B08_Attachment_No__3_Bid_Schedule.pdf

PDF 180 KB Posted

Attached to
BESSEMER MINE ROAD O&M
Solicitation number
140L1226R0003
Issued by

About this file

Bid Schedule - Bessemer Mine Road

This is a bid schedule for the Bessemer Mine Road project outlining three line items for which contractors must provide pricing. Item 1 requires mobilization and demobilization services on a lump sum (LS) basis. Item 2 specifies traffic control services, also priced as a lump sum. Item 3 calls for the supply and installation of 7,200 tons of Class 2 aggregate road base (natural material), with pricing on a per-ton basis. The schedule contains empty columns for Unit Cost and Cost, indicating that bidders are required to complete the pricing information for each line item. The document concludes with a TOTAL row for the overall project cost calculation. No response dates, award dates, set-asides, or federal agency information is provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule- Bessemer Mine Road

Item Description of Work Quantity Unit Unit Cost Cost

1 Mob/De-mob 1 LS

Traffic Control 1 LS

3 Class 2 aggregate road base (natural) 7,200 Ton

TOTAL

File details come from the government source that posted it. Updated .