The provided document is a Contract Progress Report for a federal contract. The report indicates the contractor has satisfactorily completed the indicated percentage of the contract per the contract specifications. The contract information includes the project number, contract number, and completion date. The report lists the work elements, percentage of total, percentage completed this period, and cumulative percentage completed. The report is submitted by the contractor and reviewed by or for the Contracting Officer.

The related federal contract opportunity is for the installation of fabric shade structures and a playground at the TCBS (location not specified). The solicitation number is 140A2324R0082 and the requirement is being procured by the Department of the Interior, Bureau of Indian Affairs, Bureau of Indian Education.

View the file

Other files for this federal contract opportunity

Other files attached to INSTALL FABRIC SHADE STRUCTURES. TCBS, newest first.
File Type Posted
Copy_of_B08_Questions_and_Answers_Log_(1)_0001.xlsx XLSX spreadsheet
Sol_140A2324R0082_Amd_0001.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
A06_TCBS_Utility_Plan_NW_Campus.pdf PDF
Sol_140A2324R0082.pdf PDF
A06_TCBS_Ramada__Cantilever_Locations.pdf PDF
B08_Material_Approval_Submittal_BIE.pdf PDF
B03_WD_AZ20240016_01-19-2024.pdf PDF
A04_TCBS_Shade_Structures_Revised_SOW_3-6-2024_(002).docx DOCX document
B08_Progress_Schedule.pdf PDF
A06_Drawings_Sunshades_and_Playground.pdf PDF
B08_SF-24_Bid_Bond_Form.pdf PDF
B08_BIA_FEDERAL_HEALTH_AND_SAFETY_CODES.pdf PDF
SF-25_Performance_Bond_Form.pdf PDF
SF-25A_Payment_Bond_Form.pdf PDF
B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Interior, CONTRACT PROGRESS REPORT

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM: TO:

PROJECT NO. CONTRACT NO. COMPLETION DATE

LINE

NO.

WORK ELEMENT

% OF

TOTAL

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

FORM IA-C713

File details come from the government source that posted it. Updated .