B08_Attachment_01_HARDEN_FARM_SEWER_CD_DRAWINGS.pdf

PDF 6 MB Posted

Attached to
ACAD 255256 - Replace Harden Farm Sewer Federal contract opportunity
Solicitation number
140P2025R0044
Issued by
Department of the Interior National Park Service National Office

About this file

These are comprehensive construction design drawings for the Harden Farm Sewer Replacement project at Acadia National Park, prepared as 100% Construction Documents (CD) for the National Park Service. The 18-page set includes detailed site plans, profiles, electrical plans, and technical details for replacing the existing sewage system, with specific focus on:

The project involves installing a new sewer pump station, force main, and gravity sewer lines connecting the Harden Farm housing area to municipal facilities. Key technical components include a proposed sewer pump station with associated infrastructure, electrical systems, site grading, demolition of existing infrastructure, erosion control measures, and utility relocations. The drawings provide precise engineering specifications for site layout, pipe routing, electrical connections, fencing, gate details, and construction methods, with annotations indicating the project is set for full construction implementation within Acadia National Park's boundaries, specifically around the Harden Farm housing area.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALINAST

ATE OF MAINE

L.

No. 11164

PROFESS IONAL ENGIN

EE

R

L IC EN S ED

WATT

12/23 /2024

AutoCAD SHX Text

MUSEUM

AutoCAD SHX Text

MUSEUM

AutoCAD SHX Text

FRENCHMAN

AutoCAD SHX Text

ISLE AU HAUT

AutoCAD SHX Text

16 MILES TO

AutoCAD SHX Text

BERNARD

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

SWAN ISLAND

AutoCAD SHX Text

FERRY TO

AutoCAD SHX Text

ATLANTIC

AutoCAD SHX Text

AutoCAD SHX Text

COVE

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

SWIM

AutoCAD SHX Text

SEAWALL

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

BASS

AutoCAD SHX Text

GREAT

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

CRANBERRY

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

NORTHEAST

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

SOUTHWEST

AutoCAD SHX Text

ATLANTIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

MARSH

AutoCAD SHX Text

PRETTY

AutoCAD SHX Text

AIRPORT

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

THOMPSON

AutoCAD SHX Text

MT. DESERT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

HQ.

AutoCAD SHX Text V.C.

AutoCAD SHX Text

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

BAR

AutoCAD SHX Text

& ELLSWORTH

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

LITTLE

AutoCAD SHX Text

CRANBERRY

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

BAKER

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

SWIM BEACH

AutoCAD SHX Text

BLACKWOODS

AutoCAD SHX Text

FABBRI

AutoCAD SHX Text

ATLANTIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

ONE WAY

AutoCAD SHX Text

STATION

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

ONE WAY

AutoCAD SHX Text

AutoCAD SHX Text

BROOK

AutoCAD SHX Text

BEAR

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

BAR

AutoCAD SHX Text

BAY

AutoCAD SHX Text

AutoCAD SHX Text

PENINSULA

AutoCAD SHX Text

SCHOODIC

AutoCAD SHX Text

& GOULDSBORO

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

BIRCH

AutoCAD SHX Text

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

& WEST GOULDSBORO

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISLE AU

AutoCAD SHX Text

ATLANTIC

AutoCAD SHX Text

HAUT

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

PARK

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

ACADIA

AutoCAD SHX Text

BUCKSPORT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BANGOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELLSWORTH

AutoCAD SHX Text

GRAHAM

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

GRAND

AutoCAD SHX Text

AutoCAD SHX Text

ISLE AU HAUT

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

SCALE OF KILOMETERS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

PICNIC AREA

AutoCAD SHX Text

AIRPORT

AutoCAD SHX Text

LIGHTHOUSE

AutoCAD SHX Text

CAMPGROUND

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

INFORMATION CENTER

AutoCAD SHX Text

RANGER STATION

AutoCAD SHX Text

PARK HEADQUARTERS

AutoCAD SHX Text

VISITOR CENTER

AutoCAD SHX Text V.C.

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

FERRY ROUTE

AutoCAD SHX Text

UNPAVED ROAD

AutoCAD SHX Text

COUNTY LINE

AutoCAD SHX Text

PAVED ROAD

AutoCAD SHX Text

PARK BOUNDARY

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

THIS PROJECT

AutoCAD SHX Text

INDEX OF SHEETS

AutoCAD SHX Text TITLE OF SHEET TITLE OF SHEET COVER SHEET & PROJECT LOCATIONS MAP COVER SHEET & PROJECT LOCATIONS MAP INDEX, LEGENDS & NOTES INDEX, LEGENDS & NOTES OVERALL SITE PLAN DEMOLITION PLAN SITE PLAN FORCEMAIN PLAN & PROFILE FORCEMAIN PLAN & PROFILE FORCEMAIN PLAN & PROFILE FORCEMAIN PLAN & PROFILE DETAILS DETAILS DETAILS DETAILS SITE ELECTRICAL DEMOLITION PLAN OVERALL SITE ELECTRICAL PLAN SITE ELECTRICAL PLAN SITE ELECTRICAL DETAILS ELECTRICAL POWER PLAN, SCHEDULE, AND DIAGRAM

AutoCAD SHX Text

SHEET SHEET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

AutoCAD SHX Text

SUB SUB SHEET SHEET C0 C1 C2 C3 PP1 PP2 PP3 PP4 C4 C5 C6 C7 E1 E2 E3 E4 E5

AutoCAD SHX Text

STATE

AutoCAD SHX Text

REGION

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

NAME OF PARK

AutoCAD SHX Text

TITLE OF DRAWING

AutoCAD SHX Text

REPLACE HARDEN FARM SEWAGE

AutoCAD SHX Text

HARDEN FARM HOUSING

AutoCAD SHX Text 60,026

AutoCAD SHX Text

ACAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HANCOCK

AutoCAD SHX Text

MAINE

AutoCAD SHX Text

100% CD

AutoCAD SHX Text

ACAD 255256

AutoCAD SHX Text

OF

AutoCAD SHX Text

PKG.

AutoCAD SHX Text

NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

LOCATION WITHIN PARK

AutoCAD SHX Text

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

NATIONAL PARK SERVICE

AutoCAD SHX Text

DENVER SERVICE CENTER

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

QUALITY DESIGN CERTIFICATION

AutoCAD SHX Text Prepared in Accordance with Design Development (Title I) OR Variance from Design Development (Title I) Approved by Superintendent on OR Construction Drawing Not Preceded by Design Development (Title I)

AutoCAD SHX Text Project Manager Date

AutoCAD SHX Text Date

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Mark Sheet REVISION Date Initial

B

W2

ALINAST

ATE OF MAINE

L.

No. 11164

PROFESS IONAL ENGIN

EE

R

L IC EN S ED

WATT

12/23 /2024

AutoCAD SHX Text

SITE LAYOUT NOTES

AutoCAD SHX Text

1. CONTRACTOR SHALL VERIFY ALL EXISTING SURVEY INFORMATION IN THE FIELD AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO AND DURING WORK. ALL FIELD ADJUSTMENTS TO BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO IMPLEMENTATION. 2. SURVEY LAYOUT - FEATURES SHOWN ON THIS PLAN ARE INTENDED TO BE LAID OUT OR MARKED FOR CONSTRUCTION ON THE GROUND USING LAND SURVEYING INSTRUMENTATION WITH A RELATIVE PRECISION OF 0.04 FEET OR BETTER, UNLESS OTHERWISE SPECIFIED IN WRITING BY THE CONTRACTING OFFICER. GOVERNMENT SHALL SUPPLY ELECTRONIC FILE FOR PROJECT LAYOUT. C.O. SHALL APPROVE PROJECT LAYOUT IN FIELD PRIOR TO IMPLEMENTATION. 3. ALL LINES ARE PERPENDICULAR OR PARALLEL TO THE LINES FROM WHICH THEY ARE MEASURED UNLESS OTHERWISE INDICATED. 4. V.I.F. - VERIFY LAYOUT IN FIELD WITH CONTRACTING OFFICER PRIOR TO IMPLEMENTATION. 5. COORDINATE WITH OTHER DRAWINGS AS REQUIRED.

AutoCAD SHX Text

SITE GRADING NOTES

AutoCAD SHX Text

1. CONTRACTOR TO VERIFY ELEVATIONS OF PROPOSED DESIGNS, GRADING, ETC. PRIOR TO CONSTRUCTION. ALL GRADING SHALL BE COORDINATED WITH ADJACENT IMPROVEMENTS ASSOCIATED WITH THE HARDEN FARM HOUSING PROJECT (ACAD 309000). ANY DISCREPANCIES NOTED IN PROPOSED DESIGNS OR BETWEEN THE TWO PROJECTS SHALL BE REPORTED IMMEDIATELY TO CONTRACTING OFFICER. 2. PROPOSED GRADES TO BLEND SMOOTHLY INTO EXISTING GRADES. 3. CONTRACTOR TO STOCKPILE FOR REUSE ANY MATERIALS EXCAVATED. EXISTING SUITABLE MATERIALS TO BE REUSED WHERE EXCAVATED FROM TRENCH. 4. ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE EROSION CONTROL BLANKET. ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE EROSION CONTROL BLANKET. 5. FINISH GRADING AT THE COMPLETION OF THE PROJECT IS INTENDED TO MATCH EXISTING FINISH GRADING AT THE COMPLETION OF THE PROJECT IS INTENDED TO MATCH EXISTING GRADE UNLESS OTHERWISE NOTED. CONTRACTOR TO MATCH EXISTING GROUND ELEVATION, GROUND COVER AND EXISTING MATERIALS UNLESS OTHERWISE NOTED. EXISTING MATERIALS EXCAVATED DURING CONSTRUCTION TO BE REUSED IN THE SAME APPLICATION IN WHICH THEY WERE REMOVED. SEE SITE GRADING NOTES #4. 6. GRADING ADJACENT TO ANY EXISTING STRUCTURES SHALL PROVIDE FOR POSITIVE DRAINAGE GRADING ADJACENT TO ANY EXISTING STRUCTURES SHALL PROVIDE FOR POSITIVE DRAINAGE AWAY FROM STRUCTURES. 7. GRADING SHALL ALLOW FOR POSITIVE DRAINAGE TO ALL EXISTING OR PROPOSED DRAINAGE GRADING SHALL ALLOW FOR POSITIVE DRAINAGE TO ALL EXISTING OR PROPOSED DRAINAGE STRUCTURES. ADJUST FRAMES AND GRATES OF DRAINAGE STRUCTURES IN DISTURBED AREAS TO PROVIDE SMOOTH FINISH GRADING AND POSITIVE DRAINAGE. 8. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL LEAVE SITE IN A STABLE, SAFE ALL WORK PERFORMED UNDER THIS CONTRACT SHALL LEAVE SITE IN A STABLE, SAFE CONDITION. NO UNSTABLE SLOPES OR OTHER AREAS ARE PERMITTED AS A RESULT OF WORK PERFORMED BY THE CONTRACTOR OR THEIR AGENTS.

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

AutoCAD SHX Text

LIGHT, RADIAL

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

UTILITY BOX

AutoCAD SHX Text

MH

AutoCAD SHX Text

UTILITY MANHOLE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text S

AutoCAD SHX Text

SEWER MANHOLE

AutoCAD SHX Text

WATER VALVE/GATE

AutoCAD SHX Text

CONIFEROUS TREE

AutoCAD SHX Text

DECIDUOUS TREE

AutoCAD SHX Text

DOOR ELEVATION AT SILL

AutoCAD SHX Text 100.3

AutoCAD SHX Text

SPOT ELEVATION

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

UNDERGROUND UTILITIES

AutoCAD SHX Text

OVERHEAD WIRES

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

WATERLINE

AutoCAD SHX Text 59.3

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

TREELINE

AutoCAD SHX Text

1. DEMOLITION SHALL BE SEQUENCED SUCH THAT SEWER SERVICE IS NOT INTERRUPTED FOR MORE THAN 4 DEMOLITION SHALL BE SEQUENCED SUCH THAT SEWER SERVICE IS NOT INTERRUPTED FOR MORE THAN 4 HOURS AT ANY GIVEN TIME. ALL INTERRUPTIONS TO SERVICE SHALL BE APPROVED, IN WRITING, BY THE CONTRACT OFFICER. THE CONTRACTOR SHALL NOT INTERRUPT SERVICE WITHOUT AT LEAST 1 WEEK PRIOR APPROVAL. 2. SEQUENCE OF DEMOLITION & CONSTRUCTION: SEQUENCE OF DEMOLITION & CONSTRUCTION: 1. DEMOLISH ONLY STRUCTURES REQUIRED TO BUILD/PROVIDE NEW SYSTEM. 2. BUILD NEW PUMP STATION AND FORCE MAIN. 3. INTERCEPT EXISTING FLOWS AND BYPASS TO NEW SYSTEM. 5. CONNECT NEW COLLECTION SYSTEM. 6. DEMOLISH OLD TREATMENT SYSTEM AS NOTED. 3. CONTRACTING OFFICER (C.O.) TO APPROVE LAYOUT PRIOR TO REMOVALS. FLAG ALL VEGETATION DESIGNATED CONTRACTING OFFICER (C.O.) TO APPROVE LAYOUT PRIOR TO REMOVALS. FLAG ALL VEGETATION DESIGNATED FOR REMOVAL FOR C.O. APPROVAL PRIOR TO REMOVAL. REFER TO SPECIFICATIONS FOR VEGETATION REMOVAL. 4. MINIMAL TREE CLEARING IS ANTICIPATED AS DEVELOPMENT IS PRIMARILY LOCATED IN OPEN AREAS OF THE MINIMAL TREE CLEARING IS ANTICIPATED AS DEVELOPMENT IS PRIMARILY LOCATED IN OPEN AREAS OF THE SITE. ANY TREE REMOVALS SHALL BE CLOSELY COORDINATED WITH GOVERNMENT. NO CLEARING PERMITTED BETWEEN APRIL 15 AND NOVEMBER 1. 5. DEMOLITION PLANS DO NOT PURPORT TO SHOW ALL DEMOLITION AND REMOVALS REQUIRED. MAJORITY OF DEMOLITION PLANS DO NOT PURPORT TO SHOW ALL DEMOLITION AND REMOVALS REQUIRED. MAJORITY OF FORCEMAIN PATH DOES NOT SHOW DEMOLITION BECAUSE IT FOLLOWS EXISTING UTILITY ROUTING AND MINIMAL CLEARING/DEMOLITION APART FROM TRENCH EXCAVATION IS ANTICIPATED. 6. CONTRACTOR SHALL CAREFULLY COORDINATE DEMOLITION WITH ALL PLANS AND SPECIFICATIONS. CONTRACTOR CONTRACTOR SHALL CAREFULLY COORDINATE DEMOLITION WITH ALL PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO COMPLETE THE WORK, REGARDLESS IF SHOWN GRAPHICALLY ON THE PLANS OR NOT. 7. SELECTIVE CLEARING - C.O. SHALL IDENTIFY ALL VEGETATION TO REMOVE. VEGETATION SHALL BE CUT TO SELECTIVE CLEARING - C.O. SHALL IDENTIFY ALL VEGETATION TO REMOVE. VEGETATION SHALL BE CUT TO GROUND LEVEL. CONTRACTOR SHALL REMOVE DESIGNATED VEGETATION WITHOUT DAMAGE TO RESIDUAL STAND, AS APPLICABLE. 8. REFER TO SPECIFICATIONS AND PLAN SHEETS FOR SEDIMENTATION AND EROSION CONTROL NOTES AND REFER TO SPECIFICATIONS AND PLAN SHEETS FOR SEDIMENTATION AND EROSION CONTROL NOTES AND DETAILS. 9. CONTRACTING OFFICER WILL DESIGNATE SALVAGEABLE MATERIALS TO BE RETAINED AND/OR STORED. ALL CONTRACTING OFFICER WILL DESIGNATE SALVAGEABLE MATERIALS TO BE RETAINED AND/OR STORED. ALL OTHER MATERIAL DESIGNATED FOR REMOVAL SHALL BE REMOVED FROM SITE AND DISCARDED IN A LEGAL MANNER. 10. CONTRACTOR TO PROVIDE GOVERNMENT WITH WASTE MANAGEMENT PLAN SUBMITTAL PRIOR TO CONTRACTOR TO PROVIDE GOVERNMENT WITH WASTE MANAGEMENT PLAN SUBMITTAL PRIOR TO PRE-CONSTRUCTION CONFERENCE. SEE SPECIFICATION SECTION 01 74 19 FOR REQUIREMENTS AND DETAILS FOR CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

AutoCAD SHX Text

DEMOLITION AND REMOVAL NOTES

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

1. ALL KNOWN EXISTING UNDERGROUND UTILITIES ARE SHOWN ON THE PLAN. ALL KNOWN EXISTING UNDERGROUND UTILITIES ARE SHOWN ON THE PLAN. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING LOCATION, ELEVATION, SIZE AND MATERIAL PRIOR TO ORDERING AND INSTALLING MATERIALS. 2. CONTRACTOR IS RESPONSIBLE FOR MARKING OF EXISTING UTILITIES. SEE GENERAL CONTRACTOR IS RESPONSIBLE FOR MARKING OF EXISTING UTILITIES. SEE GENERAL NOTES #2. 3. PROVIDE TEST PITS PRIOR TO CONSTRUCTION AT ALL POTENTIAL CONFLICTS TO PROVIDE TEST PITS PRIOR TO CONSTRUCTION AT ALL POTENTIAL CONFLICTS TO VERIFY CLEARANCES. 4. ALL EXISTING GATE VALVES, CURB STOPS, MANHOLE & CATCH BASIN RIMS TO ALL EXISTING GATE VALVES, CURB STOPS, MANHOLE & CATCH BASIN RIMS TO REMAIN THAT ARE DISTURBED BY THE PROJECT SHALL BE SET FLUSH WITH FINISH GRADE OR AS DIRECTED BY THE CONTRACTING OFFICER. 5. CONTRACTOR RESPONSIBLE FOR ALL DEWATERING NECESSARY TO PROVIDE DRY CONTRACTOR RESPONSIBLE FOR ALL DEWATERING NECESSARY TO PROVIDE DRY EXCAVATION FOR UTILITY INSTALL. ALL PUMPS, DEWATERING BAGS AND MATERIALS FOR DEWATERING SHALL BE PROVIDED BY THE CONTRACTOR. 6. EXCAVATING ADJACENT TO EXISTING UTILITIES REQUIRES CLOSE COORDINATION AND EXCAVATING ADJACENT TO EXISTING UTILITIES REQUIRES CLOSE COORDINATION AND CAREFUL EXCAVATION. EMPLOY HAND EXCAVATION BY MEANS OF SHOVELING OR PNEUMATIC EXCAVATION WITHIN 2' OF EXISTING UTILITIES.

AutoCAD SHX Text

1' CONTOUR - EXISTING

AutoCAD SHX Text

5' CONTOUR - EXISTING

AutoCAD SHX Text

UTILITY NOTES

AutoCAD SHX Text

UGU

AutoCAD SHX Text S

AutoCAD SHX Text

SD

AutoCAD SHX Text W

AutoCAD SHX Text

LANDSCAPE STONE

AutoCAD SHX Text

SCD

AutoCAD SHX Text

STONE CHECK DAM

AutoCAD SHX Text

UNDERDRAIN

AutoCAD SHX Text

CATCHBASIN/FIELD BASIN

AutoCAD SHX Text

STORMDRAIN

AutoCAD SHX Text

SILTFENCE

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

AutoCAD SHX Text

RETAINING WALL

AutoCAD SHX Text

VERIFY IN FIELD

AutoCAD SHX Text V.I.F.

AutoCAD SHX Text

CONTRACTING OFFICER

AutoCAD SHX Text C.O.

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ANP

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

A/E FIRM - 140P4322F0018

AutoCAD SHX Text

PRIME/CIVIL:

AutoCAD SHX Text

HEDEFINE ENGINEERING & DESIGN, INC.

AutoCAD SHX Text

ELLSWORTH, MAINE

AutoCAD SHX Text

MEP ENGINEER:

AutoCAD SHX Text

CARPENTER ASSOCIATES

AutoCAD SHX Text

OLD TOWN, MAINE

AutoCAD SHX Text

ENVIRONMENTAL:

AutoCAD SHX Text

ATLANTIC RESOURCE CO.

AutoCAD SHX Text

BASS HARBOR, MAINE

AutoCAD SHX Text

INDEX, LEGENDS & NOTES

AutoCAD SHX Text

REPLACE HARDEN FARM SEWAGE WITH

AutoCAD SHX Text

CONNECTION TO MUNICIPAL FACILITIES

AutoCAD SHX Text

AutoCAD SHX Text 60,026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AW

AutoCAD SHX Text

LH

AutoCAD SHX Text

AW

AutoCAD SHX Text 12/23/2024

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ACAD 255256

AutoCAD SHX Text C0

AutoCAD SHX Text

BENCHMARK

AutoCAD SHX Text

MINIMUM REQUIREMENTS FOR EROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text PERMANENT SEEDING NOTES FOR ALL DISTURBED AREAS 1. DURING PERIOD FROM APRIL 15 TO OCTOBER 15, AREAS DISTURBED SHALL BE SEEDED AND MULCHED AS DURING PERIOD FROM APRIL 15 TO OCTOBER 15, AREAS DISTURBED SHALL BE SEEDED AND MULCHED AS SPECIFIED IN THE CONTRACT DOCUMENTS. SEE OVER WINTER STABILIZATION NOTES BELOW. 2. AFTER SEEDING, AREAS DISTURBED SHALL BE MULCHED AS DESCRIBED IN MDEP BEST MANAGEMENT PRACTICES. AFTER SEEDING, AREAS DISTURBED SHALL BE MULCHED AS DESCRIBED IN MDEP BEST MANAGEMENT PRACTICES. MULCH SHALL BE APPLIED BY THE CONTRACTOR. 3. NO PERMANENT SEEDING SHALL TAKE PLACE BETWEEN JUNE 15 AND AUGUST 15 UNLESS DAILY WATERING IS NO PERMANENT SEEDING SHALL TAKE PLACE BETWEEN JUNE 15 AND AUGUST 15 UNLESS DAILY WATERING IS PROVIDED, AT NOT ADDITIONAL COST TO THE GOVERNMENT. AS A CONTINGENCY PLAN, AREAS DISTURBED BETWEEN THESE DATES SHALL BE STRAW MULCHED AT A RATE OF 2 BALES/1,000 SF. AND SECURED WITH A PEG AND TWINE OF 4-6 PEGS/SY OR WITH "TERRA TACK II" OR EQUALS AT A RATE OF 60 GALLONS/ACRE. 4. WEEKLY, OR AFTER PRECIPITATION PRODUCING THE EQUIVALENT OF ONE HALF INCH OF RAINFALL OR SNOWMELT, WEEKLY, OR AFTER PRECIPITATION PRODUCING THE EQUIVALENT OF ONE HALF INCH OF RAINFALL OR SNOWMELT, ALL MULCHED AREAS SHALL BE INSPECTED FOR SUITABILITY FOR EROSION CONTROL AND SLOPE PROTECTION. WEAKENED AREAS SHALL BE RE-MULCHED. 5. WITHIN 30-45 DAYS OF SEED APPLICATION, ALL AREAS SHALL BE INSPECTED FOR SATISFACTORY GROWTH. WITHIN 30-45 DAYS OF SEED APPLICATION, ALL AREAS SHALL BE INSPECTED FOR SATISFACTORY GROWTH. AREAS OF LESS THAN 75% GROWTH SHALL BE RESEEDED AT ORIGINAL APPLICATION RATES, MULCHED AND MAINTAINED ACCORDINGLY AS SPECIFIED ABOVE. 6. PERMANENT SEEDING SHALL BE INSTALLED IMMEDIATELY UPON REACHING FINAL GRADE UNLESS OTHERWISE PERMANENT SEEDING SHALL BE INSTALLED IMMEDIATELY UPON REACHING FINAL GRADE UNLESS OTHERWISE NOTED. 7. SEED SHALL BE AS PROVIDED IN THE SPECIFICATIONS, SEED WILL NOT BE PROVIDED BY GOVERNMENT. SEED SHALL BE AS PROVIDED IN THE SPECIFICATIONS, SEED WILL NOT BE PROVIDED BY GOVERNMENT.

AutoCAD SHX Text EROSION CONTROL CONSTRUCTION SEQUENCE ALL EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL OCCUR AFTER APRIL 15 AND BEFORE NOVEMBER 1 UNLESS WINTER EROSION CONTROL MEASURES ARE IMPLEMENTED. THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL DEVICES PRIOR TO THE DISTURBANCE OF ANY WORK AREA. THE CONTRACTING OFFICER SHALL REVIEW THE PROPOSED SEQUENCING OF CONSTRUCTION ACTIVITIES AND PROPOSED OR INSTALLED EROSION CONTROL MEASURES AND MAY DIRECT THE CONTRACTOR TO MODIFY THE SEQUENCING IF, AT THEIR SOLE DISCRETION, THEY DETERMINE THEY ARE NOT PROGRESSING IN A LOGICAL MANNER. SEE SPECIFICATION SECTION 013216. 1. INSTALL ALL SILT FENCING, COIR WATTLES, CONSTRUCTION ENTRANCE(S) AND ANY OTHER EROSION CONTROL INSTALL ALL SILT FENCING, COIR WATTLES, CONSTRUCTION ENTRANCE(S) AND ANY OTHER EROSION CONTROL ITEMS REQUIRED BY SITE CONDITIONS OR THE CONTRACTORS EROSION CONTROL PLAN. REVIEW PLANS FOR AREAS TO RECEIVE ADDITIONAL EROSION CONTROL MEASURES. ALL EROSION MEASURES AND PROTECTION SHALL REMAIN IN PLACE UNTIL SITE IS PERMANENTLY STABILIZED. 2. LOCATE AND PREPARE DEWATERING AREAS. DEWATERING OPERATION SHALL UTILIZE DEWATERING BAGS OR LOCATE AND PREPARE DEWATERING AREAS. DEWATERING OPERATION SHALL UTILIZE DEWATERING BAGS OR SIMILAR METHODS. SEE DEWATERING DETAILS. 3. BEGIN GENERAL DEMOLITION AND REMOVALS REQUIRED FOR PUMP STATION INSTALLATION, FOUNDATION BEGIN GENERAL DEMOLITION AND REMOVALS REQUIRED FOR PUMP STATION INSTALLATION, FOUNDATION INSTALLATION AND FORCEMAIN INSTALLATION. BEGIN UTILITY TRENCHING AND CONSTRUCTION. CONTRACTOR TO PHASE WORK IN SUCH A MANNER SO THAT A MINIMAL PORTION OF THE SITE IS DISTURBED AT ONE TIME. WORK IN THE DISTURBED AREA SHALL BE COMPLETED AND STABILIZED PRIOR TO ANOTHER AREA BEING DISTURBED. SEE PROJECT PHASING NOTES IN PROJECT MANUAL. 4. GRADE PROJECT TO SUBGRADE LEVEL IN SUCH A MANNER TO MINIMIZE EARTH MOVING AND TO PRESERVE GRADE PROJECT TO SUBGRADE LEVEL IN SUCH A MANNER TO MINIMIZE EARTH MOVING AND TO PRESERVE LAND NOT TO BE DISTURBED. 5. COMPLETE UTILITY, WETWELL AND PUMP STATION CONSTRUCTION. COMPLETE UTILITY, WETWELL AND PUMP STATION CONSTRUCTION. 6. COMPLETE PUMP STATION SLAB CONSTRUCTION, SETTING OF ENCLOSURE AND EXTERIOR SLAB CONSTRUCTION. COMPLETE PUMP STATION SLAB CONSTRUCTION, SETTING OF ENCLOSURE AND EXTERIOR SLAB CONSTRUCTION. 7. COMPLETE FINISH GRADING. LOAM, SEED AND MULCH (WITH EROSION CONTROL BLANKET WHERE REQUIRED) ALL COMPLETE FINISH GRADING. LOAM, SEED AND MULCH (WITH EROSION CONTROL BLANKET WHERE REQUIRED) ALL DISTURBED AREAS NOT TO BE PAVED, GRAVEL, OR OTHER GROUND COVER. REMOVE EXCESS ACCUMULATED SEDIMENTS FROM SEDIMENTATION AREAS. 8. COMPLETE UNFINISHED CONSTRUCTION, INCLUDING DEMOLITION OF ON-SITE SEPTIC TREATMENT SYSTEM. (SEE COMPLETE UNFINISHED CONSTRUCTION, INCLUDING DEMOLITION OF ON-SITE SEPTIC TREATMENT SYSTEM. (SEE DEMOLITION AND REMOVAL NOTES). 9. REMOVE TEMPORARY DIVERSION DITCHES, LEVEL SPREADERS, AND STONE CHECK DAMS WHEN 75% OF GRASS REMOVE TEMPORARY DIVERSION DITCHES, LEVEL SPREADERS, AND STONE CHECK DAMS WHEN 75% OF GRASS GROWTH HAS BEEN ESTABLISHED.

AutoCAD SHX Text INFRASTRUCTURE MAINTENANCE STRUCTURE TYPE INSPECTION CLEANING INSPECTION CLEANING CLEANING STONE CHECK DAMS MONTHLY MONTHLY SILT FENCES MONTHLYMONTHLY

AutoCAD SHX Text TEMPORARY SEEDING NOTES 1. ANY DISTURBED ARES TO BE LEFT IN ROUGH GRADED FORM FOR MORE THAN 30 DAYS BUT LESS THAN ONE ANY DISTURBED ARES TO BE LEFT IN ROUGH GRADED FORM FOR MORE THAN 30 DAYS BUT LESS THAN ONE GROWING SEASON SHALL BE TEMPORARILY SEEDED AND MULCHED. 2. APPLICATION RATES AND MATERIALS USED SHALL BE THE SAME AS FOR PERMANENT SEEDING EXCEPT SEED APPLICATION RATES AND MATERIALS USED SHALL BE THE SAME AS FOR PERMANENT SEEDING EXCEPT SEED MIXTURE SHALL BE AS PROVIDED BY THE CONTRACTING OFFICER.

AutoCAD SHX Text DORMANT SEEDING NOTES 1. IF AFTER SEPTEMBER 15, SITE SHALL BE STABILIZED ACCORDING TO BMP'S AND SHALL BE SEEDED IN SPRING. IF AFTER SEPTEMBER 15, SITE SHALL BE STABILIZED ACCORDING TO BMP'S AND SHALL BE SEEDED IN SPRING.

AutoCAD SHX Text EROSION CONTROL GENERAL NOTES 1. ON-SITE STABILIZATION WILL BE DONE WITHIN 15 DAYS OF FINAL GRADING OR WITHIN 30 DAYS OF INITIAL SOIL ON-SITE STABILIZATION WILL BE DONE WITHIN 15 DAYS OF FINAL GRADING OR WITHIN 30 DAYS OF INITIAL SOIL DISTURBANCE. 2. EVERY WEEK AND AFTER PRECIPITATION PRODUCING THE EQUIVALENT OF ONE HALF INCH OF RAINFALL, THE EVERY WEEK AND AFTER PRECIPITATION PRODUCING THE EQUIVALENT OF ONE HALF INCH OF RAINFALL, THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES. MAINTENANCE SHALL INCLUDE, BUT NOT BE LIMITED TO, REMOVAL OF SEDIMENT FROM SILT FENCE IF SOIL ACCUMULATES TO A DEPTH OF ONE-HALF THE FABRIC HEIGHT; REPAIR OF STONE CHECK DAMS IF RUNOFF CHANNELIZES UNDER OR AROUND THE DAMS AND WASHING OF TEMPORARY CONSTRUCTION ENTRANCES PRIOR TO OCCURRENCES OF SIGNIFICANT TRACKING. 3. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH "MAINE ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH "MAINE EROSION & SEDIMENT CONTROL HANDBOOK FOR CONSTRUCTION: BEST MANAGEMENT PRACTICES", BY MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION, LATEST EDITION & MDEP CHAPTER 500 STORMWATER MANAGEMENT; APPENDIX A, B & C. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL MEASURES, INCLUDING MATERIALS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL MEASURES, INCLUDING MATERIALS, CONSTRUCTION, MAINTENANCE AND REMOVAL. 5. EROSION CONTROL BLANKET SHALL BE INSTALLED ON ALL LOAMED AND SEEDED AREAS WHICH HAVE A SLOPE EROSION CONTROL BLANKET SHALL BE INSTALLED ON ALL LOAMED AND SEEDED AREAS WHICH HAVE A SLOPE GREATER THAN 3:1. 6. WATER SHALL BE UTILIZED TO CONTROL DUST IF NECESSARY. (AS DETERMINED BY THE CONTRACTING OFFICER) WATER SHALL BE UTILIZED TO CONTROL DUST IF NECESSARY. (AS DETERMINED BY THE CONTRACTING OFFICER) 7. EROSION CONTROL MEASURES SHALL BE INSPECTED ON A MONTHLY BASIS ONCE FINAL STABILIZATION IS EROSION CONTROL MEASURES SHALL BE INSPECTED ON A MONTHLY BASIS ONCE FINAL STABILIZATION IS COMPLETE, BY THE CONTRACTING OFFICER. THIS INSPECTION IN NO WAY REDUCES OR ELIMINATES THE CONTRACTOR'S RESPONSIBILITY TO ADHERE WITH VERBAL OR WRITTEN REQUIREMENTS OF DEP, ARMY CORPS, EPA, OR OTHER JURISDICTIONAL AGENCIES. 8. AFTER EACH INSPECTION OF EROSION CONTROL MEASURES, AN INSPECTION REPORT DETAILING THE SCOPE OF THE AFTER EACH INSPECTION OF EROSION CONTROL MEASURES, AN INSPECTION REPORT DETAILING THE SCOPE OF THE INSPECTION, NAME(S) OF PERSONNEL CONDUCTION THE INSPECTION, DATE, MAJOR OBSERVATIONS, AND ACTIONS TAKEN, SHALL BE MADE AND KEPT ON FILE FOR THREE YEARS AFTER THE INSPECTION.

AutoCAD SHX Text SPECIFIC INSTRUCTIONS: 1. SILT FENCE - SILT FENCES SHOULD BE CHECKED SILT FENCE - SILT FENCES SHOULD BE CHECKED IMMEDIATELY BEFORE AND AFTER STORMS, BUT AT LEAST MONTHLY DURING CONSTRUCTION. IF NEEDED, THEY SHOULD BE REPLACED. THIS ALSO APPLIES IF COIL WATTLES ARE USED.

AutoCAD SHX Text OVER WINTER STABILIZATION CONTROL MEASURES NOTES 1. SEE SPECIFICATION SECTION 312500.3.4 FOR OVER WINTER CONSTRUCTION REQUIREMENTS. SEE SPECIFICATION SECTION 312500.3.4 FOR OVER WINTER CONSTRUCTION REQUIREMENTS. 2. SEE OTHER RELEVANT SPECIFICATION SECTIONS FOR PLAN PREPARATION, APPROVAL AND MONITORINGSEE OTHER RELEVANT SPECIFICATION SECTIONS FOR PLAN PREPARATION, APPROVAL AND MONITORING

AutoCAD SHX Text EXISTING CONDITIONS OBTAINED FROM PLANS PROVIDED BY PLISGA & DAY LAND SURVEYORS. DIGITAL FILE RECEIVED FROM PLISGA & DAY ON OCTOBER 17, 2023 NAMED: "23067_PHASE II TO HEDEFINE.dwg" SOME EXISTING UTILITY INFORMATION WAS UPDATED BASED ON HISTORICAL PLANS AND SITE OBSERVATIONS. - HEDEFINE ENGINEERING & DESIGN, INC. TAKES NO RESPONSIBILITY FOR THE ACCURACY AND OR HEDEFINE ENGINEERING & DESIGN, INC. TAKES NO RESPONSIBILITY FOR THE ACCURACY AND OR COMPLETENESS OF THE AFOREMENTIONED PLANS. 1. CONTRACTOR RESPONSIBLE FOR MEETING ALL MAINE DOT AND MUTCD CONSTRUCTION WARNING SIGN CONTRACTOR RESPONSIBLE FOR MEETING ALL MAINE DOT AND MUTCD CONSTRUCTION WARNING SIGN REQUIREMENTS. 2. CONTRACTOR RESPONSIBLE FOR COORDINATING WITH A UTILITY LOCATOR PRIOR TO BEGINNING ANY CONTRACTOR RESPONSIBLE FOR COORDINATING WITH A UTILITY LOCATOR PRIOR TO BEGINNING ANY EXCAVATIONS. ALL KNOWN EXISTING UTILITIES SHALL BE MARKED ON THE GROUND AT AN INTERVAL SUFFICIENT TO IDENTIFY LOCATION AND ORIENTATION OF EXISTING UTILITIES. FOLLOW ALL APPLICABLE CODES AND REGULATIONS FOR UTILITY LOCATING AND REPORTING. 3. NOT ALL REQUIRED EROSION CONTROL ITEMS ARE SHOWN FOR CLARITY. CONTRACTOR TO REFERENCE PLANS, NOT ALL REQUIRED EROSION CONTROL ITEMS ARE SHOWN FOR CLARITY. CONTRACTOR TO REFERENCE PLANS, EROSION CONTROL NOTES AND SPECIFICATION SECTION 015723 PRIOR TO SUBMITTING AND EROSION CONTROL PLAN TO THE CONTRACTING OFFICER. 4. EXISTING ACCESS DRIVE SHALL BE USED TO ACCESS THE PROJECT SITE. CONTRACTOR RESPONSIBLE FOR EXISTING ACCESS DRIVE SHALL BE USED TO ACCESS THE PROJECT SITE. CONTRACTOR RESPONSIBLE FOR MAKING IMPROVEMENTS TO STABILIZE ROAD FOR ACCESS IF DIRECTED BY CONTRACTING OFFICER. 5. NO METAL TRACKED EQUIPMENT SHALL BE ALLOWED ON PAVEMENT WITHOUT MEANS FOR PROTECTING NO METAL TRACKED EQUIPMENT SHALL BE ALLOWED ON PAVEMENT WITHOUT MEANS FOR PROTECTING PAVEMENT. 6. THE HARDEN FARM CAMPUS HAS EXISTING HOUSING AND ADJACENT CONSTRUCTION ACTIVITIES WILL BE THE HARDEN FARM CAMPUS HAS EXISTING HOUSING AND ADJACENT CONSTRUCTION ACTIVITIES WILL BE PERFORMED CONCURRENTLY. CONTRACTOR RESPONSIBLE FOR MAINTAINING A SAFE AND SECURE JOBSITE. ALL CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, LOCAL REQUIREMENTS, NPS SAFETY STANDARDS, AND ANY OTHER APPLICABLE SAFETY STANDARD. CLOSURE SIGNAGE, FLAGGERS, SAFETY LIGHTING, AND CONSTRUCTION FENCING SHALL BE UTILIZED TO CLEARLY IDENTIFY THE PROJECT AREA AND PREVENT UNAUTHORIZED ENTRANCE INTO WORK AREAS. 7. PROJECT WORK AREA INCLUDES WORK ALONG AND CROSSING ROADS OPEN TO FACILITY STAFF AND VISITORS. PROJECT WORK AREA INCLUDES WORK ALONG AND CROSSING ROADS OPEN TO FACILITY STAFF AND VISITORS. CONTRACTOR RESPONSIBLE FOR MAINTAINING SAFE FLOW OF TRAFFIC AT ALL TIMES. TRAFFIC CONTROL SIGNS SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION AND SHALL BE MAINTAINED AND UPDATED AS WORK PROGRESSES. ALL SIGNAGE SHALL BE IN ACCORDANCE WITH MUTCD (LATEST EDITION), STATE AND LOCAL REQUIREMENTS. CONTRACTOR RESPONSIBLE TO MAINTAIN ACCESS FOR NPS PERSONNEL AT ALL TIMES. CONTRACTOR TO PROVIDE WRITTEN NOTICE OF ROAD CLOSURE AS DETAILED IN SPECIFICATION. 8. ANY DAMAGE TO ROADS, LAWNS, STRUCTURES, OR OTHER ITEMS CAUSED BY CONSTRUCTION ACTIVITIES SHALL ANY DAMAGE TO ROADS, LAWNS, STRUCTURES, OR OTHER ITEMS CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTING OFFICER TO APPROVE ALL REPAIRS.

AutoCAD SHX Text

GENERAL SITE PLAN NOTES

AutoCAD SHX Text

OHE

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

SCALE C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 100

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 10'

AutoCAD SHX Text

SCALE B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 40'

AutoCAD SHX Text

SCALE D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1/8" = 1'

AutoCAD SHX Text

SCALE E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 60'

AutoCAD SHX Text

HS

AutoCAD SHX Text

HEADSTONE

AutoCAD SHX Text

SCALE F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 20'

WATER LINE MARKED BY CENTERLINE IN 2023

VAN

AT

E OF MAINE

L.

No. 11164

PROFESSIONAL ENGIN

EE

R

LICENSED

WATT

12/23 /2024

AutoCAD SHX Text S

AutoCAD SHX Text

PARK LOOP ROAD

AutoCAD SHX Text

KEBO STREET

AutoCAD SHX Text

KEBO STREET

AutoCAD SHX Text

GREAT MEADOW ROAD

AutoCAD SHX Text

GREAT MEADOW ROAD

AutoCAD SHX Text

PROPOSED DEVELOPMENT AT HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text

EXISTING HARDEN FARM HOUSING

AutoCAD SHX Text

PROPOSED DEVELOPMENT AT GREAT MEADOW STREAM CROSSING (ACAD 251732)

AutoCAD SHX Text

PROPOSED 4" SEWER FORCE MAIN LINE

AutoCAD SHX Text

KEBO GOLF COURSE

AutoCAD SHX Text

GATE AT ACADIA NATIONAL PARK PROPERTY BOUNDARY

AutoCAD SHX Text

CONNECT PROPOSED SEWER FORCEMAIN INTO EXISTING GRAVITY SEWER MANHOLE STA. 47+75

AutoCAD SHX Text

PROPOSED SEWER PUMP STATION AND ENCLOSURE

AutoCAD SHX Text 75'

AutoCAD SHX Text 75'

AutoCAD SHX Text 70'

AutoCAD SHX Text 75'

AutoCAD SHX Text 70'

AutoCAD SHX Text 65'

AutoCAD SHX Text 60'

AutoCAD SHX Text 65'

AutoCAD SHX Text 80'

AutoCAD SHX Text 85'

AutoCAD SHX Text 90'

AutoCAD SHX Text 95'

AutoCAD SHX Text 100'

AutoCAD SHX Text 105'

AutoCAD SHX Text 110'

AutoCAD SHX Text 115'

AutoCAD SHX Text 85'

AutoCAD SHX Text 90'

AutoCAD SHX Text 95'

AutoCAD SHX Text 110'

AutoCAD SHX Text 105'

AutoCAD SHX Text 105'

AutoCAD SHX Text 100'

AutoCAD SHX Text 75'

AutoCAD SHX Text 115'

AutoCAD SHX Text 120'

AutoCAD SHX Text 110'

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

GV

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

GV

AutoCAD SHX Text S

AutoCAD SHX Text

GV

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

SEE 1/C2 "DEMOLITION PLAN"

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text 70'

AutoCAD SHX Text 75'

AutoCAD SHX Text

SEE 1/C3 "SITE PLAN"

AutoCAD SHX Text

PARK LOOP ROAD

AutoCAD SHX Text

EXISTING 6" SEWER FORCEMAIN RUNS PARALLEL TO PROPOSED FORCEMAIN

AutoCAD SHX Text 1+00

AutoCAD SHX Text 3+00

AutoCAD SHX Text 5+00

AutoCAD SHX Text 7+00

AutoCAD SHX Text 9+00

AutoCAD SHX Text 11+00

AutoCAD SHX Text 13+00

AutoCAD SHX Text 15+00

AutoCAD SHX Text 17+00

AutoCAD SHX Text 19+00

AutoCAD SHX Text 21+00

AutoCAD SHX Text 23+00

AutoCAD SHX Text 25+00

AutoCAD SHX Text 27+00

AutoCAD SHX Text 29+00

AutoCAD SHX Text 31+00

AutoCAD SHX Text 33+00

AutoCAD SHX Text 35+00

AutoCAD SHX Text 37+00

AutoCAD SHX Text 39+00

AutoCAD SHX Text 41+00

AutoCAD SHX Text 43+00

AutoCAD SHX Text 45+00

AutoCAD SHX Text 47+00

AutoCAD SHX Text S

AutoCAD SHX Text

GV

AutoCAD SHX Text S

AutoCAD SHX Text PROPOSED ELECTRICAL CONDUIT INSTALLED IN SAME TRENCH AS PROPOSED FORECMAIN (NOT SHOWN FOR CLARITY. SEE E SHEETS.

AutoCAD SHX Text

AutoCAD SHX Text

OVERALL SITE PLAN

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text C1

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

A/E FIRM - 140P4323F0027

AutoCAD SHX Text

PRIME/CIVIL:

AutoCAD SHX Text

HEDEFINE ENGINEERING & DESIGN, INC.

AutoCAD SHX Text

ELLSWORTH, MAINE

AutoCAD SHX Text

MEP ENGINEER:

AutoCAD SHX Text

CARPENTER ASSOCIATES

AutoCAD SHX Text

OLD TOWN, MAINE

AutoCAD SHX Text

ENVIRONMENTAL:

AutoCAD SHX Text

ATLANTIC RESOURCE CO.

AutoCAD SHX Text

BASS HARBOR, MAINE

AutoCAD SHX Text

OVERALL SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text 60,026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RC

AutoCAD SHX Text

LH

AutoCAD SHX Text

RC

AutoCAD SHX Text 12/23/2024

AutoCAD SHX Text

HARDEN FARM SEWER REPLACEMENT

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ACAD255256

AutoCAD SHX Text C1

AutoCAD SHX Text SOME LINEWORK, INCLUDING ONGOING OR PROPOSED PROJECTS (AS NOTED ON PLAN) HAS NOT BEEN CONSTRUCTED AS OF THE RELEASE DATE OF THESE DRAWINGS. CONTRACTOR TO COORDINATE WITH GOVERNMENT AND ANY ONGOING WORK TO VERIFY FINAL DESIGN OR LOCATION OF ADJACENT WORK. - EXISTING CONDITIONS OBTAINED FROM PLANS PROVIDED BY PLISGA & DAY LAND EXISTING CONDITIONS OBTAINED FROM PLANS PROVIDED BY PLISGA & DAY LAND SURVEYORS AND VHB. PLANS RECEIVED FROM PLISGA & DAY LAND SURVEYORS APRIL 18, 2023 TITLED: "23067_Phase II to Hedefine", REVISED SEPTEMBER 3 2024. - PLANS RECEIVED FROM VHB DECEMBER 15, 2023 NAMED: "C3-Great Meadow PLANS RECEIVED FROM VHB DECEMBER 15, 2023 NAMED: "C3-Great Meadow Culvert.dwg" INCLUDE PROPOSED LINEWORK FOR ACAD TO 140P4323F0023 "PROPOSED DEVELOPMENT AT GREAT MEADOW STREAM CROSSING. - PLANS RECEIVED FROM VHB FEBRUARY 13 2024 NAMED: PLANS RECEIVED FROM VHB FEBRUARY 13 2024 NAMED: "ACAD-XC-SITE-Model.dwg" INCLUDE PROPOSED LINEWORK FOR ACAD TO 140P2023F0317 "PROPOSED DEVELOPMENT AT HARDEN FARM HOUSING", PLAN UPDATED APRIL 26, 2024. - SOME HISTORICAL SEWER FEATURES WERE DIGITIZED FROM AS BUILT PLANS SOME HISTORICAL SEWER FEATURES WERE DIGITIZED FROM AS BUILT PLANS FROM THE HARDEN FARM RESIDENTIAL AREA PROJECT, AS BUILT DRAWINGS DATED OCTOBER 1963. - BORINGS TAKEN AUGUST 22, 2023 BY NEW ENGLAND BORING CONTRACTORS. BORINGS TAKEN AUGUST 22, 2023 BY NEW ENGLAND BORING CONTRACTORS. - EXISTING FORCEMAIN LOCATION TAKEN FROM PLAN ENTITLED "SDM SITE EXISTING FORCEMAIN LOCATION TAKEN FROM PLAN ENTITLED "SDM SITE ASBUILT.dwg" FROM HEDEFINE ENGINEERING & DESIGN. PLAN DATED SEPTEMBER 17. 2015 - SOME NATURAL RESOURCES, INCLUDING BUT NOT LIMITED TO, WETLANDS, SOME NATURAL RESOURCES, INCLUDING BUT NOT LIMITED TO, WETLANDS, VERNAL POOLS, AND WETLANDS OF SPECIAL SIGNIFICANCE ARE NOT SHOWN ON THIS SHEET FOR CLARITY. SEE PLAN AND PROFILE SHEETS FOR MORE DETAILS. - HEDEFINE ENGINEERING & DESIGN, INC. TAKES NO RESPONSIBILITY FOR THE HEDEFINE ENGINEERING & DESIGN, INC. TAKES NO RESPONSIBILITY FOR THE ACCURACY AND OR COMPLETENESS OF THE AFOREMENTIONED PLANS.

GENERAL SITE PLAN NOTES

W

W2

W

W

W

W

W

W

W

W

W

W

W

W

W

W 2 W2

W2

W2 W2

W2 W2

W2 W2

W2

W2 W

W

W

W

ALINAST

AT

E OF MAINE

L.

No. 11164

PROFESSIONAL ENGIN

EE

R

LICENSED

WATT

12/23 /2024

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

AutoCAD SHX Text ASSOCIATED MANHOLES, STRUCTURES AND PIPING TO BE REMOVED AND DISPOSED OF IN A LEGAL MANNER.

AutoCAD SHX Text

CONTRACTOR TO VERIFY EXTENTS OF EXISTING DRIP HOSE SYSTEM AND REMOVE.

AutoCAD SHX Text DISTURBED AREAS SUBJECT TO MINOR REGRADING. CONFIRM LIMITS WITH CONTRACTING OFFICER PRIOR TO INITIATING WORK.

AutoCAD SHX Text

REMOVE APPROXIMATELY 143' OF ELECTRICAL CONDUIT SERVICING EXISTING SEPTITECH.

AutoCAD SHX Text

LIMITS OF CONSTRUCTION

AutoCAD SHX Text

ALL AREAS OF DISTURBED MATERIAL SUBJECT TO REGRADING AND REPLACEMENT.

AutoCAD SHX Text APPROXIMATE LIMITS OF DRIP HOSE AREA. SEE DEMOLITION NOTES FOR DETAILS OF REMOVALS AND RESTORATION.

AutoCAD SHX Text REMOVE SEWER LINE FROM CAPPED END TOWARD THE TREATMENT SYSTEM. COORDINATE WITH ADJACENT HOUSING PROJECT.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROTECT EXISTING BUILDING AS NECESSARY DURING DEMOLITION.

AutoCAD SHX Text REMOVE ELECTRICAL EQUIPMENT FOR CONTROLLER AND UV DISINFECTION LOCATED INSIDE UTILITY ROOM.

AutoCAD SHX Text REMOVE TREES AND VEGETATION. COORDINATE ALL TREE REMOVALS WITH CONTRACTING OFFICER.

AutoCAD SHX Text

GATE TO BE REMOVED IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text SEPTITECH MODEL M1500H, 1500 GAL. SEPTIC TANK TO BE PUMPED AND FILLED. TANKS CONTENT TO BE DISPOSED OF IN A LEGAL MANNER

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE AND RETURN GATE TO ACADIA NPS MAINTENANCE STAFF

AutoCAD SHX Text EXISTING WATER LINE TO BE DEMOLISHED IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CUT AND REMOVE PAVEMENT TO ACCOMODATE NEW UDERGROUND ELECTRICAL. SEE E SHEETS.

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN @ EXISTING HOUSING & PROPOSED PUMP STATION

AutoCAD SHX Text

SCALE F

AutoCAD SHX Text C2

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

A/E FIRM - 140P4323F0027

AutoCAD SHX Text

PRIME/CIVIL:

AutoCAD SHX Text

HEDEFINE ENGINEERING & DESIGN, INC.

AutoCAD SHX Text

ELLSWORTH, MAINE

AutoCAD SHX Text

MEP ENGINEER:

AutoCAD SHX Text

CARPENTER ASSOCIATES

AutoCAD SHX Text

OLD TOWN, MAINE

AutoCAD SHX Text

ENVIRONMENTAL:

AutoCAD SHX Text

ATLANTIC RESOURCE CO.

AutoCAD SHX Text

BASS HARBOR, MAINE

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text 60,026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RC

AutoCAD SHX Text

LH

AutoCAD SHX Text

RC

AutoCAD SHX Text 12/23/2024

AutoCAD SHX Text

HARDEN FARM SEWER REPLACEMENT

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ACAD255256

AutoCAD SHX Text C2

AutoCAD SHX Text

DEMOLITION LEGEND

AutoCAD SHX Text

DEMOLITION OUTLINES

AutoCAD SHX Text

LIMITS OF DRIP HOSE AREA TO BE RESTORED

AutoCAD SHX Text

LIMIT OF CONSTRUCTION

AutoCAD SHX Text

DEMOLITION NOTES

AutoCAD SHX Text

1. EXISTING SEPTIC SYSTEM TO BE DEMOLISHED INCLUDING PUMPING OUT AND EXISTING SEPTIC SYSTEM TO BE DEMOLISHED INCLUDING PUMPING OUT AND FILLING EXISTING SEPTIC TANKS AND VAULTS WITH FLOWABLE FILL; DECOMMISSIONING, CUTTING AND CAPPING OF SEWER AND ELECTRICAL UTILITIES; REMOVAL AND DISPOSAL OF ALL EXISTING SANITARY SEWER TREATMENT SYSTEM, ASSOCIATED EQUIPMENT AND APPURTENANCES. 2. DRIP HOSE AREA TO HAVE ALL HOSES REMOVED. SPREAD MULCH EVENLY DRIP HOSE AREA TO HAVE ALL HOSES REMOVED. SPREAD MULCH EVENLY OVER AREA AND APPLY MINIMUM 6" NEW MULCH. 3. DEMOLITION PLAN DOES NOT PURPORT TO SHOW ALL DEMOLITION AND DEMOLITION PLAN DOES NOT PURPORT TO SHOW ALL DEMOLITION AND REMOVALS REQUIRED TO FACILITATE NEW PROJECT. CONTRACTOR RESPONSIBLE FOR REVIEW OF CONTRACT DOCUMENTS AND EXISTING SITE CONDITIONS TO IDENTIFY DEMOLITION REQUIRED TO ACCOMMODATE NEW CONSTRUCTION AND REMOVE PORTIONS OF THE EXISTING SYSTEM WHICH IS BEING DECOMMISSIONED AS SHOWN ON PLANS AND AS NOTED IN SPECIFICATIONS. 4. CONTRACTOR TO COORDINATE ALL DEMOLITION WITH CONTRACTING OFFICER IN CONTRACTOR TO COORDINATE ALL DEMOLITION WITH CONTRACTING OFFICER IN FIELD. 5. CONTRACTOR RESPONSIBLE FOR DISPOSING OF ALL DEMOLITION DEBRIS IN A CONTRACTOR RESPONSIBLE FOR DISPOSING OF ALL DEMOLITION DEBRIS IN A LEGAL MANNER. 6. ALL PROPOSED DEMOLITION WORK MUST BE COORDINATED WITH THE HARDEN ALL PROPOSED DEMOLITION WORK MUST BE COORDINATED WITH THE HARDEN FARM HOUSING (ACAD 309000).

AutoCAD SHX Text

LIMITS OF VEGETATION & TREE REMOVAL

AutoCAD SHX Text

LIMITS OF HARDSCAPE AREA TO BE REMOVED

AutoCAD SHX Text

HATCH LEGEND

- WETLANDSWETLANDS

W

W

W

W

W

W

W

W

W

W

W

W

HATCH LEGEND

ALINAST

AT

E OF MAINE

L.

No. 11164

PROFESSIONAL ENGIN

EE

R

LICENSED

WATT

12/23/2024

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

GV

AutoCAD SHX Text

EXISTING 18" CORRUGATED PLASTIC INV, IN - 102.2' INV. OUT - 101.56'OUT - 101.56'

AutoCAD SHX Text PROPOSED NEW 8" WATER LINE TO CONNECT TO EXISTING WATER LINE INCLUDED IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text

PROPOSED NEW 4" SEWER FORCEMAIN (TYP.) (SEE PLAN AND PROFILE SHEETS)

AutoCAD SHX Text APPROXIMATE LOCATION FOR TRANSFORMER VAULT. SEE ELECTRICAL PLAN FOR DETAILS AND UGE. COORDINATE BOLLARD PLACEMENT WITH UTILITY COMPANY PRIOR TO SETTING VAULT AND FENCE.

AutoCAD SHX Text

GRAVE HEADSTONE (TYP.)

AutoCAD SHX Text PROVIDE 4" TYPE 'B' GROUNDWATER UNDERDRAIN FOR SEWER WETWELL. CONNECT TO STORMDRAIN SYSTEM IN ADJACENT HARDEN FARM HOUSING PROJECT (ACAD 309000). APPROXIMATE INVERT 103.45. COORDINATE WITH CONTRACTING OFFICER.

AutoCAD SHX Text CONCRETE PAD FOR 150 GALLON, DOUBLE WALL DIESEL TANK AND 100# LP TANK. SEE SPECIFICATIONS. ENSURE LOCATION COMPLIES WITH NFPA 58 DISTANCE REQUIREMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ADJACENT IMPROVEMENTS INCLUDING SEWER NETWORK INCLUDED IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000).

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

TRASH ENCLOSURE

AutoCAD SHX Text S

AutoCAD SHX Text

SEWER PUMP STATION

AutoCAD SHX Text 8' TALL CEDAR FENCE (SEE DETAIL 1/C6) PROVIDE 6" CRUSHED STONE BETWEEN ENCLOSURE AND FENCE, WITH SEPARATION FABRIC BELOW STONE.

AutoCAD SHX Text

SILT FENCE (TYP.) (SEE DETAIL 2/C4)

AutoCAD SHX Text

FFE: 106.15

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text PROVIDE 4" TYPE 'B' GROUNDWATER UNDERDRAIN FOR TRANSFORMER VAULT. CONNECT TO STORMDRAIN SYSTEM IN ADJACENT HARDEN FARM HOUSING PROJECT (ACAD 309000). APPROXIMATE INVERT 103.6. COORDINATE WITH CONTRACTING OFFICER

AutoCAD SHX Text

UNDERDRAIN HIGH POINT 104.0

AutoCAD SHX Text

CONSTRUCTION ENTRANCE. (SEE DETAIL 1/C4)

AutoCAD SHX Text

SEE DETAIL 3/C6 FOR CONCRETE SLAB DIMENSIONS

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED SEWER PUMP STATION (SEE DETAIL 8/C4 & SPECIFICATIONS)

AutoCAD SHX Text

LIMIT OF WORK (TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

BORING B-18 REFUSAL = 91.4' SEE NOTE 1.

AutoCAD SHX Text

BOLLARDS (TYP.). SEE E SHEETS FOR DETAILS.

AutoCAD SHX Text

6' CEDAR FENCE. SEE DETAIL 1/C6.

AutoCAD SHX Text COORDINATE WITH HARDEN FARM HOUSING CONTRACTOR TO LOCATE SEWER STUB, EXTEND TO WETWELL.

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE C

AutoCAD SHX Text C3

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

A/E FIRM - 140P4323F0027

AutoCAD SHX Text

PRIME/CIVIL:

AutoCAD SHX Text

HEDEFINE ENGINEERING & DESIGN, INC.

AutoCAD SHX Text

ELLSWORTH, MAINE

AutoCAD SHX Text

MEP ENGINEER:

AutoCAD SHX Text

CARPENTER ASSOCIATES

AutoCAD SHX Text

OLD TOWN, MAINE

AutoCAD SHX Text

ENVIRONMENTAL:

AutoCAD SHX Text

ATLANTIC RESOURCE CO.

AutoCAD SHX Text

BASS HARBOR, MAINE

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text 60,026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RC

AutoCAD SHX Text

LH

AutoCAD SHX Text

RC

AutoCAD SHX Text 12/23/2024

AutoCAD SHX Text

HARDEN FARM SEWER REPLACEMENT

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ACAD255256

AutoCAD SHX Text C3

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

PROPOSED

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

ELEV. CONTOURS

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNDERDRAIN

AutoCAD SHX Text

CURB

AutoCAD SHX Text

UNDERGROUND UTILITY

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

(OR MULCH BERM)

AutoCAD SHX Text

TREE OR TREELINE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SEWER MANHOLE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

NOTES: 1. BORING NEAR PROPOSED LOCATION OF PUMP STATION WET WELL PERFORMED BORING NEAR PROPOSED LOCATION OF PUMP STATION WET WELL PERFORMED BY S.W. COLE IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000). GEOTECH REPORT AVAILABLE UPON REQUEST.

VAN

AT

E OF MAINE

L.

No. 11164

PROFESSIONAL ENGIN

EE

R

LICENSED

WATT

12/23 /2024

AutoCAD SHX Text

EXISTING GRADE (TYP.)

AutoCAD SHX Text

CONTINUOUS PITCH

AutoCAD SHX Text

PUMP STATION WET WELL

AutoCAD SHX Text PROVIDE 4" EXTRUDED POLYSTYRENE INSULATION AROUND FORCEMAIN ON ANY SIDE WHERE LESS THAN 5' OF COVER

AutoCAD SHX Text

3' CLEANOUT MANHOLESTA. 9+38±(SEE DETAIL 7/C5)

AutoCAD SHX Text

4' AIR/VACUUMVALVE MANHOLE STA. 9+44±(SEE DETAIL 1/C5)

AutoCAD SHX Text

18" CORRUGATED PLASTIC PIPE INV. IN - 102.1

AutoCAD SHX Text PROVIDE 4" MIN. INSULATION ABOVE PIPES WHERE BETWEEN 5' AND 3' OF GROUND COVER IS PROVIDED. MINIMUM COVER OVER SEWER FORCEMAIN SHALL BE 3'.

AutoCAD SHX Text

PROPOSED ROUTE OF 4" FORCEMAIN

AutoCAD SHX Text

CONCRETE ANCHOR. (SEE DETAIL 10/C5)

AutoCAD SHX Text

PROPOSED 8" WATER LINE APPROX. INVERT - 99

AutoCAD SHX Text EXISTING CATCH BASIN STA. 4+96 ±RIM - 107.5 10" CLAY PIPE INV. - 105.7 6" CLAY PIPE INV. - 105.8 INV. SUMP - 105.8SUMP - 105.8

AutoCAD SHX Text

EXISTING 6" CLAY PIPE INV. - 105.8

AutoCAD SHX Text 107'

AutoCAD SHX Text 110'

AutoCAD SHX Text 115'

AutoCAD SHX Text 121'

AutoCAD SHX Text 120'

AutoCAD SHX Text 115'

AutoCAD SHX Text 110'

AutoCAD SHX Text 105'

AutoCAD SHX Text 116'

AutoCAD SHX Text 115'

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

HS

AutoCAD SHX Text

PROPOSED DEVELOPMENT AT HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text CLEANOUT WITH GATE VALVE AND AIR/VACUUM VALVE IN SEPARATE MANHOLES. GATE VALVE LOCATED OUTSIDE MANHOLE. STA 9+38± & 9+44± (HIGH POINT)PROVIDE UNDERDRAIN TO DAYLIGHT

AutoCAD SHX Text REMOVE AND REINSTALL SIGNS ALONG PATH OF PROPOSED FORCEMAIN (TYPICAL OF 8 LOCATIONS)

AutoCAD SHX Text

NEW GATE INSTALLED AT 5+20±(SEE DETAIL 1/C7)

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

EXISTING TRAIL (TYP.)

AutoCAD SHX Text

EXISTING TRAIL (TYP.)

AutoCAD SHX Text EXISTING CATCH BASIN. CAREFULLY COORDINATE FORCEMAIN INSTALLATION WITH CATCH BASIN LOCATION. PROVIDE INLET PROTECTION PRIOR TO DISTURBING ADJACENT GROUND. ADJUST PATH OF FORCEMAIN AS NEEDED AND PROVIDE INSULATION BETWEEN FORCEMAIN AND CATCH BASIN.

AutoCAD SHX Text CUT AND PATCH PAVEMENT WHERE FORCEMAIN CROSSES ROAD. PROVIDE BUTT JOINT, SEE DETAIL 6/C4

AutoCAD SHX Text INTENT IS TO PLACE FM SUFFICIENTLY OFF THE SIDE OF THE EXISTING PAVEMENT SO THAT PAVEMENT REPLACEMENT IS NOT REQUIRED. IF CONTRACTOR NEEDS TO IMPACT PAVEMENT ALONG THE FM PATHWAY IT SHALL BE REPLACED IN KIND. PAVEMENT REPLACEMENT SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT PRICE. (TYP.)

AutoCAD SHX Text B1

AutoCAD SHX Text B2

AutoCAD SHX Text B3

AutoCAD SHX Text B4

AutoCAD SHX Text B5

AutoCAD SHX Text B6

AutoCAD SHX Text B7

AutoCAD SHX Text B8

AutoCAD SHX Text B9

AutoCAD SHX Text B10

AutoCAD SHX Text B11

AutoCAD SHX Text B12

AutoCAD SHX Text B13

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

SEE SHEET P&P-2

AutoCAD SHX Text

PARK LOOP ROAD

AutoCAD SHX Text

KEBO STREET

AutoCAD SHX Text

AutoCAD SHX Text

GV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ADJACENT IMPROVEMENTS INCLUDING SEWER NETWORK INCLUDED IN SCOPE OF HARDEN FARM HOUSING (ACAD 309000)

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING 18" CORRUGATED PLASTIC INV, IN - 102.2' INV. OUT - 101.56'OUT - 101.56'

AutoCAD SHX Text

GV

AutoCAD SHX Text S

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

A/E FIRM - 140P4323F0027

AutoCAD SHX Text

PRIME/CIVIL:

AutoCAD SHX Text

HEDEFINE ENGINEERING & DESIGN, INC.

AutoCAD SHX Text

ELLSWORTH, MAINE

AutoCAD SHX Text

MEP ENGINEER:

AutoCAD SHX Text

CARPENTER ASSOCIATES

AutoCAD SHX Text

OLD TOWN, MAINE

AutoCAD SHX Text

ENVIRONMENTAL:

AutoCAD SHX Text

ATLANTIC RESOURCE CO.

AutoCAD SHX Text

BASS HARBOR, MAINE

AutoCAD SHX Text

FORCEMAIN PLAN & PROFILE

AutoCAD SHX Text

STA 0+00 - STA. 12+00

AutoCAD SHX Text

AutoCAD SHX Text 60,026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RC

AutoCAD SHX Text

LH

AutoCAD SHX Text

RC

AutoCAD SHX Text 12/23/2024

AutoCAD SHX Text

HARDEN FARM SEWER REPLACEMENT

AutoCAD SHX Text

ACADIA NATIONAL PARK

AutoCAD SHX Text

ACAD255256

AutoCAD SHX Text P&P-1

AutoCAD SHX Text

HATCH LEGEND

AutoCAD SHX Text

- MAINE VERNAL POOL INDICATOR SPECIES BREEDING AREA (IBA)MAINE VERNAL POOL INDICATOR SPECIES BREEDING AREA (IBA)

AutoCAD SHX Text

PLAN VIEW STA. 00+00 - 12+00

AutoCAD SHX Text

SCALE B

PROFILE VIEW STA. 00+00 - 12+00 SCALE: H:1" = 20' V: 1" = 2'

AT

E OF MAINE

L.

No. 11164

PROFESSIONAL ENGIN

EE

R

LICENSED

WATT

12/23 /2024

AutoCAD SHX Text

EXISTING GRADE (TYP.)

AutoCAD SHX Text

PROPOSED ROUTE OF 4" FORCEMAIN

AutoCAD SHX Text

EXISTING 15" CONCRETE INV. IN - 72.1 IN - 72.1 INV. OUT - 71.6OUT - 71.6