all herbicide labels, SLNs and Safety Data Sheets
All HAS approved for each refuge specific project prior to project initiation
COR, FPI, or Site Rep
Once
Office and filed
Direct observation and notification; scheduled and unscheduled inspection of HAS during field operations

C.11.2 – 3

F.2

F.3.5

F.3.11

Avoidance of non-target damage to desirable native vegetation and wildlife; no damage to government property
Contractor treatments
COR, FPI, or Site Rep
Weekly, monthly, or as needed
Field
Scheduled and unscheduled site inspections during work performance

C.5.14E.2.7 F.3.6 F.3.16

Contractor provides current Accident and Safety and Spill Prevention Plans
Presence of hard copy of plan (s)
COR, FPI, or Site Rep
Once
Office or field
Direct observation
C.5.16
Contractor provides a current Decontamination Plan and implements crew, equipment, and site decontamination protocols
Presence of hard copy of plan (s); washing of equipment
COR, FPI, or Site Rep
Once
Office or field
Direct observation
C.5.15
All Contractor employees are ‘E-Verified’ registered U.S. citizens
Presence of documentation
COR, FPI, or Site Rep
As needed
Field
Occasional inspection
C.6.1 - 4
Contractor shall ensure the physical security of work locations including securing all Gov’t issued keys and key cards and returning upon project completion
Key or key card (s) in possession of authorized personnel only
COR, FPI, or Site Rep
As needed
Office or field
Occasional or random inspection; direct observation

C.5.9

C.5.14.1

F.3.6

Contractor ensures worker safety and provides appropriate PPE
Workers issued and using Contractor supplied PPE
COR, FPI, or Site Rep
Each inspection
Field
Direct observation

C.5.19 C.6.11

Contractor ensures safety of the public in a professional manner during all treatment operations
No incidents reported by station personnel, partner agencies or the public
COR, FPI, or Site Rep
Duration of POP
Office and field
Direct notification or observation; second or third party notification

C.5.13.1 -3 E.2.2 F.1 F.3.17 F.3.20F.3.21 F.4.1 - 3

Ensure submission of all deliverables
Universal Daily Progress Reports, track logs, and Comprehensive Project Summary Report
COR, FPI, or Site Rep
Daily, weekly, biweekly, monthly and upon task order completion
Office
Direct observation and notification

E.2.9 E.2.12 – E.2.14

F.1

Submission of final invoice for payment when Acceptance Criteria have been achieved
Invoice receipt
COR, FPI, or Site Rep
once
Office
Direct notification

· The QASP is not part of the Performance Work Statement (PWS) and is not part of the contract.

· The QASP:

-- is mandatory for performance-based services acquisitions -- is required by the FAR -- describes what will be inspected, who will do the inspection, when and where they will do it, and how they will do it -- is an internal document that describes HOW the Government will verify WHAT it is paying for -- is an inspection plan to determine if the contractor produced the results required by the PWS -- does not go to the contractor

· Prepare the QASP at the same time you’re preparing the SOW; however, the Government can either prepare the QASP or have the offerors submit a proposed QASP for the Government to consider in developing the Government’s plan.

· FAR does not specify format for QASP.

· Your inspections must focus on the contractor’s results, not its processes, unless the PWS specifies processes for some tasks.

· Determine if service is a PROJECT or an OPERATION.

· A PROJECT is one result to inspect, unless you inspect intermediate results, e.g., mopping floors, emptying wastebaskets.

· An OPERATION is continuous or repetitive performance. You must decide whether to inspect each instance of the performance of a task (which is called 100% inspection) or only some instances, e.g., providing maintenance services for Government-owned computer equipment. You may want to review validated customer complaints, unscheduled inspections, perform random sampling of some operations, and conduct 100% inspection on other operations.

· If using performance incentives, these incentives must correspond to specific performance standards in the QASP and must be capable of being measured objectively.