This pricing schedule template is for the rehabilitation of interior geothermal piping at the Thomas House within Monocacy National Battlefield. The schedule includes line items for tasks such as mobilization, disposal of existing circulation water, removal and cleaning of the closed loop system, installation of air handlers, heat pumps, circulation pumps and control panel, installation of new HDPE piping and ancillary components, refilling the system, and general requirements. Pricing is also included for overhead, profit, and bonds. The total proposed price is left blank.
The related federal contract opportunity is a solicitation from the National Park Service - National Capital Area for the rehabilitation of geothermal piping at Monocacy National Battlefield's Thomas House. The solicitation number is 140P3023R0011.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project: Rehabilitate Interior Thomas House Geothermal Piping | ||||
| NPS Park: Monocacy National Battlefield (MONO) | ||||
| Pricing Schedule | ||||
| Item No. | Description/Task Grouping | Unit of Measure | Unit Price | Price |
| 1 | Mobilization and Demobilization | Lump Sum | $ - 0 | $ - 0 |
| 2 | Dispose of Existing Circulation water | Lump Sum | $ - 0 | $ - 0 |
| 3 | Remove Existing Pipe | Lump Sum | $ - 0 | $ - 0 |
| 4 | Clean Closed Loop System (filter, neutralizer, inhibitor) | Lump Sum | $ - 0 | $ - 0 |
| 5 | Install Air Handlers | Each | $ - 0 | $ - 0 |
| 6 | Install Heat Pumps | Each | $ - 0 | $ - 0 |
| 7 | Install Circulation Pumps and Control Panel | Each | $ - 0 | $ - 0 |
| 8 | Install new HDPE Piping and Ancillary Components | Lump Sum | $ - 0 | $ - 0 |
| 9 | Refill System | Lump Sum | $ - 0 | $ - 0 |
| 10 | Operational Status | Lump Sum | $ - 0 | $ - 0 |
| 11 | Other Materials | Lump Sum | $ - 0 | $ - 0 |
| 12 | General Requirements | Lump Sum | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 | |||
| 13 | Overhead | Lump Sum | $ - 0 | $ - 0 |
| 14 | Profit | Lump Sum | $ - 0 | $ - 0 |
| 15 | Bonds | Lump Sum | $ - 0 | $ - 0 |
| TOTAL | $ - 0 |