B08_Material_Approval_Submittal_BIE.pdf
PDF 78 KB Posted
- Attached to
- INSTALL FABRIC SHADE STRUCTURES. TCBS Federal contract opportunity
- Solicitation number
- 140A2324R0082
About this file
This document is a Material Approval Submittal form (IA Form 3000) used by contractors to submit shop drawings, equipment data, manufacturer's literature, certificates, and material samples to the government for approval on a federal contract.
The key details are: This form is to be used by contractors to submit materials for approval in accordance with the contract provisions. Items to be approved must be clearly identified and supporting documentation attached. Submissions must be numbered consecutively by contract. Resubmissions must include the previous submission number. This submittal is not valid without the contracting officer's approval signature, as required by the contract terms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_B08_Questions_and_Answers_Log_(1)_0001.xlsx | XLSX spreadsheet | |
| Sol_140A2324R0082_Amd_0001.pdf | ||
| B03_WD_AZ20240016_01-19-2024.pdf | ||
| A04_TCBS_Shade_Structures_Revised_SOW_3-6-2024_(002).docx | DOCX document | |
| Sol_140A2324R0082.pdf | ||
| B08_Progress_Report.pdf | ||
| A06_TCBS_Ramada__Cantilever_Locations.pdf | ||
| B08_Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| A06_TCBS_Utility_Plan_NW_Campus.pdf | ||
| B08_Progress_Schedule.pdf | ||
| A06_Drawings_Sunshades_and_Playground.pdf | ||
| B08_SF-24_Bid_Bond_Form.pdf | ||
| B08_BIA_FEDERAL_HEALTH_AND_SAFETY_CODES.pdf | ||
| SF-25_Performance_Bond_Form.pdf | ||
| SF-25A_Payment_Bond_Form.pdf | ||
| B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IA FORM 3000 V2
PREVIOUS EDITION IS OBSOLETE.
Department of the Interior, Indian Revised on Aug 11, 2021
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
TO: (Project Engineer or Contracting Officer Representative) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION/
PARA NO./DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., etc)
AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Project Engineer or Contracting Officer Representative)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE
REVERSE
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3.Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4.Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5.This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
IA FORM 3000 V2