B08_Attachment_14_Bid_Schedule.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- REPAIR/REPLACE ROOFING ON AZ STRUCTURES
- Solicitation number
- 140P8624R0005
About this file
This document is a Bid Schedule for a federal contract opportunity related to repairing or replacing roofing on various structures in the Golden Gate National Recreation Area in San Francisco, CA.
The solicitation number is 140P8624R0005, and the project is titled "Repair or Replace Roofing on Various Structures". The Bid Schedule requires offerors to provide pricing for all base line items and any option line items. The line items include repairing the roof of the Alcatraz Dock Restroom, replacing the roof of the Alcatraz Electric Shop, and providing unit pricing for associated dry rot repairs. The total base price for the contract line items 1 through 4 is to be provided. All measurement and payment information is included in the project specifications.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quote-Price Sheet Offerror:
| Bid Schedule | ||||||||
| SOLICITATION NUMBER: 140P8624R0005 | ||||||||
| PARK - PMIS: 306945B | ||||||||
| DEVELOPED AREA: Golden Gate National Recreation Area, San Francisco, CA | ||||||||
| PROJECT TITLE: Repair or Replace Roofing on Various Structures | ||||||||
| Quoters are required to submit, at a minimum, a quotation that conforms to the solicitation documents with pricing for all Base line items and all Option line items (if any). Failure to do so may render your quotation unacceptable. For any lump-sum (LS) line items, provide the total price only. For any unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars. Failure to provide all information may be cause for an unfavorable rating. | ||||||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | MATERIAL | LABOR | EQUIPMENT | MARKUPS | TOTAL PRICE |
| 1 | Repair Roof Alcatraz Dock Restroom | 1 | LS | $ - 0 | ||||
| 2 | Dock Restroom Dry Rot. Square Feet (SF) Unit Pricing (To include demo, repair, put back, cleaning, labor, materials and markups) | 106 | SF | $ - 0 | ||||
| 3 | Replace Roof Alcatraz Electric Shop | 1 | LS | $ - 0 | ||||
| 4 | Electric Shop Dry Rot. Linear Feet (LF) Unit Pricing (To include demo, repair, put back, cleaning, labor, materials and markups) | 110 | LF | $ - 0 | ||||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) -------------------------------------------------------------------------- | $ - 0 | |||||||
| All measurement and payment information is included in the project specifications, Section 012700. |
File details come from the government source that posted it. Updated .