B08_Att_04_140P8426Q0079_Tech_Info_Form.pdf

PDF 91 KB Posted

Attached to
Replace Turbidity Meters, NPS-ORCA
Solicitation number
140P8426Q0079
Issued by

About this file

This is a Technical Information Form (Attachment 04) for RFQ No. 140P8426Q0079 issued by the National Park Service for the replacement of turbidity meters at Lake Creek Water Treatment Plant at Oregon Caves National Monument & Preserve. Quoters must submit business information including company name, address, UEI, phone, contact name, and signature. The form requires disclosure of whether the quoter plans to self-perform all work or utilize subcontractors, with detailed identification of any subcontractors and their assigned key trades, along with a description of work activities the quoter will self-perform.

The form mandates submission of relevant project experience with a minimum of three past performance references, including project title, contract number, agency/owner, contract amount, performance period, similarity description to the current requirement, and past performance reference contact information with phone and email. Quoters must certify whether their firm holds an Oregon Construction Contractors Board license, provide license details or proof of searchability, and confirm the same for any proposed subcontractors. Additionally, quoters must submit a technical approach narrative limited to ten pages addressing site assessment and mobilization plan, removal and demolition methodology, installation approach, testing and commissioning plan, quality assurance measures, personnel qualifications (specifically requiring confirmation that calibration/commissioning will be performed by a Hach-certified technician), general schedule, approach to minimizing service interruption, and optional Hach service plan details.

View the file

Other files

File Type Posted
B08_Att_03_140P8426Q0079_SCA_Wages.pdf PDF
B08_Att_02_140P8426Q0079_Construction_Wages.pdf PDF
B08_Att_05_140P8426Q0079_GenRefs.docx DOCX document
B08_Att_01_140P8426Q0079_Specs.pdf PDF
Sol_140P8426Q0079.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL INFORMATION FORM

(Attachment 04)

Replace Turbidity Meters at Lake Creek Water Treatment Plant Oregon Caves National Monument & Preserve

RFQ No.: 140P8426Q0079

Quoters shall submit the following information:

Quoters Business Name: ___________________________________

Quoters Address: ___________________________________

Quoters UEI: ___________________________________

Quoters Phone: ___________________________________

Quoters Contact Name: ___________________________________

Quoters Signature: ___________________________________

CONTRACTOR’S PROPOSED TEAM:

Do you plan to self-perform all of the work? ___________________________

YES or NO answer

Are you proposing to use a subcontractor? ___________________________ YES or NO answer

List any proposed subcontractor(s) and indicate what key trade they may be assigned to perform:

Subcontractor Name Key Trade (Roofing, etc.)

If you are proposing to use a subcontractor, describe what work activities you plan to self-perform:

RFQ No. 140P8426Q0079, Attachment 04, Technical Information Form

LIST OF RELEVANT EXPERIENCE (LIST OF PROJECTS) & PAST PERFORMANCE REFERENCES:

1) Project Title: ___________________________ Contract # (if known): ______________

Agency/Owner: ___________________________ $ Amount: _______________________

Performance Period: ___________________________

Briefly describe how this project is similar in nature and scope to current advertised requirement:

Past Performance Reference (Name & Title): _______________________________________________

Phone Number: ___________________________ Email: __________________________

2) Project Title: ___________________________ Contract # (if known): ______________

Performance Period: ___________________________

Briefly describe how this project is similar in nature and scope to current advertised requirement:

3) Project Title: ___________________________ Contract # (if known): ______________

Performance Period: ___________________________

Briefly describe how this project is similar in nature and scope to current advertised requirement:

RFQ No. 140P8426Q0079, Attachment 04, Technical Information Form

OREGON CONTRACTOR STATE LICENSE:

Is your firm an Oregon Construction Contractors Board Contractor? ______________________ YES or NO answer ☐ license details/number: ______________________ ☐ proof of license is searchable online or include with your quote

IF you are proposing to use a subcontractor for any of the work:

Is subcontractor an OR Construction Contractors Board Contractor? _______________________ YES or NO answer ☐ license details/number: ______________________ ☐ proof of license is searchable online or include with your quote

TECHNICAL APPROACH

☐ Submit a brief written narrative limited to 10 pages describing your general technical approach to successfully accomplish this project (use separate pages as necessary).

NARRATIVE – Address site assessment and mobilization plan, removal and demolition approach, installation methodology, testing and commissioning plan, quality assurance, personnel qualifications (include confirmation that calibration/commissioning will be performed by a Hach-certified technician), general schedule, approach to minimizing service interruption for the facility, and optional Hach service plan details.

File details come from the government source that posted it. Updated .