B08_Att_02_Quote_Sheet.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
DEEP CLEAN BARRY BAKER TUNNEL
Solicitation number
140P8624Q0064
Issued by

About this file

This document contains pricing templates and sample contract price schedules for Design-Bid-Build (DBB) and Design-Build (DB) federal contract opportunities.

The DBB template is for a National Park Service solicitation (N2011080811) for a Johnstonian Visitors Center project at Yellowstone National Park, with line items for the visitors center, water line, sewer line, rock excavation, and optional geothermal wells and photovoltaic system. The DB template is for a NPS solicitation (N2011080811) for a new structure in Yosemite Valley, with line items for design and construction, plus an optional photovoltaic system.

The pricing template for the federal contract opportunity 140P8624Q0064 is for deep cleaning of the Barry Baker Tunnel at the Golden Gate National Recreation Area. The contract line item is for the tunnel deep cleaning on a lump-sum basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Quote Sheet
National Park Service
Solicitation Number:140P8624Q0064
Developed Area:Golden Gate National Recreation Area
Project Title:Deep Clean Barry Baker Tunnel
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleUnit of MeasureQTYTotal
1Deep Clean Barry Baker TunnelLS1
TOTAL

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 9) ----------------------------------------------------------- ERROR:#REF!

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

File details come from the government source that posted it. Updated .