B08_Attach_2_Photo_logs.pdf
PDF 953 KB Posted
- Attached to
- GAAR HEATING SYSTEM REPLACEMENT BETTLES VISITOR CE Federal contract opportunity
- Solicitation number
- 140P9725Q0016
About this file
This is a Photo Log document for the Bettles Visitor Center Heating System Replacement Project, containing 11 technical photographs documenting existing mechanical systems to be replaced. The photos catalog various components slated for replacement under Contract Line Item 1 and Option Line Item 1, including glycol supply lines, air separator (AS-1), boiler manifold, and a heat recovery ventilation (HRV) unit. Specific equipment identified for replacement includes valves, pumps, corroded lines, glycol make up and expansion tanks, HRV mechanical assembly, exhaust and supply lines, and an instant hot water heater. The photographs provide visual documentation of the current mechanical room and heating infrastructure at the Bettles Visitor Center, supporting the scope of work for the upcoming heating system replacement project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P9725Q0016_Amd_0002.pdf | ||
| Sol_140P9725Q0016_Amd_0001.pdf | ||
| B08_Attach_7_Original_2007_Construction_Drawings___Mechanical_and_Electrical_Sheets.pdf | ||
| B08_Attach_3_Hot_Work_Permit.pdf | ||
| B08_Attach_4_Wage_Determination_AK20250001_3_14_25.pdf | ||
| B08_Attach_5_CM-16_Submittal_Form.pdf | ||
| B08_Attach_1_SOW.pdf | ||
| B08_Attach_6_Bid_Schedule_(price).xlsx | XLSX spreadsheet | |
| Sol_140P9725Q0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHOTO LOG
BETTLES VISITOR CENTER - HEATING SYSTEM REPLACEMENT PROJECT
Photo 1: Mechanical room entrance Photo 2: View in mechanical room
Photo 3: View of existing hot water heater (replacement of pump connected to the unit is covered under Contract Line Item 1;
replacement of existing hot water heater and associated manifold/valves is NOT included)
Photo 4: View of existing boiler manifold (to be replaced under Contract Line Item 1)
Photo 5: View of glycol supply lines (valves, pumps, and corroded lines to be replaced under Contract Line Item 1).
Photo 6: View of existing glycol make up tank and expansion tank (to be replaced under Contract Line Item 1)
Photo 7: View of air separator (AS-1, to be replaced under Contract Line Item 1)
Photo 8: View of existing Heat Recovery Ventilation unit (to be replaced under Option Line Item 1)
Photo 9: View of existing HRV exhaust and supply lines Photo 10: View of existing HRV mechanical assembly to be replaced under Option Line Item 1
Photo 11: View of existing instant hot water heater (to be replaced under Option Line Item 1)
File details come from the government source that posted it. Updated .