B08_Price_Schedule_ROCR_HVAC_Services.xls
XLS spreadsheet 33 KB Posted
- Solicitation number
- 140P1326Q0032
About this file
This is a Price Schedule for HVAC maintenance and repair services at Rock Creek Park facilities under solicitation 140P1326Q0032 issued by the Department of the Interior National Park Service Intermountain Region. The contract consists of two CLINs: CLIN 00010 covers yearly HVAC maintenance pricing across 24 specified park sites including CABA, Grove locations, Pierce Barn facilities, Edgewater Stables, the Nature Center, and other designated structures; CLIN 00020 establishes labor rates for repair and emergency work across multiple trade categories including HVAC Technicians, Plumbers/Pipefitters, Electricians, Boiler Technicians, Sheet-Metal Workers, and Laborers, with separate regular time and emergency rate structures for each classification.
The pricing template is structured for a base year plus four option years (OY1-OY4) with an additional six-month task order extension period. The contractor bears responsibility for all formulas and calculations within the spreadsheet and must ensure all HVAC equipment across all sites is accounted for in pricing; contractors may add equipment or systems to individual site tabs as needed with appropriate highlighting. All pricing fields currently show $0.00, indicating this is an unfilled template awaiting contractor submission. The summary sheet aggregates total pricing across both CLINs and all contract periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1326Q0032_Amd_0002.pdf | ||
| B09_A2_SCA_DOL_WD_2015-4281_rev_39-8_22_2026_0002.pdf | ||
| Sol_140P1326Q0032_Amd_0001.pdf | ||
| B08_PWS_ROCR_HVAC_Maintenance_8_19_26.docx | DOCX document | |
| A08_Equipement_list.xlsx | XLSX spreadsheet | |
| B08_Limitation_on_Subcontracting_Percentage_Worksheet_v1_2.docx | DOCX document | |
| Sol_140P1326Q0032.pdf | ||
| B08_SCA_DOL_WD_2015-4281_rev_38_7_30_2026.pdf | ||
| B08_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Sheet
| PRICE SCHEDULE - Contractor responsible for any formulas used in sheet. Each site will have all HVAC equipment maintained under this contract, it is the contractors responsibility to ensure that all pieces are accounted for when providing pricing. Some systems may be missing from the indifividual tabs, contractor can add equipment or systems to tabs as needed (highligh any equipment or systems added) | |||||||
| CLIN 00010: Pricing for the HVAC yearly maintenance as outlined in the PWS. | |||||||
| Base Line Item | Sites | Base | OY1 | OY2 | OY3 | OY4 | 6 Month Task Order Extension |
| 00010 | CABA | ||||||
| 00020 | Grove 24 | ||||||
| 00030 | D3 | ||||||
| 00040 | Pierce Barn Comfort Station | ||||||
| 00050 | Pierce Barn | ||||||
| 00060 | Pierce Mill | ||||||
| 00070 | Grove 1 | ||||||
| 00080 | Edgewater Stables | ||||||
| 00090 | Old Stone House | ||||||
| 00100 | Montrose CS | ||||||
| 00110 | Maintenance Yard | ||||||
| 00120 | Nature Center | ||||||
| 00130 | Klingle | ||||||
| 00140 | Center for Urban Ecology | ||||||
| 00150 | Conduit School | ||||||
| 00160 | Nebraska House/ Dorm | ||||||
| 00170 | Battleground | ||||||
| 00180 | H3 Police Station | ||||||
| 00190 | ROCR Tennis Center | ||||||
| 00200 | Grove 6 | ||||||
| 00210 | Grove 10 | ||||||
| 00220 | Meridian Hill Park Lodge House | ||||||
| 00230 | Chesapeake House | ||||||
| 00240 | Lanscape Architect Office | ||||||
| Awarded Total: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| CLIN 00020: Labor Rates for repair/emergency | |||||||
| Labor Description | Base | OY1 | OY2 | OY3 | OY4 | 6 Month Task Order Extension | |
| HVAC Tech Regular Time Rate | |||||||
| HVAC Tech Emergency Rate | |||||||
| Plumber/Pipefitter Regular Time Rate | |||||||
| Plumber/Pipefitter Emergency Rate | |||||||
| Electrician Regular Time Rate | |||||||
| Electrician Emergency Rate | |||||||
| Boiler Tech Regular Time Rate | |||||||
| Boiler Tech Emergency Time Rate | |||||||
| Sheet-Metal Worker Regular Time Rate | |||||||
| Sheet-Metal Worker Emergency Rate | |||||||
| Laborer Regular Time Rate | |||||||
| Laborer Emergency Rate | |||||||
| Total: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| CLIN 00010 | CLIN 00020 | Total | |||||
| BASE | $0.00 | $0.00 | $0.00 | ||||
| OY1 | $0.00 | ||||||
| OY2 | $0.00 | ||||||
| OY3 | $0.00 | ||||||
| OY4 | $0.00 | ||||||
| 6-Mo Ext | $0.00 | ||||||
| Evaluated Total: | $0.00 |
File details come from the government source that posted it. Updated .