This is a Statement of Work (SOW) for the National Park Service's Delaware Water Gap National Recreation Area requiring the removal and replacement of two failed wastewater lift station pumps at Milford Beach, located at 150 Milford Beach Road in Pennsylvania.
The contractor must provide all labor, materials, equipment, supervision, and incidentals to complete the following work: remove and properly dispose of two existing submersible wastewater pumps and furnish and install two new submersible sewage pumps rated at 10 horsepower, 460-volt, three-phase, suitable for raw wastewater service and designed for wet well guide rail installation. The contractor shall rehabilitate the lift station by removing and replacing pump guide rails, guide brackets, mounting hardware, lifting chains, and fasteners with corrosion-resistant or stainless steel materials. The contractor must also remove and replace the discharge piping from the wet well to the existing check valve assembly with new piping rated for wastewater pressure service. Additional responsibilities include providing lifting equipment for safe removal and installation, protecting adjacent infrastructure, obtaining all required permits prior to commencement, coordinating inspections with local and state authorities, and initiating utility locate requests prior to excavation. The contractor shall perform testing and startup activities including confirmation of correct pump rotation, verification of pump startup under the existing control system, confirmation of proper seating on guide rails, verification of system operation, and confirmation that pumps cycle properly with no leaks present at discharge connections. The contractor must provide a minimum twelve-month manufacturer's warranty on pumps and installed components with documentation at project closeout. The estimated onsite construction duration is 4–5 working days, with lead time for pumps and specialized components estimated at approximately 3–4 weeks after award. Prior to installation, the contractor shall submit pump product data sheets, shop drawings if applicable, installation methodology, warranty documentation, and proof of permits. The contractor must comply with OSHA confined space regulations, fall protection requirements, lockout/tagout procedures, NPS safety requirements, and utility locate requirements, submitting a site-specific safety plan prior to mobilization. Payment shall be made upon satisfactory completion of work and acceptance by the Contracting Officer's Representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0002.pdf | ||
| Sol_140P4526R0015_Amd_0002.pdf | ||
| Milford_Beach_Pump_Manual_0001.pdf | ||
| Valves_0001.jpg | JPG image | |
| pump_name_plate_0001.jpg | JPG image | |
| pumps3_0001.jpg | JPG image | |
| SCAN0074_0001.PDF | ||
| Sol_140P4526R0015_Amd_0001.pdf | ||
| pumps_2_0001.jpg | JPG image | |
| B08_Attachment_2_WD_Replace_Lift_Station_Pumps_DEWA.pdf | ||
| Sol_140P4526R0015.pdf | ||
| B08_Solicitation_Replace_Lift_Station_Pumps_DEWA.pdf | ||
| B08_Attachment_3_Price_Schedule_Replace_Lift_Station_Pumps_DEWA.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Wastewater Lift Station Pumps Milford Beach – 150 Milford Beach Road Delaware Water Gap National Recreation Area
1.0 PROJECT OVERVIEW
The National Park Service (NPS), Delaware Water Gap National Recreation Area (DEWA), requires the removal and replacement of two (2) failed wastewater lift station pumps at the Milford Beach wastewater lift station located at 150 Milford Beach Road.
Work includes pump replacement, rehabilitation of pump guide systems and associated hardware, replacement of discharge piping between the wet well and check valve assembly, system startup, and testing.
The objective of this project is to restore reliable wastewater conveyance operations to ensure continued park operations and public access.
2.0 SCOPE OF WORK
The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the following:
2.1 Pump Removal and Replacement
• Remove and properly dispose of two (2) existing submersible wastewater pumps.
• Furnish and install two (2) new submersible sewage pumps meeting or exceeding the following minimum specifications:
o 10 horsepower o 460-volt, three-phase o Suitable for raw wastewater service o Designed for wet well guide rail installation
• Pumps shall be compatible with the existing lift-out guide rail system configuration.
• Pumps shall be rated for continuous duty in municipal wastewater environments.
2.2 Lift Station Rehabilitation
• Remove existing pump guide rails, guide brackets, hardware, and associated piping components as necessary.
• Furnish and install new:
o Guide rails o Guide brackets o Mounting hardware o Lifting chains o Fasteners and corrosion-resistant hardware
• All hardware shall be stainless steel or corrosion-resistant material suitable for wastewater environments.
2.3 Discharge Line Replacement
• Remove and replace the discharge piping from the lift station wet well to the existing check valve assembly.
• Provide new piping, fittings, and flanges rated for wastewater pressure service.
• All piping shall be properly aligned, restrained, and supported.
• Connections shall be watertight and suitable for underground installation.
2.4 Equipment and Access
• Contractor shall provide necessary lifting equipment (e.g., boom truck or equivalent) for safe removal and installation of pumps and guide systems.
• Contractor shall protect adjacent infrastructure and restore disturbed areas to original condition.
3.0 PERMITS AND REGULATORY COMPLIANCE
The Contractor shall:
• Obtain all required permits prior to commencement of work.
• Coordinate required inspections with the appropriate local and state authorities.
• Comply with all applicable township, state, and federal wastewater regulations.
• Initiate a utility locate request (Pennsylvania One Call or equivalent) prior to excavation activities.
The Contractor shall not be responsible for private utilities not identified or marked by the Government.
4.0 ASSUMPTIONS AND SITE CONDITIONS
The following conditions are assumed:
• Government will provide reasonable access to the lift station during normal working hours.
• Wet well conditions are reasonably free of excessive debris preventing pump removal.
• Existing electrical controls and control panel are functional and compatible with replacement pumps.
If unforeseen site conditions are encountered, the Contractor shall notify the Contracting Officer’s Representative (COR) immediately. Work outside the scope of this SOW shall not proceed without written authorization.
5.0 TESTING AND STARTUP
The Contractor shall:
• Confirm correct pump rotation.
• Verify pump startup under existing control system.
• Confirm proper seating on guide rails.
• Verify system operation to existing discharge system.
Testing shall include confirmation that pumps cycle properly and no leaks are present at discharge connections.
6.0 WARRANTY
Contractor shall provide a minimum twelve (12) month manufacturer’s warranty on pumps and installed components.
Warranty documentation shall be provided to the Government at project closeout.
7.0 PERIOD OF PERFORMANCE
Estimated onsite construction duration: 4–5 working days.
Lead time for pumps and specialized components may be approximately 3–4 weeks after award.
8.0 SUBMITTALS
Prior to installation, Contractor shall submit:
• Pump product data sheets
• Shop drawings (if applicable)
• Installation methodology
• Warranty documentation
• Proof of permits
9.0 SAFETY REQUIREMENTS
Contractor shall comply with:
• OSHA confined space regulations
• Fall protection requirements
• Lockout/Tagout procedures
• NPS safety requirements
• Utility locate requirements prior to excavation
A site-specific safety plan shall be submitted prior to mobilization.
10.0 PAYMENT
Payment shall be made upon satisfactory completion of work and acceptance by the COR.
| STATEMENT OF WORK |
| Replace Wastewater Lift Station Pumps |
| 1.0 PROJECT OVERVIEW |
| 2.0 SCOPE OF WORK |
| 2.1 Pump Removal and Replacement |
| 2.2 Lift Station Rehabilitation |
| 2.3 Discharge Line Replacement |
| 2.4 Equipment and Access |
| 3.0 PERMITS AND REGULATORY COMPLIANCE |
| 4.0 ASSUMPTIONS AND SITE CONDITIONS |
| 5.0 TESTING AND STARTUP |
| 6.0 WARRANTY |
| 7.0 PERIOD OF PERFORMANCE |
| 8.0 SUBMITTALS |
| 9.0 SAFETY REQUIREMENTS |
| 10.0 PAYMENT |