B08_Attachment_2_EP_Well_Houses_Rehab_Specifications_Updated_6_13_24.pdf
PDF 2 MB Posted
- Attached to
- YOSE- REHAB WELL HOUSES 2/6 AND 3/7
- Solicitation number
- 140P8524R0006
About this file
This document appears to be a set of technical specifications for the rehabilitation of Well Houses 2/6 and 3/7 at Yosemite National Park. The work includes replacing interior piping, valves, meters, chemical feed equipment, and doors in the well houses, as well as installing new metal roofs, soffits, and safety showers. Bid options are included for replacing the well pumps in wells 2, 3, and 7. The project is set aside for small businesses, with a NAICS code of 237110 and a size standard of $45.0 million. Proposals are due by 12:00 p.m. Pacific Time on July 15, 2024, and the estimated construction magnitude is between $500,000 and $1,000,000. The project is being procured by the Department of the Interior National Park Service.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YOSEMITE NATIONAL PARK
CALIFORNIA
REHABILITATE WELL HOUSES 2/6 AND 3/7 IN EL PORTAL
PMIS NO. 248058
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
PACIFIC WEST REGION
March 2024
Rehabilitate Well Houses 2/6 and 3/7 Specifications 3/2024
YOSE - 248058 1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 33 23 Submittal Procedures 01 35 13 Natural Resources Protection 01 35 13.22 Archeological and Cultural Resources Protection 01 35 23 Safety Requirements 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data
DIVISION 03 – CONCRETE
03 33 00 Cast-in-Place Concrete
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 41 13 Metal Roof Panels 07 42 13 Metal Soffit Panels
DIVISION 09 – FINISHES
09 91 00 Painting
DIVISION 26 – ELECTRICAL
26 00 10 Common Work Results for Electrical 26 05 48 Seismic Requirements for Electrical Systems
DIVISION 31 – EARTHWORK
31 23 33 Utility Trenching and Backfilling
DIVISION 33 – UTILITIES
33 13 00 Disinfection of Water System
DIVISION 40 – PROCESS INTEGRATION
40 05 24 Openings and Penetrations in Construction
YOSE - 248058 2
40 28 00 Pipe and Pipe Fittings: General Statement 40 28 00.01 Pipe: Steel 40 28 00.02 Pipe: Ductile Iron 40 28 01 Pipe Support Systems 40 28 02 Valves 40 28 02.02 Gate Valves 10 28 02.04 Butterfly Valves 40 28 02.07 Check Valves 40 28 02.09 Specialty Valves
YOSE - 248058 01 11 00 - 1
SUMMARY OF WORK
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 WORK SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work phases.
3. Government Furnished Materials.
4. Contractor use of site.
5. Occupancy requirements for buildings.
6. Conduct of operations.
7. Work Restrictions.
8. Special Construction Requirements
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: El Portal, Mariposa County, California in the administrative area for Yosemite National Park. The project includes the existing Well Houses 2/6 and 3/7.
B. The Work consists of the following:
1. The Work includes improvements to the existing El Portal Water System. The work includes, but is not limited to, the following major components:
a. Well House #2/6 Improvements, including, but not limited to, replacement of existing in-terior piping, valves, meters and appurtenances; replacement of the chemical feed equipment and chemical storage tanks; adding a safety shower within the building; replacing both metal door frames and doors, applying the specified coatings to the walls and floor of the building;
metal soffit installation, and replacement of the supply and distribution pipe from inside the building to the outside of the building, and connecting to the existing piping.
b. Well House #3/7 Improvements, including, but not limited to, replacement of existing in-terior piping, valves, and appurtenances; replacement of the chemical feed equipment and chemical storage tanks; adding a safety shower within the building, replacing the single metal door frame and door, applying the specified coatings to the walls and floor of the building;
replacement of the existing cedar shake roof with a metal roof, soffit repairs, and installation of a metal soffit.; and replacement of the supply and distribution piping from inside the building to the outside of the building and connecting to the existing piping.
c. Well pump replacement for wells #2 and #6 (BID OPTION A ONLY)
d. Well pump replacement for wells #3 and #7 (BID OPTION B ONLY)
C. Project will be constructed under a single prime contract.
YOSE - 248058 01 11 00 - 2
1.3 WORK PHASES
A. The Work shall be conducted to minimize interruptions to existing water service. Each wellhouse will be its own phase to keep interruptions to a minimum.
1.4 GOVERNMENT FURNISHED MATERIALS
A. There will be no Government-furnished material or equipment on this project.
1.5 CONTRACTOR USE OF SITE
A. General:
1. The Contractor’s use of the premises is limited to the scheduled construction period and restricted to the designated work areas, including staging area(s) allocated for Contractor’s use and shown on the drawings. Staging locations are to be approved by the Contracting Officer.
Do not disturb portions of Project site beyond areas in which the Work is indicated. Contractor shall restore all disturbed surfaces in and around the well houses to pre-construction conditions, excluding the new equipment.
2. Limit site disturbance, including trenching and clearing of vegetation, to 20 feet beyond building perimeter.
3. The Contractor may move personnel, equipment, and material on park roads for the purpose of performing the work, subject to restrictions described in the Contract Documents.
4. General information about the use of YNP facilities can be found on the park website at https://www.nps.gov/yose/index.htm, in the official park map, and in the Yosemite Guide newsletter. The latest versions of the map and newsletter are available at park entrance stations, visitor contact stations, and on the park website.
5. Contractor personnel shall at all times comply with all published park regulations.
6. Contractor’s use of the site shall be shared with other users and limited by the Government’s right to perform work. Road access to adjacent well houses must remain open at all times; all other internal roads may only be interrupted between the hours of 6:00PM and 6:00AM with 48-hour previous notice and approval.
7. Confine storage of materials to staging areas noted on drawings, or other locations within the project boundary as previously reviewed and approved by the COR. All material storage areas must be defined and approved prior to the start of construction.
B. Preservation of Natural Features:
1. Refer also to Section 1 35 50 Natural and Cultural Resource Protection
2. All earth-moving equipment shall be power washed and inspected before entering the Park to ensure it is free of non-native weeds and/or seeds. Equipment will be inspected by NPS Park Botanist. In addition, all excavated soil for trenching will be placed on a tarp and used to backfill the trench. No additional fill may be brought in or used without approval and inspected from the Service.
3. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
4. Provide temporary barriers to protect existing trees and plants and root zones.
https://www.nps.gov/yose/index.htm
YOSE - 248058 01 11 00 - 3
5. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with COR and remove agreed-on roots and branches that interfere with construction.
6. Do not fasten ropes, cables, or guys to existing trees.
7. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
C. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, park visitors, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
D. Construction Camp: No contractor camping is allowed at the site or elsewhere in the park.
E. Hauling Restrictions: Comply with all legal load restrictions and maximum vehicle height and length in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.
Information regarding vehicle restrictions in the park can be found at https://www.nps.gov/yose/planyourvisit/restrictions.htm. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment. Wide loads require permits and escorts from the park traffic management office, with a minimum two week notice, and transport is required to occur during normal work hours when escort staff are available.
1. Vehicles over 45 feet are prohibited and 1-way controlled traffic for all other vehicles 20 miles East of Mariposa (Mariposa County) 24 hours per day, seven days per week due to rockslide repairs.
1.6 OCCUPANCY REQUIREMENTS FOR BUILDINGS
A. Two buildings are present in the construction area and must allow for entrance and usage by the Park at all times.
1.7 CONDUCT OF OPERATIONS
A. At all times the contractor shall conduct his operations in conformance with the federal, state, local, and park rules and regulations.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer (CO). Submit requests ten (10) work days in advance of such work to the CO for approval. Requests for work which will generate noise disruptive to visitors and residents during evening hours will not be considered.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the CO.
https://www.nps.gov/yose/planyourvisit/restrictions.htm
YOSE - 248058 01 11 00 - 4
1.8 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be performed between 8:00 a.m. and 5:00 p.m., Monday through Friday, unless otherwise indicated.
1. If weekend, evening, or early morning hours are needed to complete project on schedule, Contractor shall obtain approval from CO.
B. Existing Utilities
1. Existing Utilities: Contractor is responsible for properly initiating a ticket with the California 811 Utility Locate service prior to any digging. Yosemite is considered to be in Northern California, which is served by https://www.usanorth811.org/. Contractor is also responsible for notifying the COR and the YNP Utility Branch Chief of proposed locations and times for excavation at least two weeks in advance to allow for NPS location of NPS-owned utilities.
2. Contractor shall be responsible for locating and preventing damage to known utilities by hand-digging prior to using heavy equipment to dig. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Contractor shall submit a plan for any utility interruptions to the COR not less than 14 days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without the Government’s written permission.
D. Work in Roadways: Temporary Traffic Control shall conform to the requirements outlined in Section 01 55 26.
E. Rain and snow may interfere with construction at the Work location. Snow plowing of main access routes to the Site will be performed by the Government only when required for public safety or convenience. Plowing of access roads within the Project work area is the responsibility of the Contractor.
F. The Park or Park roads may be closed by the Government during emergencies. Park roads are frequently congested by tourist traffic during the summer months, weekends, and holiday periods.
The Contractor shall take into consideration operational limits on site access.
G. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
A. Contractor shall complete pre-construction walk-through with the Contracting Officer Representative to verify all piping alignments, and general scope of work.
https://www.usanorth811.org/
YOSE - 248058 01 11 00 - 5
B. State of California Department of Public Health (CDPH) Drinking Water permits to operate shall be obtained by the Park using test reports and other documentation provided by the Contractor before the end of the contract. This shall include completion of required CDPH inspections.
C. The contractor shall perform, acquire, and provide the following:
1. Utilities approved valving plan
2. Lockout Tagout (water and electric)
3. Flushing and disinfection plan AWWA C-651
4. Disinfection of wells AWWA C-654
5. NSF 60 & 61 for materials and additives.
6. Temporary water permit for construction water.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
YOSE - 248058 01 26 01 - 1
CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01
CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 WORK SUMMARY
A. The work of this section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager, Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
YOSE - 248058 01 26 01 - 2
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker.
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation– Policy and company calculation to be made available.
4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.
YOSE - 248058 01 26 01 - 3
5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.
6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank
YOSE - 248058 01 26 01 - 4
reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government-provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 “Construction Schedule” for TIA requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS.
All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each, and itemizing the hours required for each craft that will be directly engaged in modification work.
Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers’ compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor costs for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
http://www.nps.gov/dscw/publicforms.htm#cf http://www.nps.gov/dscw/publicforms.htm#cf
YOSE - 248058 01 26 01 - 5
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers schedule is utilized, then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then half of the equipment costs minus any operating costs, major repair, and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment standby time must be justified, documented, and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts, and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31 which have been applied to the specific type of work included in this project.
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to part 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
YOSE - 248058 01 26 01 - 6
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 01 26 01
YOSE - 248058 01 27 00 - 1
DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00
PART 1 GENERAL
1.1 WORK SUMMARY
A. This section covers requirements for performing and completing the work items in accordance with the Contract Documents, and establishes a basis for measurement and payment for each bid item of work.
B. Provide all labor, materials, tools, equipment, services, and incidentals as necessary to perform the work as described in this section and in accordance with the Contract Documents and Drawings and to the satisfaction of NPS.
C. Work will be paid for at the bid prices listed in the bid schedule. It is the responsibility of the Contractor to make a thorough investigation of the Contract Documents, and the site to determine the scope of work included in bid items. The payment of said prices will constitute complete compensation for all work shown on the Drawings and provided in the Specifications or other Contract Documents, and for all costs of accepting the general risks, liabilities and shall include, but not be limited to, compensation for overhead, profit, materials, equipment and labor and services, and performing all work required to accomplish and complete the work specified.
D. Conformance with the requirements of this section shall in no way relieve the Contractor from his/her responsibilities for compliance with laws, regulations, orders, and decrees, or responsibilities for public safety and convenience applicable to the Project, and the provisions of the Contract Documents.
1.2 RELATED WORK
A. Attention is directed to the General Requirements and related work specified in other sections includes, but is not limited to:
a. Section 01 31 00, Project Management and Coordination
b. Section 01 71 13, Mobilization
1.3 DEFINITIONS
A. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.
B. Measurement by Area: Measured by square dimension, parallel to the surface improvement, using mean length and width or radius.
C. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness.
D. Measurement by Weight: Measured by mass using permanently-installed and certified commercial scales.
YOSE - 248058 01 27 00 - 2
1.4 SUBMITTALS
A. Submittals shall be in conformance with Contracting Requirements, Specifications, and Division 1 - General Requirements.
1.5 REFERENCES
A. Applicable ASTM and AASHTO standards.
B. A reference within parentheses to a law or regulation is included in the Contract for convenience only and is not a comprehensive listing of related laws and regulations. Lack of a reference does not indicate no related laws or regulations exist.
C. Where the version of a referenced document is not specified, use the most recent version in effect on the date of the Notice to Bidders.
D. A code not specified as a federal code is a California code.
E. An agency or a department not specified as a federal or local agency or department is a California agency or department.
1.6 QUALITY ASSURANCE
A. Conform to the Contract Documents including but not limited to Permits, Technical Conditions, Drawings, and Standard Specifications.
B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
C. NPS may assure conformance to contract specifications by inspection of the Contractor's procedures, by oversight of the Contractor's quality control inspection and records, and by independent verification sampling and testing. Acceptance tests will be performed using similar test methods used for quality control testing.
1.7 PROJECT CONDITIONS AND REQUIREMENTS
A. Unless otherwise specified, measurement will be made when the work is in place, complete, and accepted.
B. Measurements will be made of the actual work performed, except work outside the design limits or other adjusted or specified limits (staked limits) will not be measured.
C. After the items of work are completed and before final payment is made, the quantities of the items of work performed will be determined as the basis for final settlement.
1.8 TOLERANCES
A. Actual authorized quantities of work satisfactorily completed under the contract will be measured according to United States Standard Measures for English units.
B. Unauthorized wasting of material will be deducted and only such quantities as are actually incorporated in the completed work will be included in the final progress payment.
YOSE - 248058 01 27 00 - 3
PART 2 PRODUCTS
2.1 GENERAL
A. Conform to the Contract Documents including but not limited to Permits, Technical Conditions, Drawings, and Standard Specifications.
PART 3 EXECUTION
3.1 GENERAL
A. The Contractor shall perform all work necessary to construct and deliver to NPS a complete Project conforming to the Contract Documents. Details not shown or provided in the Drawings and Specifications, but required for a complete and operational Project, shall be included in the Contract Price as approved by NPS.
B. Progress payments to Contractor will conform to each Bid Item in this section and Section 01 77 00 Closeout Procedures.
C. The quantity of materials shown on the Drawings is approximate only and is provided for reference in preparation of the Contractor’s Schedule of Values; the actual quantity of materials used for completion of the work as shown on the Drawings may vary.
D. Measurements and quantities for materials supplied and improvements scheduled to be completed or placed in the Work are to be verified by the NPS Representative having authority for approvals and final acceptance.
E. Substantial completion and final inspection and completion of the work shall conform to General Requirements and Section 01 77 00 Closeout Procedures.
3.2 COORDINATION AND SCHEDULING OF THE WORK
A. It is the Contractor’s responsibility to coordinate and plan construction activities such that the required sequencing, time constraints, and milestones stated in the Contract Documents are incorporated into the overall performance of the Work.
B. Unless otherwise specified, the Work to be performed by the Contractor is not required to follow any sequences as may be apparent in the list of bid items.
3.3 MEASUREMENT OF QUANTITIES
A. Full compensation for all expenses involved in conforming to the requirements for measuring quantities shall be considered as included in the fixed, unit, or lump-sum prices paid for the quantities being measured, and no additional compensation will be paid therefore.
B. Unit price work will be measured according to the Contract Documents, and as specified herein.
For all bid items listed in the Pricing Schedules as Lump Sum work items, no measurement for payment is required for the work performed under those work items.
C. Lump Sum Work - Lump sum payments will be made in accordance with estimates made by the Contractor, submitted to NPS for review and verification and approved by NPS for the amount and value of work performed by the Contractor up to the time of each estimate.
YOSE - 248058 01 27 00 - 4
D. Unit Price Work - Payment for any item of work which has a fixed unit price in the Contract, shall be based on the actual number of units of work satisfactorily completed in accordance with the Contract, as determined by NPS. No payment will be made for work done, for the Contractor’s convenience that is outside of the prescribed or ordered limits.
3.4 BID ITEMS OF WORK DESCRIPTIONS
A. The bid items of work described hereunder, paid pursuant to the Agreement for the Contract items of work identified in the Pricing Schedule, shall constitute full compensation for furnishing all labor, materials, tools, equipment, services, and incidentals as necessary to perform all work in the manner and time prescribed in the Contract Documents, inclusive of all provisions in the Contract Documents, complete and in place as shown on the Drawings, and as otherwise may be directed by NPS.
B. Progress Payments will be made as work progresses, conforming to the provisions of the Contract Documents.
C. Base Bid Rehabilitate Well Houses 2/6 and 3/7
1. Contract Line Item No. 10 – Mobilization / Demobilization [LS]
a. This item consists of mobilizing and demobilizing all required equipment and construction materials to the site. For bid purposes, 60% shall be mobilization, 40% shall be demobilization.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as conforming to all the requirements in the complete work.
c. Payment will be made at the contract price paid shall include full compensation for mobilizing the Contractor's forces which shall include but not be limited to: bonds, insurance, permits, submittals, professional services, record drawings, purchasing, transportation, setup, establishment of a field office and staging yards, project signage, labor requirements, safety protocols, cleaning of equipment, and furnishing all labor, materials, tools, equipment, services and incidentals required for performance and completion of the work; including full compensation for Closeout Procedures and operations required to demobilize the Contractor's forces and restore all staging and storage areas and project site which shall include but not be limited to: the removal of all equipment, materials, debris, project signs, field office, and clean-up for a complete as shown on Drawings conforming to the Contract Documents; and as otherwise directed by and to the acceptance of NPS.
d. Payment will be made at the contract lump sum price. Maximum price for this bid item shall be six percent (6%) of the Total Base Bid.
2. Contract Line Item No. 20– Rehab Well House 2/6 [LS]
a. This item consists of furnishing all materials, equipment, and labor to upgrade the interior of the well house. It is proposed to replace all the piping within the well house with new piping. The air release valve, flow meter, pressure gauges, sampling taps, flexible chemical piping, injection taps, check valve, gate valves, globe valves, pressure gauges, spigots, and fittings are to be replaced as well. In addition, unions will be provided to aid in maintenance activities. The new piping and fittings will basically match the existing except for the upgrades in materials.
A new eyewash station is to be added within the well house. A new heating unit is to be provided for temperature control. Aluminum soffits are to be installed as noted on the plans, along with some minor structural repairs. The distribution
YOSE - 248058 01 27 00 - 5
piping from inside the well house to the outside of the well house is to be replaced with new pipe and a new valve. The interior and exterior of the well house and equipment is to be painted in epoxy sealskin brown.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as conforming to all the requirements in the complete work.
c. Payment will be made at the contract lump sum price.
3. Contract Line Item No. 30 – Rehab Well House 3/7 [LS]
a. This item consists of furnishing all materials, equipment, and labor to upgrade the interior of the well house. It is proposed to replace all the piping within the well house with new piping. The air release valve, flow meter, pressure gauges, sampling taps, flexible chemical piping, injection taps, check valve, gate valves, globe valves, pressure gauges, spigots, and fittings are to be replaced as well. In addition, unions will be provided to aid in maintenance activities. The new piping and fittings will basically match the existing except for the upgrades in materials.
A new eyewash station is to be added within the well house. A new heating unit may or may not need to be provided for temperature control. Aluminum soffits are to be installed as noted on the plans, along with installation of a metal-seam roof.
The distribution piping from inside the well house to the outside of the well house is to be replaced with new pipe and a new valve. The interior and exterior of the well house and equipment is to be painted in epoxy sealskin brown.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as
4. Contract Line-Item No. 40 – Bid Option A – Replace the Well Pump for Well 2 [LS]
a. This item consists of furnishing all materials, equipment, and labor to install new submersible pumps in well 2. The pump for Well 2 is a 7.5 HP pump.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as
5. Contract Line-Item No. 50 – Bid Option A – Replace the Well Pump for Well 3 [LS] submersible pumps in well 3. The pump for Well 3 is a 15.0 HP pump.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as
6. Contract Line-Item No. 60 – Bid Option D – Replace the Well Pump for Well 7 [LS] submersible pumps in well 7. The pump for Well 7 is a 5.0 HP pump.
b. Payment shall be measured on a lump sum basis, complete and accepted by NPS as
END OF SECTION 01 27 00
YOSE - 248058 01 31 00 - 1
PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 WORK SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on the Project including, but not limited to, the following:
1. Construction Coordination.
2. Submittals
3. Requests for Information (RFIs).
4. Project meetings.
5. Environmental Coordination.
6. Project Conditions and Requirements
7. Permits
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 Closeout Procedures for coordinating closeout of the Contract.
C. Definitions:
1. Agency with Jurisdiction
2. Construction Permits – Contractor Provided
3. Government Furnished Permits
1.2 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations to ensure efficient and orderly installation of each part of the Work.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair or all components, especially where availability of space is limited.
3. Make provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
http://www.nps.gov/dscw/definitionsdc_a.htm#awj http://www.nps.gov/dscw/definitionsdc_c.htm#cpcp http://www.nps.gov/dscw/definitionsdc_g.htm#gfperm
YOSE - 248058 01 31 00 - 2
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Permit requirements.
7. Pre-installation conferences.
8. Closeout Procedures activities.
9. Commissioning activities.
1.3 SUBMITTALS
A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer’s Representative (COR) will notify Contractor of tentative date for the Pre-Construction Conference.
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Temporary Storm Water Pollution Prevention Plan (UPPP).
11. Contractors Commissioning Plan.
12. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
B. All items listed must be provided to the Contracting Officer (CO) and the COR before the Pre- Construction Conference is held. If all of these documents have not been received one week
YOSE - 248058 01 31 00 - 3
prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
1.4 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI.
1. CO will not respond to RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the
Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
8. Contractor's signature.
9. Requested date for response.
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.
CO will determine the critical nature of each RFI and issue a response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of engineer’s actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. CO’s action may include a request for additional information, in which case time for response will date from time of receipt of additional information.
3. CO’s action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.
YOSE - 248058 01 31 00 - 4
1.5 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, the CO will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:
1. Roles & Responsibilities/ Lines of Authority.
2. Park rules and regulations.
3. Jobsite Safety.
4. Resolution of comments on required Division 01 documents.
5. Coordination of Subcontractors.
6. Labor law application.
7. Modifications.
8. Payments to Contractor.
9. Payroll reports.
10. Contract time.
11. Liquidated damages.
12. Contractor Performance Evaluation.
13. Display of Hotline posters.
14. Notice to proceed.
15. Correspondence procedures.
16. Acceptance/rejection of work.
17. Progress meetings.
18. Submittal procedures.
19. NPS Final Accessibility Inspection.
20. Environmental requirements.
21. Permit requirements.
22. As-constructed drawings/operation and maintenance (O&M) manuals.
23. Saturday, Sunday, holiday and night work.
24. Reference materials.
25. Value engineering.
B. Progress Meetings: The Contractor shall schedule weekly meetings with the CO and other Government representatives. The Contractor shall facilitate these meetings and document the agenda and minutes.
1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.
All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:
a. Approval of minutes of previous meetings.
b. Submittal status.
c. Review of off-site fabrication and delivery schedules.
d. Requests for information (RFI) and other issues.
e. Modifications.
f. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
YOSE - 248058 01 31 00 - 5
g. Inspections of work in progress and projected special inspections
h. Construction Schedule update (provide updated CPM).
i. Status of Project Record Drawings and O&M manuals.
j. Other business relating to work.
k. Permit requirements.
1.6 ENVIRONMENTAL COORDINATION
A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.
1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.
2. Responsibilities: Responsibilities shall include:
a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.
b. Implementation of the Waste Management Plan (WMP).
c. Implementation of the Storm Water Pollution Prevention Plan (UPPP).
d. Presentation of an overview of environmental issues and site specific procedures relating to management plans at the Preconstruction conference.
e. Training for Contractor personnel in accordance with their position requirements.
f. Monitoring and documentation of environmental procedures.
B. Perform project quality control in accordance with requirements specified in Related Sections, including:
1. Quality Requirements.
2. Regulatory Requirements.
3. Noise & Acoustics Management.
4. Temporary Storm Water Pollution Prevention Environmental Management.
5. Construction Waste Management.
C. Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:
1. Overview of environmental issues related to the building industry.
2. Overview of environmental issues related to the Project.
3. Review of site-specific procedures and management plans:
a. Construction Waste Management.
b. Noise & Acoustics Management.
c. Temporary Storm Water Pollution Prevention.
4. Compliance with environmental regulations: As specified in Regulatory Requirements.
Submit Contractor 40 CFR employee training records upon request of the CO.
D. Provide documentation for environmental procedures as specified herein and in accordance with approved Waste Management Plan and Storm Water Pollution Prevention Plan.
YOSE - 248058 01 31 00 - 6
1.7 PROJECT CONDITIONS AND REQUIREMENTS
A. This project is planned for the 2024 - 2025 construction season.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .