About this file
This document contains construction specifications and figures for a federal contract opportunity to replace a failing water well at Stovepipe Wells in Death Valley National Park. The project involves demolishing an existing failing well and constructing a new production well, designated as Well #1A, along with associated site work. It also includes options to replace pump and motor assemblies in two existing wells at Furnace Creek, and demolishing two other non-productive wells. The specifications provide details on the location of the existing and new wells, descriptions of site features and existing infrastructure, and coordination requirements. Figures show maps of the project sites, photographs of existing conditions, and examples of the type of equipment to be installed.
The related federal contract opportunity is solicitation number 140P8120R0012 to replace the failing well for the National Park Service's Pacific West Region. The project specifications and figures provide the technical requirements for the work to be performed under this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and Answers 2_0002.docx | DOCX document | |
| Sol_140P8120R0012_Amd_0001.pdf | ||
| B09 Site Visit Meeting Minutes and QA_0001.docx | DOCX document | |
| DEVA SPW Saline Well Concrete Vault-piping_0001.jpg | JPG image | |
| DEVA SPW Saline Well Concrete Vault_0001.jpg | JPG image | |
| DEVA SPW Old Well_0001.jpg | JPG image | |
| DEVA SPW Well 1A sitevisitsigninsheet_0001.pdf | ||
| Sol_140P8120R0012.pdf | ||
| B08 Release of Claims.pdf | ||
| B08 Construction Invoice NPS 302 .docx | DOCX document | |
| B08 PPQ.docx | DOCX document | |
| B08 DEVA 249573 SPW 1A Construction Specs.pdf | ||
| B08 Solicitation final.pdf | ||
| B08 Contract Price Schedule Attachment.docx | DOCX document | |
| B03 WD CA20190003.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEVA 249573 REPLACE FAILING WELL AT STOVEPIPE WELLS
CONSTRUCTION SPECIFICATIONS
APPENDIX #1 ‐ FIGURES 1 THROUGH 6
“Saline Well”:
36° 36’ 07.36” N 117° 08’ 39.37” W
CONTRACT PRICE
SCHEDULE OPTION 2
Existing Failing Well #1:
36° 36’ 4.66” N 117° 08’ 49.96” W
Existing Well #2
RO Plant at Stovepipe Wells
N
FIGURE 1 ‐ GENERAL PROJECT LOCATION MAP
OF THE STOVEPIPE WELLS AREA
DEVA 249573 REPLACE FAILING WELL
AT STOVEPIPE WELLS
(NOTE: NOT SHOWN IN FIGURE 1 IS CONTRACT PRICE SCHEDULE
OPTION 1 REPLACEMENT PUMP/MOTOR ASSEMBLIES IN WELL #2
AND WELL #3 AT FURNACE CREEK. SEE FIGURE 2.)
“Old Well”:
36° 36’ 14.69” N 117° 08’ 42.67” W
CONTRACT PRICE
SCHEDULE OPTION 3
NEW WELL (DESIGNATED WELL #1A)
– APPROXIMATE LOCATION
CONTRACT PRICE
SCHEDULE
BASE ITEMS
FIGURE 2 ‐ GENERAL PROJECT LOCATION MAP OF THE
FURNACE CREEK AREA
CONTRACT PRICE SCHEDULE OPTION 1 REPLACE
PUMP/MOTOR ASSEMBLIES IN WELL #2 AND WELL #3 AT
FURNACE CREEK
(NOTE: NOT SHOWN IN FIGURE 2 IS CONTRACT PRICE SCHEDULE BASE ITEMS AND OPTIONS
2 & 3 DESTROY “SALINE WELL” AND DESTROY “OLD WELL” . SEE FIGURE 1.)
WELL #2 AT FURNACE CREEK:
36° 27’ 04.57” N 116° 49’ 34.80” W
CONTRACT PRICE SCHEDULE OPTION 1
WELL #3 AT FURNACE CREEK:
36° 26’ 58.16” N 116° 49’ 23.69” W
CONTRACT PRICE SCHEDULE OPTION 1
FIGURE 3 – STOVEPIPE WELLS PROJECT SITE
FOR NEW WELL (DESIGNATED WELL #1A)
VIEWED LOOKING TO THE WEST.
VIEW OF:
1. LOCATION OF NEW WELL (DESIGNATED
WELL #1A.)
2. CONCRETE VAULT HOUSING EXISTING
FAILING WELL #1. TO BE DEMOLISHED.
ALUMINUM LID AND FRAME TO BE
SALVAGED FOR PARK’S FUTURE USE.
3. EXISTING BLOW‐OFF HYDRANT TO BE
REPLACED WITH NEW WHARF HEAD
BLOW‐OFF HYDRANT.
4. EXISTING CONCRETE WATER METER
VAULT TO REMAIN IN SERVICE.
EXISTING WATER METER AND
ASSOCIATED APPURTENANCES TO
REMAIN IN SERVICE. EXISTING WATER
LINE CONNECTION FROM FAILING
WELL #1 TO THE WATER METER TO BE
DEMOLISHED AND NEW WATER LINE
FROM THE NEW WELL TO BE
CONNECTED TO THE EXISTING WATER
METER.
WATER LINE
TO RO PLANT
WATER LINE
FROM WELL #2TO BLOW‐OFF HYDRANT
FROM NEW WELL
WATER METER – TO REMAIN IN SERVICE
4‐INCH HDPE
(TYP)
FIGURE 4 – EXISTING WATER METER
VAULT ADJACENT TO FAILING WELL #1.
1. INCOMING WATER LINE FROM
FAILING WELL #1 TO BE
DEMOLISHED AND NEW WATER
LINE COMING FROM NEW WELL
(DESIGNATED WELL #1A) TO BE
CONNECTED TO THE EXISTING
WATER METER.
2. EXISTING WATER METER AND
ASSOCIATED APPURTENANCES TO
REMAIN IN SERVICE.
3. EXISTING BLOW‐OFF HYDRANT
(NOT SEEN IN PHOTOGRAPH) TO
TO BE DEMOLISHED AND
EXISTING WATER LINE TO BE
CONNECTED TO NEW NEW
WHARF HEAD BLOW‐OFF
HYDRANT.
4. EXISTING WATER METER VAULT
TO REMAIN IN SERVICE.
N
CHECK VALVE
GATE VALVES
FIGURE 5 – INSIDE VIEW OF
CONCRETE VAULT HOUSING
FAILING WELL #1
1. EXISTING ELECTRICAL
DISCONNECT TO BE
RELOCATED TO UNISTRUT
MOUNTING A NEW WELL
(DESIGNATED WELL #1A).
2. EXISTING PIPING, ELECTRICAL
CONDUIT, ELECTRICAL
CABLING, AND SIGNAL
CABLING TO BE DEMOLISHED.
3. CONCRETE VAULT TO BE
DEMOLISHED.
4. FAILING WELL #1 TO BE
DESTROYED FOLLOWING THE
WATER WELL STANDARD:
STATE OF CALIFORNIA.
5. ALUMINUM DOOR AND
FRAME TO BE SALVAGED FOR
THE PARK’S FUTURE USE OF IT.
FIGURE 6 – COORDINATION INFORMATION
FIGURE 6.A EXISTING UNISTRUT
MOUNTING AT WELL #2 AT
STOVEPIPE WELLS THAT IS TO BE
REPLICATED AT THE NEW WELL
(DESIGNATED WELL #1A):
1. CONCRETE PAD FIVE (5) FEET
BY FIVE (5) BY FIVE (5) INCHES
THICK.
2. ELECTRICAL POWER
DISCONNECT.
3. TWO‐PLUG OUTDOOR OUTLET
– 120 V.
4. VISUAL AND AUDIO ALARM.
FIGURE 6.B EXAMPLE WHARF HEAD
BLOW‐OFF HYDRANT CONFIGURATION. A
SIMILAR CONFIGURATION IS TO BE USED
TO REPLACE THE EXISTING BLOW‐OFF
HYDRANTS CONNECTED TO THE EXISTING
METER VAULT PIPING AT (FAILING) WELL
#1 AND PRODUCTION WELL #2. THE
EXISTING BLOW‐OFF HYDRANTS ARE TO BE
DEMOLISHED.
FIGURE 6.C EXISTING YASKAWA IQPUMP1000
VFD PUMP/MOTOR ASSEMBLY CONTROLLER
MOUNTED INSIDE THE EXISTING RO PLANT AT
STOVEPIPE WELLS. THE NEW PUMP/MOTOR
ASSEMBLY TO BE INSTALLED IN THE NEW WELL
(DESIGNATED WELL #1A) WILL HAVE ITS FLOW
RATE CONTROLLED BY THE EXISTING VFD
CONTROLLER TO BE SYNCRONIZED WITH THE
PRODUCTION RATE OF THE EXISTING RO
TREATMENT SYSTEM. THE VFD CONTOLLER IS
CONNECTED TO THE RO PLANT’S
PROGRAMMABLE LOGIC CONTROLLER THAT
CONROLS THE RO TREATMENT SYSTEM
OPERATION.