This Statement of Work (SOW) details a boiler upgrade project for the U.S. Geological Survey's Columbia Environmental Research Center (CERC) in Columbia, Missouri. The project scope requires removing and replacing the existing infrastructure in the Administration Building (A3), including two non-condensing 1,000,000 BTU/Hr. boilers, a 200-gallon storage tank, and a 1/6 hp circulating pump with new, more efficient equipment. The new system must include modulating, condensing boilers with a minimum 97% Annual Fuel Utilization Efficiency (AFUE), appropriately sized recirculation pump and storage tank, and supporting controls with BACnet capabilities.

The contract specifies a 60-day performance period from Notice-to-Proceed, with work to be conducted during the CERC's normal business hours (7:00 AM to 4:00 PM, Monday through Friday). The contractor will be responsible for providing operational and maintenance training to CERC maintenance staff and will offer a 12-month warranty on all equipment. Additional requirements include coordinating utility power disruptions, complying with electrical codes, producing necessary drawings, and ensuring minimal interference with ongoing facility operations. The project aims to improve the building's energy efficiency and replace aging heating infrastructure.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

U. S. GEOLOGICAL SURVEY

Columbia Environmental Research Center (CERC) 4200 New Haven Road

Columbia, Missouri 65201

STATEMENT OF WORK

ADMINISTRATION BUILDING (A3) BOILER UPGRADE

I. GENERAL INFORMATION

a. INTRODUCTION. The Department of the Interior (DOI), U.S. Geological Survey (USGS), Columbia Environmental Research Center (CERC) 4200 New Haven Road, Columbia, MO

65202 has a requirement

b. BACKGROUND. The Columbia Environmental Research Center(CERC) conducts research needed to address national and international environmental contaminant issues and the effects of habitat alterations on aquatic and terrestrial ecosystems. The Administration

Building(A3) at CERC is a 34,019-square-foot research laboratory building that houses several research laboratories, office space, a research flume, and a 6,000-square-foot research wet laboratory. A3 currently has; two non-condensing 1,000,000 BTU/Hr.

boilers exhausted into a 24" stack, with one 1/6 hp circulating pump, and one 200-gallon storage tank.

c. DEFINITION/APPLICABLE DOCUMENTS.

i. Attachment 7_Picture

d. SCOPE. The contractor shall provide all materials, labor, equipment, travel, and supervision necessary to remove and replace the existing hot water boilers, recirculating pump, and storage tank with efficient, modulating, condensing boilers and appropriately sized recirculation pump and storage tank to include supporting controls.

II. WORK REQUIREMENTS

a. TECHNICAL REQUIREMENTS

i. Existing Site Conditions.

1. Two non-condensing 1,000,000 BTU/Hr. boilers

2. One 200-gallon storage tank

3. One 1/6 hp circulating pump

4. One common 24" exhaust

ii. CONSTRUCTION.

1. All circuits shall be installed to the existing Local and National Electrical

Code Standard.

this purchase order begins and shall be maintained throughout the period of performance.

xv. LICENSES-PERMITS. The contractor shall, without additional expense to the

Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.

xvi. ACCIDENT PREVENTION AND FIRE HAZARDS. The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or a subcontractor working under his/her direction. If welding is required, permission shall be obtained from the COTR.

xvii. INDEMNITY. The contractor shall confine all work on Government premises to areas authorized or approved by the Contracting Officer or COTR. The contractor shall save and keep harmless and indemnify the Government against any and all liability claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property

(Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting in whole or part from the negligent acts or omissions of the contractor.