B08_Attachment_4_Pipe_Penetration_Membrane-Roof.pdf

PDF 239 KB Posted

Attached to
REPLACE METER BASES & PANELS AT CAPEHART Federal contract opportunity
Solicitation number
140P8624R0007
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document appears to be a manufacturer's guide detail for installing a silicone roof coating around a plumbing vent or pipe penetration on a membrane roof. The details specify the required materials and installation procedures, including the use of a stain-blocking primer for existing modified bitumen or built-up roofing substrates. The document provides notes regarding acceptable substrates, completion of all detailing prior to coating installation, and reference to the manufacturer's warranty requirements. This appears to be a technical installation guide rather than a federal contract opportunity document.

The associated federal contract opportunity is a solicitation from the Department of the Interior National Park Service Pacific West Region to REPLACE METER BASES & PANELS AT CAPEHART. The solicitation number is 140P8624R0007, and the opportunity type is a Solicitation. No additional details about the contract requirements, pricing, or other terms are provided in the information given.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING PIPE PENETRATION FLASHING

EXISTING PREVIOUSLY COATED OR

NON-COATED ROOFING ASSEMBLY

EXISTING PIPE

PRO-GRADE

(STAIN BLOCKING PRIMER REQUIRED FOR

EXISTING MB/BUR ROOFS -SEE NOTE #2)

PRETREAT CORNER AT PIPE UPTURN PRIOR TO

COATING INSTALLATION USING ONE OF THE

METHODS BELOW:

(STAIN BLOCKING PRIMER REQUIRED FOR

EXISTING MB/BUR ROOFS -SEE NOTE #2)

· SEALANT (125 WET MILS)

- PRO-GRADE

- PRO-GRADE

- PRO-GRADE

· REINFORCED COATING (32 WET MILS)

EXTEND PRO-GRADE

988 ONTO EXISTING

PIPE PENETRATION FLASHING COMPLETELY

ENCAPSULATING ALL SURFACES

2"

MIN

2"

MIN

999 N. Sepulveda Blvd., Suite 800

El Segundo, CA 90245

800-486-1278 www.henry.com

SCALE: N.T.S. 06-20-2017

MANUFACTURER GUIDE DETAILS ARE FOR REFERENCE ONLY. HENRY

DOES NOT ASSUME RESPONSIBILITY FOR ERRORS OR

DEVIATIONS IN DESIGN OR ENGINEERING. PROJECT SPECIFIC VERIFICATION IS RECOMMENDED PRIOR TO INSTALLATION.

PLUMBING VENT OR PIPE PENETRATION

ON A MEMBRANE ROOF

NOTES:

1. DETAIL SHOWS PRO-GRADE

988 INSTALLED OVER AN EXISTING PREVIOUSLY COATED OR NON-COATED ROOFING

ASSEMBLY. ACCEPTABLE SUBSTRATES INCLUDE GRANULATED OR SMOOTH SURFACED MODIFIED BITUMEN (MB), SMOOTH SURFACED ASPHALT BUILT-UP ROOFING (BUR), AGED EPDM, PVC, HYPALON

OR TPO.

2. INSTALL PRO-GRADE

294 STAIN BLOCKING PRIMER ONTO EXISTING MB/BUR ROOF PRIOR TO FLASHING/COATING

INSTALLATION (STAIN BLOCKING PRIMER NOT SHOWN FOR CLARITY).

3. COMPLETE ALL DETAILING PRIOR TO INSTALLATION OF ROOF COATING.

4. DECK AND EXISTING ROOFING ASSEMBLY SHOWN ARE FOR REFERENCE ONLY.

5. REFER TO PRO-GRADE

988 GUIDE SPECIFICATION, INSTALLATION MANUAL AND/OR APPLICATION GUIDE FOR

RECOMMENDED INSTALLATION PROCEDURES.

6. REFER TO PRO-GRADE

988 WARRANTY CHART FOR SUBSTRATE SPECIFIC FIELD COATING MINIMUM

REQUIREMENTS.

PRO-GRADE

988 SILICONE ROOF COATING

PIPE PENETRATION

PG988-7A

Sheets and Views
7A_Pipe_Penetration_Membrane-Roof

File details come from the government source that posted it. Updated .