B08 - ATTACH_0011_Production_Shipping Receipt Forecast Template HHS_JMC.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- The Family of Hand Held Signals
- Solicitation number
- W519TC-23-R-0080
About this file
This file is a production and shipping receipt forecast template for use in managing Government-Owned, Contractor-Operated (GOCO) and Contractor-Owned, Contractor-Operated (COCO) inventory related to the Family of Hand Held Signals contract. The template is designed to track planned production status and outbound shipments across a 12-month period from June 2022 through June 2023. It requires contractors to document production forecasts by delivery order and Contract Line Item Number (CLIN), along with corresponding DODIC model nomenclature and Military Standard Requisitioning and Issue Procedures (MILSTRIP) data. The template captures monthly production quantities planned for each reporting period.
The outbound shipment section requires contractors to report actual shipments using WAWF (Wide Area Workflow) receiving reports and DD250 forms, including lot numbers, ship-to locations, quantities, shipment dates, and tracking information. Contractors must document the submission and signature dates for Shipment Requests (SIR), scheduled and actual pick-up dates, and the current status of each shipment. The template includes fields to identify and explain shipment status when tracking or pick-up information is incomplete or delayed, providing the government with comprehensive visibility into production scheduling and logistics execution for this hand-held signals requirement.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Production Forecast (GOCO-COCO)
| PRODUCTION-WAWF RECEIVING REPORT STATUS | |
| Contract Number | AS OF: |
Planned Production Status
DODIC Model / Nomenclature Delivery Order CLIN MILSTRIP SHIP TO (DODAAC) MILSTRIP QTY 6/1/22 7/1/22 8/1/22 9/1/22 10/1/22 11/1/22 12/1/22 1/1/23 2/1/23 3/1/23 4/1/23 5/1/23 6/1/23 Total
Receipt Forecast (GOCO-COCO)
| Outbound Shipment Report- WAWF Receiving Report (DD250) Status | |||||||||||||||
| DODIC | Model / Nomenclature | Delivery Order | CLIN | DD250/Shipment Number | LOT Number | MILSTRIP | SHIP TO (DODAAC) | SHIPMENT QTY | DD250 Date | Shipment Request / SIR Submission Date | Shipment Request / SIR Signed Date | Shipment Tracking # | Scheduled Pick Up Date | Actual Pick up Date | Status |
| If N & O are blank, what is the status of the shipment? If the date Scheduled Pick Up Date is past with no actual pick up date, what is the status? |
File details come from the government source that posted it. Updated .