B08_Att_09_Lead_Paint_24-530-XRF-Baker_Beach.pdf
PDF 37 KB Posted
- Attached to
- RENEWAL OF BAKER BEACH RESTROOM FACILITY
- Solicitation number
- 140P8624R0022
About this file
This document is a Lead Paint XRF Assay Report for the Baker Beach RR Building in San Francisco, California. The report provides the results of a lead paint testing assessment conducted on January 18, 2024 for various building components such as walls, ceilings, trim, and fascia. The testing results indicate that all surfaces tested negative for lead-based paint, with no lead content detected above the applicable thresholds. This report is relevant to the federal contract opportunity for the "Renewal of Baker Beach Restroom Facility" solicitation number 140P8624R0022, issued by the Department of the Interior National Park Service Pacific West Region. The contract requires the refurbishment of a heavily used public restroom facility located at Golden Gate National Recreation Area, Baker Beach.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD PAINT XRF ASSAY REPORT ADVANTAGE ENVIRONMENTAL and SSI
Baker Beach RR Building, San Francisco, CA January 18, 2024 24-530 Page 1 of 1
Assay No Time Component Substrate Side Condition Color Results PbL PbL
Error PbK PbK Error
20 1/18/24 11:53 Calibration Calibration Calibration Calibration 0.12 0 0 0
21 1/18/24 12:02 Calibration Calibration Calibration Calibration Positive 1 0.1 0.05 0.32
22 1/18/24 12:06 Calibration Calibration Calibration Calibration Negative 0.9 0.1 0.25 0.32
23 1/18/24 12:06 Calibration Calibration Calibration Calibration Positive 1 0.1 0.19 0.32
24 1/18/24 12:12 Ceiling-Eve Wood A Intact White Negative 0 0.02 0.13 1.04
25 1/18/24 12:15 Wall Concrete A Intact White Negative 0 0.02 -0.37 1.13
26 1/18/24 12:16 Facia Wood A Intact Brown Negative 0 0.02 0.2 1.56
27 1/18/24 12:18 Facia Metal A Intact Brown Negative 0 0.02 0.25 2.28
28 1/18/24 12:19 Trim Wood A Intact White Negative 0 0.02 0.8 1.8
29 1/18/24 12:19 Ceiling-Eve Wood C Intact White Negative 0 0.02 0.22 1.5
30 1/18/24 12:25 Trim Wood C Intact White Negative 0 0.02 0.4 1.6
31 1/18/24 12:26 Facia Wood C Intact Brown Negative 0 0.03 0.25 1.7
32 1/18/24 12:26 Facia Metal C Intact Brown Negative 0 0.02 0.16 1.7
33 1/18/24 12:27 Wall Concrete C Intact White Negative 0 0.02 -0.08 1.08
34 1/18/24 12:28 Calibration Calibration Calibration Calibration Negative 0.9 0.1 0.3 0.32
35 1/18/24 12:33 Calibration Calibration Calibration Calibration Positive 1 0.1 0.18 0.32
File details come from the government source that posted it. Updated .