This document contains a pricing schedule template and information for a federal contract opportunity to rehabilitate the interior geothermal piping at the Thomas House of Monocacy National Battlefield. The pricing schedule template includes line items for mobilization, disposal of existing circulation water, removal and cleaning of existing pipe, installation of heat pumps, circulation pumps and control panel, new HDPE piping and ancillary components, refilling the system, operational status, other materials, and general requirements. Pricing is to be provided by the contractor for each line item and totals are automatically calculated. The related federal contract opportunity is solicitation number 140P3023R0011 from the National Park Service's National Capital Area for work at Monocacy National Battlefield. The description matches the work outlined in the pricing schedule template.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project: Rehabilitate Interior Thomas House Geothermal Piping
NPS Park: Monocacy National Battlefield (MONO)
Pricing Schedule
Item No.Description/Task GroupingUnit of MeasureUnit PricePrice
1Mobilization and DemobilizationLump Sum$ - 0$ - 0
2Dispose of Existing Circulation waterLump Sum$ - 0$ - 0
3Remove Existing PipeLump Sum$ - 0$ - 0
4Clean Closed Loop System (filter, neutralizer, inhibitor)Lump Sum$ - 0$ - 0
5Install Heat PumpsEach$ - 0$ - 0
6Install Circulation Pumps and Control PanelEach$ - 0$ - 0
7Install new HDPE Piping and Ancillary ComponentsLump Sum$ - 0$ - 0
8Refill SystemLump Sum$ - 0$ - 0
9Operational StatusLump Sum$ - 0$ - 0
10Other MaterialsLump Sum$ - 0$ - 0
11General RequirementsLump Sum$ - 0$ - 0
SUBTOTAL$ - 0
14OverheadLump Sum$ - 0$ - 0
15ProfitLump Sum$ - 0$ - 0
16BondsLump Sum$ - 0$ - 0
TOTAL$ - 0