This is a Questions and Answers document clarifying requirements for a lift station pump project. The document addresses three key inquiries from potential contractors regarding project specifications and scope.

The first clarification confirms that the required pumps are 3 horsepower (HP), not 10HP as listed in the Statement of Work (SOW), representing a critical specification correction. The second response confirms that the scope of work for removing and replacing discharge piping from the lift station wet well to the existing check valve assembly includes both above-ground and underground piping extending from the lift station to the check valve box. The third item addresses a request for pump specifications and performance data, including pump curves, gallons per minute (GPM), total dynamic head (TDH), horsepower, and voltage information, with a note that a manual has been attached as a reference document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please confirm the pumps you require are 3HP not 10HP as listed in the SOW

1. The correct size is 3HP and not 10HP as listed in the SOW.

Regarding the remove and replacing of the discharge piping from the lift station wet well to the existing check valve assembly.

2. Does this include the underground piping as well?

Yes, this includes the underground piping from the lift station to the check valve box.

3. Could you please provide any available pump specifications or performance data (pump curves, GPM, TDH, HP, voltage, etc.)?

Manual attached.