This Statement of Work (SOW) details the comprehensive rebuild of Yellowstone National Park's 2005 Pierce Contender Engine 4, aimed at extending the vehicle's service life by 15 years. The rebuild requires full compliance with NFPA 1912 standards and includes extensive refurbishment tasks across multiple systems, such as cooling, engine, transmission, suspension, brake systems, electrical components, and fire pump equipment. Key modifications include replacing emergency and auxiliary lighting with LED systems, updating SCBA seat brackets, installing GPS and monitoring systems, and addressing specific damage repairs.
The project has a 180-day performance period, with potential adjustments for supply chain issues. Contractors must be certified and perform all work to specific welding and technical standards, including American Welding Society specifications. The SOW includes optional pricing for potential additional repairs like pump rebuilds, transmission rebuilds, battery replacement, and tire replacement. Detailed photographic documentation accompanies the document, showing the current condition of the fire apparatus from multiple angles and highlighting specific areas requiring repair or modification.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1426Q0002_Amd_0002.pdf | ||
| Instuctions_to_Offerors_Updated_0002.pdf | ||
| IMG_1849_0001.JPG | JPG image | |
| Sol_140P1426Q0002_Amd_0001.pdf | ||
| IMG_1850_0001.JPG | JPG image | |
| IMG_1851_0001.JPG | JPG image | |
| IMG_1848_0001.JPG | JPG image | |
| Wage_Determination_Park_CO_WY.pdf | ||
| B08_Attachment_2_Equipment_Needed_Engine_4.xlsx | XLSX spreadsheet | |
| Sol_140P1426Q0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Yellowstone Engine 4 Rebuild Statement of Work
Introduction Yellowstone National Park’s 2005 Pierce Contender #15998TR (Engine 4) to be refurbished due to age. This refurbishment aims to extend the service life of Yellowstone National Park Engine 4 by an additional 15 years with replacement, rebuild, or repair of the components of the apparatus due to age and use.
Compliance with all standards applicable to a fire apparatus will be maintained. The refurbishing of Engine 4 will comply with NFPA 1912: Standard for Fire Apparatus Refurbishing.
Compliance Requirements
• All refurbishment work must adhere to NFPA specifications.
• Contractor must certify compliance with NFPA standards.
• All steel welding will be done to American Welding Society D1.1-96 standards for structural steel welding.
• All aluminum welding will be done to American Welding Society and ANSI D1.2-96 requirements for structural welding of aluminum.
• All work must be certified and performed by Master Fire EVT.
Notifications and Reporting Yellowstone National Park will deliver the fire apparatus. Upon delivery the apparatus will be inspected and deficiencies outside of the scope of this project will be identified. Once on site and work has begun all items that were not included in the initial bid or are considered an option, will be approved by the Contract Specialist/Contracting Officer and the Yellowstone National Park Fire
Chief before work is performed.
Performance Time Once the apparatus is delivered there is a be a 180-day performance period to complete the work.
This time can be adjusted due to unforeseen circumstance such as supply chain and parts availability.
Refurbishment Tasks
Engine and Driveline Cooling System
• Upgrade and replace all components of the cooling system, including all hoses, radiator, water pump, radiator cap, and all hoses. Hoses shall be silicone.
• Check the air conditioning system.
• Replace the condenser when replacing the radiator.
Engine Inspection
• Check for leaks.
• Assess engine health concerning motor rebuild or replacement (currently not expected).
• Notify AHJ (Authority Having Jurisdiction) if deficiencies are found.
Engine Belts
• Replace all belts on the engine.
Alternator
• Inspect/performance test for rebuild or replacement; notify AHJ of findings.
Battery
• Inspect and replace batteries and battery cables as needed.
Transmission
• Inspection and Maintenance
• Inspect for leaks.
Driveline
• Inspect and notify AHJ (Authority Having Jurisdiction) if deficiencies are found.
Suspension
• Update chassis suspension with new springs and shock absorbers.
Brake System
• Complete brake replacement at wheel ends, including brake shoes, pins, drums, retraction springs, air chambers and rubber brake hoses.
Brake Valves
• Replace all brake valves with new ones. (Treadle, relay, QR)
Seals and Bearings
• Replace wheel seals and hub seals.
• Inspect wheel bearings and report any deficiencies to AHJ.
Generator and Scene Lighting Modifications
• Remove gas-powered generator and all associated wiring.
• Replace 240V scene lights with 12V LED scene lights.
Damage Repair
• Repair impact damage on the rear face of the truck on the right (crew chief) side to like-new condition. See photo 5
• Replace damaged marker light, front corner on the right (crew chief) side.
• Replace front speaker mounted in the bumper to a flush mount speaker
NFPA Compliance Updates Emergency Lighting
• Replace all emergency lights with LEDs compliant with NFPA with the same size and type equivalent.
• Ensuring proper coverage is provided in compliance with NFPA.
Reflective
• Update the rear face of the truck with chevrons.
• Ensure current reflective striping meets NFPA standards
Wheels
• Install new heavy-duty or severe-duty aluminum wheels of proper size.
Windshields
• Replace both windshields.
Seat Belts
• Replace all seat belts to meet NFPA specifications.
SCBA Seat Brackets
• Replace the five (5) in seat SCBA brackets with SmartDock Gen II SCBA Bracket
Equipment Installation Fire Equipment Chargers – will be provided with the apparatus
• Install thermal imaging camera charger in the cab.
• GPS and Monitoring Systems
• Install GPS locator in the windshield.
• Install gas monitor charger in the cab.
• An automotive 6 Way Fuse Block,12V Blade Fuse 6 Circuit with LED Indicator
Waterproof Cover will be utilized for powering the four devices and allowing for future additions.
Auxiliary Lighting
• Remove side spotlights – seal opening with stainless or aluminum plate with gasket or silicone seal.
• Replace roof marker lights with a brow light bar that has the marker lights built in. The brow light bar should have adjustments for intensity. (Example, high, medium, and low)
Fire Pump Engineer’s Panel
• Evaluate all gauges for replacement, uniformity, and appearance.
Plumbing System
• Inspect for leaks, damage, or deterioration
• Notify AHJ (Authority Having Jurisdiction) if deficiencies are found
Plumbing Valves
• Rebuild or replace all plumbing valves and drains on the fire pump with the same brand name.
• No substitutions allowed.
Pump and Pump Transmission
• Check for leaks.
• Consider rebuilds based on findings (no known deficiencies).
• Update to the new Waterous VPO electric priming system.
Option Pricing The following items need pricing in the event upon inspection it is deemed necessary to make the repairs, replacement, or rebuild.
• Pump Rebuild
• Pump Transmission Rebuild
• Foam Pump rebuild and/or replacement
• Battery replacement
• Tire Replacement
• Gauges on Pump Panel
PHOTO #1
DESCRIPTION: Front
PHOTO #2
DESCRIPTION: Rear
PHOTO #3
DESCRIPTION: Driver Side
PHOTO #4
DESCRIPTION: Crew Chief Side
PHOTO #5
DESCRIPTION: Crew Chief Rear Corner Body Damage
PHOTO #6
DESCRIPTION: Crew Chief Front Corner Damaged Lights
PHOTO #7
DESCRIPTION: Current Speaker Install
PHOTO #8
DESCRIPTION: Preferred Speaker Install
| Introduction |
| Compliance Requirements |
| Notifications and Reporting |
| Performance Time |
| Refurbishment Tasks |
| Cooling System |
| Engine Inspection |
| Engine Belts |
| Alternator |
| Battery |
| Transmission |
| Driveline |
| Suspension |
| Brake System |
| Brake Valves |
| Seals and Bearings |
| Generator and Scene Lighting Modifications |
| Damage Repair |
| NFPA Compliance Updates |
| Emergency Lighting |
| Reflective |
| Wheels |
| Windshields |
| Seat Belts |
| SCBA Seat Brackets |
| Equipment Installation |
| Fire Equipment Chargers – will be provided with the apparatus |
| Auxiliary Lighting |
| Fire Pump |
| Engineer’s Panel |
| Plumbing System |
| Plumbing Valves |
| Pump and Pump Transmission |
Option Pricing