B08_Attachment 0002_AMC OIB Assessment Results 29 June 2020.pdf

PDF 1 MB Posted

Attached to
AMC E2E Process Mapping Federal contract opportunity
Solicitation number
W52P1J20R0087
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This solicitation requests proposals for enterprise process mapping services to support the Army Material Command. The U.S. Army Contracting Command, Rock Island will award an indefinite delivery indefinite quantity contract with a ceiling of $5 million to a small business for a base year and four option years. The guaranteed minimum task order is for process improvement documentation for the CECOM Life Cycle Management Command with a 12-month period of performance. Offerors must submit technical experience, past performance questionnaires, pricing, and oral presentations by specified dates in July and August 2020. Pricing must remain valid for 120 days and will not be adjusted during the five-year contract period. The award will be made following a best value determination considering technical approach, program management approach, and price as evaluation factors.

View the file

Other files for this federal contract opportunity

Other files attached to AMC E2E Process Mapping, newest first.
File Type Posted
B08_Attachment 0012_Instructions to Offerors_27 July 2020.pdf PDF
B08_Attachment 0015_RFP W52P1J20R0087_AMC E2E Process Mapping_27 July 2020.pdf PDF
B08_Attachment 0019_W52P1J20R0087_Amendment 0003.pdf PDF
B08_Attachment 0013_Basis of Award_22 July 2020.pdf PDF
B08_Attachment 0018_W52P1J20R0087_Amendment 0002.pdf PDF
B08_Attachment 0016_QA_22 July 2020.pdf PDF
B08_Attachment 0017_W52P1J20R0087_Amendment 0001.pdf PDF
B08_Attachment 0012_Instructions to Offerors_22 July 2020.pdf PDF
B08_Attachment 0015_RFP W52P1J20R0087_AMC E2E Process Mapping.pdf PDF
B08_W52P1J20R0087_Amendment 0001.pdf PDF
B08_Attachment 0013_Basis of Award.pdf PDF
B08_Attachment 0011_Past Performance Questionnaire.pdf PDF
B08_Attachment 0005_CDRL_C002.pdf PDF
B08_Attachment 0003_CDRL_A001.pdf PDF
B08_Attachment 0001_PWS_AMC E2E Process Mapping.pdf PDF
B08_Attachment 0014_CECOM LCMC TO SOO.pdf PDF
B08_Attachment 0015_RFP W52P1J20R0087_AMC E2E Process Mapping.pdf PDF
B08_Attachment 0008_CDRL_D001.pdf PDF
B08_Attachment 0009_CDRL_D002.pdf PDF
B08_Attachment 0004_CDRL_C001.pdf PDF
B08_Attachment 0007_CDRL_C004.pdf PDF
B08_Attachment 0010_Pricing Matrix.xlsx XLSX spreadsheet
B08_Attachment 0012_Instructions to Offerors.pdf PDF
B08_Attachment 0006_CDRL_C003.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

AMC Depot and Arsenal Optimization Assessment Results

Presenter Presentation Notes Ladies and Gentlemen, good morning (afternoon).

On behalf of General Gus Perna, the 19th Commanding General of the U.S. Army Materiel Command, I would like to provide you with an informational overview of the U.S. Army Materiel Command Headquartered at Redstone Arsenal in Huntsville, Alabama.

I’m _____________, from _______________ and it’s my privilege to share this overview with you on behalf of GEN Perna.

At Army Materiel Command, we proudly say, “If a Warfighter shoots it, drives it, flies it, wears it, communicates with it, or eats it - the Army Materiel Command Provides It!” [Next Slide]

Way Ahead

AMC-level actions:

LCMC-level actions:

Site actions:

OIB-wide solutions

LCMC-

solutions

• Active supervision expectations

• Operational culture

• OIB capacity planning stds.

• Overall OIB strategy

Recommended areas to work

• Depot strategy

• Depot oversight/support

• O/T management

• Supervision

• Hourly/daily goals

• Work planning (pilots)

• System for Management

Site actions

• All sites can take action to reduce loss-time, anticipate issues, increase rigor, and manage O/T

• But many issues require more substantial and coordinated actions—three approaches:

‒ Define top-down and OIB-wide (broad or phased rollout) ‒ Pilot at the LCMC level ‒ Pilot at the Depot/Arsenal level, systematize, then extend across OIB

Top-Down

Bottom-Up

Opportunity Matrix

Just-Do-Its A1. Enforce shift starts, ends, and breaks A2. Manage O/T (approval and AAR) A3. Conduct shop floor AARs and take actions (e.g. update BOMs)

Quick-Wins B1. Implement shop floor production system (hourly/daily goals) B2. Standardize PY planning, management, and utilization B3. Standardize daily/weekly capacity planning process B4. Implement standardized common Lean tools1

Medium-Level Efforts C1. Improve level and quality of active supervision C2. Design and instill a high-performing operational culture C3. Implement missing SFM elements and grow SFM maturity C4. Implement dynamic shop floor resource balancing C5. Implement process for best practice sharing C6. Implement key leading metrics and cascade C7. Simplify and standardize core ILSC2 processes3

C8. Set targets for and reduce man-hour standards

Higher-Level Efforts D1. Move LCMCs to oversight and support of site execution D2. Implement centralized dynamic demand planning (ILSC) D3. Organize ILSC around key value streams D4. Segment labor rates by cost center to improve cost accuracy D5. Develop overarching OIB strategy

1 – Kitting, Kanban, segmenting workflow, milestone management, setup preplanning 2 – Refers to ALC, ILSC, and/or MLRC 3 – For example, provisioning, item management, and work loading

EFFORT

BE

N

EF

IT

HighLow Med

Hi gh

Lo w

Me d

A1

A2 A3

B1

B2 B4

C8

C5

C6 C7 D4

C1

C2 C3

C4 D1

D2D3

D5B3

AMC Depot and Arsenal Optimization Assessment Results
Way Ahead