B09_140P2026R0048_A0003_MACA_258051_0003.pdf
PDF 6 MB Posted
- Attached to
- MACA 258051 - Replace Seasonal Housing
- Solicitation number
- 140P2026R0048
About this file
This is Amendment 0003 to Solicitation Number 140P2026R0048 for Replace Seasonal Housing Units (MACA 258051) issued by the National Park Service (NPS) Denver Service Center. The amendment's sole purpose is to post the prebid site visit sign-in sheet and presentation slides from the June 11, 2026 pre-proposal conference. The proposal due date remains unchanged at July 16, 2026 at 5:00 PM Mountain Time, and all other terms and conditions remain unchanged.
The underlying solicitation is a total small business set-aside under NAICS 236116 for construction services involving two phases: Phase 1 includes construction of up to two new prototype housing structures, one storage building, and associated site amenities and landscape restoration; Phase 2 involves demolition, remediation, and landscape restoration of existing housing structures. The contract will be firm-fixed-price with a period of performance of 425 calendar days after Notice to Proceed. Source selection will use a best value/tradeoff method with evaluation factors including technical approach (most important), project experience, schedule, key personnel, and past performance. Offers must be submitted via email to the contracting officer and proposal submission email by July 2, 2026 (based on presentation materials, though the amendment references July 16, 2026). Key requirements include Davis-Bacon wage compliance, liquidated damages of $1,349 per day, an offer guarantee/bid bond valid for 90 days, and a minimum 15 percent self-performance requirement. The procurement includes optional line items for additional construction elements with a 90-day exercise period after award.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Tony Jasper
See continuation page
NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287
PDS
140P2026R0048
MACA 25805106/25/2026
05/27/2026
1 14
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P2026R0048/0003
The purpose of Amendment 0003 is to post the prebid site visit sign-in sheet and presentation slides. The proposal due date remains July 16, 2026 at 5:00pm MT. All other terms and conditions remain unchanged.
Pre-proposal Conference/Site Visit
June 11, 2026
Replace Seasonal Housing Units
MACA 258051
Solicitation Number 140P2026R0048
Request for Proposals No.1443N5010070901
INTRODUCTIONS
• Tony Jasper Contracting Officer - NPS Denver Service Center
• Maren Lane, Project Specialist– NPS DSC
• NPS MACA Staff
• Participants
Request for Proposals No.1443N5010070901
Agenda
9:30 to 10:00 – Meeting for a project overview, introductions
10:00-11:00 – Meeting at the project site
Request for Proposals No.1443N5010070901
TODAY’S GOAL
• Provide offerors an opportunity to gain a better understanding of the project and the proposal submission/evaluation process.
• Provide potential offerors an opportunity for a thorough site investigation.
• Questions are encouraged. Questions shall be asked in the open for the entire group to hear. Please no side-bar conversations. Questions that can not be answered today will be answered via a solicitation amendment.
PROJECT BACKGROUND
Request for Proposals No.1443N5010070901
PROJECT SCOPE
• Phase 1: Construction of up to two (2) new prototype housing structures, one (1) storage building, and associated site amenities and landscape restoration.
• Phase 2: Demolition, remediation, and landscape restoration of existing housing structures.
PROJECT SCOPE
Hazardous Waste Materials
• Asbestos-Containing Material (ACM)
• Present in the existing Seasonal
Quarters
– Phone Building at Seasonal Quarters
– Seasonal Apartment #97
– Seasonal Apartment #98
– Seasonal Apartment #99
Additional information is in spec section 02 11 00 Summary of Removal and Abatement Work and Survey Report.
Building 97
Building 98
Building 99
Request for Proposals No.1443N5010070901
BATS and Tree Removal
• Presence of Federal and/or State listed bats has been observed or detected at multiple sites across the project area.
• In coordination with USFWS, and in an effort to minimize disturbance to bat habitat, this project includes timing restrictions on all work at specific locations where bat presence has been confirmed.
• Tree removal will be limited to prior to April 1 and after November 15
More information about bats can be found in spec section 31 13 00 Tree Removal and Protection.
Northern Long-eared BatGray Bat
Indiana Bat
SOLICITATION KEY POINTS
• Released to SAM.gov on May 28th
• Procurement is being conducted as a Total Small Business Set-Aside under NAICS 236116
• Period of Performance 425 calendar days after NTP – which will be issued shortly after contract award
• One Firm-Fixed-Price contract will be awarded
• Source selection will be made using Best Value/Tradeoff method (see FAR 15.101-1)
• Offers are currently due July 2nd
Request for Proposals No.1443N5010070901
CONTRACT
LINE ITEM
NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE
CONSTRUCT NEW SEASONAL
HOUSING BUILDING 2
LS
CONSTRUCT BASE SITE
IMPROVEMENTS FOR PROPOSED
HOUSING SITE
LS
INSTALL WATER / SEWER SERVICE
UTILITIES
LS
(OPTION A)
CONSTRUCT NEW SEASONAL
HOUSING BUILDING 1
LS
(OPTION B)
CONSTRUCT SITE IMPROVEMENTS
FOR NEW SEASONAL HOUSING
BUILDING 1
LS
(OPTION C)
DEMOLISH EXISTING HOUSING
QUARTERS
LS
(OPTION D)
DELEGATED DESIGN AND
CONSTRUCTION OF MULTI-
PURPOSE / STORAGE BUILDING
LS
(OPTION E)
CONSTRUCT SITE IMPROVEMENTS
FOR MULTI-PURPOSE / STORAGE
BUILDING
LS
(OPTION F)
CONSTRUCT OPEN AIR PAVILION
LS
Key Solicitation Clauses
• Special Requirement 2 – Performance of Work by the Contractor
• Special Requirement 3 – Option for Additional Services (NPS has 90 days after award to exercise the options)
• Special Requirement 4 - Key Personnel
– PM, Superintendent, QC Manager and Safety Manager – no substitutions for first 90 days)
• Liquidated Damages ($1,349/day)
• Davis Bacon Wage Requirements apply. Certified payrolls are due weekly.
Request for Proposals No.1443N5010070901
PROPOSAL INSTRUCTIONS
• Please read Section L thoroughly
• Email submissions to CO/CS on or before 5pm MT, July 2nd, 2026
– anthony_Jasper@ios.doi.gov, john_kotchian@ios.doi.gov and
CS_DSC_Proposal_Submission@nps.gov
• Make sure you verify receipt from NPS
• Pay attention to detailed page limitation requirements (8 page max technical approach)
• Pay attention to attachment size limitations
• Offer Guarantee/Bid Bond is required – valid for 90 days
• Please submit your proposal as two separate pdf files – Volume 1:
Technical; Volume 2: Price
PROPOSAL EVALUATION
Basis of Award
• The Contracting Officer (CO) will award a contract to the offeror who submits a proposal that conforms to solicitation requirements; offers fair and reasonable pricing; and provides the best value to the government considering all evaluation factors combined
• The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
• All evaluation factors other than price (Factors 1-5), when combined are approximately equally important to price.
Request for Proposals No.1443N5010070901
PROPOSAL EVALUATION PROCESS
Basis of Award (Continued)
• NPS evaluates the technical volume first without knowledge of the offeror’s pricing. Once the evaluation team rates the technical volume, pricing is revealed. The team then determines which proposal offers the overall best value to the Government.
• NPS intends to award a contract without entering into discussions. In the event that NPS chooses to enter into discussions, a competitive range will be established and the process described under FAR 15.306 will be followed.
PROPOSAL CONTENTS (Technical Volume)
• Technical Volume must contain the following five sections pertaining to each evaluation factor. These are listed in descending order of importance
Factor 1 – Technical Approach
Factor 2 – Project Experience
Factor 3 – Schedule
Factor 4 – Key Personnel
Factor 5 – Past Performance
Request for Proposals No.1443N5010070901
PROPOSAL CONTENTS (Technical Volume)
Factor 1 – Technical Approach: 8 page max narrative discussing your approach to THIS SPECIFIC
PROJECT.
Factor 2 – Project Experience – up to 2 relevant projects in the last 10 years. Use Project Experience Questionnaire form attached to the solicitation
Factor 3 – Schedule: Gantt Chart format schedule with NTP of October 1st. NO NARRATIVE IS REQUIRED
Factor 4 – Key Personnel: Resumes for PM, Superintendent, QC Manager, and Safety Manager. 2 PAGE
MAX FOR EACH
Factor 5 – Past Performance: PPQs for the 2 projects submitted under Factor 1.
PROPOSAL CONTENTS
Volume 2 – Business and Price Proposal
• Signed SF1442
• Acknowledgement of Solicitation Amendments
• Completed Contract Price Schedule
• Bid Bond
• Section K: Reps & Certs
• General References
• Proposed Substitutions
• Subcontracting Percentage Worksheet ((to track required 15% self performance)
Request for Proposals No.1443N5010070901
USE OF AI TOOLS IN PROPOSAL WRITING
• NPS does not restrict offerors in any way in using AI tools or software to assist in the proposal writing and submission process
• Substance is everything!
REMINDERS
• Questions are due to the CO 14 days prior to bid deadline. It is the Offeror’s responsibility to take notes and submit questions in writing by the deadline.
• Submit questions only to Anthony_jasper@ios.doi.gov, and John_Kotchian@ios.doi.gov. Please do NOT reach out to the park directly or any other NPS staff other than myself or John.
• Email proposals on or before July 2, 2026.
• Solicitation and project documents are only changed with a formal amendment.
QUESTIONS?
Thank you for your interest in this project!
| B09_140P2026R0048 A0003_SF30_MACA 258051 |
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
| B09_140P2026R0048 A0003_Att_Sign-In Sheet_MACA 258051 |
| B09_140P2026R0048 A0003_Att_Prebid Slides_MACA 258051 |