B08 PF26 BLS Call Sheet.xlsx
XLSX spreadsheet 290 KB Posted
- Solicitation number
- W91QVPBLSPF26
About this file
This is a pricing/quote submission template for a base life support and transportation services contract for Pacific Friendship 26, a military operation in Vietnam. The document outlines detailed line items for supplies and services required from June 10 through July 7, with pricing requested in either USD or Vietnamese Dong (VND).
The primary supplies and services include: 311 interpreter services; transportation assets consisting of 8-passenger vans (78 units), 12-passenger vans (180 units), 4x4 trucks (4 units), cargo vans (22 units), box trucks (4 units), and 30-40 passenger buses (7 units); hygiene and sanitation infrastructure including 49 latrines and 25 hand washing stations; medical facilities equipment with 99 adjustable dental chairs and 110 office dividers; accommodation infrastructure with 25 tents equipped with air conditioning and power generation, 4 pop-up tents, and 2 additional power generation units; 3-tank sanitation stations (22 units); supply tables measuring 0.6 x 1.8 meters (99 units); and grey water removal services for 900 gallons. The detailed daily schedule specifies interpreter and transportation requirements by team type and location (primarily Dong Hoi and two primary schools: Son Thuy and Le Ninh), with particular emphasis on dental clinic setup and operations from June 22 through July 2. Quotes must be submitted no later than 1:00 p.m. Hawaii Standard Time on May 15, 2026, with questions due by May 1, 2026. The contract involves the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 PF26 BLS Call Sheet Mod.xlsx | XLSX spreadsheet | |
| B08 W91QVP-26-Q-A004 Answers to Industry.pdf | ||
| B08 Solicitation - W91QVP26QA004.pdf | ||
| B08 PF26 BLS PWS final.pdf | ||
| B08 Attachment A01 Experience Information Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Totals
| NAME OF COMPANY SUBMITTING OFFER: |
| QUOTE VALID FOR ____DAYS |
| Line | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | UNITS (UM) | UNIT PRICE | TOTAL PRICE |
| - | Interpreter Services (PWS PARA 5.2.12) | 311 | USD or VND | ||
| 30-40 Passenger (PAX) Bus (PWS PARA 5.2.11) | 7 | USD or VND | |||
| - | 8 Passenger (PAX) Vans (PWS PARA 5.2.10) | 78 | USD or VND | ||
| - | 12 Passenger (PAX) Vans (PWS PARA 5.2.11) | 180 | USD or VND | ||
| - | 4 x 4 Truck (PWS PARA 5.210) | 4 | USD or VND | ||
| - | Cargo Van (PWS PARA 5.210) | 22 | USD or VND | ||
| - | Box Truck (PWS PARA 5.2.10) | 4 | USD or VND | ||
| - | Latrines (PWS PARA 5.2.1) | 49 | USD or VND | ||
| - | Hand Washing (H/W) Station (PWS PARA 5.2.2) | 25 | USD or VND | ||
| - | Tents with A/C and Power Generation (PWS PARA 5.2.7) | 25 | USD or VND | ||
| - | Pop up Tents (PWS 5.2.7) | 4 | USD or VND | ||
| - | Power Generation (PWS 5.2.3) | 2 | USD or VND | ||
| - | Adjustable Dental Chair(PWS PARA 5.2.6) | 99 | USD or VND | ||
| - | Office Dividers (PWS PARA 5.2.13) | 110 | USD or VND | ||
| - | 3 Tank Sanitation Station (PWS 5.2.7) | 22 | USD or VND | ||
| - | Supply Tables ( .6 x 1.8 m) (PWS 5.2.6) | 99 | USD or VND | ||
| - | Grey Water Removal (Gallons) (PWS 5.6.5) | 900 | USD or VND | ||
| - | 30-40 Passenger Bus w or w/o Latrine (PWS PARA 5.2.11) | 7 | USD or VND | ||
| 1948 | TOTAL | USD or VND |
Interpreters
| Interpreter | NOTES | |||
| Qty | Date | Location | Remarks (Unit) | 1. ARFOR Team Interpreters must provide written translation services according to PWS Section 5.2.13 (gg) |
2. Engineer Team must provide specialized services according to PWS Section 5.2.13 (ff)
3. Dental, Stroke, and Teams must provide Specialized Medical translator/interpreter services according to PWS Section 5.2.13 (ee)
| 1 | 10-Jun | 1 x ARFOR Team |
| 3 | 11-Jun | 1 x ARFOR Team |
2 x Engineer 3 12-Jun 1 X ARFOR Team 2 x Engineer 4 13-Jun 2 x ARFOR Team 2 x Engineer 4 14-Jun 2 x ARFOR Team 2 x Engineer 4 15-Jun 2 x ARFOR Team 2 x Engineer 4 16-Jun 2 x ARFOR Team 2 x Engineer 4 17-Jun 2 x ARFOR Team 2 x Engineer 4 18-Jun 2 x ARFOR Team 2 x Engineer 4 19-Jun 2 x ARFOR Team 2 x Engineer 4 20-Jun 2 x ARFOR Team 2 x Engineer 4 21-Jun 2 x ARFOR Team 2 x Engineer 17 22-Jun 2 x ARFOR Team 9 x Dental Team 2 x SUAS 2 x MIL-CIV 2 x Engineer 29 23-Jun 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x MIL-CIV 2 x SUAS 4 x VET 2 x Engineers 2 x Disease Surv.
2 X STROKE
31 24-Jun 2 x ARFOR 9 x Dental Team 2 X Trauma 2 x EOD 2 x MIL-CIV 2 x SUAS 4 x VET 2 x Engineers 2 x Disease Surv.
4 X STROKE
31 25-Jun 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x Engineer 2 x MIL-CIV 2 x SUAS 4 x VET 2 x Engineer 2 x Disease Surv.
2 X STROKE
27 26-Jun 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x MIL-CIV 2 x SUAS 4 x VET 2 x Engineers 2 x Disease Surv.
8 27-Jun 4 x ARFOR Team 2 x Engineers 2 x Disease Surv.
8 28-Jun 4 x ARFOR Team 2 x Engineers 2 x Disease Surv.
29 29-Jun 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x P. Recovery 2 x MIL-CIV 4 x VET 2 x Engineers 2 x Disease Surv.
2 X STROKE
27 30-Jun 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x P. Recovery 2 x MIL-CIV 2 x VET 2 x Engineers 2 x Disease Surv.
2 X STROKE
25 1-Jul 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x P. Recovery 2 x MIL-CIV 2 x Engineers 2 x Disease Surv.
2 X STROKE
29 2-Jul 2 x ARFOR Team 9 x Dental Team 2 x Trauma 2 x EOD 2 x P. Recovery 2 x MIL-CIV 2 x Engineers 2 x Disease Surv.
2 X STROKE
4 x Lit. Ops
| 2 | 3-Jul | 2 x ARFOR Team |
| 2 | 4-Jul | 2 x ARFOR Team |
| 1 | 5-Jul | 1 x ARFOR Team |
| 1 | 6-Jul | 1 x ARFOR Team |
| 1 | 7-Jul | 1 x ARFOR Team |
| 311 |
Transportation
| 8 PAX Vans | 12 PAX Vans | Cargo Van (50% Cargo Space) | Box Truck | 4 x 4 Truck | 30-40 PAX Bus | ||||||||||||||||||||||||||||||
| Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | ||||||||||||
| 0 | 10-Jun | Dong Hoi | 1 | 10-Jun | Dong Hoi | 1 x ARFOR | 10-Jun | Dong Hoi | 0 | 10-Jun | 0 | 10-Jun | 1 | 10-Jun | Airport to Dong Hoi (MT Hotel) | Contingency | |||||||||||||||||||
| 1 | 11-Jun | Dong Hoi | 1x KTR Team | 3 | 11-Jun | Dong Hoi | 1 x ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 11-Jun | Dong Hoi | 1 X Engineers | 0 | 11-Jun | 0 | 11-Jun | 0 | 11-Jun | |||||||||||||||||||||||||
| 1 | 12-Jun | Dong Hoi | 1x KTR Team | 3 | 12-Jun | Dong Hoi | 1 x ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 12-Jun | Dong Hoi | 1 X Engineers | 0 | 12-Jun | 0 | 12-Jun | 0 | 12-Jun | |||||||||||||||||||||||||
| 1 | 13-Jun | Dong Hoi | 1x KTR Team | 3 | 13-Jun | Dong Hoi | 1 x ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 13-Jun | Dong Hoi | 1 X Engineers | 0 | 13-Jun | 0 | 13-Jun | 0 | 13-Jun | |||||||||||||||||||||||||
| 1 | 14-Jun | Dong Hoi | 1x KTR Team | 3 | 14-Jun | Dong Hoi | 1 x ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 14-Jun | Dong Hoi | 1 X Engineers | 0 | 14-Jun | 0 | 14-Jun | 0 | 14-Jun | |||||||||||||||||||||||||
| 1 | 15-Jun | Dong Hoi | 1x KTR Team | 3 | 15-Jun | Dong Hoi | 1 x ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 15-Jun | Dong Hoi | 1 X Engineers | 1 | 15-Jun | Dong Hoi | Dong Hoi to Dong Ha | 0 | 15-Jun | 0 | 15-Jun | |||||||||||||||||||||||
| 1 | 16-Jun | Dong Hoi | 1x KTR Team | 4 | 16-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 16-Jun | Dong Hoi | 1 X Engineers | 0 | 16-Jun | 0 | 16-Jun | 0 | 16-Jun | |||||||||||||||||||||||||
| 1 | 17-Jun | Dong Hoi | 1x KTR Team | 4 | 17-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 17-Jun | Dong Hoi | 1 X Engineers | 1 | 17-Jun | HANOI | Hanoi Embassy to Dong Hoi | 0 | 17-Jun | 0 | 17-Jun | |||||||||||||||||||||||
| 1 | 18-Jun | Dong Hoi | 1x KTR Team | 4 | 18-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 18-Jun | Dong Hoi | 1 X Engineers | 0 | 18-Jun | 0 | 18-Jun | 0 | 18-Jun | |||||||||||||||||||||||||
| 1 | 19-Jun | Dong Hoi | 1x KTR Team | 4 | 19-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 19-Jun | Dong Hoi | 1 X Engineers | 0 | 19-Jun | 0 | 19-Jun | 2 | 19-Jun | Airport to Dong Hoi (MT Hotel) | Contingency | |||||||||||||||||||||||
| 1 | 20-Jun | Dong Hoi | 1x KTR Team | 4 | 20-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 20-Jun | Dong Hoi | 1 X Engineers | 0 | 20-Jun | 20-Jun | 20-Jun | |||||||||||||||||||||||||||
| 2 | 21-Jun | Dong Hoi | 1 x CG VIP 1x KTR Team | 4 | 21-Jun | Dong Hoi | 2 X ARFOR | ||||||||||||||||||||||||||||
| 2 x Engineers | 1 | 21-Jun | Dong Hoi | 1 X Engineers | 0 | 21-Jun | 0 | 21-Jun | 2 | 21-Jun | Airport to Dong Hoi (MT Hotel) | Contingency | |||||||||||||||||||||||
| 5 | 22-Jun | Dong Hoi | 1 x CG VIP |
1 x MIL-CIV 1x KTR Team 2 x Dental 10 22-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers
| 1 x Lit. Ops | 1 | 22-Jun | Dong Hoi | 1 X Engineers | 0 | 22-Jun | 0 | 22-Jun | 0 | 22-Jun | |||
| 5 | 23-Jun | Dong Hoi | 1 x CG VIP |
1 x MIL-CIV 1x KTR Team 2 x Dental 12 23-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
1 x STROKE
| 1 x Lit. Ops | 1 | 23-Jun | Dong Hoi | 1 X Engineers | 0 | 23-Jun | 0 | 23-Jun | Dong Ha | 0 | 23-Jun | |||
| 6 | 24-Jun | Dong Hoi | 1 x CG VIP |
1 x EOD 1x KTR Team
1 X MIL-CIV
2 x Dental 13 24-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
2 x STROKE
| 1 x Lit. Ops | 1 | 24-Jun | Dong Hoi | 1 X Engineers | 0 | 24-Jun | 0 | 24-Jun | 0 | 24-Jun | |||
| 8 | 25-Jun | Dong Hoi | 1 x CG VIP |
1 x EOD 1x KTR Team 1 x SUAS 1 x MIL-CIV 2 x DENTAL 1 x Disease Surv. 12 25-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
1 X STROKE
| 1 x Lit. Ops | 1 | 25-Jun | Dong Hoi | 1 X Engineers | 0 | 25-Jun | 1 | 25-Jun | 1 x EOD Team | 0 | 25-Jun | |||
| 7 | 26-Jun | Dong Hoi | 1 x CG VIP |
1 x EOD 1 x SUAS 1 x MIL-CIV 2 x DENTAL 1 x Disease Surv. 11 26-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
| 1 x Lit. Ops | 1 | 26-Jun | Dong Hoi | 1 X Engineers | 0 | 26-Jun | 1 | 26-Jun | 1 x EOD Team | 0 | 26-Jun | |||
| 2 | 27-Jun | Dong Hoi | 1 x CG VIP | |||||||||||
| 1 x Disease Surv. | 11 | 27-Jun | Dong Hoi | 8 X ARFOR |
2 x Engineers
| 1 x Disease Surv. | 1 | 27-Jun | Dong Hoi | 1 X Engineers | 0 | 27-Jun | 0 | 27-Jun | 0 | 27-Jun | |||
| 2 | 28-Jun | Dong Hoi | 1 x CG VIP | ||||||||||
| 1 x Disease Surv. | 11 | 28-Jun | Dong Hoi | 8 X ARFOR |
2 x Engineers
| 1 x Disease Surv. | 1 | 28-Jun | Dong Hoi | 1 X Engineers | 0 | 28-Jun | 0 | 28-Jun | 0 | 28-Jun | |||
| 7 | 29-Jun | Dong Hoi | 1 x CG VIP |
1 x EOD 1 x P. R 1 x MIL-CIV
2 X DENTAL
1 x Disease Surv. 12 29-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
1 x STROKE
| 1 x Lit. Ops | 1 | 29-Jun | Dong Hoi | 1 X Engineers | 0 | 29-Jun | 1 | 29-Jun | 1 x EOD Team | 0 | 29-Jun | |||
| 7 | 30-Jun | Dong Hoi | 1 x CG VIP |
1 x EOD 1 x P.R.
1 x MIL-CIV
2 X DENTAL
1 x Disease Surv. 13 30-Jun Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 1 x VET 2 x Engineers 1 x Disease Surv.
1 X STROKE
| 1 x Lit. Ops | 1 | 30-Jun | Dong Hoi | 1 X Engineers | 0 | 30-Jun | 1 | 30-Jun | 1 x EOD Team | 0 | 30-Jun | |||
| 7 | 1-Jul | Dong Hoi | 1 x CG VIP |
1 x EOD 1 x P.R.
1 x MIL-CIV
2 X DENTAL
1 x Disease Surv. 12 s Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
1 x STROKE
| 1 x Lit. Ops | 1 | 1-Jul | Dong Hoi | 1 X Engineers | 0 | 1-Jul | 0 | 1-Jul | 0 | 1-Jul | |||
| 6 | 2-Jul | Dong Hoi | 1 x CG VIP |
1 x EOD 1 x P.R.
1 x MIL-CIV 2 X DENTAL 12 2-Jul Dong Hoi 2 X ARFOR 2 x DENTAL 2 x TRAUMA 1 x MIL-CIV 2 x Engineers 1 x Disease Surv.
1 x STROKE
| 1 x Lit. Ops | 1 | 2-Jul | Dong Hoi | 1 X Engineers | 1 | 2-Jul | Dong Hoi | DONG Hoi to Hanoi | 0 | 2-Jul | 0 | 2-Jul | |||
| 3 | 3-Jul | Dong Hoi | 1 x CG VIP | ||||||||||||
| 2 X DENTAL | 6 | 3-Jul | Dong Hoi | 2 X ARFOR |
2 x DENTAL
| 2 x TRAUMA | 0 | 3-Jul | Dong Hoi | 1 | 3-Jul | Dong Hoi | Dong Hoi to Dong Ha | 0 | 3-Jul | 0 | 3-Jul | |||||||||||||||||
| 1 | 4-Jul | Dong Hoi | 1 x CG VIP | 2 | 4-Jul | Dong Hoi | 2 X ARFOR | 0 | 4-Jul | Dong Hoi | 0 | 4-Jul | 0 | 4-Jul | 2 | 4-Jul | Airport to Dong Hoi (MT Hotel) | Contingency | ||||||||||
| 0 | 5-Jul | Dong Hoi | 1 | 5-Jul | Dong Hoi | 1 x ARFOR | 0 | 5-Jul | Dong Hoi | 0 | 5-Jul | 0 | 5-Jul | 0 | 5-Jul | |||||||||||||
| 0 | 6-Jul | Dong Hoi | 1 | 6-Jul | Dong Hoi | 1 x ARFOR | 0 | 6-Jul | Dong Hoi | 0 | 6-Jul | 0 | 6-Jul | 0 | 6-Jul | |||||||||||||
| 0 | 7-Jul | Dong Hoi | 1 | 7-Jul | Dong Hoi | 1 x ARFOR | 0 | 7-Jul | Dong Hoi | 0 | 7-Jul | 0 | 7-Jul | 0 | 7-Jul | |||||||||||||
| 78 | 180 | 22 | 4 | 4 | 7 |
Hygiene
| Latrine | Hand Washing Station | Engineer Team Location | |||||||
| Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | ||
| 0 | 10-Jun | 0 | 10-Jun | ||||||
| 2 | 11-Jun | 2 x Engineer Team | 1 | 11-Jun | 1 x Engineer Team | ||||
| 2 | 12-Jun | 2 x Engineer Team | 1 | 12-Jun | 1 x Engineer Team | ||||
| 2 | 13-Jun | 2 x Engineer Team | 1 | 13-Jun | 1 x Engineer Team | ||||
| 2 | 14-Jun | 2 x Engineer Team | 1 | 14-Jun | 1 x Engineer Team | EOD Team Location | |||
| 2 | 15-Jun | 2 x Engineer Team | 1 | 15-Jun | 1 x Engineer Team | ||||
| 2 | 16-Jun | 2 x Engineer Team | 1 | 16-Jun | 1 x Engineer Team | ||||
| 2 | 17-Jun | 2 x Engineer Team | 1 | 17-Jun | 1 x Engineer Team | PCC Team Location | |||
| 2 | 18-Jun | 2 x Engineer Team | 1 | 18-Jun | 1 x Engineer Team | ||||
| 2 | 19-Jun | 2 x Engineer Team | 1 | 19-Jun | 1 x Engineer Team | ||||
| 2 | 20-Jun | 2 x Engineer Team | 1 | 20-Jun | 1 x Engineer Team | ||||
| 2 | 21-Jun | 2 x Engineer Team | 1 | 21-Jun | 1 x Engineer Team | ||||
| 2 | 22-Jun | 2 x Engineer Team | 1 | 22-Jun | 1 x Engineer Team | ||||
| 2 | 23-Jun | 2 x Engineer Team | 1 | 23-Jun | 1 x Engineer Team | ||||
| 2 | 24-Jun | 2 x Engineer Team | 1 | 24-Jun | 1 x Engineer Team | ||||
| 2 | 25-Jun | 2 x Engineer Team | 1 | 25-Jun | 1 x Engineer Team | ||||
| 2 | 26-Jun | 2 x Engineer Team | |||||||
| 1 | 26-Jun | 1 x Engineer Team |
| 2 | 27-Jun | 2 x Engineer Team | 1 | 27-Jun | 1 x Engineer Team | |
| 2 | 28-Jun | 2 x Engineer Team | ||||
| 1 | 28-Jun |
1 x Engineer Team
| 2 | 29-Jun | 2 x Engineer Team | |
| 1 | 29-Jun |
1 x Engineer Team
| 4 | 30-Jun | 2 x Engineer Team | |||
| 2 x EOD Team | 2 | 30-Jun | 1 x EOD |
1 x Engineer Team
| 4 | 1-Jul | 2 x Engineer Team | |||
| 2 x EOD Team | 2 | 1-Jul | 1 x EOD Team |
1 x Engineer Team
| 3 | 2-Jul | 2 x Engineer Team | |||
| 1 x P. Recovery | 2 | 2-Jul | 1 x Engineer Team |
1 x P. Recovery
| 0 | 3-Jul | 0 | 3-Jul |
| 0 | 4-Jul | 0 | 4-Jul |
| 0 | 5-Jul | 0 | 5-Jul |
| 49 | 25 |
Tents and Power Generation
| Tent | Pop Up Tent | Power Generation (5K) | Notes | Engineer Team Location | ||||||||||||
| Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Tent includes Air Conditioning, Generator (Petroluen, Oil, Lubricants (POL) and servicing), Power Outlets (5) , Light Set, 10 x Folding Chairs, 2 x Folding Tables, 3 Large Coolers, 50 Lbs Non-potable Ice Daily | ||||
| 0 | 10-Jun | 0 | 10-Jun | 0 | 10-Jun | |||||||||||
| 1 | 11-Jun | 1 x Engineer Team | 0 | 11-Jun | 0 | 11-Jun | ||||||||||
| 1 | 12-Jun | 1 x Engineer Team | 0 | 12-Jun | 0 | 12-Jun | ||||||||||
| 1 | 13-Jun | 1 x Engineer Team | 0 | 13-Jun | 0 | 13-Jun | ||||||||||
| 1 | 14-Jun | 1 x Engineer Team | 0 | 14-Jun | 0 | 14-Jun | Litoral Team Location | |||||||||
| 1 | 15-Jun | 1 x Engineer Team | 0 | 15-Jun | 0 | 15-Jun | Pending | |||||||||
| 1 | 16-Jun | 1 x Engineer Team | 0 | 16-Jun | 0 | 16-Jun | ||||||||||
| 1 | 17-Jun | 1 x Engineer Team | 0 | 17-Jun | 0 | 17-Jun | ||||||||||
| 1 | 18-Jun | 1 x Engineer Team | 0 | 18-Jun | 0 | 18-Jun | ||||||||||
| 1 | 19-Jun | 1 x Engineer Team | 0 | 19-Jun | 0 | 19-Jun | Personell Recovery Location | |||||||||
| 1 | 20-Jun | 1 x Engineer Team | 0 | 20-Jun | 0 | 20-Jun | Pending | |||||||||
| 1 | 21-Jun | 1 x Engineer Team | 0 | 21-Jun | 0 | 21-Jun | ||||||||||
| 1 | 22-Jun | 1 x Engineer Team | 0 | 22-Jun | 0 | 22-Jun | Tent needs to be a pop-up canopy style, that will be secured to the conctrete slab (i.e. sandbags, weights, etc). | |||||||||
| 1 | 23-Jun | 1 x Engineer Team | 0 | 23-Jun | 0 | 23-Jun | ||||||||||
| 1 | 24-Jun | 1 x Engineer Team | 0 | 24-Jun | 0 | 24-Jun | ||||||||||
| 1 | 25-Jun | 1 x Engineer Team | 0 | 25-Jun | 0 | 25-Jun | ||||||||||
| 1 | 26-Jun | 1 x Engineer Team | ||||||||||||||
| 0 | 26-Jun | 0 | 26-Jun | |||||||||||||
| 1 | 27-Jun | 1 x Engineer Team | 0 | 27-Jun | 0 | 27-Jun | ||||||||||
| 1 | 28-Jun | 1 x Engineer Team | 0 | 28-Jun | 0 | 28-Jun | ||||||||||
| 1 | 29-Jun | 1 x Engineer Team | 0 | 29-Jun | 0 | 29-Jun | ||||||||||
| 2 | 30-Jun | 1 x Engineer Team | ||||||||||||||
| 1 x EOD | 0 | 30-Jun | 0 | 30-Jun | ||||||||||||
| 2 | 1-Jul | 1 x Engineer Team | ||||||||||||||
| 1 x EOD | 0 | 1-Jul | 1 | 1-Jul | 1 x Littoral Ops Site | |||||||||||
| 2 | 2-Jul | 1 x Engineers | ||||||||||||||
| 1 x P. Recovery | 4 | 2-Jul | 2 x MASCAL Site | |||||||||||||
| 2 x Littoral Ops Site | 1 | 2-Jul | 1 x Littoral Ops Site | |||||||||||||
| 0 | 3-Jul | 0 | 3-Jul | 0 | 3-Jul | |||||||||||
| 0 | 4-Jul | 0 | 4-Jul | 0 | 4-Jul | |||||||||||
| 0 | 5-Jul | 4 | 2 | |||||||||||||
| 25 |
| Pop up Tent |
| Tent needs to be a pop-up canopy style, that will be secured to the conctrete slab (i.e. sandbags, weights, etc). |
AirCon
| Air Conditioning | Notes | |||
| Qty | Date | Location | Remarks (Unit) | A/C Unit can be plugged into School Power |
| 0 | 13-Jun | |||
| 0 | 14-Jun | |||
| 0 | 15-Jun | |||
| 0 | 16-Jun | |||
| 0 | 17-Jun | |||
| 0 | 18-Jun | |||
| 0 | 19-Jun | |||
| 0 | 20-Jun | |||
| 0 | 21-Jun | |||
| 4 | 22-Jun | Dental Clinic | ||
| 4 | 23-Jun | Dental Clinic | ||
| 4 | 24-Jun | Dental Clinic | ||
| 4 | 25-Jun | Dental Clinic | ||
| 4 | 26-Jun | Dental Clinic | ||
| 4 | 27-Jun | Dental Clinic | ||
| 4 | 28-Jun | Dental Clinic | ||
| 4 | 29-Jun | Dental Clinic | ||
| 4 | 30-Jun | Dental Clinic | ||
| 4 | 1-Jul | Dental Clinic | ||
| 4 | 2-Jul | Dental Clinic | ||
| 3-Jul | ||||
| 4-Jul | ||||
| 0 | 5-Jul | |||
| 44 | 0 |
Dental Facility
| Adjustable Dental Chairs | Office Divider | 3 Tank Sanitation Station | Supply Tables ( .6 x 1.8 m) | Grey Water Removal (Gallons) | |||||||||||||||||
| Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | Qty | Date | Location | Remarks (Unit) | ||
| 0 | 13-Jun | 0 | 13-Jun | 0 | 13-Jun | 0 | 13-Jun | 0 | 13-Jun | ||||||||||||
| 0 | 14-Jun | 0 | 14-Jun | 0 | 14-Jun | 0 | 14-Jun | 0 | 14-Jun | ||||||||||||
| 0 | 15-Jun | 0 | 15-Jun | 0 | 15-Jun | 0 | 15-Jun | 0 | 15-Jun | ||||||||||||
| 0 | 16-Jun | 0 | 16-Jun | 0 | 16-Jun | 0 | 16-Jun | 0 | 16-Jun | ||||||||||||
| 0 | 17-Jun | 0 | 17-Jun | 0 | 17-Jun | 0 | 17-Jun | 0 | 17-Jun | ||||||||||||
| 0 | 18-Jun | 0 | 18-Jun | 0 | 18-Jun | 0 | 18-Jun | 0 | 18-Jun | ||||||||||||
| 0 | 19-Jun | 0 | 19-Jun | 0 | 19-Jun | 0 | 19-Jun | 0 | 19-Jun | ||||||||||||
| 0 | 20-Jun | 0 | 20-Jun | 0 | 20-Jun | 0 | 20-Jun | 0 | 20-Jun | ||||||||||||
| 0 | 21-Jun | 0 | 21-Jun | 0 | 21-Jun | 0 | 21-Jun | 0 | 21-Jun | ||||||||||||
| 9 | 22-Jun | Son Thuy primary school | |||||||||||||||||||
| Le Ninh primary school | 5 x Son Thuy | ||||||||||||||||||||
| 4 x Le Nihn | 10 | 22-Jun | Son Thuy primary school | ||||||||||||||||||
| Le Ninh primary school | 5 x Son Thuy | ||||||||||||||||||||
| 5 x Le Nihn | 2 | 22-Jun | Son Thuy primary school | ||||||||||||||||||
| Le Ninh primary school | 1 x Son Thuy | ||||||||||||||||||||
| 1 x Le Nihn | 9 | 22-Jun | Son Thuy primary school | ||||||||||||||||||
| Le Ninh primary school | 5 x Son Thuy | ||||||||||||||||||||
| 4 x Le Nihn | 100 | 22-Jun | Son Thuy primary school | ||||||||||||||||||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 23-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 23-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 23-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 2 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 23-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 23-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 24-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 24-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 24-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 3 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 24-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 24-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 25-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 25-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 25-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 4 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 25-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 25-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 26-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 26-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 26-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 26-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 26-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 27-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 27-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 27-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 6 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 27-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 0 | 27-Jun | Son Thuy primary school |
Le Ninh primary school
| 9 | 28-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 28-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 28-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 7 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 28-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 0 | 28-Jun | Son Thuy primary school |
Le Ninh primary school
| 9 | 29-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 29-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 29-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 8 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 29-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 29-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 30-Jun | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 30-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 30-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 9 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 30-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 30-Jun | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 1-Jul | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 1-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 1-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 10 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 1-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 1-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 9 | 2-Jul | Son Thuy primary school | |||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 10 | 2-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 5 x Le Nihn | 2 | 2-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 11 x Son Thuy | ||||
| 1 x Le Nihn | 9 | 2-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 5 x Son Thuy | ||||
| 4 x Le Nihn | 100 | 2-Jul | Son Thuy primary school | ||
| Le Ninh primary school | 50 x Son Thuy |
50 x Le Nihn
| 0 | 3-Jul | 0 | 3-Jul | 0 | 3-Jul | 0 | 3-Jul | 0 | 3-Jul |
| 0 | 4-Jul | 0 | 4-Jul | 0 | 4-Jul | 0 | 4-Jul | 0 | 4-Jul |
| 0 | 5-Jul | 0 | 5-Jul | 0 | 5-Jul | 0 | 5-Jul | 0 | 5-Jul |
| 99 | 110 | 22 | 99 | 900 |
| Location 1 |
| Son Thuy primary school |
| Location 2 |
| Le Ninh primary school |
image1.png image2.png image3.png
File details come from the government source that posted it. Updated .