This document is a Subcontracting Percentage Worksheet related to Solicitation 140P3024R0007 for the NACE Folger Park Rehabilitation project. The worksheet provides instructions for the prime contractor to calculate the subcontracting labor cost percentage, in accordance with FAR Clause 52.219-14 Limitations on Subcontracting. The worksheet requires the prime contractor to input their direct labor, fringe benefits, and general & administrative (G&A) costs, as well as the subcontractor's direct labor and G&A costs, if available. It then provides the formula to calculate the subcontracting labor cost percentage, which cannot exceed 85% of the total contract value, excluding materials. The prime contractor or similarly situated entities must perform a minimum of 15% of the work, excluding materials. The solicitation is being issued by the Department of the Interior National Park Service for the NACE Folger Park Rehabilitation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPS-National Capital Area Solicitation: 140P3022Q0014 – Strategic Elevator ID/IQ Page 2 of 2

United States Department of the Interior

NATIONAL PARK SERVICE

CONOPS NATIONAL

IN REPLY REFER TO:

6 August 2024

SUBJECT: FAR 52.219-14 – LIMITATIONS ON SUBCONTRACTING (DEVIATION OCT 2022)

SOLICITATION 140P3024R0007 – NACE Folger Park Rehabilitation

PRIME CONTRACTOR: ________________________________________________________

SUBCONTRACTOR: ___________________________________________________________

Is the subcontractor listed similarly situated? Yes or No (Circle one). Only one subcontractor shall be listed per form.

To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).

a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

e) Next, using the formula below, calculate the subcontracting labor percentage.

____(D)____

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

In accordance with FAR Clause 52.219-14(e)(3), General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Therefore, the prime contractor or similarly situated entities shall perform a minimum of 15 percent of the work, excluding the cost of materials.

NPS-National Capital Area Page 1 of 1

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

image1.png image2.emf

Microsoft_Excel_Worksheet.xlsx Sheet1

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR

FRINGE BENEFITS

SUB TOTAL (A)$0 (B)$0

LABOR G&A** @ 10.00% $0.00 10.00% $0.00

TOTAL LABOR COST (C)$0 (D)$0

Subcontracting Labor Percentage ERROR:#DIV/0!