B08_Attachment_2_EXHIBIT_A_-_Dock_Restroom_and_Electric_Shop_Existing_Conditions.pdf

PDF 12 MB Posted

Attached to
REPAIR/REPLACE ROOFING ON AZ STRUCTURES
Solicitation number
140P8624R0005
Issued by

About this file

This document appears to be Exhibit A - Dock Restroom and Electric Shop Existing Conditions, which is an attachment to Solicitation Number 140P8624R0005 issued by the Department of the Interior National Park Service Pacific West Region to REPAIR/REPLACE ROOFING ON AZ STRUCTURES.

The exhibit provides details on the existing conditions of the dock restroom and electric shop facilities that are part of the overall roofing repair/replacement project. It includes information on the building layouts, dimensions, construction materials, and existing utility infrastructure. This attachment would provide important context for offerors responding to the solicitation requirements for the roofing work at these specific facilities.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing Conditions Summary

Repair or Replace Roofing at Various Structures, Alcatraz (Dock Restroom and Electric Shop, AL-89)

September 20, 2023

Dock Restroom

Electric Shop

Dock Restroom - Concrete Tile Roofing System Repair

4’x4’ skylights. 2 of 4 depicted.

Dock Restroom Utility Corridor Sheathing Rot Area #1: 8 SF

All square footages are approximate. Contractor to field verify.

Dock Restroom Utility Corridor Sheathing Rot Area #2: 22 SF

All square footages are

Dock Restroom Utility Corridor Sheathing Rot Area #3: 16 SF Note spare concrete ridge and field tiles.

All square footages are approximate. Contractor to field verify.

Dock Restroom Utility Corridor Sheathing Rot Area #4: 8 SF (2 boards/2 rafter bays)

All square footages are approximate. Contractor to field verify.

Dock Restroom Utility Corridor Sheathing Rot Area #5: 20 SF

Dock Restroom Men’s Side Sheathing Rot Area #6: 12 SF

Dock Restroom Men’s Side Sheathing Rot Area #7: 8 SF (2 boards/2 rafter bays)

Dock Restroom Men’s Side Sheathing Rot Area #8: 4 SF

Dock Restroom Women’s Side Sheathing Rot Area #9: 4 SF

Dock Restroom Women’s Side Sheathing Rot Area #10: 4 SF

Dock Restroom Water Fountain Cover - eastern elevation

Dock Restroom Water Fountain Cover -western elevation

Dock Restroom Water Fountain Cover

– rafters/ridge beam

Dock Restroom Water Fountain Cover– rafters/ridge beam

Electric Shop – Corrugated Transite Roof Replacement

22’x65’

All linear footages are approximate.

Contractor to field

Electric Shop – Rafter Rot Area #11 – 2 full rafter replacements @ 44 LF total

All linear footages are approximate. Contractor to field verify.

Electric Shop – Rafter Rot Area #12 – One full rafter replacement @ 22LF total

All linear footages are approximate. Contractor to field verify.

Electric Shop – Rafter Rot Area #13 – 2 full rafter replacements @ 44LF total

All linear footages are

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22

File details come from the government source that posted it. Updated .