About this file

This document contains a price schedule attachment for a solicitation to replace a failing water well at Death Valley National Park. The attachment includes 20 line items with descriptions of work required, estimated quantities, unit prices, and total proposed prices. The base work covers well drilling and installation from line items 1 through 17, including mobilization, drilling a test well, furnishing and installing well casing and screen, gravel packing, sealing, development, testing, disinfection, and destroying an existing failing well. There are also three optional line items to replace pumps at additional wells and destroy abandoned wells. The total proposed price for the base work and all options is requested. Notes indicate the government may award the base work and then options 1, 2 or 3 within 90 days if determined to be in the best interest.

The related federal contract opportunity is solicitation number 140P8120R0012 to replace the failing well at Stovepipe Wells for Death Valley National Park, issued by the National Park Service Pacific West Region of the Department of the Interior. The document provides pricing details for a specific solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to DEVA Replacement of a Failing Well, newest first.
File Type Posted
Question and Answers 2_0002.docx DOCX document
Sol_140P8120R0012_Amd_0001.pdf PDF
B09 Site Visit Meeting Minutes and QA_0001.docx DOCX document
DEVA SPW Saline Well Concrete Vault_0001.jpg JPG image
DEVA SPW Old Well_0001.jpg JPG image
DEVA SPW Well 1A sitevisitsigninsheet_0001.pdf PDF
DEVA SPW Saline Well Concrete Vault-piping_0001.jpg JPG image
B08 DEVA 249573 Specs appendix.pdf PDF
Sol_140P8120R0012.pdf PDF
B08 DEVA 249573 SPW 1A Construction Specs.pdf PDF
B08 Solicitation final.pdf PDF
B03 WD CA20190003.pdf PDF
B08 Release of Claims.pdf PDF
B08 Construction Invoice NPS 302 .docx DOCX document
B08 PPQ.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Schedule Replace Failing Water Well at Stovepipe Wells at Death Valley National Park

Contract Line Item Number (CLIN)
Contract Line Item Title
Quantity/Unit of Measure
Unit Price
Total Price
1
Mobilization/Demobilization
1 LS
$
$
2
Drill and Set Temporary Conductor Casing for Test Well
1 LS
$
$
3
Drill Test Well
_320_*NTE
$
$
4
Furnish 8-Inch Well Casing
_283*NTE
$
$
5
Install 8 inch Well Casing
_283_*NTE
$
$
6
Furnish 8 Inch Well Screen
_40_*NTE
$
$
7
Install 8 Inch Well Screen
40__*NTE
$
$
8
Gravel Pack Material
_90*NTE
$
$
9
Formation Stabilizer Material
175_*NTE
$
$
10
Grout Surface Seal
_50_*NTE
$
$
11
Well Development
1 LS
$
$
12
Pumping and Recovery Tests
1 LS
$
$
13
Disinfection
1 LS
$
$
14
Video Inspection Logging of Completed Test Well
1 LS
$
$
15
Pitless Adapter and Connection to Existing Vault
1 LS
$
$
16
Pump/Motor Assembly
1 LS
$
$
17
Destroy Failing Existing Well #1
1 LS
$
$

Optional Line Items

18
Option 1: Replacement Pump/Motor Assemblies in Well #2 and Well #3 at Furnace Creek
1 LS
$
$
19
Option 2: Destroy Abandoned Saline Well at Stovepipe Wells
1 LS
$
$
20
Option 3: Destroy Abandoned “Old Well” at Stovepipe Wells
1 LS
$
$
Total Base Price (items 1-17)
$
Total Price of Options 1 +2 +3 (Items 18-20)
$
Total Price for Base Plus All Options (Items 1-20)
$

** See Notes Below on 2nd Page.

**Notes: FAR 52.217-5 - Evaluation of Options - Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

It is anticipated that the Government will award the base work however, may award options 1, 2 or 3 within 90 days of award of the contract.

File details come from the government source that posted it. Updated .