B08_Attachment_2_EXHIBIT_A_-_Dock_Restroom_and_Electric_Shop_Existing_Conditions.pdf
PDF 12 MB Posted
- Attached to
- REPAIR/REPLACE ROOFING ON AZ STRUCTURES
- Solicitation number
- 140P8624R0005
About this file
This document appears to be Exhibit A - Dock Restroom and Electric Shop Existing Conditions, which is an attachment to Solicitation Number 140P8624R0005 issued by the Department of the Interior National Park Service Pacific West Region to REPAIR/REPLACE ROOFING ON AZ STRUCTURES.
The exhibit provides details on the existing conditions of the dock restroom and electric shop facilities that are part of the overall roofing repair/replacement project. It includes information on the building layouts, dimensions, construction materials, and existing utility infrastructure. This attachment would provide important context for offerors responding to the solicitation requirements for the roofing work at these specific facilities.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Conditions Summary
Repair or Replace Roofing at Various Structures, Alcatraz (Dock Restroom and Electric Shop, AL-89)
September 20, 2023
Dock Restroom
Electric Shop
Dock Restroom - Concrete Tile Roofing System Repair
4’x4’ skylights. 2 of 4 depicted.
Dock Restroom Utility Corridor Sheathing Rot Area #1: 8 SF
All square footages are approximate. Contractor to field verify.
Dock Restroom Utility Corridor Sheathing Rot Area #2: 22 SF
All square footages are
Dock Restroom Utility Corridor Sheathing Rot Area #3: 16 SF Note spare concrete ridge and field tiles.
All square footages are approximate. Contractor to field verify.
Dock Restroom Utility Corridor Sheathing Rot Area #4: 8 SF (2 boards/2 rafter bays)
All square footages are approximate. Contractor to field verify.
Dock Restroom Utility Corridor Sheathing Rot Area #5: 20 SF
Dock Restroom Men’s Side Sheathing Rot Area #6: 12 SF
Dock Restroom Men’s Side Sheathing Rot Area #7: 8 SF (2 boards/2 rafter bays)
Dock Restroom Men’s Side Sheathing Rot Area #8: 4 SF
Dock Restroom Women’s Side Sheathing Rot Area #9: 4 SF
Dock Restroom Women’s Side Sheathing Rot Area #10: 4 SF
Dock Restroom Water Fountain Cover - eastern elevation
Dock Restroom Water Fountain Cover -western elevation
Dock Restroom Water Fountain Cover
– rafters/ridge beam
Dock Restroom Water Fountain Cover– rafters/ridge beam
Electric Shop – Corrugated Transite Roof Replacement
22’x65’
All linear footages are approximate.
Contractor to field
Electric Shop – Rafter Rot Area #11 – 2 full rafter replacements @ 44 LF total
All linear footages are approximate. Contractor to field verify.
Electric Shop – Rafter Rot Area #12 – One full rafter replacement @ 22LF total
All linear footages are approximate. Contractor to field verify.
Electric Shop – Rafter Rot Area #13 – 2 full rafter replacements @ 44LF total
All linear footages are
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
File details come from the government source that posted it. Updated .