B08_Attach_2_DDEM_Exhibit_2_Maintenance_Schedule_-_Copy.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- NAMA EISENHOWER FACILITY CONTRACT
- Solicitation number
- 140P2124Q0034
About this file
This document appears to be an exhibit detailing the maintenance schedule for the Eisenhower Memorial facility. It lists the various lighting, plumbing, mechanical, electrical, irrigation, and other systems that require regular maintenance, along with the specific equipment, location, and description of the required maintenance activities. The document covers interior and exterior lighting fixtures, plumbing systems like water fountains and restroom fixtures, HVAC units, electrical panels, irrigation components, and other building systems. The required maintenance activities typically involve inspecting, cleaning, and replacing components as needed to ensure proper operation of the facility. This information is likely included as part of a larger operations and maintenance plan or contract for the Eisenhower Memorial.
The related federal contract opportunity is for the NAMA Eisenhower Facility Contract, solicitation number 140P2124Q0034, issued by the Department of the Interior National Park Service. This appears to be a contract to provide facility management and maintenance services for the Eisenhower Memorial.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2124Q0034_Amd_0006.pdf | ||
| Sol_140P2124Q0034_Amd_0005.pdf | ||
| Sol_140P2124Q0034_Amd_0004.pdf | ||
| B09_Attach_3_DDEM_Mx_Bid_SheetUpdateBronzeRemoved_0004.xls | XLS spreadsheet | |
| B09_Attachment_6_Evaluation_Amend_2_0003.docx | DOCX document | |
| Sol_140P2124Q0034_Amd_0003.pdf | ||
| Sol_140P2124Q0034_Amd_0002.pdf | ||
| B09_Attachment_6_Evaluation_criterion_and_instructions_0001.docx | DOCX document | |
| QnA_Final_0001.rtf | RTF text file | |
| Sol_140P2124Q0034_Amd_0001.pdf | ||
| B08_Attach_1_New_PWS_DDEM_Memorial_Maintenance.docx | DOCX document | |
| B08_Attachment_6_Evaluation_criterion_and_instructions.docx | DOCX document | |
| B08_Attachment_5_WD_15-4281.txt | TXT text file | |
| Sol_140P2124Q0034.pdf | ||
| B08_Attach_3_DDEM_Mx_Bid_SheetUpdate_.xls | XLS spreadsheet | |
| B08_Attachment_4_-_Quality_Assurance_Surveillance_Plan.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 EXHIBIT 2: NPS Eisenhower Memorial Maintenance Schedule
| LIGHTING | |||||||
| Equipment | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Interior Lights | |||||||
| 27 | Book Store | Bookstore | Small Recessed | Maintain fixture and replace if outage occurs | |||
| 3 | Breakroom | Recessed | Maintain fixture and replace if outage occurs | ||||
| 2 | Breakroom | Over Sink | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 1 | Book Store Storage Room | Recessed | Maintain fixture and replace if outage occurs | ||||
| 3 | Staircase | Stairs to Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 1 | Staircase | Stairs to Basement | Recessed | Maintain fixture and replace if outage occurs | |||
| 2 | Basement | Bottom of Stairs | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 12 | Equipment | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 4 | Mechanical | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 4 | IT/Security | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 8 | Storage | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 6 | Electric | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 1 | Lift Equipment | Basement | Fluorescent | Maintain fixture and replace if outage occurs | |||
| 1 | Staff Restroom | Fluorescent | Maintain fixture and replace if outage occurs | ||||
| 1 | Staff Restroom | Recessed | Maintain fixture and replace if outage occurs | ||||
| 3 | Men Public Restroom | Recessed | Maintain fixture and replace if outage occurs | ||||
| 2 | Men Public Restroom | Over Sink | Fluorescent | Maintain fixture and replace if outage occurs | |||
| Men Public Restroom | Ceiling Light | Maintain fixture and replace if outage occurs | |||||
| 4 | Women Public Restroom | Recessed | Maintain fixture and replace if outage occurs | ||||
| 2 | Women Public Restroom | Over Sink | Fluorescent | Maintain fixture and replace if outage occurs | |||
| Women Public Restroom | Ceiling Light | Maintain fixture and replace if outage occurs |
| Exterior Lights | ||||||
| Lights On Poles | 57 | Outside Memorial | On Poles | Maintain fixture and replace if outage occurs | ||
| Light Troughs | 4 Troughs | Maintain fixture and replace if outage occurs | ||||
| 4 | Outside Entry Way | Entry Way | Small Recessed | Maintain fixture and replace if outage occurs | ||
| Spot | 3 | Restroom Entry | Maintain fixture and replace if outage occurs | |||
| 3 | Outside Information Window | Small Recessed | Maintain fixture and replace if outage occurs | |||
| 4 | Custodial Closet | Betwenn Public Restrooms | Maintain fixture and replace if outage occurs |
| PLUMBING SYSTEMS | |||||||
| Equipment | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Water Fountain | 1 | Outside Family Restroom | Drinking Water Fountain | Maintain fixture inaccording to O&M Manual | |||
| Domestic Cold Water Sys | 1 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Sub Pumps Panel | 1 | Equipment | Basement | SP-2 Control Panel | Maintain fixture inaccording to O&M Manual | ||
| Sub Pumps | 2 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Eye Wash | 1 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Water Cooler | 1 | Breakroom | Staff Breakroom | Maintain fixture inaccording to O&M Manual | |||
| Stem Gate Valves | 4 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Pressure Regulator | 1 | Equipment | Basement | 3 Gate Valves | Maintain fixture inaccording to O&M Manual | ||
| Drain Trap Primer | 1 | Equipment | Basement | SN 71059 | Maintain fixture inaccording to O&M Manual |
| Fixtures | |||||
| Sink | 1 | Custodial Closet | Betwenn Public Restrooms | Maintain fixture inaccording to O&M Manual | |
| Sink | 1 | Breakroom | Breakroom | Maintain fixture inaccording to O&M Manual | |
| Sink | 4 | Men Public Restroom | Maintain fixture inaccording to O&M Manual | ||
| Sink | 4 | Women Public Restroom | Maintain fixture inaccording to O&M Manual | ||
| Sink | 1 | Staff Rest Room | Maintain fixture inaccording to O&M Manual | ||
| Sink | 1 | Family Restroom | Maintain fixture inaccording to O&M Manual | ||
| Toilet | 3 | Men Public Restroom | Maintain fixture inaccording to O&M Manual | ||
| Toilet | 5 | Women Public Restroom | Maintain fixture inaccording to O&M Manual | ||
| Toilet | 1 | Staff Restroom | Maintain fixture inaccording to O&M Manual | ||
| Toilet | 1 | Family Restroom | Maintain fixture inaccording to O&M Manual | ||
| Urinal | 2 | Men Public Restroom | Maintain fixture inaccording to O&M Manual |
| Drainage | ||||
| 8 | Equipment Room | Basement | Maintain fixture inaccording to O&M Manual | |
| 1 | Mechanical Room | Basement | Maintain fixture inaccording to O&M Manual | |
| 2 | Storeage Room | Basement | Maintain fixture inaccording to O&M Manual | |
| 1 | Staff Restroom | Maintain fixture inaccording to O&M Manual | ||
| 3 | Men Restroom | Maintain fixture inaccording to O&M Manual | ||
| 2 | Women Restroom | Maintain fixture inaccording to O&M Manual | ||
| 1 | Custodial Closet | Maintain fixture inaccording to O&M Manual |
| 1 | Outside Men Restroom |
| 1 | Outside Women Restroom |
| 1 | Outside By Tapestry |
| 2 | Behind D-Day Statue |
Backflow Preventer
| Backflow Valve | 1 | Equipment | Basement | SN TA-1222 | Maintain fixture inaccording to O&M Manual |
| Irrigation Backflow Valve | 1 | Equipment | Basement | SN TN-1200 | Maintain fixture inaccording to O&M Manual |
| Backflow | 1 | Storage Room | Basement | Maintain fixture inaccording to O&M Manual |
| MECHANICAL SYSTEMS | |||||||
| Equipment | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Water Heater | 1 | Mechanical | Basement | Maintain fixture inaccording to O&M Manual | |||
| HVAC Unit | 1 | On Roof | CU-1 | ||||
| HAVC Unit | 1 | On Roof | CU-2 | ||||
| HVAC | 1 | Mechanical | Basement | ||||
| AC Unit | 1 | IT/Security | Basement | AC-1 | |||
| AC Unit | 1 | Electrical | Basement | AC-2 | |||
| AC Unit | 1 | Lift Equipment | Basement | AC-3 | |||
| Heater | 1 | Custodial Closet | Betwenn Public Restrooms | EUH-1 | |||
| Heater | 1 | Men Restroom Entry | EUH-2 | ||||
| Heater | 1 | Women Restroom Entry | EUH-3 |
ELEVATOR/LIFT 1 Staff Breakroom/Basement Savaria, Model 2.50 (63mm) Cylinder
| ELECTRICAL SYSTEMS | |||||||
| Equipment | Qty | Structure | Room | Location | Description | Required Maintenance | |
| System | |||||||
| Breaker Panels | Electrical | Basement | Maintain fixture inaccording to O&M Manual | ||||
| Snow Melt System | Electrical | Basement | Maintain fixture inaccording to O&M Manual | ||||
| Tapestry | Plaza | Mural | Maintain fixture inaccording to O&M Manual |
Panels
Lighting Racks
GFCI
| IRRIGATION SYSTEM | |||||||
| Equipment | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Rain Water Filtration | 3 | Equipment | Basement | RWFS-1 Profimat Automatic Back Preventive Filter | Maintain fixture inaccording to O&M Manual | ||
| Rain Water Filtration | 2 | Equipment | Basement | RWBP-1 | Maintain fixture inaccording to O&M Manual | ||
| Chorine Feeder | 1 | Equipment | Basement | Stenner Pump Company | Maintain fixture inaccording to O&M Manual | ||
| UV Filter | 3 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Chemical Tank Feeder | 1 | Equipment | Basement | Maintain fixture inaccording to O&M Manual | |||
| Pump | 1 | Equipment | Basement | FLSH BST-1 | Maintain fixture inaccording to O&M Manual | ||
| Pump | 1 | Equipment | Basement | FLSH BST-2 | Maintain fixture inaccording to O&M Manual | ||
| Pump | 1 | Equipment | Basement | IRR BST-1 | Maintain fixture inaccording to O&M Manual | ||
| Pump | 1 | Equipment | Basement | IRR BST-2 | Maintain fixture inaccording to O&M Manual | ||
| Rain Water Filtration | 1 | Equipment | Basement | RWSP-1 Panel | Maintain fixture inaccording to O&M Manual | ||
| Control Panel | 1 | Equipment | Basement | Calsense CS 3000 | Maintain fixture inaccording to O&M Manual |
| BRONZE SCULPTURE CONSERVATION | |||||
| Material | Qty | Structure | Area/Item | Required Maintenance |
| 2nd Inaugural Address | |
| ` | D-Day Address |
| Young Boy |
| GENERAL MASONRY CLEANING | |||||
| Equipment | Qty | Structure | Location | Required Maintenance |
| FIRE SUPPRESSION SYSTEM | ||||||
| Qty | Structure | Room | Location | Description | Required Maintenance | |
| Fire Sprinkler System | 1 | Maintain fixture inaccording to O&M Manual | ||||
| Smoke Detectors | Maintain fixture inaccording to O&M Manual | |||||
| 2 | Stairs to basement | |||||
| 1 | Basement Hallway | |||||
| 1 | IT/Security | |||||
| 1 | Mechanical | |||||
| 4 | Storage | |||||
| 1 | Lift Equipment | |||||
| 1 | Electrical | |||||
| 2 | Equipment | |||||
| 2 | Staff Breakroom | |||||
| 1 | Staff Restroom | |||||
| 4 | Bookstore | |||||
| 1 | Bookstore Entry Way |
Filtration Tanks
Water Treatment
Fountain Electrical Equipment
E
File details come from the government source that posted it. Updated .