B08_-_Attachment_2_-_Price_schedule_-_NACE_Hazard_Tree_Maintenance.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- NACE FY26 HAZARDOUS TREE CYCLIC MAINTENANCE
- Solicitation number
- 140P3026Q0042
About this file
This is a Price Schedule Proposal for the FY26 Remove or Prune Hazardous and Diseased Trees project at the National Association for Conservation and Education (NACE) located at 1900 Anacostia Drive, Washington, DC 20020, under solicitation number 140P3026Q0042 issued by the Department of the Interior National Park Service.
The pricing schedule is structured into two contract line items (CLINs): CLIN 10 covering a six-month period from September through February, and CLIN 20 covering a six-month period from March through September. Each CLIN is valued at 60 days and requires submission of pricing for a tree crew as specified in the Statement of Work (SOW). The proposal template includes a daily breakdown section for each CLIN requiring vendors to provide hourly rates for specific labor categories including Site Supervisor, Arborist, Sawyer, and Ground Labor (multiple positions), as well as equipment costs, overhead and profit (OH&P), and a total daily rate calculation. However, the submitted proposal contains all zero values in the pricing fields, indicating this is either an incomplete submission or a blank template awaiting detailed pricing information from the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P3026Q0042.pdf | ||
| B08_-_Attachment_1_-_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_-_Attchment_3_-_SOW_FY26_Hazardous_Tree_Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Price Schedule Proposal | |
| NACE | |
| FY26 Hazard Tree Mitigation |
| Project Title | FY26 Remove or Prune Hazardous and Diseased Trees |
| Site Location | NACE |
| Address | 1900 Anacostia Dr |
| City State Zip | Washington, DC 20020 |
| Pricing Schedule Sheet | ||||||
| Quote Data: | ||||||
| CLIN | Cost Element/Source | Park | Project/Source | QTY days | Unit Price | Extended Price |
| 10 | Tree Crew (see SOW) 6 months (Sep - Feb) | NACE | 60 | $0.00 | $0.00 | |
| 20 | Tree Crew (see SOW) 6 months (March - Sep) | NACE | 60 | $0.00 | $0.00 |
$0.00
Preparer's signature:
Daily Breakdown
| CLIN 10 (6 MONTHS) | CLIN 20 (6 MONTHS) | ||
| CREW | Rate/hourly | CREW | Rate/hourly |
| Site Supervisor | Site Supervisor | ||
| Arborist | Arborist | ||
| Sawyer | Sawyer | ||
| Ground Labor | Ground Labor | ||
| Ground Labor | Ground Labor | ||
| Daily Labor Rate | 0 | Daily Labor Rate | 0 |
| Equipment | Equipment | ||
| OH&P | OH&P | ||
| Total Daily Rate | 0 | Total Daily Rate | 0 |
File details come from the government source that posted it. Updated .