This price schedule sheet outlines costs for replacing the metal roof on the Tremont Kitchen and Dining Hall at Great Smoky Mountains National Park. It includes line items for mobilization, R-Panel metal roofing totaling 9,315 square feet, R-Panel insulation for the same area, 392 square feet of gable trim, associated roofing materials, 392 linear feet of guttering and downspouts, caulks and sealants, demolition and debris removal, equipment rental for aerial lifts, a generator and welding, labor, profit, and contingency. It also includes additional costs for design contingency at 10%, standard general conditions at 8%, overhead at 10%, and profit at 10%. The total estimated cost is not provided.

The related federal contract opportunity is solicitation number 140P5323R0051 from the National Park Service Southeast Region within the Department of the Interior to replace the metal roof on the Tremont Kitchen and Dining Hall at Great Smoky Mountains National Park.

View the file

Other files

File Type Posted
B09_vendor_question_(All)_0002.docx DOCX document
Sol_140P5323R0051_Amd_0002.pdf PDF
B09_vendor_question_0001.docx DOCX document
Sol_140P5323R0051_Amd_0001.pdf PDF
A04_Tremont_Roof_321413_SOW_RCR.pdf PDF
Construction_Contract_Administration.docx DOCX document
Sol_140P5323R0051.pdf PDF
B08_Solicitation_140P5323R0051_Site_Photos.pdf PDF
B03_DOL_Davis_Bacon_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

GREAT SMOKY MOUNTAINS NATIONAL PARK

PMIS No. 321413 Replace Metal Roof on Tremont Kitchen & Dining Hall DATE:

ITEM DESCRIPTION EST. UNIT TOTAL

QTY UNIT PRICE PRICE

A. TREMONT WATER TANK

1 Mobilization 1 EA

2 R-Panel metal roofing 9,315 Sq Ft

3 R-Panel Insulation 9,315 Sq Ft

4 Gable trim 392 Sq Ft

Associated roofing materials (fasteners, roof boots, flashing, d-rings etc.)

1 EA

6 Guttering and downspouts 392 Ln Ft

7 Caulks and sealants 1 EA

8 Demo, debris removal 1 EA

9 Equipment rental (aerial lifts, generator, welding) 1 EA

10 Labor 1 EA

11 Profit 1 EA

12 Contingency 1 EA

Sub-Total =

ADDITIONAL COSTS

1 Design Contingency 1 EA 10% -$

2 Standard General Conditions 1 EA 8% -$

3 Overhead 1 EA 10% -$

4 Profit 1 EA 10% $0.00

Sub-Total = -$

Total = -$