Bid Schedule - Bessemer Mine Road
This is a bid schedule for the Bessemer Mine Road project outlining three line items for which contractors must provide pricing. Item 1 requires mobilization and demobilization services on a lump sum (LS) basis. Item 2 specifies traffic control services, also priced as a lump sum. Item 3 calls for the supply and installation of 7,200 tons of Class 2 aggregate road base (natural material), with pricing on a per-ton basis. The schedule contains empty columns for Unit Cost and Cost, indicating that bidders are required to complete the pricing information for each line item. The document concludes with a TOTAL row for the overall project cost calculation. No response dates, award dates, set-asides, or federal agency information is provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule- Bessemer Mine Road
Item Description of Work Quantity Unit Unit Cost Cost
1 Mob/De-mob 1 LS
Traffic Control 1 LS
3 Class 2 aggregate road base (natural) 7,200 Ton
TOTAL
File details come from the government source that posted it. Updated .