B08_Attachment_6_Daily_Report_Log.doc

DOC document 77 KB Posted

Attached to
HAFE 254773 CONSTRUCTION GUTTER & DS Federal contract opportunity
Solicitation number
140P3023R0015
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a contractor's quality control daily report template along with testing report templates to be used on a federal construction contract for gutters and downspouts awarded by the Department of the Interior National Park Service National Office. The quality control daily report template requires contractors to log weather conditions, personnel on site by job category, equipment used, work performed by prime and subcontractors, inspections and testing done with results, deficiencies noted, and certification of compliance with contract requirements. Accompanying testing report templates specify details required for individual inspections, test locations and methods, results, compliance determinations, and certification.

Together these templates provide a framework for contractors to systematically document daily quality control, inspections, and testing activities to demonstrate contract compliance for a National Park Service construction project involving gutters and downspouts.

View the file

Other files for this federal contract opportunity

Other files attached to HAFE 254773 CONSTRUCTION GUTTER & DS, newest first.
File Type Posted
B09_Updated_DOL_WD_JeffCo_WV20220037_8_25_23_0002.pdf PDF
B09_Amendment_0002_to_Solicitation_140P3023R0015_P0002_Answers_to_RFIs_0002.docx DOCX document
Sol_140P3023R0015_Amd_0002.pdf PDF
Sol_140P3023R0015_Amd_0001.pdf PDF
B08_Attachment_11_Map_Site_Visit_Meeting_Location_Parkwide_Gutters.pdf PDF
B08_Attachment_10_HAFE_254773_Rehabilitate_Gutters_Parkwide_100__FINAL_SUBMITTAL_LIST.pdf PDF
B08_Attachment_8_HAFE_254773_Rehabilitate_Gutters_Parkwide_100__FINAL_DRAWINGS_LR.pdf PDF
Sol_140P3023R0015.pdf PDF
B08_Attachment_12_Site_Visit_Agenda_HAFE_Parkwide_Gutters_8_28_23_10AM_ED.doc DOC document
B08_Attachment_2_CAAC_Letter_2020-04_-_05_01_20.pdf PDF
B08_Attachment_1_Construction_Contract_Administration.docx DOCX document
B08_Attachment_9_HAFE_254773_Rehabilitate_Gutters_Parkwide_100__FINAL_SPECIFICATIONS.pdf PDF
B08_Attachment_5_FACTS_Sheet_HAFE_Parkwide_Gutters___Drainage_Systems.docx DOCX document
B08_Attachment_13_US_340_Rock_Slide_Handout_20230526.pdf PDF
B08_Attachment_4_HAFE_254773_GUTTERS___DRAINAGE_Price_Schedule_02_02_2023.xlsx XLSX spreadsheet
B08_Attachment_3_DOL_WD_JeffCo_WV20220037_6_30_23.pdf PDF
B08_Attachment_7_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S QUALITY CONTROL DAILY REPORT

REPORT NO. SHEET 1 OF 3

PRIVATE

PROJECT

CONTRACT NO.

DATE

PARK

CONTRACTOR'S REPRESENTATIVE ON THE JOB

WEATHER (Rain, Snow, Cloudy, Windy, etc.)
RAINFALL

Inches

TEMPERATURE
GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)

MAX.

MIN.

1. PRIME CONTRACTOR

NO. EMPLOYEES BY JOB CATEGORIES

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY PRIME CONTRACTOR:

MATERIALS DELIVERED

OFFICIAL VISITORS TO SITE

2A. SUBCONTRACTOR, _____________________________________________: (If more than one subcontractor use copies of following page.)

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)

4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)

Type and Location of Testing: ____________________________________________________________________________________

5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING REQUIRED:

6. REMARKS:

7. CERTIFICATION:

I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above.

Contractor's Quality Control Representative

PRIVATE

SUBCONTRACTOR WORK CONTINUED:

CONTRACT NO.
REPORT NO. _______

SHEET 2 OF 3

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
COMMENTS

WORK PERFORMED BY SUBCONTRACTOR:

DAILY TEST REPORT INFORMATION SHEET

CONTRACT NO. REPORT NO. _____________

SHEET 3 OF 3

PRIVATE

1. Individual Making Inspection or Test:

2. Testing Laboratory; Name:
Phone #:

Address:

3. Description of Work and Test Method:

4. Location of Samples and Tests or Inspections:

5. Specification Section:

6. Inspection or Test Data:

7. Test Results and Interpretations of Test Results:

8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:

9. Recommendations:

10. Corrective Actions Taken:

CERTIFICATION:

I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.

Signature of Inspector