B08 Attachment 2 Past Performance Evaluation Questionnaire.docx

DOCX document 21 KB Posted

Attached to
Repair Boiler Building 55350 and Plumbing Building 91249
Solicitation number
W9124A22R0012
Issued by

About this file

This document contains a performance assessment questionnaire template for evaluating past performance on federal contracts. The template requests information on the contractor, including company name, program details, contract number and type, award and completion dates, scope of work, and total value. It also includes sections for the contractor to identify a point of contact and for the respondent to provide ratings and rationale on compliance with requirements, project management, timeliness, customer satisfaction, and general comments. The respondent is asked to identify their organization, name, contact information, and note any other relevant past efforts for the contractor.

View the file

Other files

File Type Posted
B08 Amedment 0001 Solicitation W9124A22R0012 (Released).pdf PDF
B08 Amedment 0001 Solicitation W9124A22R0012 (Conform Released).pdf PDF
project-1-Picture 13 Bldg 91249 Outside Ground.pdf PDF
project-1-picture 7 fourth floor Ladder.pdf PDF
project-1-Picture 11 outide wall of Bldg 91249 Leaders and Grounding.pdf PDF
B08 Solicitation W9124A22R0012 07-05-2022.pdf PDF
B08 Attachment 3 Wage Determination General Decision Number AZ20220023 06-10-2022 Building.pdf PDF
project-1-201809697-91249-historic asbestos testing.pdf PDF
project-1-201807524-91249-Tower-Cabin-Windows.pdf PDF
B08 Attachment 1-SOO-combined-HUAC-FEE18018-8J-Bldg-55350-HIO32505-8J-Bldg-91249-30-JUN-2022.docx DOCX document
project-1-Picture 12 Bldg 91249 outside water valve.pdf PDF
project-1-picture 1 first floor conduit.pdf PDF
project-1-picture 6 third floor overflow drain.pdf PDF
project-1-223-25-360 Flight Control Tower.pdf PDF
project-1-Fort Huachuca 91249 Floor 01.pdf PDF
project-1-91249-Sample-Plan-Tower-Cabin-Windows.pdf PDF
project-1-picture 2 first floor ladder and telecom cable.pdf PDF
project-1-Picture 12 Bldg 91249 outside water valve (1).pdf PDF
project-1-91249-SP-ACM-LBP-Ext-Ladder.doc DOC document
project-1-picture 10 Sixth floor Bathroom.pdf PDF
project-1-201804690-91249-WC-1st-Floor-Equip-Rm-Tower-Cabin.pdf PDF
project-1-Picture 8 Fourth Floor Valves.pdf PDF
project-1-Fort Huachuca 91249 Floor 03.pdf PDF
project-1-Fort Huachuca 91249 Floor 06.pdf PDF
project-1-BACT Testing.pdf PDF
project-1-Fort Huachuca 91249 Floor 04.pdf PDF
project-1-Combined Photos a.pdf PDF
project-1-Picture 3 Second floor conduit.pdf PDF
project-1-201910012-C EMGS.pdf PDF
project-1-Fort Huachuca 91249 Floor 05.pdf PDF
project-1-picture 4 second floor dry transformer.pdf PDF
project-1-picture 9 Fifth Floor Kitchen.pdf PDF
project-1-Fort Huachuca 91249 Floor 02.pdf PDF
project-2-223-25-361 Electromagnetic Test Facility.pdf PDF
project-1-91248 Utility Site Plan-91248 AREA GAS SEWER WATER.pdf PDF
project-1-Picture 5 third floor Water Heater.pdf PDF
project-1-20-001 Bldg 91249 LAAF Control Tower Egress HIO14201-7J.pdf PDF
project-1-201609924-91249-tower-stairs-breakroom floor.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Assessment Questionnaire

Please provide your candid responses. The information that you provide will be used in the awarding of federal contracts. Therefore, it is important that your information be as factual, accurate and complete as possible to preclude the need for follow-up by the evaluators. If you do not have knowledge of or experience with the company in question, please forward this Questionnaire to the person who does. Please return the completed Questionnaire to the Contracting Officer identified in the cover letter within the stated timeframe.

Rating Definitions:

Substantial Confidence: Performance meets contractual requirements and exceeds many requirements that benefit the end user. Work was accomplished with few, if any, minor problems for which corrective actions taken by the contractor were highly effective. The offeror has been highly successfully in performing the required effort.

Satisfactory Confidence: Performance meets contractual requirements and exceeds some requirements that benefit the end user. Work was accomplished with some minor problems for which corrective actions taken by the contractor were effective. The offeror has successfully performed the required effort.

Limited Confidence: Performance does not meet some contractual requirements. Serious problems with contractor performance were experienced for which the contractor has either not yet identified corrective actions or the corrective actions taken appear only marginally effective. The offeror has had little success performing the required effort.

No Confidence: Performance does not meet most contractual requirements. Serious problems with contractor performance were experienced for which the corrective actions were ineffective. The offeror has not successfully performed the required effort.

PART I. (To be completed by the Offeror)

A. CONTRACT IDENTIFICATION

Contractor/Company Name/Division:

Address:

Program Identification/Title:

Contract Number:

Contract Type:

Prime Contractor Name (if different from the contractor name cited above):

Contract Award Date:

Forecasted or Actual Contract Completion Date:

Nature of the Contractual Effort or Items Purchased:

Total Contract Value:

B. IDENTIFICATION OF OFFEROR’S REPRESENTATIVE

Name:

Title:

Date:

Telephone Number:

Address:

E-mail Address:

PART II. EVALUATION (To be completed by Point of Contact – Respondent) *Note: rationale is required for each response.

A. Compliance of Products, Services, Documents, and Related Deliverables to Specification Requirements and Standards of Good Workmanship

· Substantial Confidence

· Satisfactory Confidence

· Limited Confidence

· No Confidence

Rationale: __________________________________________________________

B. Effectiveness of Project Management (to include use and control of subcontractors).

· Limited Confidence

· No Confidence

Rationale: __________________________________________________________

C. Timeliness of Performance for Services and Product Deliverables.

· Limited Confidence

· No Confidence

Rationale: __________________________________________________________

D. Commitment to Customer Satisfaction and Business-like Concern for its Customers’ Interest

· Limited Confidence

· No Confidence

Rationale: __________________________________________________________

E. General Comments. Provide any other relevant performance information.

Comments: _________________________________________________________

F. Other Information Sources. Please provide the following information:

Are you aware of other relevant past efforts by this company?

If yes, please provide the name and telephone number of a point of contact:

Point of Contact (Name): __________________________________________ Telephone Number: ______________________________________________

G. Respondent Identification. Please provide the following information:

Organization:

Name:

Title:

Date:

Telephone Number Address:

E-mail Address:

PART III. RETURN INFORMATION

Thank you for your assistance.

________________________________________________________________________________
SignatureDate

Typed or Printed Name

File details come from the government source that posted it. Updated .