B08_Attachment_1_-_Pricing_Schedule_(excel_template).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 140P3023R0011
About this file
This document contains a pricing schedule template and information for a federal contract opportunity to rehabilitate the interior geothermal piping at the Thomas House of Monocacy National Battlefield. The pricing schedule template includes line items for mobilization, disposal of existing circulation water, removal and cleaning of existing pipe, installation of heat pumps, circulation pumps and control panel, new HDPE piping and ancillary components, refilling the system, operational status, other materials, and general requirements. Pricing is to be provided by the contractor for each line item and totals are automatically calculated. The related federal contract opportunity is solicitation number 140P3023R0011 from the National Park Service's National Capital Area for work at Monocacy National Battlefield. The description matches the work outlined in the pricing schedule template.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project: Rehabilitate Interior Thomas House Geothermal Piping | ||||
| NPS Park: Monocacy National Battlefield (MONO) | ||||
| Pricing Schedule | ||||
| Item No. | Description/Task Grouping | Unit of Measure | Unit Price | Price |
| 1 | Mobilization and Demobilization | Lump Sum | $ - 0 | $ - 0 |
| 2 | Dispose of Existing Circulation water | Lump Sum | $ - 0 | $ - 0 |
| 3 | Remove Existing Pipe | Lump Sum | $ - 0 | $ - 0 |
| 4 | Clean Closed Loop System (filter, neutralizer, inhibitor) | Lump Sum | $ - 0 | $ - 0 |
| 5 | Install Heat Pumps | Each | $ - 0 | $ - 0 |
| 6 | Install Circulation Pumps and Control Panel | Each | $ - 0 | $ - 0 |
| 7 | Install new HDPE Piping and Ancillary Components | Lump Sum | $ - 0 | $ - 0 |
| 8 | Refill System | Lump Sum | $ - 0 | $ - 0 |
| 9 | Operational Status | Lump Sum | $ - 0 | $ - 0 |
| 10 | Other Materials | Lump Sum | $ - 0 | $ - 0 |
| 11 | General Requirements | Lump Sum | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 | |||
| 14 | Overhead | Lump Sum | $ - 0 | $ - 0 |
| 15 | Profit | Lump Sum | $ - 0 | $ - 0 |
| 16 | Bonds | Lump Sum | $ - 0 | $ - 0 |
| TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .