This is a Statement of Structural Tests and Special Inspections for the National Park Service (NPS) Denver Service Center, prepared in accordance with Chapter 17 of the 2024 International Building Code (IBC 2024).

The document covers the Replace Seasonal Housing Units project at Mammoth Cave National Park (MACA), PMIS Number 258051, designed by structural engineering firm DJ&A, P.C. The statement establishes requirements for seismic and wind-force-resisting system inspections, quality control procedures, and inspector/technician qualifications. The project is exempt from seismic-force-resisting system special inspections because it is light-frame construction with SDS = 0.29 and building height under 35 feet. Similarly, wind-force-resisting system special inspections are not required due to light-frame construction, Exposure Category B assignment, and ultimate basic wind speed of 105 mph. The Construction Contractor's Quality Control Supervisor must provide all special inspection reports and associated documentation to the Contracting Officer and correct all identified deficiencies.

The document provides a comprehensive listing of required structural tests and special inspections organized by construction type, including Structural Steel (welding and bolting per AISC 360-22 and AISC 341-22 standards), Concrete Construction, Wood Construction, Soils, Fabricated Items, Wind Resistance, Seismic Resistance, Sprayed Fire-Resistive Materials, Intumescent Fire-Resistive Materials, Fire-Resistant Penetrations and Joints, and Smoke Control. Each inspection item specifies required qualifications for inspectors and testing technicians (such as ICC-SWSI/AWS-CWI, ACI-CCSI, EIT, and ASNT Level III certifications), identifies whether continuous or periodic inspection is required, and provides frequency parameters for periodic inspections. The document was prepared by Ammon Groesbeck and signed by a licensed Kentucky Professional Engineer on April 18, 2025.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPS DSC Statement of Structural Tests & Special Inspections IBC 2024 PARK/PMIS page 1 of 15

Statement of Structural Tests and Special Inspections National Park Service (NPS) - Denver Service Center (DSC) | 8-22-24

Park: Mammoth Cave National Park (MACA)

Project Management Information System (PMIS) Number: 258051

Project Name: Replace Seasonal Housing Units

Structural Engineering Firm: DJ&A, P.C.

This Statement of Structural Tests and Special Inspections is being submitted as required by Chapter 17 of the

2024 International Building Code (IBC 2024). It includes the following:

1. Seismic requirements

2. Wind requirements

3. Qualification Requirements for Inspectors and Testing Technicians

4. Listing of Required Structural Tests and Special Inspections

The Construction Contractor’s Quality Control Supervisor will provide copies of all special inspection reports and associated documentation to the Contracting Officer (CO). The Construction Contractor will be required to correct all deficiencies discovered in the Special Inspection and Structural Testing program.

Prepared By: Ammon Groesbeck (Type or print name)

Signature: ____________________________________________________ Date: ________________

Stamped by Professional Engineer (PE) or Structural Engineer (SE)

4/18/2025

PARK/PMIS page 2 of 15

Seismic and Wind Requirements

Seismic Requirements, IBC 2024 Section 1704.3

Description of seismic-force-resisting system and designated seismic systems subject to special inspections:

This project is not subject to seismic-force-resisting system special inspections per IBC-21 Section 1705.13.

The structure is of light-frame construction, SDS = 0.29, and the building height is under 35’. The structure therefore, does not require seismic special inspections per IBC-24 1705.13, Exception 1.

Wind Requirements, IBC 2024 Section 1704.3

Description of wind-force-resisting system and designated wind systems subject to special inspections:

This project is not subject to wind-force-resisting system special inspections per IBC-24 Section 1705.12(1).

The structure is of light-frame construction, is assigned to Exposure Category B, and the ultimate basic wind speed is Vult = 105 mph. Risk II structures are not required to be designed for tornado loads.

PARK/PMIS page 3 of 15

Instructions:

1. Under Listing of Required Structural Tests and Special Inspections:

a. Required? - Place an X for all Special Inspections and Tests required for this project.

b. Required Qualifications - Provide qualifications for the special inspector, using the

Qualification Requirements for Inspector and Testing Technicians list below, for all required Structural Tests and Special Inspections.

c. Continuous - If marked with an X, continuous special inspection shall be as defined in Chapter

2, IBC 2024.

d. Periodic - If marked with an X, provide the minimum number of tests, i.e. 20% of all field welds, or the amount of work to be inspected (e.g. 10% of all wall surfaces).

2. Attach completed Statement of Structural Tests and Special Inspections to the end of NPS DSC Division 1 Specifications Section 01 40 00 Quality Requirements.

Qualification Requirements for Inspectors and Testing Technicians

PE/SE Structural Engineer – licensed PE or SE specializing in the design of buildings and structures

PE/GE Geotechnical Engineer – licensed PE specializing in soil mechanics and foundations

EIT Engineer-In-Training – graduate engineer who has passed the Fundamentals of engineering examination

American Concrete Institute (ACI) Certification

ACI-CCSI Concrete Construction Special Inspector

ACI-LTT Concrete Laboratory Testing Technician Level 1 or 2

ACI-STT Concrete Strength Testing Technician

ACI-FTT Concrete Field Testing Technician – Grade I

American Society of Non-Destructive Testing (ASNT) Certification

Non-Destructive Testing Technician – Level II or III

American Welding Society (AWS) Certification

AWS-CWI Certified Welding Inspector

Exterior Design Institute (EDI) Certification

EDI-EIFS Certified EIFS inspector

International Code Council (ICC) Certification

ICC-PCSI Prestressed Concrete Special Inspector

ICC-RCSI Reinforced Concrete Special Inspector

ICC-SSI Soils Special Inspector

ICC-SFSI Spray-applied Fireproofing Special Inspector

ICC-SMSI Structural Masonry Special Inspector

ICC-SSBSI Structural Steel and Bolting Special Inspector

ICC-SWSI Structural Welding Special Inspector

National Institute for Certification in Engineering Technologies (NICET) Certification

NICET-CT Concrete Technician – Levels I, II, III and IV

NICET-GET Geotechnical Engineering Technician - Levels I, II, III and IV

NICET-ST Soils Technician - Levels I, II, III and IV

PARK/PMIS page 4 of 15

Other

PARK/PMIS page 5 of 15

Listing of Required Structural Tests and Special Inspections R e q u ir e d

Structural Test or Special Inspection Required

Qualifications

C o n ti n u o u s

P e ri o d ic Frequency of

Periodic Test or Inspection

Structural Steel (IBC 2024 Section 1705.2; American Institute of Steel Construction: AISC 360-22 Chapter N, AISC 341-22 Chapter J)

Prior to Welding (AISC 360-22 Table C-N5.4-1)

X

1. Welder qualification records and continuity records.

ICC-SWSI/AWS-

CWI

2. Welding procedure specifications (WPS) available.

ICC-SWSI/AWS-

3. Manufacturer certifications for welding consumables available.

ICC-SWSI/AWS-

X 4. Material identification (type/grade).

ICC-SWSI/AWS-

X 5. Welder identification system.

6. Fit-up of groove welds (including joint geometry).

X a. Joint preparation.

b. Dimensions (alignment, root opening, root face, bevel).

ICC-SWSI/AWS-

X c. Cleanliness (condition of steel surfaces).

X d. Tacking (tack weld quality and location).

X e. Backing type and fit (if applicable).

7. Fit-up of CJP (complete joint penetration) groove welds of HSS (hollow structural sections) T-, Y- and K-joints without backing (including joint geometry).

X a. Joint preparation.

PARK/PMIS page 6 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Periodic Test or Inspection

X

b. Dimensions (alignment, root opening, root face, bevel).

X c. Cleanliness (condition of steel surfaces).

X d. Tacking (tack weld quality and location).

X 8. Configuration and finish of access holes.

9. Fit-up of fillet welds.

X a. Dimensions (alignment, gaps at root).

ICC-SWSI/AWS-

X b. Cleanliness (condition of steel surfaces).

X c. Tacking (tack weld quality and location).

X 10. Check welding equipment.

During Welding (AISC 360-22 Table C-N5.4-2)

1. Control and handling of welding consumables

X a. Packaging.

ICC-SWSI/AWS-

X b. Exposure control.

X 2. No welding over cracked tack welds.

3. Environmental conditions.

X a. Wind speed within limits.

ICC-SWSI/AWS-

X b. Precipitation and temperature.

4. WPS followed.

X a. Settings on welding equipment.

ICC-SWSI/AWS-

PARK/PMIS page 7 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Periodic Test or Inspection

X b. Travel speed.

ICC-SWSI/AWS-

X c. Selected welding materials.

X d. Shielding gas type/flow rate.

X e. Preheat applied.

f. Interpass temperature maintained

(minimum/maximum).

ICC-SWSI/AWS-

X g. Proper position (F, V, H, OH).

h. Intermix of filler metals avoided unless approved (AISC 341-22 Section J7).

ICC-SWSI/AWS-

X 5. Use of qualified welders.

6. Welding techniques.

X a. Interpass and final cleaning.

ICC-SWSI/AWS-

X b. Each pass within profile limitations.

X c. Each pass meets quality requirements.

7. Placement and installation of headed stud anchors.

ICC-SWSI/AWS-

After Welding (AISC 360-22 Table C-N5.4-3)

X 1. Welds cleaned.

ICC-SWSI/AWS-

X 2. Size, length and location of welds.

3. Welds meet visual acceptance criteria.

X a. Crack prohibition.

ICC-SWSI/AWS-

PARK/PMIS page 8 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Periodic Test or Inspection

X b. Weld/base-metal fusion.

ICC-SWSI/AWS-

X c. Crater cross section.

X d. Weld profiles.

X e. Weld size.

X f. Undercut.

X g. Porosity.

X 4. Arc strikes.

X 5. k-area.

6. Weld access holes in rolled heavy shapes and built-up heavy shapes.

ICC-SWSI/AWS-

7. Backing removed and weld tabs removed (if required).

ICC-SWSI/AWS-

X 8. Repair activities.

9. Document acceptance or rejection of welded joint or member.

ICC-SWSI/AWS-

10. No prohibited welds have been added without the approval of the EOR (Engineer of Record).

ICC-SWSI/AWS-

11. Placement of reinforcing or contouring fillet welds (if required) (AISC 341-22 Table J7.1).

ICC-SWSI/AWS-

Nondestructive Testing (AISC 360-22 Section N5 and AISC 341-22 Section J7)

1. Risk Category II Structures - Perform Ultrasonic Testing on 10% of CJP groove welds in butt, T-and corner joints subject to transversely applied tension loading, in materials 5/16 inch thick or greater.

ASNT Level III

PARK/PMIS page 9 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

2. Risk Category III or IV Structures - Perform Ultrasonic Testing on all CJP groove welds subject to transversely applied tension loading in butt, T- and corner joints, in materials 5/16 inch thick or greater.

ICC-SWSI/AWS-

3. Access Holes - Perform Magnetic Particle Testing or Liquid Penetrant Testing when the flange thickness exceeds 1.5 inches for rolled shapes, or when the web thickness exceeds 1.5 inches for built-up shapes.

ICC-SWSI/AWS-

4. Welded Joints Subject to Fatigue - Perform testing per AISC 360-22 Section N5c.

ICC-SWSI/AWS-

Nondestructive Testing (AISC 341-22 Section J7)

Column Splice and Column to Base Plate PJP Groove Weld (AISC 341-22 Section J7 2b)

1. Perform Ultrasonic Testing on 100% of PJP

(partial-joint-penetration) groove welds in column splices and column to base plate welds.

CWI X

2. CJP Groove weld.

3. Lamellar tearing.

4. Beam cope and access hole.

5. Reduced beam section repair.

6. Weld tab removal.

Prior to Bolting (AISC 360-22 Table C-N5.6-1)

These inspections are not required for snug-tight joints.

1. Manufacturer’s certifications available for fastener materials.

ICC-SSBSI

2. Fasteners marked in accordance with ASTM requirements.

PARK/PMIS page 10 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

3. Correct fasteners selected for the joint detail

(grade, type, bolt length if threads are to be excluded from shear plane).

4. Correct bolting procedure selected for joint detail.

5. Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements.

6. Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used.

7. Protected storage provided for bolts, nuts, washers and other fastener components.

During Bolting (AISC 360-22 Table C-N5.6-2)

These inspections are not required for snug-tight joints.

These inspections are not required for pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut method with matchmarking techniques, the direct-tension-indicator method, or the twist-off-type tension control bolt method.

1. Fastener assemblies, of suitable condition, placed in all holes and washers (if required) are positioned as required.

2. Joint brought to the snug-tight condition prior to the pretensioning operation.

3. Fastener component not turned by the wrench prevented from rotating.

4. Fasteners are pretensioned in accordance with the RCSC (Resource Council on Structural Connections) Specification, progressing systematically from the most rigid point toward the free edges.

After Bolting (AISC 360-22 Table C-N5.6-3)

Document acceptance or rejection of bolted connections.

PARK/PMIS page 11 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Galvanized Structural Steel Main Members (AISC 360-22 Table C-N5.6-3)

X Inspect per AISC 360-22 Section N5.7. ICC-SSBSI X

Other Inspection Tasks (AISC 360-22 Section N5.8 and AISC 341-22 Section J9)

1. Verify compliance of fabricated steel with the details shown on the approved shop drawings.

2. Verify compliance of the erected steel frame with the details shown on the approved erection drawings, including braces, stiffeners, member locations and joint details.

EIT

3. Anchor rods and other embedments support structural steel.

a. Verify the diameter, grade, type and length of the anchor rod or embedded item.

ICC-SSBSI or ICC-

RCSI

b. Verify the extent or depth of embedment into the concrete.

ICC-SSBSI or ICC-

4. Protected zone - no holes or unapproved attachments made by fabricator or erector, as applicable. (AISC 341-22)

Concrete Construction (IBC 2024 Section 1705.3)

1. Inspect reinforcing steel, including prestressing tendons, and verify placement.

ACI-CCSI or ICC-

2. Inspection of reinforcing steel welding

a. Verify weldability of reinforcing bars other than ASTM A706.

ICC-SWSI

b. Inspect welded reinforcement splices. ICC-SWSI X

c. Inspect single pass fillet welds, maximum

5/16 inch.

ICC-SWSI

d. Inspect all other weds. ICC-SWSI X

X 3. Inspection of anchors cast in concrete.

ACI-CCSI or ICC-

PARK/PMIS page 12 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

4. Inspection of anchors post-installed in hardened concrete members.

a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension load.

ACI-CCSI or ICC-

RCSI X

b. Mechanical anchors and adhesive anchors not defined in 4a.

ACI-CCSI or ICC-

X 5. Verify use of approved design mix.

6. Prior to placement fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.

ACI-CCSI or ICC-

7. Inspect concrete and shotcrete placement for proper application techniques.

ACI-CCSI or ICC-

8. Inspect for maintenance of specified curing temperature and techniques.

ACI-CCSI or ICC-

9. Verification of in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.

ACI-CCSI or ICC-

10. Inspection formwork for shape, location and dimensions of the concrete member being formed.

RCSI X

Wood Construction (IBC 2024 Section 1705.5)

1. Inspect prefabricated wood structural elements in accordance with Section 1704.2.5.

2. High load diaphragms:

X a. Verify sheathing grade and thickness. EIT X

X

b. Verify nominal size of framing members at adjoining panel edges.

X c. Verify nail or staple diameter and length. EIT X

X d. Verify number of fastener lines. EIT X

PARK/PMIS page 13 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Periodic Test or Inspection

X

e. Verify spacing between fasteners in each line and at panel edges.

3. Shearwalls:

X a. Verify sheathing grade and thickness. EIT X

X

b. Verify nominal size of framing members at adjoining panel edges.

X c. Verify nail or staple diameter and length. EIT X

X d. Verify number of fastener lines. EIT X

X

e. Verify spacing between fasteners in each line and at panel edges.

X f. Location and size of holdowns. EIT X

4. Verify nailing, bolting, anchoring and fastening of:

X a. Drag struts and collectors. EIT X

X b. Braces. EIT X

X c. Hold-downs. EIT X

5. Metal-plate-connected wood trusses spanning

60 feet or greater:

a. Verify temporary installation restraint/bracing installed in accordance with the approved shop drawings.

b. Verify permanent individual truss member restraint/bracing installed in accordance with the approved shop drawings.

Soils (IBC 2024 Section 1705.6)

1. Verify materials below shallow foundations are adequate to achieve the required bearing capacity.

2. Verify excavations are extended to proper depth and have reached proper material.

PARK/PMIS page 14 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Periodic Test or Inspection

X

3. Perform classification and testing of compacted fill materials.

4. During fill placement, verify use of proper materials and procedure in accordance with the provisions of the approved geotechnical report.

Verify densities and lift thicknesses during placement and compaction of compacted fill.

5. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly.

Fabricated Items (IBC 2024 Section 1705.11)

1. Inspect fabricated items in accordance with

Section 1704.2.5.

Wind Resistance (IBC 2024 Section 1705.12)

1. Provide inspections when required by Section

1705.12.

Seismic Resistance (IBC 2024 Section 1705.13)

1. Provide inspections when required by Section

1705.13.

Testing and Qualification for Seismic Resistance (IBC 2024 Section 1705.14)

1. Test and qualify seismic resistance in accordance with IBC 2024 Section 1705.14 and the project specifications.

Sprayed Fire-Resistive Materials (IBC 2024 Section 1705.15)

1. Inspect sprayed fire-resistant materials in accordance with IBC 2024 Section 1705.15 and the project specifications.

ICC-SFSI

PARK/PMIS page 15 of 15

R e q u ir e

Qualifications

C o n ti n u o ri o d ic Frequency of

Intumescent Fire-Resistive Materials (IBC 2024 Section 1705.16)

1. Perform inspections in accordance with AWCI

12-B (Association of the Wall and Ceiling Industry) and IBC 2024 Section 1705.16.

Fire-Resistant Penetrations and Joints (IBC 2024 Section 1705.18)

1. Perform inspections in accordance with project specifications and IBC 2024 Section 1705.18.

Smoke Control (IBC 2024 Section 1705.19)

1. Perform testing in accordance with project specifications and IBC 2024 Section 1705.19.

File details come from the government source that posted it. Updated .