B08-Attachment 0007-Configuration Change Management SOW.pdf
PDF 188 KB Posted
- Attached to
- 60mm 81mm 120mm High Explosive Load, Assemble, Pack (HE LAP) Federal contract opportunity
- Solicitation number
- W52P1J22R0007
About this file
This document outlines a statement of work for configuration change management on a federal contract. The contractor may submit engineering change proposals, notices of revision, and requests for variance to modify requirements in the government's technical data package. The contractor is responsible for preparing and submitting these changes as required and shall not produce any items incorporating changes until approved by the government. Requests for deviation must be submitted pre-production while requests for waiver can be submitted post-production but before acceptance. Permanent proposed changes to specifications require an engineering change proposal and notice of revision. Submission of a change request does not affect delivery schedules defined in the contract.
The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Joint Munitions Command to provide 60mm, 81mm and 120mm high explosive load, assemble and pack requirements. The statement of work outlines the process for engineering and specification changes to the technical data package requirements on the contract.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0007 Configuration Change Management Statement of Work
June 22, 2021
a. The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL).
If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
1. ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change.
Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
i. Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
ii. All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
2. RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre- production (formerly known as Request for Deviation (RFD)) or post- production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
b. Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
c. Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e.
Specification Change Notices (SCNs) are not required).