B09 Site Visit Meeting Minutes and QA_0001.docx

DOCX document 14 KB Posted

Attached to
DEVA Replacement of a Failing Well
Solicitation number
140P8120R0012
Issued by

About this file

The document summarizes meeting minutes and questions from a site visit for a federal contract solicitation to replace a failing water well for Death Valley National Park. The site visit covered four well locations at the park including the old well and saline well proposed for demolition, the failing well 1A and related reverse osmosis plant proposed for replacement, and two additional potable water pumphouses. Key questions asked by the contractor and answered by the National Park Service staff in attendance regarded confirming the power would be deactivated before well demolition, the handling of the concrete vault and plumbing during well demolition, how to connect new wiring from the replacement well to the existing infrastructure, and specifying the material of existing drop pipes. The solicitation aims to replace the failing well to ensure the continued supply of potable water to park facilities.

View the file

Other files

File Type Posted
Question and Answers 2_0002.docx DOCX document
Sol_140P8120R0012_Amd_0001.pdf PDF
DEVA SPW Old Well_0001.jpg JPG image
DEVA SPW Saline Well Concrete Vault_0001.jpg JPG image
DEVA SPW Well 1A sitevisitsigninsheet_0001.pdf PDF
DEVA SPW Saline Well Concrete Vault-piping_0001.jpg JPG image
B08 DEVA 249573 SPW 1A Construction Specs.pdf PDF
B08 Solicitation final.pdf PDF
Sol_140P8120R0012.pdf PDF
B08 PPQ.docx DOCX document
B08 Release of Claims.pdf PDF
B08 DEVA 249573 Specs appendix.pdf PDF
B08 Construction Invoice NPS 302 .docx DOCX document
B03 WD CA20190003.pdf PDF
B08 Contract Price Schedule Attachment.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Meeting Minutes and Q&A Solicitation 140P8120R0012 site visit for DEVA 229573 SPW Well 1A The site visit was attended by Mr. Venkat Reddy, Operations Manager for Aries Construction Corporation.

The NPS staff in attendance was Steven Bosiljevac, Regional Civil Engineer/COR; Tom Buck, Water Operator Supervisor; Mark Coolie, Water Operator.

The check-in for the site visit was held from 8:00 AM to 8:05 AM PDT on 7/29/20.

At 8:05 AM the COR briefed Mr. Reddy on the project's SOW by reviewing the Definition of Contract Line Items. Mr. Reddy did not have any questions.

At 8:15 AM review of the project areas began.

-The "Old Well" (to be destroyed) was the first location visited. Mr. Reddy did not have any questions.

-The "Saline Well" (to be destroyed) was the second location visited. Mr. Reddy had the following questions:

Q.1 Will the existing power drop next to the "Saline Well" (less than 10 feet away) that presently is energized be de-energized at the time the contractor comes onsite to destroy the well?

A.1 NPS response: The Park will have SCE de-energize the power drop prior to the time the contractor comes onsite to destroy the well.

Q.2 Does the NPS want to keep the concrete vault around the "Saline Well" or have it demolished?

A.2 NPS response: The demolition of the concrete vault and the plumbing inside of it is part of the scope of work for destroying the "Saline Well." The metal vault lid is to be salvaged and the Park will retain possession of it. The water meter will be salvaged and the Park will retain possession of it.

-The Failing Well 1 and new Well 1A and RO Plant was the next location visited. Mr. Reddy had the following question:

Q.3 Does new electrical and signal wires need to be run from new Well 1A into the RO plant and to the VFD and PLC?

A.3 NPS response: The new wiring for electrical power and signal cable from new Well 1A can be connected to the existing wiring that presently goes to the existing failing Well 1 that is outside of the RO plant following NEC and manufacturers' recommendations. The existing water meter vault can be used to house the connection points of new wiring to existing wiring.

-The Furnace Creek potable water system's pumphouse #2/#3 was the third location visited. Mr. Reddy had the following question:

Q.4 What is the material of the existing drop pipe?

A.4 NPS response: The existing drop pipes in both FC Well #2 and FC Well #3 are steel drop pipe.

At 10:30 AM the site visit ended.